27

Compositeworks - recent major projects

Embed Size (px)

Citation preview

3

SPECIFICATIONS

Length 62.3m

Beam 10.8m

Draft 3.3m

Builder Feadship

Year 2000

REFIT

Naval Architect Azure

Designer Steve Howard / Chahan Interior Design

Duration 6 months / 6 months

Exterior: Complete remodelling of sun deck including installation of new carbon fi bre swimming pool and sunbeds forward, lowering of aft deck level, complete with new bar and furniture and a custom liferaft launching system

Interior: Complete replacement of major guest areas including salon, dining and owner’s areas as well as upgrade of major interior systems

4 5

9

10 11

12 13

after

before

14 15

SPECIFICATIONS

Length before / after 65.6m / 68.7m

Beam 9.7m

Draft 3.7m

Builder Feadship

Year 1983

REFIT

Naval Architect Olesinski Design

Designer Olesinski Design

Duration 7 months

Exterior: Total remodelling of superstructure forward and aft on every deck. 3m+ transom extension, 1m high modification to forward sheerline up to bow, modifications to fashion plates, wing stations, bulwarks and other superstructure details to totally modernise the vessels profile leaving it complete unrecognisable from it’s previous guises.

Interior: Replacement of VIP flooring, installation of beach club in lazarette.

16 17

19

24 25

SPECIFICATIONS

Length 138.4m

Beam 18.5m

Draft 5m

Builder Lurssen

Year 2004

REFIT

Naval Architect Azure

Designer Beiderbeck

Duration 3 months

Exterior: Design, manufacture and installation of a self supporting carbon fibre swimming pool to grace one of the worlds best know mega yachts. With strict heating, water storage and pumping requirements and a very short project duration it was a challenge described by Lurssen themselves as impossible.....

26 27

30 31

32 33

SPECIFICATIONS

Length before / after 30m / 35.8m

Beam 7.3m

Draft 2.5m

Builder Inace

Year 2009

REFIT

Naval Architect Azure

Designer Stefano Pastrovich

Duration 5 months / 5 months

Exterior: Hull extension at stern area of yacht over 6m in length to create a large aft deck dining/bar area, spacious swim platform and new interior engineering and toy storage area complete with additional ensuite crew cabin

Interior: Removal and replacement of all major guest areas with modern African themed Pastrovich masterpiece. All exterior areas modernised and co-ordinate with new interior

34 35

afterbefore

36 37

40 41

45