Composite Unit Rates
This section lists a selection of all-in composite unit rates commonly used for estimatin g.
composite unit rates
Note: Cost information for the countries featured is based on the following cities :
- Shanghai & Beijing
- Kuala Lumpur- Bangkok
55
composite unit rates (architectural elements)
Ceiling Finishes
Skim coat plastering and emulsion paint
Plaster and emulsion paint
Fibrous plasterboard ceiling; timber framing; emulsion paint
Mineral fibre board ceiling; medium quality; exposed grid suspension system
Aluminium strip ceiling; medium qualit y
Cement and sand (1:3) paving
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Carpet; medium quality; including screed backing
T eak block parquet; 6mm thk; including screed backing
Ti m ber strip flooring; 12mm thk; including screed backing
Floor Finishes
Plaster and emulsion paint
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Wall finishes; Internal
We ll burnt clay brick wall 115mm thk; internal ; plaster and paint to both sides
Gypsum wall partition; paint to both sides
Walls
Aluminium curtain walling system ; 6 mm thk tinted tempered glass; flat surfaces
Granite cladding; medium quality; flat surfaces
Alucobond aluminium cladding; flat surfaces
Facade
Reinforced concrete flat roof; 150mm thk; built-up waterproofing membrane
T iled pitch roof; timber roof truss framing; glazed clay interlocking tile s
M etal roof; structural steel roof truss framin g
Roofing
Granite finish; medium quality; including screed backing (non-european source)
Granite finish; medium quality; including screed backing (non-european source)
56
composite unit rates (architectural elements)
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
Hong Kong
798
820
1,329
4,429
3,986
3,100
399
499
144
399
997
930
67
399
930
864
333
598
687
100
122
399
333
465
HK$ Beijing
560
480
720
1,100
800
1,200
150
200
50
180
700
600
50
180
600
400
250
300
350
50
58
170
160
200
RMB Shanghai
550
530
700
1,500
900
1,150
150
200
56
200
900
600
55
180
700
400
280
280
320
50
55
180
160
220
RMB
57
composite unit rates (architectural elements)
Ceiling Finishes
Skim coat plastering and emulsion paint
Plaster and emulsion paint
Fibrous plasterboard ceiling; timber framing; emulsion paint
Mineral fibre board ceiling; medium quality; exposed grid suspension system
Aluminium strip ceiling; medium qualit y
Cement and sand (1:3) paving
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Carpet; medium quality; including screed backing
T eak block parquet; 6mm thk; including screed backing
Ti m ber strip flooring; 12mm thk; including screed backing
Floor Finishes
Plaster and emulsion paint
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Wall finishes; Internal
We ll burnt clay brick wall 115mm thk; internal ; plaster and paint to both sides
Gypsum wall partition; paint to both sides
Walls
Aluminium curtain walling system ; 6 mm thk tinted tempered glass; flat surfaces
Granite cladding; medium quality; flat surfaces
Alucobond aluminium cladding; flat surfaces
Facade
Reinforced concrete flat roof; 150mm thk; built-up waterproofing membrane
T iled pitch roof; timber roof truss framing; glazed clay interlocking tile s
M etal roof; structural steel roof truss framin g
Roofing
Granite finish; medium quality; including screed backing (non-european source)
Granite finish; medium quality; including screed backing (non-european source)
58
composite unit rates (architectural elements)
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
Malaysia
220
190
320
840
850
580
86
95
26
75
500
550
15
75
470
510
180
95
200
15
26
70
70
165
RMIndia (Tier II Cities)
2,300
4,500
5,500
12,000
4,500
5,500
750
1,800
380
1,400
5,000
3,500
180
1,000
4,500
3,250
1,000
3,500
3,200
275
350
900
1,050
1,700
INR India (Tier I Cities)
2,300
4,500
5,500
13,000
4,500
5,500
750
1,800
380
1,400
5,000
3,500
180
1,100
4,500
3,250
1,000
3,500
3,200
275
350
900
1,050
1,700
INR
59
composite unit rates (architectural elements)
Ceiling Finishes
Skim coat plastering and emulsion paint
Plaster and emulsion paint
Fibrous plasterboard ceiling; timber framing; emulsion paint
Mineral fibre board ceiling; medium quality; exposed grid suspension system
Aluminium strip ceiling; medium qualit y
Cement and sand (1:3) paving
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Carpet; medium quality; including screed backing
T eak block parquet; 6mm thk; including screed backing
Ti m ber strip flooring; 12mm thk; including screed backing
Floor Finishes
Plaster and emulsion paint
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Wall finishes; Internal
We ll burnt clay brick wall 115mm thk; internal ; plaster and paint to both sides
Gypsum wall partition; paint to both sides
Walls
Aluminium curtain walling system ; 6 mm thk tinted tempered glass; flat surfaces
Granite cladding; medium quality; flat surfaces
Alucobond aluminium cladding; flat surfaces
Facade
Reinforced concrete flat roof; 150mm thk; built-up waterproofing membrane
T iled pitch roof; timber roof truss framing; glazed clay interlocking tile s
M etal roof; structural steel roof truss framin g
Roofing
Granite finish; medium quality; including screed backing (non-european source)
Granite finish; medium quality; including screed backing (non-european source)
60
composite unit rates (architectural elements)
Unit
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
Singapore
210
190
350
750
550
360
80
80
26
80
210
230
23
80
200
220
80
100
160
13
25
45
40
150
S$ UAE
420
N/A
700
1,800
1,800
1,200
100
220
70
150
400
500
40
150
400
450
130
250
280
65
80
180
170
230
AEDMaldives
N/A
N/A
N/A
N/A
N/A
N/A
N/A
85
20
N/A
190
N/A
N/A
N/A
175
N/A
N/A
N/A
N/A
N/A
19
N/A
N/A
N/A
USD
61
composite unit rates (architectural elements)
Ceiling Finishes
Skim coat plastering and emulsion paint
Plaster and emulsion paint
Fibrous plasterboard ceiling; timber framing; emulsion paint
Mineral fibre board ceiling; medium quality; exposed grid suspension system
Aluminium strip ceiling; medium qualit y
Cement and sand (1:3) paving
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Carpet; medium quality; including screed backing
T eak block parquet; 6mm thk; including screed backing
Ti m ber strip flooring; 12mm thk; including screed backing
Floor Finishes
Plaster and emulsion paint
Ceramic tiled finish; medium quality; including screed backing
M arble finish; medium quality; including screed backing (non-european source)
Wall finishes; Internal
We ll burnt clay brick wall 115mm thk; internal ; plaster and paint to both sides
Gypsum wall partition; paint to both sides
Walls
Aluminium curtain walling system ; 6 mm thk tinted tempered glass; flat surfaces
Granite cladding; medium quality; flat surfaces
Alucobond aluminium cladding; flat surfaces
Facade
Reinforced concrete flat roof; 150mm thk; built-up waterproofing membrane
T iled pitch roof; timber roof truss framing; glazed clay interlocking tile s
M etal roof; structural steel roof truss framin g
Roofing
Granite finish; medium quality; including screed backing (non-european source)
Granite finish; medium quality; including screed backing (non-european source)
62
composite unit rates (architectural elements)
Unit
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
m 2
Vietnam
740
1,000
1,900
4,200
2,500
2,600
350
400
95
350
1,550
1,550
65
350
1,550
1,550
350
800
1,300
80
95
200
250
550
VND(’000) Thailand
1,500
1,200
2,400
6,000
5,000
4,500
800
800
250
850
2,800
2,800
240
850
2,800
2,800
1,200
1,800
3,000
250
300
650
580
1,600
BAHT
63
composite unit rates (external works)
Rubble pitching retaining wall; 225mm thick; including concrete base
Reinforced concrete retaining wall; 225mm thick; including concrete base
Retaining Walls (Based on an average height of 2m)
450mm wide (internal) precast concrete block drain; including concrete base; 1m high of rubble pitching retaining wall both sides
450mm diameter precast concrete storm water pipe; 1m deep; concrete base and surround
Drains
Premixed road; sand bed, crusher run, base course and wearing course
Interlocking paver; including sand bed
Roads
64
composite unit rates (external works)
Unit Shanghai
m 2
m 2
m
m
m 2
m 2
RMB
320
85
780
630
N/A
750
Beijing RMB
300
100
800
650
600
850
Hong KongHK$
465
333
1,196
997
1,063
1,329
65
composite unit rates (external works)
Rubble pitching retaining wall; 225mm thick; including concrete base
Reinforced concrete retaining wall; 225mm thick; including concrete base
Retaining Walls (Based on an average height of 2m)
450mm wide (internal) precast concrete block drain; including concrete base; 1m high of rubble pitching retaining wall both sides
450mm diameter precast concrete storm water pipe; 1m deep; concrete base and surround
Drains
Premixed road; sand bed, crusher run, base course and wearing course
Interlocking paver; including sand bed
Roads
66
composite unit rates (external works)
Unit India (Tier I Cities)
m 2
m 2
m
m
m 2
m 2
INR
1,400
850
N/A
2,500
N/A
7,500
India (Tier II Cities) INR
1,400
850
N/A
2,500
N/A
7,500
MalaysiaRM
74
86
217
258
295
471
67
composite unit rates (external works)
Rubble pitching retaining wall; 225mm thick; including concrete base
Reinforced concrete retaining wall; 225mm thick; including concrete base
Retaining Walls (Based on an average height of 2m)
450mm wide (internal) precast concrete block drain; including concrete base; 1m high of rubble pitching retaining wall both sides
450mm diameter precast concrete storm water pipe; 1m deep; concrete base and surround
Drains
Premixed road; sand bed, crusher run, base course and wearing course
Interlocking paver; including sand bed
Roads
68
composite unit rates (external works)
Unit Maldives
m 2
m 2
m
m
m 2
m 2
USD
N/A
N/A
N/A
N/A
N/A
N/A
UAEAED
350
100
400
450
N/A
1,000
SingaporeS$
120
90
420
380
420
300
69
composite unit rates (external works)
Rubble pitching retaining wall; 225mm thick; including concrete base
Reinforced concrete retaining wall; 225mm thick; including concrete base
Retaining Walls (Based on an average height of 2m)
450mm wide (internal) precast concrete block drain; including concrete base; 1m high of rubble pitching retaining wall both sides
450mm diameter precast concrete storm water pipe; 1m deep; concrete base and surround
Drains
Premixed road; sand bed, crusher run, base course and wearing course
Interlocking paver; including sand bed
Roads
70
composite unit rates (external works)
Unit Thailand
m 2
m 2
m
m
m 2
m 2
BAHT
1,200
900
800
1,000
1,000
1,800
Vietnam VND(’000)
450
350
1,750
NA
NA
1,650
71