    Providing onshore and offshore services to the Oil & Gas, Petrochemical, Utilities, Construction, Facilities Management and Heavy Industries

    Total Solutions Middle East

  • About Us

    Total Solutions Middle East is a leading:

    Specialists service provider to:

    Oil & Gas

    Petrochemical

    Utilities

    Construction

    Facilities Management and

    Heavy Industries

    Rope access and working at height

    provider in the Middle East.

    SERVICES

    Painting

    Blasting

    Pipe-Work Inspection

    NDT/NDE

    Composite repairs

    Welding & fabrication

    Rigging & lifting

    Insulation

    CUI

    Building Maintenance

    Electrical Installation

    Plumbing & Piping

    Confined space work

    General maintenance

    Surveys and

    inspections

    Safety systems

    Fire Protection

    Bolt Torque Testing

    2

  • About Us

    ISO9001:2008 Accredited company

    Member of IRATA (Trainer and Operator)

    Undertake works for Oil & Gas companies throughout the Middle

    East

    Employ qualified and experienced tradesmen

    Provide dedicated training facilities

    Provide unique solutions in the Middle East:

    Work positioning nets

    Temporary working platforms for under-jetty/pier works

    Guy wire tensioning

    Flare stack works

    Removable insulation blankets

    ….. and more

    3

    Tradesmen

    Painters

    Blasters

    Welders

    NDT Technicians

    Electricians

    Plumbers

    Insulators

    Welding Inspectors

    Pipe Fitters

    General Maintenance

    Engineers

  • Composite Repairs

    A system that reinstates

    wall thickness of pipes,

    storage tanks and

    equipment affected by

    external or internal

    corrosion.

    Applied using epoxy resins

    and glass fabrics

    4

    Technology used by:

    What it is

  • Benefits of Composite Technology

    5

    Repairs and reinstates steelwork

    integrity quickly and cost

    effectively

    Installed online minimising plant

    shut down

    No hot works

    Avoids section replacement

    therefore reducing plant

    downtime

    Rapid application

    Highly flexible - repairs irregular

    shapes such as bends, t-joints,

    etc.

    Reduces cost

    20 year warranty

  • Features of Composite Technology

    Can be installed on any repair length

    Can withstand operating pressure exceeding 120 bar

    Application temperature -5 ºC to + 90 ºC

    Service temperature -50 ºC to +150 ºC

    Minimal risk to personnel

    Proven and certified by HSE and AEA

    Surface preparation requirement to ST2 standard (manual cleaning)

    6

  • Installation

    7

    Kevlar Reinforced Epoxy Paste mixed and applied onto the prepared steel substrate

    by trowel and levelled off.

    This will fill in any surface pitting and cover over welds.

  • Installation

    8

    The next step is to apply

    the Composite wrap

    manually around the pipe.

    This is spiral applied by

    overlapping 50% building

    up the layers.

    The epoxy saturated

    composite wrap is applied

    with 4 passes from

    upstream to downstream

    to give a total of 8 layers.

  • Installation

    9

    The repair is wrapped in polythene and compressed using rubber uniwraps.

    Uniwraps are removed the following day.

    The operator’s pipe coating is then applied on both ends of the repair.

    The pipeline can be backfilled so painting may not be required.

  • Remote Location Working

    10

    The installation teams do not require heavy equipment.

    This reduces mobilisation time and cost.

  • Case Study

    11

    Pipe line rehabilitation

    program to maintain more

    than 2,000 kms of pipeline

    buried deep in desert plains,

    remote mountain passes

    and rock strewn wadis

    Most of the line was in good

    condition

    In some areas the original

    coating had broken down

    and there was localised

    external corrosion damage

  • Case Study – The Findings

    12

    Corrosion had resulted in wall thickness

    loss of up to 85%.

    Most of the defects identified for repair had

    between 50 to 80% wall loss.

    The operator wanted to minimise the risk of

    leaks developing.

    They needed to restore the integrity of the

    line.

    The operator wanted to avoid shutting down

    the line so cutting out and replacing

    sections was not an option.

    Welding steel sleeves would require hot

    work on already weakened lines raising

    safety concerns.

    Composite repairs were specified.

  • Case Study - Preparation

    13

    Composite repairs designed

    for each pipe on the

    network taking into account

    operating parameters.

    Design includes min

    thickness, length of the

    repair and length of taper at

    each end of the repair.

    This allows the installation

    teams to calculate the

    quantity of material required

    for each repair.

    Each location was identified on the pipeline and grit blasted to

    SA 2.5

    On defects with severe wall loss hand preparation was

    carried out to ST2

  • Case Study - Installation

    14

    Line detail: 20 inch Gas

    transmission line

    Defect type: External

    corrosion pitting

    Remaining wall: 80% wall

    loss

    Cause of defect: Failure of

    coating

    Design pressure: 120 bar

    Design temp: 40 ºC

  • Example Installation

    15

    Line detail: 12 inch export oil line

    Defect type: Thinning of elbow wall thickness

    Remaining wall: 80% wall loss

    Cause for defect: Internal erosion

    Design Pressure: 62 bar

    Design temperature: 50 ºC

  • Example Installation

    16

    Line detail: 12 inch Fuel

    Gas Line to boilers

    Defect type: Extensive

    external Corrosion pitting

    Remaining Wall: 2mm

    (recorded in places).

    Average – 60% wall loss

    Cause of Defect: Deluge /

    condensation from plant

    Operating Pressure: 10

    bar

    Design Temp: 25 ºC

  • Example Installation

    17

    Line Detail: 36 inch sea

    cooling water line

    Cause of defect: Internal

    erosion pitting due to failure

    of internal rubber lining

    Remaining Wall: 60% wall

    loss

    Design temperature: 50 ºC

  • Example Installation

    18

    Line Detail: 42 inch main oil

    line

    Cause of defect: Internal

    wall loss close to flange joint

  • Example Installation

    19

    Composite repair to well

    head tower risers

    Composite repair to LPG

    Tank dome

    Using Rope Access

  • Complex Geometry Repairs

    20

  • NEW – Splash Zone Repairs

    21

    Repairs for caissons and risers suffering external

    corrosion with up to an 80% wall loss.

    Can be used for pressures up to 250 barg/ 3625

    psi and temperatures ranging from -75°C to

    +220°C/ -103 to 428°F.

    At present all composite technology is

    applied to a dry surface, but this repair

    type can cure in the wet.

    This is due to a specially formulated

    epoxy-based resin.

  • How can we support your needs?

    22

    Pipe repairs?

    Tank repairs?

    Leaks?

    Corrosion?

    Valve decommissioning?

    NDT indicating pipe

    thinning?

    Mission critical steel work

    requiring repair?

    Are you considering pipe

    replacement?

  • Contact Information

    23

    Bahrain

    India

    Iraq

    Kuwait

    Oman

    Qatar

    Saudi Arabia

    United Arab Emirates

    Mick Flaherty COO

    +971 50 370 4686

    [email protected]

    Francis Doherty CFO

    +971 50 804 7978

    [email protected]

    Head Office

    Total Solutions Middle East

    PO Box 283712

    Dubai

    UAE

    T: +971 4 450 8368

    F: +971 4 450 8371

    W: www.totalsolutionsme.com