Composite ARNG Safety Development & Assessment Program (CASDAP) Information Update Brief Mr. Kenneth Washington [email protected] (703)

Embed Size (px)

Citation preview

  • Slide 1

Composite ARNG Safety Development & Assessment Program (CASDAP) Information Update Brief Mr. Kenneth Washington [email protected] (703) 607-3505 Slide 2 Multiple Lines of Unsynchronized Redundant Effort Focus on problem identification Problem resolution not built into processes Commonalities of overlapping effort Unsynchronized scheduling Time/Resource Intensive for both units and inspectors Heavy disruption of unit OPTEMPO Units subjected to redundant comprehensive inspections Disjointed, unconsolidated data bases of common interest to multiple users Lack consistent interpretation of standards Aviation Support Activity Accident Prevention Survey ASAAPS CLRT COMET IH/OH VPP Voluntary Protection Programs Command Maintenance Evaluation Team Industrial Hygiene/ Occupational Health Assessments Command Logistics Review Team OIP Organizational Inspection Programs (Unit Specific) Aviation Training and Assessment Team ATAT Slide 3 Regulatory Safety Audits Requirement: AR 385-10, DA Pam 385-10, and NGR 385-10 require Ground Safety Assessments and program audits every 36 months Requirement: NGR 385-5 establishes the Aviation Support Activity Accident Prevention Survey Program (ASAAPS) Facilities shall be subjected to not more than one ASAAPS in a twelve month period and not less than one ASAAPS every three years Program Background Slide 4 Existing Program Deficiencies Aviation Support Activity Accident Prevention Survey Program (ASAAPS): 1.Not funded for 2011 or 2012 2.Volunteer participation unreliable due to competing priorities 3.Volunteer members required to travel for 5 days 4.Results not standardized 5.Results not analyzed for trend analysis and counter measure development 6.Travel expenses incurred, even if no foundational safety program existed Program Background Slide 5 Existing Program Deficiencies Ground Safety Assessments: 1.Results not analyzed for trend analysis and counter measure development 2.Travel expenses incurred, even if no foundational safety program existed 3.Resistance from State Safety Managers to be assessed by contractors during on-site assessments Program Background Slide 6 Composite ARNG Safety Development & Assessment Program Mission Statement: Identify safety system inadequacies through standardized remote assessments, share best practices, assist states in resolving program gaps, thoroughly develop tailored countermeasures, and deliver actionable metrics for AVS resource prioritization in order to proactively resolve program deficiencies to enhance Soldier survivability throughout ARNG formations. CASDAP: Resolution-focused Slide 7 Composite ARNG Safety Development & Assessment Program Launches in Q1FY13 Allows State and Facility Safety Managers to first conduct remote assessments of their own Safety and Occ Health programs, and supports customized follow-on developmental actions (on-line support/on-site coaching) Generates cost savings from reduced travel of large inspection teams, and greater efficiency in unit visits Inspection results are maintained on a server, giving units the ability to self-audit and upload supporting docs SOPs, appointment orders, HAZLOGS, and photographs substantiate requirements typically inspected on site Meets requirements based in AR and NGR 385-series (safety) and AR 40-5 (preventive medicine) regulations, and satisfies NGR 385-5 (Aviation Support Activity Accident Prevention Survey Program) requirements Users gain access to an online continuity file for inspection programs to include FORSCOM ARMS, range and explosive safety, and SASOHI checklists, and are able to electronically share best practices Expandable to incorporate additional checklists in future updates Enables tailored program development and issue resolution from the ARNG level, helps generate actionable safety metrics and provides benchmark examples to facilitate safety program improvements Detailed video-based users tutorials will be distributed to each state safety manager in Q1FY13 https://www.guardsafetyeaudit.org CASDAP Program Highlights Slide 8 AVS Proactive Safety Management ARNG Organizational Safety Programs DA Safety Audits FORSCOM ARMS Combat Readiness Center OIP ATAT COMET CLRT CASDAT-C On-line CASDAT-M On-Site ARNG Safety Support Center Risks & Trends holistically assessed to drive funding & Priorities Tailored Countermeasure Development Deficiencies Resolved & Best Practices Delivered to States Synchronized Lines of Effort Slide 9 Phase I Local/State Assessment Phase II Development & Remote Assessment Phase III On-Site Assessment CASDAP Composite ARNG Safety Development & Assessment Program All ARNG State Safety Office All AASF Other Facilities Selected by CASDAT Slide 10 1.CASDAP includes the CASDAT (Composite ARNG Safety Development & Assessment Team) and the SSC (ARNG Safety Support Center). The CASDAT is comprised of the CASDAT-C and the CASDAT-M. 2.CASDAT-C, is a team of contract Subject Matter Experts specializing in ground and aviation safety that provide safety program development through on-line assessments using the eAudit Tool. 3.CASDAT-M, is a team of military SMEs conducting on-site assessments and coaching, following the initial remote phase. Remote and On-Site Assistance Slide 11 CASDAT-C 1.Coordinate integration of the eAudit tool across all states and territories 2.Provide Technical assistance 3.Distribute best practices 4.Identify deficiencies and help develop solutions 5.Provide expertise for countermeasure product development by SSC Team Specifics Slide 12 1.Team composition tailored based upon on-line assessment results 2.Augmented by trained SMEs, utilizing Certified Accident Investigators 3.Reduced footprint because 80% of assessment is conducted on-line 4.Reduced on-site presence that is mostly developmental and not assessment focused 5.Augmented by CASDAT-C Team Specifics CASDAT-M Slide 13 Sample CASDAP Reporting Metrics 7,924 Hearing Conservation SOPs 1,578 ASO Positions3,402 ADSNCO Positions 69.92% Qualified MOSQ 45.24% Qualified ADSNCO 84.46% Non-current (5,702 in Final Phase) QUALIFIED 1,204 UNQUALIFIED 374 QUALIFIED 1,432 UNQUALIFIED 1,745 CURRENT 1,458 >2 YEARS (EXPIRED) 5,634 PIPELNE 6,365 NOT SCHEDULED 11,704 Standardized Reporting Features Offers comprehensive look across states Provides data to drive resourcing decisions Guides policy updates improve operations Slide 14 Composite ARNG Safety Development & Assessment Team (CASDAT) Remote E-Audit Tool Rollout Plan OPTEMPO: All States Complete Annual E-Audit; 12 State Visits/Year What: Comprehensive Web-based Questionnaire (E-Audit Tool) Enables More Efficient Targeted Gap Resolution How: Advance Self-Assessments With Potential Solutions Presented During NGB Onsite Visits Who: Accommodates Air/Ground/Explosives Safety, Occupational Health/Industrial Hygiene Program Stakeholders Complete Contract (AVS/CTC ) Complete/Launch E-Audit Tool 54 State/Territory E-Audit Self-Assessments Complete (Phase 1) Cost Benefit Analysis: Within current MDEP budget Compliant with AR 385-10 and NGR 385-5 Provides metrics to identify problem areas Allows on-site assessment team to be tailored to resolve previously identified issues On-site assessment becomes coaching tool; developmental team arrives with solutions Predictability for states Holistic approach integrates all safety programs Collaborative approach to sharing of best-practices Supports Comprehensive Safety Campaign (FY13) 1 Apr 12 1 Sep 12 1 Nov 12 STOP THE LOSS Q1FY13Q2FY13Q3FY13Q4FY13 States Conduct E-Audit Assessment/ Site Preparation On-site Visits (3 States) (Follow-up Coaching & Assessment) States Conduct E-Audit Assessment/ Site Preparation On-site Visits (3 States) (Follow-up Coaching & Assessment) States Conduct E-Audit Assessment/ Site Preparation On-site Visits (3 States) (Follow-up Coaching & Assessment) States Conduct E-Audit Assessment/ Site Preparation On-site Visits (3 States) (Follow-up Coaching & Assessment) Identify 12 States for FY13 On-site Visits E-Audit is PreRequisite For On-site Visit Develop CASDAT users guide 27 Jun 12 CASDAT brief for ARNG NOSHC CASDAT brief for ARNG ESAOC 27 Jun 12 14 Jul 12 CofS Launch Endorsement Memo 6 Aug 12 Slide 15 Beta Testing In Progress 23 May initial beta test; continued testing 13 June through 01 July 2012 Target launch: 1 September 2012 Finalizing Business Practices Enhanced lower level user capabilities to support user friendly interface Limited lower level user capabilities to delete or destroy vital information Added additional roles to accommodate unique organizational structures Help button features: One button, driven by SME, meets all needs with historic archive capabilities; Includes e-mail notification Built communications log to show improvement history between users and assessment team Added capability to identify who assigned checklists & how a user is logged in Graphic changes for readability and reporting continuity E-Audit Tool Progress to Date Slide 16 E-Audit Tool Roll Out Answering Questions Step 1: Answer the question Step 2: Add supporting notes and comments Step 3: Save your answer. Doing so directs you to upload supporting documents. (button off slide) E-Audit Tool Screenshots Slide 17 E-Audit Tool Roll Out The Help Function Step 1: Click the highlighted text to submit a question Step 2: Type your question STEP 3: SME receives e-mail request for Help E-Audit Tool Screenshots Slide 18 E-Audit Tool Roll Out History log Note: Status complete indicated when document attached Feedback given, hover mouse to read Answer to question shown. Notice when document was attached General information: Who & when E-Audit Tool Screenshots Slide 19 File Upload Features Slide 20 E-Audit Tool Screenshots File Upload Features Slide 21 E-Audit Tool Screenshots File Upload Features Slide 22 E-Audit Tool Roll Out Checklist Graphics ASSF #1 within Maine shown. If listed as Global - graphic would show national results Graph shows number of aviation questions by tab answered asYes or No. If bar not shown, those questions have not yet been answered Next Steps: Graphic functionality currently built into tool: Visual changes being considered. Total checklist score calculated Drill-down Capabilities Slide 23 Chief of Staff Endorsement Slide 24 Composite ARNG Safety Development & Assessment Program (CASDAP) Information Update Brief Mr. Kenneth Washington [email protected] (703) 607-3505