Workshop #1 | 12.16.2013 COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124 Grand St

COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

Workshop #1 | 12.16.2013

COMPLETE STREETS REDESIGN OF

WASHINGTON STREET

HOBOKEN WASHINGTON STREET

124  Grand  St  

Page 2: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 2  

Page 3: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 3  

   

Project  descrip4o

n,  

extents      

Page 4: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 4  

Page 5: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 5  Environmental  Impact/Green  Streets Bicycle  Parking  

Senior  Mobility/ADA  Compliance/Ped  Safety

Consistency  with  Existing  Plans Enhance  Aesthetic  Value

TrafFic  /  Parking  Solutions/Signals

Complete  Streets

Maintenance  and  Operations

Historical  Context

Purpose  /  Goals  

Page 6: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 6  

Page 7: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 7  

Page 8: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 8  

Exis4ng  Condi4ons  •  Traffic  Signals  •  Crash  Rates  •  Parking/Loading  

•  Ligh4ng  •  Complete  Street  •  Streetscape/Green  

Page 9: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 9  Tonight  

Page 10: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 10  

Tiffany  Robinson  BeHna  Zimny    Mark  Keener      Kevin  Perry    

Mike  Dannemiller          Charlie  Cunion    Gordon  Meth    Tim  Krehel      Randall  Ide  

Page 11: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 11  

✔  ✔  ✔  

✔  

✔  

✔  ✔  

✔  

✔  

✔  ✔  

✔  

✔  ✔  

Page 12: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 12  

5:05  5:11  5:17  5:23  5:29  5:35  5:41  5:47  5:53  5:59  

6:05  6:11  6:17  6:23  6:29  6:35  6:41  6:47  6:53  6:59  

7:06  7:16  7:26  7:36  7:46  7:56  

8:06  8:16  8:26  8:36  8:46  8:56  

9:06  9:16  9:26  9:49      

Page 13: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 13  

✔  ✔  ✔  

✔  

✔  

✔  ✔  

✔  

✔  

✔  ✔  

✔  

✔  ✔  

Page 14: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 14  

Page 15: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 15  

Now  What?  

Page 16: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 16  

+80%  (over)  

85%    Streetscape  appearance    84%    Pedestrian  safety      

Consulted  Experts.              You  said:  

Page 17: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 17  

+70%  (over)  

79%    Mix  of  shops,  restaurants,  and  entertainment    73%    Appearance  of  shop  fronts,  windows  and  signs    73%    NighHme  ligh4ng    71%  Trash  collec4on    

Page 18: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 18  

 -­‐70%(just  less  than)  

69%    Historic  character    69%  Appearance  of  buildings    68%    Green  Infrastructure/Stormwater    67%    Traffic  and  parking      

Page 19: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 19  

 First:  Do  No  Harm      

First...  do  no  harm    ἐπὶ  δηλήσει  δὲ  καὶ  ἀδικίῃ  εἴρξειν  

....formulate  things  that  fit    Fit  the  purpose.  Fit  the  place.  Fit  for  future  possibili4es.    

Leon  BaHsta  Alber4  (1404–  1472)  

Hippokrátēs  460  BC  –  370  BC)  

Page 20: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 20  

“nobody  goes  there  anymore...its  too  crowded”  

Page 21: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 21  

First...  do  no  harm    

....formulate  things  that  fit    Fit  the  purpose.  Fit  the  place.  Fit  for  future  possibili4es.    

Introductory  Presenta:on    (6:20pm-­‐6:45pm)    overview  of  the  project:    Be4nna      preferences  /  priori:es  for  Washington  Street.    Mark,  Gordon    

   

Worksession  1  &  2        (6:45pm-­‐7:15pm)    Streetscape/Urban  Design  (street  as  a  room)      Charlie,  Randy,  Mark      Transporta:on  (street  as  a  system)    Mike,  Gordon  

 

Reporter’s  Briefings        (7:15-­‐7:30pm)    Workgroups  report  findings  and  recommenda:ons    

   

Whats  Next?              (7:30pm-­‐7:40pm)    Project  :meline,  website,    complete  survey  by  Jan  1  

   

Make  your  Mark            (7:40pm-­‐8:00pm)    You  on-­‐camera          Fill  in  the  blank            Best  picture    

preferences / priorities!

Page 22: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 22  

preferences / priorities!

Page 23: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

Downtown!Uptown!

!

Downtown!

Page 24: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

Downtown!Uptown!

!

Uptown!

Page 25: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 25  

Page 26: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 26  

Page 27: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 27  

       UPTOWN  à      Upgrade  Ligh4ng    Improve  and  Maintain  Landscape          

Page 28: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 28  

S  O  U  T  H  à  Upgrade  ligh4ng  Refresh  furnishings  Rethink  signs,  clu}er  Regulate  dining  and  merchandising  Maintain  remove  trash  and  gum  Consider  design,  appearance  Manage  Parking,  Loading  

Page 29: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 29  

Upgrade  Ligh4ng  Refresh  furnishings  Rethink  temporary  signs  and  clu}er  

Page 30: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 30  W A T E R S T R E E T | D E S I G N E L E M E N T S 9 . 2 1 . 1 1 3 6

Privately owned public spaces

Ars Medendi (part one of two) by Jim Sanborn, 2009Thomas Jefferson University

Upgrade  Ligh4ng  Refresh  furnishings  Rethink  temporary  signs  and  clu}er  

Page 31: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 31  

B R OWN&

K E E N E RW A T E R S T R E E T | D E S I G N E L E M E N T S 9 . 2 1 . 1 1 3 7

1AVENUE OF THE ARTS

PHILADELPHIA, PENNSLYVANIASOUTH BROAD STREET

EXISTING DAYTIME FAÇADESJANUARY 30, 2007

1AVENUE OF THE ARTS

PHILADELPHIA, PENNSLYVANIASOUTH BROAD STREET

EXISTING DAYTIME FAÇADESJANUARY 30, 2007

Page 32: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 32  

Page 33: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 33  

Upgrade  Ligh4ng  Refresh  furnishings  Rethink  temporary  signs  and  clu}er  

Page 34: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 34  

Page 35: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 35  

Page 36: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 36  

Page 37: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 37  

Page 38: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 38  

Page 39: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 39  

Page 40: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 40  

Page 41: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 41  

Introductory  Presenta:on    (6:20pm-­‐6:45pm)    overview  of  the  project:    Be4nna      preferences  /  priori:es  for  Washington  Street.    Mark,  Gordon    

   

Worksession  1  &  2        (6:45pm-­‐7:15pm)    Streetscape/Urban  Design  (street  as  a  room)      Charlie,  Randy,  Mark      Transporta:on  (street  as  a  system)    Mike,  Gordon  

 

Reporter  Briefs          (7:15-­‐7:30pm)    Workgroups  report  findings  and  recommenda:ons    

   

Whats  Next?              (7:30pm-­‐7:40pm)    Project  :meline,  website,    complete  survey  by  Jan  1  

   

Make  your  Mark            (7:40pm-­‐8:00pm)    You  on-­‐camera          Fill  in  the  blank            Best  picture    

Page 42: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

B R OWN&

K E E N E RW A T E R S T R E E T | D E S I G N E L E M E N T S 9 . 2 1 . 1 1 3 9HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 42  

Page 43: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 43  

Streetscape/Urban  Design  (street  as  a  room)      Transporta:on  (street  as  a  system)    

Page 44: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 44  

 Art  projected  mapping  .  

 VIDEO  #2  

     

Page 45: COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET HOBOKEN WASHINGTON STREET 124GrandSt. HOBOKEN WASHINGTON STREET ... "Projectmeline,website,completesurveybyJan1

HOBOKEN WASHINGTON STREET

Workshop #1 | 12.16.2013 50  

Introductory  Presenta:on        overview  of  the  project:    Be4nna      preferences  /  priori:es  for  Washington  Street.    

   

Worksession  1  &  2            Streetscape/Urban  Design  (street  as  a  room)            Transporta:on  (street  as  a  system)    

 

Reporter’s  Briefings            Workgroups  report  findings  and  recommenda:ons    

   

Whats  Next?                  Project  :meline,  website,    complete  survey  by  Jan  1  

   

Make  your  Mark                You  on-­‐camera          Fill  in  the  blank            Best  picture