Complete Streets Policy Promote safety, quality of life, and economic development
in Florida
Plan, design, construct, reconstruct and operate a context-sensitive system of “Complete Streets”
Serve the transportation needs of all system users of all ages and abilities
Considers local land development patterns and built form
Coordinate with local governments, MPOs, transportation agencies, and the public
Source: FDOT Topic No. 000-625-017-a 2
Complete Streets Policy History Transportation Design Through Liveable Communities
(TDLC) – 1998 • Allows for more flexibility in design standards for urban areas • Process for communities to become TDLC designated areas
Context Sensitive Solutions (CSS) Policy – 2008 • Considered the physical setting in which a project
or activity is to be implemented
Complete Streets Policy - 2014
3
SR 907/Alton Road Reconstruction
Before After 4
SR 907/Alton Road Reconstruction
Before After 5
SR 959/Red Road Reconstruction
Before
After 6
SR 959/Red Road Reconstruction
Before
After 7
SR 959/Red Road Reconstruction
Before
After 8
SR 959/Red Road Reconstruction
Before
After 9
SR 959/Red Road Reconstruction
Before
After 10
SR 959/Red Road Reconstruction
Before
After 11
SR 959/Red Road Reconstruction
Before
After 12
I-395 Reconstruction – Zone 1
13
I-395 Reconstruction – Zone 1
14
I-395 Reconstruction – Zone 2
15
I-395 Reconstruction – Zone 2
16
I-395 Reconstruction – Zone 2
17
I-395 Reconstruction – Zone 2
18
SR 5/US 1/N Roosevelt Boulevard
Before
After/Near Completion 19
Urban Bicycle Facilities Construction
(2) Urban bicycle facilities included in projects with projected letting dates through July 2014.
(3) Urban bicycle facilities included in projects currently in the design/ ERC review phase but not yet let for construction.
(1) Letting date obtained from FDOT Contracts Administration Website.
2.2 2.4 5.0 5.6 2.1
36.8
24.2 20.5
244.9
1.3 0.7 0.0 0.0 0.8 4.3 8.0 3.6 0.2
38.0
3.5 3.1 5.0 6.4 6.4
44.8
27.8 20.7
282.8
0.0
50.0
100.0
150.0
200.0
250.0
300.0
2006 2007 2008 2009 2010 2011 2012 2013 2014 Design
Lan
e-m
iles
of
faci
lity
Year
Urban Bicycle Facilities Installed in FDOT District 6 Miami-Dade/Monroe Counties (2006 - Present)
Bicycle Lane
Wide Curb Lane
Total Urban BicycleFacilities
(3) (2)
20
Urban Bicycle Facilities Construction
(2) Urban bicycle facilities included in projects with projected letting dates through July 2014.
(3) Urban bicycle facilities included in projects currently in the design/ ERC review phase but not yet let for construction.
(1) Letting date obtained from FDOT Contracts Administration Website.
0.0 0.0 2.0 0.0 1.3 0.9
22.1 15.4
11.7
108.7
3.5 3.1 3.0 0.0 5.1 5.5
22.7
12.4 9.0
174.2
0.0
20.0
40.0
60.0
80.0
100.0
120.0
140.0
160.0
180.0
200.0
2006 2007 2008 2009 2010 2011 2012 2013 2014 Design
Dir
ect
ion
al L
ane
-mile
s o
f fa
cilit
y
Year
Urban Bicycle Facilities Installed in FDOT District 6 Miami-Dade/Monroe Counties (2006 - Present)
Monroe County
Miami-Dade County
(2) (3)
21
District Bicycle/Pedestrian Coordinator
Zakary Lata, E.I. FDOT- District 6 Room 6111A 1000 NW 111 Ave Miami, FL 33172 305-470-5308
22
23