complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

  • Upload
    vudien

  • View
    224

  • Download
    0

Embed Size (px)

Citation preview

Page 1: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

complete portfolio

www.cresco-group.comwww.facebook.com/crescoengineers

www.youtube.com/user/Crescoengineers

Page 2: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

KEY:

CA: Structural calculationPP: Preliminary engineeringPD: Basic engineeringPE: Final engineeringCO: Project coordination)CS: Safety coordinationPM: Project managementDL: Supervision of constructionSM: Site management

Page 3: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

72 | CRESCO ISSUE 02

PortFolio 2014-13cresco GrouP

76. EMBALSE – NUCLEAR PLANT REPOWERING

ansaldo nucleare embalse, argentina (2014) task: Pe

detailed design of the reinforced concrete fuel tank basins and of the basement of the diesel generators

Progetto esecutivo opere in cemento armato per vasca serbatoi combustibi-le e per basamento generatore diesel

75. SERCHIO BRIDGE DESIGN COMPETITION

Provincia di Lucca Lucca, italy (2014) task: competition

design competition for a new bridge over the serchio river. the bridge is a single arc 180 m span supporting a steel deck with tapered longitudinal edges. cresco’s design has been awar-ded with the third place prize.

concorso per nuovo ponte sul fiume serchio. il ponte ha una luce di 180 m ed è caratterizzato da un unico arco portante a via inferiore e da una sezione trasversale centrale costituita da un cassone portante in acciaio con sbalzi laterali rastremati. il progetto ha ricevuto menzione vincendo il terzo posto.

74. CHRISTCHURCH REBUILD PROGRAMME

various christchurch, new zealand (2014) task: Pe

cresco is involved in the christchurch rebuild after the catastrophic seismic events of 2010 and 2011. the invention of the brand new technology for shallow relevellable slabs known as armadillo™ is helping to rebuild on areas prone to liquefaction.

cresco è impegnata nella ricostruzio-ne della città di christchurch dopo i catastrofici eventi sismici del 2010 e 2011. L’invenzione della nuova fonda-zione rilivellabile armadillo™ ha reso possibile ricostruire su aree a rischio di liquefazione.

73. BREATHE NEW URBAN VILLAGE

cera - cHristcHurcH christchurch, new zealand (2014) task: competition

this international competition challen-ged entrants to develop a concept for a sustainable medium density living in the cbd. cresco won the compe-tition together with anselmi attiani architects with a scheme that included innovative technologies to improve safety in regard of seismic protection.

questo concorso internazionale ha sfidato i partecipanti a sviluppare un concetto sostenibile di urbanizzazio-ne a media densità nel centro città. cresco ha vinto in collaborazione con lo studio di architettura anselmi attiani presentando proposte innovative per migliorare la sicurezza antisismica.

2014

76 75

7374

Page 4: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 73

PortfoLio 2014-2013cresco GrouP

71

72. NEW CETACEANS PAVILLON NUOVO PADIGLIONE DELFINI

acquario di Genova - costa edutainment Genova, italy (2014) task: dL

site works supervision for the new cetaceans Pavilion by aldo signorelli designed by renzo Piano at Genoa aquarium. the structure was built in the yard and then moved by sea and docked.

direzione dei lavori del nuovo padiglione delfini di aldo signorelli dell’acquario di Genova progettato da renzo Piano. La struttura è stata realizzata in cantiere remoto e poi trasportata via mare e ormeggiata.

71. AEROVILLE SHOPPING MALL CENTRO COMMERCIALE

cometal s.p.a. Paris roissy, france (2013) task: Pe

the new shopping complex near charles de Gaulle airport has a commercial surface of 84,000 m2 on each of its two levels. cresco made the final design of the steel structures for the shopping mall, multiplex cinema, restaurant, plug slab floor and stairs

il nuovo centro commerciale in prossimità dell’aeroporto charles de Gaulle ha una superficie di 80.000 m2 su due livelli. cresco si è occupata del progetto esecutivo delle strutture in carpenteria metallica delle gallerie commerciali, del cinema multisala, ristorante, impalcati plug e scale.

70. SAO PAULO METRO - BRAZIL METRO SAN PAOLO - BRASILE

Geodata s.p.a. sao Paulo, brazil (2013) task: Pe

cresco designed three technical buildings for three stations of the new sao Paulo metro line. buildings were joined together with the underground tunnel through deep wells. the structural analysis was carried out in compliance with the technical brazilian standards nbr.

il progetto ha riguardato la realizzazio-ne di tre edifici adibiti a sale tecniche a servizio di altrettante stazioni. agli edifici si collegano i pozzi per l’accesso diretto al tunnel di scorrimento ferro-viario della metropolitana. il calcolo strutturale è stato eseguito utilizzando le norme tecniche brasiliane nbr.

69. FURNACE PREHEATING FORNO DI RISCALDO

arinoX s.p.a. sestri Levante, italy (2013) task: dL

cresco was responsible for the site su-pervision of construction works of the new towers steel structures and of the new heating furnaces basements insi-de the factory arinox sestri Levante.

cresco si è occupata della direzione lavori delle strutture in carpenteria metallica delle torri e delle opere civili dei basamenti dei nuovi forni di riscaldo all’interno dello stabilimento industriale arinox di sestri Levante.

2013

72

6970

Page 5: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

74 | CRESCO ISSUE 02

68 67

6566

68. KOBULETI VILLA VILLA KOBULETI

officina architetti kobuleti, Georgia (2013) task: Pe

cresco designed the reinforced concrete structures (foundations and superstructures) and steel structures (roof) of a 3,000 m2 villa and its ancilla-ries (swimming pool, garage, heliport).

cresco si è occupata della proget-tazione esecutiva delle strutture in conglomerato cementizio armato (fondazioni, elevazione e solai) e carpenteria metallica (coperture) di una villa di superficie pari a 3,000 m2 e delle sue pertinenze: piscina, garage ed eliporto.

67. TERNIUM PICKLING LINE

tenova s.p.a. Pesqueria, mexico (2013) task: Pe

cresco was responsible for the detai-led design of the steel structures and runways of the pickling line of ternium Pesqueria plant

cresco si è occupata della proget-tazione definitiva ed esecutiva di strutture e passerelle in carpenteria metallica per l’impianto di decap-paggio all’interno dello stabilimento ternium di Pesqueria.

66. RESIDENTIAL BUILDING EDIFICIO RESIDENZIALE

orval s.r.l. Genova, italy (2013) task: Pd+Pe+dL

detailed structural design by aldo si-gnorelli for via chiaravagna residential and commercial buildings.

fabbricato residenziale commer-ciale progettato da aldo signorelli in via chiaravagna – sestri Ponente – Genova.

65. FIPAV SPORT CENTRE - MILANO

fiPav milano, italy (2013) task: Pd + dL

the project consists in a comprehen-sive refurbishing and empowering of a 1963 sport centre (35,000 m2) near Piazzale accursio. the existing building has been modernized, a new sport covered field with 1000 seats, a guest house, two beach volley fields and the museum of volleyball has been built.

L’intervento consta in una ristruttura-zione globale dell’impianto comunale costruito nel 1963 che si estende per 35.000 m2. e’ stato realizzato anche un nuovo palazzetto, un edificio foreste-ria, un campo da beach volley coperto, uno scoperto e il museo.

PortfoLio 2013cresco GrouP

Page 6: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 75

64. PACINOTTI NEIGHBORHOOD QUARTIERE PACINOTTI

duferco sviluppo s.p.a. Genova, italy (2012) task: Pd+Pe

the new urban neighborhood, on a section with a size of about 11.000 m2, contains residential buildings, offices a public kindergarden and commercial areas. under the buildings two underground levels parking has been designed. cresco&signorelli srl was in charge of the final design of all structures.

il nuovo quartiere urbano, su un lotto di 10. 000 m2 contiene edifici residen-ziali, uffici, un asilo pubblico e spazi commerciali. sotto gli edifici sono stati progettati parcheggi su due livelli interrati. cresco&signorelli srl si è oc-cupata della progettazione esecutiva completa di tutte le strutture.

63. BOSCHETTO TERMINAL TERMINAL BOSCHETTO

cim s.p.a. novara, italy (2012) task: Pe+dL

the new multimodal logistic centre is located inside the “boschetto” railway juction and it contains a new pavement for the temporary storaging and handling of containers and the structural civil works, on jet grouting columns, as foundation of a new gantry crane.

il nuovo terminal logistico intermo-dale è situato all’interno dello scalo ferroviario boschetto e prevede oltre ad una piattaforma per la movimen-tazione e lo stoccaggio temporaneo dei containers, le opere strutturali su colonne jet grotuing per l’installazione di una gru a cavalletto.

62. DEBBIA HYDROPOWER PLANT MINI IDRO DEBBIA

duferco energia s.p.a. debbia, italy (2012) task: Pe+dL

cresco designed and directed on site the civil works for a new hydropower plant. the study required a particular care because both the canals and the power station were completed below ground at the base of a hillside village

cresco si è occupata della proget-tazione e della direzione lavori delle opere civili di una nuova centrale mini idroelettrica. Lo studio ha richiesto particolari cure perché sia i canali sia la centrale di tipo ipogeo sono stati posi-zionati ai piedi di un versante abitato.

61. SCRAP YARD / PARCO ROTTAMI

duferco engineering s.p.a. La Louviere, belgium (2012) task: Pe

the new scrap yard covered with a steel structure is located inside the duferco industrial site of La Louviere. the building area is about 9.000 m2. cresco designed the civil works, the steel structures and roads and railway infrastructure network.

il nuovo parco rottami coperto è situato all’interno dello stabilimento industriale duferco de La Louviere. L’edificio si sviluppa su un’area di circa 9.000 m2. cresco si è occupata del progetto delle opere civili, delle carpenterie metalliche e delle infras-trutture stradali e ferroviarie.

64 63

6162

2012

PortFolio 2012-2010cresco GrouP

Page 7: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

76 | CRESCO ISSUE 02

60 59

58 57

60. TERNIUM PICKLING LINE LINEA DI DECAPAGGIO

tenova s.p.a. Pesqueria, mexico (2012) task: Pd

cresco carried out the final design of the main steel structures and walkways of a picking line at the ternium Pes-queria Plant.

cresco si è occupata della progetta-zione definitiva di strutture e passerelle in carpenteria metallica per l’impianto di decapaggio all’interno dello stabili-mento ternium di Pesqueria.

59. ARINOX REHEATING FURNACES FORNI DI RISCALDO ARINOX

arinox s.p.a. sestri Levante, italy (2012) task: dL

cresco directed the works on site for the steel structure towers and for the reinforced concrete foundations of the new reheating furnaces inside the arinox industrial site of sestri Levante.

cresco si è occupata della direzione dei lavori delle strutture in carpenteria metallica delle torri e in calcestruzzo armato dei basamenti di nuovi forni di riscaldo all’interno del sito industriale arinox di sestri Levante.

58. ROLLING ALUMINIUM PLANT LAMINATOIO DI ALLUMINIO

Pms engineering s.p.a. sohar, oman (2011) task: Pe

the new rolling mill is situated on a surface of 250.000 m2. cresco&signorelli srl was in charge of the complete final design of steel structures, foundations of buildings, as well as of the equipment and the infrastructures.

il nuovo impianto di laminazione è situato su un lotto di superficie pari a 250.000 m2. cresco&signorelli srl si è occupata della progettazione esecutiva completa delle strutture in carpenteria metallica, delle fondazioni dei fabbricati, delle linee e delle infrastrutture.

57. AP1000 NUCLEAR PLANT CENTRALE NUCLEARE AP1000

ansaldo nucleare s.p.a. sanmen, china (2011) task: Pe+of

after designing several internal steel structures, cresco calculated the steel structure of the entire roof during the lifting phase and designed the reinforced concrete conical roof.

dopo aver sviluppato il progetto esecutivo e costruttivo di diverse strut-ture interne in carpenteria metallica, cresco si è occupata del calcolo per il sollevamento dell’intera copertura in acciaio e del progetto del successi-vo completamento in calcestruzzo armato.

2011

PortfoLio 2012-2011cresco GrouP

Page 8: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 77

PortfoLio 2011cresco GrouP

56. SHAH UNIT 720 PIPERACK UNITA’ 720 PIPERACK SHAH

eni saipem s.p.a. united arab emirates (2011) task: Pe

cresco has focused on the detailed design of steel structures and reinforced concrete foundations of the piperack unit 720 using tekla structures software.

cresco si è occupata della proget-tazione esecutiva delle carpenterie metalliche e delle fondazioni in calcestruzzo armato dell’unità 720 del piperack utilizzando il software tekla structures.

55. COAL YARD ROOFING COPERTURA PARCO CARBONE

cometaL s.p.a. vado Ligure, italy (2011) task: PP

the project concerned the technical solution for the roofing of the coal yard at vado Ligure tirreno Power Plant. the steel structure has a free span of 145 m and it has been designed with a technique that does not require the use of the existing yard for the building site.

L’attività progettuale ha riguardato la proposta tecnica per la copertura del parco carbone di vado Ligure nell’am-bito della gara indetta da tirreno Power s.p.a. La struttura proposta ha luce libera pari a 145 m ed è studiata per essere costruita senza dover interferire con il parco.

54. TERNIUM PICKLING LINE LINEA DI DECAPAGGIO TERNIUM

tenova s.p.a. monterrey, mexico (2011) task: Pd cresco carried out the final design of the main steel structures and walkways of a picking line at the ternium Plant in monterrey.

cresco si è occupata della progetta-zione definitiva di strutture e passerelle in carpenteria metallica per l’impianto di decapaggio all’interno dello stabili-mento ternium di monterrey.

53. ST. CHELY PICKLING LINE LINEA DI DECAPAGGIO

tenova s.p.a. saint chely, france (2011) task: Pe+of

the project concerned the construc-tion of two steel structures for a new annealing line at saint chely arcelor mittal plant. the structures have been designed from the layout drawings to the workshop ones using a 3d bim modeler.

L’attività progettuale ha riguardato la realizzazione di due impalcati in car-penteria metallica per una nuova linea di ricottura nello stabilimento arcelor mittal di saint chely. il progetto è stato sviluppato a partire dai disegni di layout fino ai dettagli di assemblag-gio passando per la modellazione strutturale in 3d.

56 55

54 53

Page 9: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

78 | CRESCO ISSUE 02

PortfoLio 2010cresco GrouP

52. HIGH-SPEED STATION STAZIONE AV

cimolai s.p.a. reggio emilia, italia (2010) task: ca

cresco calculated some parts of the steel structures during the erection phase of the high-speed railway sta-tion designed by santiago calatrava in reggio emilia.

cresco si è occupata del calcolo strutturale di parte delle strutture in carpenteria metallica durante la fase di montaggio della stazione dell’alta velocità progettata da santiago cala-trava a reggio emilia.

51. GENOVA AIRPORT HANGAR HANGAR GENOVA AEROPORTO

ministero dei trasporti e della navigazione Genova, italy (2010) task: Pe

structural design by aldo signorelli of a new Hangar and offices at the aero-porto cristoforo colombo di Genova.

realizzazione nuovi hangar e palazzina direzionale per l’aeroporto cristoforo colombo di Genova, con progetto di aldo signorelli.

50. CAUSTIC SODA PLANT IMPIANTO SODA CAUSTICA

General electric s.p.a. nijni novgorod, russia (2010) task: Pe+of

the project for the three levels steel structure was developed from the layout drawings to the detailed design of the workshop drawings throughout structural 3d modeling.

il progetto della struttura in carpen-teria metallica su tre livelli è stato sviluppato a partire dai disegni di layout fino al dettaglio dei normalini di officina passando per la modellazione strutturale in 3d.

49. EQUIPMENT STRUCTURES STRUTTURE DI IMPIANTO

Paul wurth s.p.a. monlevade, brazil (2010) task: Pe

cresco carried out the detailed design of the feeding gates, the hoppers and the chutes structures for a plant in monlevade (brazil)

cresco si è occupata di diverse struttu-re per le linee di estrazione, vagliatura e pesatura materiale alla rinfusa collo-cate in più parti dell’impianto presso monlevade (brasile).

2010

52 51

50 49

Page 10: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 79

48. EX AREA ANSALDO BICOCCA

urbam s.p.a. milano, italy (2009) task: Pd

cresco has been engaged for the structural calculation and design of the residential site known as ex-ansaldo at the bicocca, milan. the reinforced concrete structures included two-way solid slabs for suspended floors and foundations on piles. the total volume of the project has been approximately 200.000 m3.

Progetto definitivo strutturale del comparto residenziale sito nella ex area ansaldo del quartiere bicocca a milano.Le strutture sono state progettate interamente in c.a. con solai a piastra e fondazioni su pali. La cubatura totale dell’intervento è circa 200.000 m3.

47. HYDROELECTRIC PLANT IMPIANTO IDROELETTRICO

eLca s.r.l. cosoleto, italy (2009) task: Pe

cresco developed both preliminary engineering for cost estimates and for the construction of all civil works in order to revamp a mini-hydro power plant (800kw).

sono state progettate preliminarmen-te ad uso stima di costo e poi a livello esecutivo tutte le opere civili (prese, linee di adduzione in canale e in galle-ria, vasca di carico…) per il ripristino di una centrale mini idroelettrica (800 kw).

46. ELECTRIC BUILDING EDIFICIO ELETTRICO

sti s.r.l. Ghannouch, tunisia (2009) task: Pe

at the ccPP Ghannouch Plant cresco designed the reinforced concrete building with the function to receive the control panels and the general control system.

all’interno della centrale elettrica a ciclo combinato di Ghannouch (tunisia) è stato progettato l’edificio in calcestruzzo armato destinato ad ac-cogliere i quadri comando e controllo dell’impianto.

45. PLANT CIVIL WORKS OPERE CIVILI STABILIMENTO

verona steel s.p.a. verona, italy (2009) task: Pe

the project for the verona steel Plant empowerment overlooked the foundations of the building and of all equipment for the new production area of about 8200 m2. il progetto del potenziamento dell’im-pianto di verona steel ha riguardato le fondazioni del capannone e di tutte le macchine interne della nuova area produttiva di circa 8200 m2.

2009

48 47

46 45

PortFolio 2009-2008cresco GrouP

Page 11: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

80 | CRESCO ISSUE 02

44. MADDALENA PAVILLON PADIGLIONE ISOLA MADDALENA

kaser s.p.a. maddalena, italy (2008) task: Pe

structural design by aldo signorelli of steel and glazed facades of the ex arsenale militare building maddalena island.

Progetto costruttivo delle perimetrazi-oni in acciaio e vetro dell’ex arsenale militare dell’isola della maddalena.

43. SANREMO RAILWAY CONVERSION CONVERSIONE LINEA FERROVIARIA

regione Liguria - area 24 milano, italy (2008) task: Pe

conversion of a disused railway line by aldo signorelli, between riva Ligure and sanremo into a cycling track. (Lot n° 2: 8 km].

trasformazione della tratta ex ferrovi-aria di aldo signorelli, tra riva Ligure (im) e sanremo in pista ciclabile [lotto n° 2: sviluppo 8 km].

42. OLBIA MARKET PAVILLON COPERTURA MERCATO DI OLBIA

kaser s.p.a. olbia, italy (2008) task: Pe

detailed structural design by aldo signorelli. steel and glazed roofing for the “Piazza del mercato” at olbia

Progetto esecutivo strutturale di aldo signorelli della copertura in acciaio e vetro della “Piazza del mercato” a olbia.

41. IMPERIA HARBOR PORTO DI IMPERIA

aquamarcia – Peschiera edilizia imperia, italy (2008) task: Pe

final structural design by aldo signorelli of the touristic imperia harbor (banchina san Lazzaro parking, shipyards, residential and commercial buildings, disco club and building for local authorities).

Progetto strutturale di aldo signorelli del porto turistico di imperia: opere marittime e a terra (autorimessa banchina san Lazzaro, cantieri navali e artigiani, edifici residenziali commer-ciali a, b e c, cave nautiche, edificio discoteca, corpi dello stato).

44 43

42 41

PortfoLio 2008cresco GrouP

2008

Page 12: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 81

PortfoLio 2008cresco GrouP

40. WISCO PICKLING LINE LINEA DI DECAPAGGIO WISCO

tenova s.p.a. wuhan, china (2008) task: Pe

cresco designed the steel structures occurring for a new pickling line at wisco steel plant in china.

cresco si è occupata del progetto esecutivo delle strutture in carpenteria metallica di una nuova linea di deca-paggio all’interno dello stabilimento wisco a wuhan in cina.

39. SUNDWIG COLD ROLLING LAMINATOIO A FREDDO SUNDWIG

ferretti international s.r.l. sestri Levante, italy (2008) task: Pe+dL

cresco designed and supervised on site civil works for a cold rolling mill inside the arinox Plant for stainless steel production.

sono state progettate a livello esecuti-vo e dirette in cantiere le fondazioni in calcestruzzo armato per un laminatoio a freddo all’interno dello stabilimento arinox per la produzione di acciaio inossidabile.

38. SPARE PARTS WAREHOUSE MAGAZZINO PEZZI DI RICAMBIO

duferco clabecq s.a. clabecq, belgium (2008) task: Pe+Pm+sm

cresco has been in charge of the de-signing (civil works), of the project and site management of a new spare parts warehouse inside duferco clabecq Plant. the job has been completed in time and within the budget.

cresco si è occupata del progetto (opere civili) della gestione generale e di cantiere di un nuovo magazzino pezzi di ricambio all’interno dello stabilimento di duferco clabecq. L’o-perazione è stata conclusa nel rispetto dei tempi e del budget.

37. LISCO COLD ROLLING MILL LAMINATOIO A FREDDO LISCO

ferretti internationaL s.r.l. misurata, Libya (2008) task: Pe

cresco designed the extension for a steel structure industrial building and the civil works for a new cold rolling mill in an area of approximately 4000 m2 and further supported his client during the engineering phase on site.

L’intervento ha riguardato l’estensione di un fabbricato industriale in carpen-teria metallica e le opere civili per l’installazione del nuovo laminatoio a freddo su una superficie di circa 4000 m2. oltre all’attività di ingegneria è stata condotta una supervisione in cantiere.

40 39

38 37

Page 13: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

82 | CRESCO ISSUE 02

36. COKE OVENS FOUNDATIONS

FONDAZIONE FORNI DI COKERIA

PauL wurtH s.p.a. kashima, Japan (2008) task: PP

cresco carried out the preliminary de-sign of the coke ovens, of the auxiliary steel structures and of the runways for the feeding line.

cresco si è occupata dell’ingegneria in fase preliminare delle strutture dei forni di cokeria, dei vari impalcati di servizio delle vie di corsa per le mac-chine di alimentazione e delle e varie opere accessorie.

35. STEAM TURBINE FOUNDATION FONDAZIONI TURBINA

sti s.r.l. muara tawar, indonesia (2008) task: ca

cresco assessed and resolved all critical issues relating to the complex vibrating machinery: resonance, cracks and differential settlements of supports. we used state-of-the art fem software to design the reinforced concrete structures in accordance with british standards.

sono state affrontate e risolte tutte le criticità legate alle macchine vibranti complesse: risonanza, fessurazioni e cedimenti differenziali degli appoggi. con l’ausilio dei più evoluti software degli elementi finiti cresco ha proget-tato le strutture in calcestruzzo armato secondo le normative bs.

34. THYSSENKRUPP PICKLING LINE LINEA DI DECAPAGGIO

tenova s.p.a. terni, italy (2008) task: Pe

cresco designed the steel structures occurring for the line 4 revamping at the terni thyssenkrupp Plant.

cresco si è occupata del progetto esecutivo delle strutture per il revam-ping della linea 4 all’interno dello stabilimento thyssenkrupp di terni.

33. QUENCHING AND TEMPERING QUENCHING AND TEMPERING

duferco enGineerinG s.p.a. clabecq, belgium (2008) task: Pe

quenching and tempering plant building is about 35.000 m2. cresco designed the civil works of equipment, water treatment plant and infrastruc-tures. moreover cresco, as team leader, coordinated other engineering companies for steel works and build-ing foundation design.

L’edificio che ospita l’impianto q&t ha una superficie di circa 35.000 m2. cresco si è occupata del progetto del-le opere civili delle macchine, del wtP e delle infrastrutture. inoltre, come capogruppo, ha coordinato la proget-tazione delle carpenterie metalliche e delle fondazioni del fabbricato.

36 35

34 33

PortfoLio 2008cresco GrouP

Page 14: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 83

32. ARVEDI MILL LAMINATOIO ARVEDI

ferretti international s.r.l. cremona, italy (2007) task: Pe

cresco designed the civil works for the continuous casting and the rolling mill of the arvedi innovative plant at cre-mona. the civil works included deep excavations and special foundations and were erected inside a building of about 11.000 m2.

cresco ha progettato le opere civili della colata continua e del laminatoio dell’innovativo impianto arvedi di cremona. Le opere civili includevano scavi profondi e fondazioni speciali ed sono state realizzate all’interno di un fabbricato già costruito di dimensioni pari a circa 11.000 m2.

31. ROATAN RESORT AND VILLAS RESORT ISOLA DI ROATAN

afePa roatan, Honduras (2008) task: Pe

detailed structural design by aldo signorelli of roatan villas vicorsa and media Luna resorts detailed structural design.

Progetto strutturale di aldo signorelli per insediamento turistico - residen-ziale “villas vicorsa” e media Luna tourist village a roatan.

30. PLANT EMPOWERMENT POTENZIAMENTO IMPIANTO

duferco danish steel a.s. frederiksvaerk, denmark (2007) task: Pe+Pm+sm

cresco designed and managed the works occurring for the new equip-ment installation and for the extension of an existing forwarding bay at duferco danish steel as Plant.

cresco si è occupata del progetto e della gestione degli interventi per la costruzione delle strutture occorrenti all’installazione di nuove macchine e all’estensione di un magazzino spedizioni esistente all’interno dello stabilimento duferco danish steel as.

29. SLITTERS FOUNDATIONS FONDAZIONI SLITTERS

ferretti international s.r.l. sestri Levante, italy (2007) task: Pe+dL

cresco designed and supervised on site the civil works of two slitters. the project dealt with both above ground and underground (down to –17 m) structures.

cresco si è occupata dell’ingegneria e della direzione dei lavori delle opere civili di due slitters. il progetto ha riguardato sia le opere fuori terra che quelle interrate (sino a quota –17 m)

32 31

30 29

2007

PortFolio 2007-2006cresco GrouP

Page 15: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

84 | CRESCO ISSUE 02

28. WATER TREATMENT PLANT IMPI-ANTO DI TRATTAMENTO ACQUE

ferretti international s.r.l. cremona, italy (2007) task: Pe

the project concerned all the civil works of the water treatment process for the arvedi plant.

il progetto ha riguardato le opere civili dell’impianto di trattamento acque dello stabilimento arvedi.

27. ELECTRIC BUILDING EDIFICIO ELETTRICO

sti s.r.l. kestrel, uae (2007) task: Pe

cresco designed the reinforced con-crete building within the steam turbine control room at dubai aluminium company Led.

all’interno dello stabilimento dubai alluminium company Led, cresco ha progettato l’edificio in calcestruzzo armato destinato ad accogliere la sala controllo della turbina a vapore dell’impianto.

26. HRSG TURBINE FOUNDATION FONDAZIONE TURBINA GAS

sti s.r.l. aliveri, Greece (2007) task: ca

cresco calculated the foundations of the turbine fot the HrsG power plant. the calculation of the piled foundation focused both on the static and dynamic aspects, with modal and harmonic analysis.

cresco si è occupata del calcolo della fondazione della turbina della centrale a ciclo combinato. il calcolo della fondazione su pali ha riguardato sia gli aspetti statici che quelli dinamici, con analisi modali ed armoniche.

25. WATER TREATMENT PLANT IMPIANTO TRATTAMENTO ACQUE

sti s.r.l. rio de Janeiro, brazil (2007) task: Pe

the project concerned the under-ground civil works for the water treat-ment plant.

il progetto ha riguardato le opere civili interrate dell’impianto di trattamento acque dello stabilimento.

28 27

26 25

PortfoLio 2007cresco GrouP

Page 16: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 85

2006

PortfoLio 2007-2006cresco GrouP

24. COOLING TOWERS AND W.T.P. TORRI RAFFREDDAMENTO W.T.P.

sti s.r.l. malaga, spain (2007) task: Pe

the project concerned the reinforced concrete works for the cooling towers of HrsG power plant. the basement had general dimensions of 120 x 20 m and contains the cooling system equipment.

L’attività progettuale ha riguardato le opere in calcestruzzo armato relative alle torri di raffreddamento della cen-trale a ciclo combinato. il basamento consiste in una vasca di dimensioni in pianta di 120x20 m che ospita all’interno le colonne degli impianti di raffreddamento.

23. VIA MURATORI APPARTMENTS EDIFICI IN VIA MURATORI

Leonardo s.p.a. milano, italy (2006) task: Pe + dL

structural design of a residential building consisting in two separate bodies 7 and 12 levels high and in a 2-storey underground basement (total basement footprint 4200 m2). all structures, except the penthouse, have been designed to be in reinfor-ced concrete. indirect foundation type on piles.

Progetto esecutivo strutturale di due edifici di 7 e 12 piani ciascuno collegati da un corpo interrato comune di due esteso si una superficie di circa 4200 m2. struttura interamente in calcestruzzo armato copertura in carpenteria metallica. La struttura di fondazione è di tipo indiretto.

22. FASHION LABORATORIES LABORATORI PER LA MODA

svimer milano, italy (2006) task: Pe + dL

structural design and site supervi-sion of a 6-storey building (plus 2 underground levels, 1750 m2) used as fashion workshops.the structure combines reinforced concrete elements (the majority of it) and steel structures.the foundations are indirect type on large diameter piles.

Progetto esecutivo e direzione lavori strutturale di edificio adibito a labora-torio composto da 6 piani fuori terra e 2 piani interrati ciascuno di 1750 m2.struttura portante in calcestruzzo armato e membrature in carpenteria metallica. La struttura di fondazione è di tipo indiretto su pali.

21. NLMK MILL LINE LINEA DI LAMINAZIONE

tenova s.p.a. Lipetsk, russia (2006) task: Pe

cresco designed a multilevel steel structure for the mill of novolipetsk steel Plant. sniPP codes were used for the calculation.

cresco si è occupata della progetta-zione delle strutture metalliche di un impalcato multilivello a servizio di una linea di laminazione del complesso si-derurgico di novolipetsk. Per il calcolo sono state utilizzate le norme sniPP.

24 23

22 21

Page 17: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

86 | CRESCO ISSUE 02

PortfoLio 2006cresco GrouP

20. STEEL PLATES WAREHOUSE MAGAZZINO LAMIERE

duferco clabecq s.a. clabecq, belgium (2006) task: Pe

the steel plates warehouse has a surface of 5.460 m2 and was built with a steel structure on piled foundations. the interference with existing build-ings required technical studies in order to obtain optimal integration of the structures.

il magazzino lamiere di superficie complessiva pari a 5.460 m2 è stato realizzato in carpenteria metallica su strutture indirette di fondazione. L’interferenza con i fabbricati esistenti ha richiesto l’adozione di soluzioni tec-niche che consentissero l’integrazione delle strutture.

19. INDUSTRIAL BUILDING FABBRICATO INDUSTRIALE

duferco La Louvière s.a. La Louvière belgium (2006) task: Pe

the project concerned the extension of an industrial building named H5-H6 (2400 m2) at duferco La Louvière Plant. cresco designed for construction both the new steel structures, the connec-tion to the existing ones and the piled foundations.

L’attività progettuale ha avuto per oggetto l’estensione del capannone H5-H6 (2400 m2) all’interno dello stabi-limento duferco La Louvière. il progetto esecutivo ha riguardato le nuove carpenterie metalliche, lo studio per l’integrazione con le strutture esistenti e le fondazioni su pali.

18. THICK SLABS YARD PARCO BRAMME

duferco La Louvière s.a. La Louviere belgium (2006) task: Pe

cresco designed thick slabs yard at duferco La Louviere Plant. the project concerned two piled foundations beams 200 m long with the function of runways for a crane, the drainage network and a railway.

il Progetto ha riguardato la realizzazio-ne di un’area di stoccaggio bramme. cresco si è occupata del progetto esecutivo di due vie di scorrimento in calcestruzzo armato fondate su pali, lunghe circa 200 m, per una gru a portale, oltre alle opere civili di regimazione delle acque ed una linea ferroviaria.

17. VIA ALTAMURA APARTMENTS EDIFICI IN VIA ALTAMURA

nuova e.r.a. immobiliare s.r.l. milano, italy (2006) task: Pe + dL

structural design of a residential building consisting in two separate bodies 8 levels high and in a 2-storey underground basement (total base-ment footprint 4500 m2). all structures, except the penthouse, have been designed to be in reinfor-ced concrete.

Progetto esecutivo strutturale e direzione dei lavori di due edifici di 8 piani ciascuno collegati da un corpo interrato comune di due esteso si una superficie di circa 4500 m2.struttura interamente in calcestruzzo armato copertura in carpenteria metallica.

20 19

18 17

Page 18: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 87

PortfoLio 2006cresco GrouP

16. INDUSTRIAL BUILDING EDIFICIO INDUSTRIALE

cariGe s.p.a. Genova, italy (2006) task: Pe + dL

detailed structural design by aldo signorelli for Lo faro G.P.P. s.p.a. industrial building.

Progetto strutturale esecutivo di aldo signorelli per Lo faro G.P.P. s.p.a. industrial building.

15. WJC - WORLD JOIN CENTER CENTRO SERVIZI WJC

consorzio wJc milano, italy (2006) task: Pe + dL

cresco, in partnership with biesse consulting studio, designed the struc-tures of the Jvc. the fem has been carried out with the software known as nolian and its post-processors.

cresco ha progettato e calcolato le strutture del wJc in collaborazione con lo studio biesse consulting. Per la modellazione fem è stato utilizzato il software di calcolo strutturale nolian e post-processori.

14. STEAM TURBINE FOUNDATION FONDAZIONE TURBINA A VAPORE

sti s.r.l. sohar, oman (2006) task: ca

cresco assessed and resolved all critical issues relating to the complex vibrating machinery: resonance, cracks and differential settlements for supports. we used state-of-the art fem software to design the reinforced concrete structures in accordance to the british standards.

sono state affrontate e risolte tutte le criticità legate alle macchine vibranti complesse: risonanza, fessurazioni e cedimenti differenziali degli appoggi. con l’ausilio dei più evoluti software agli elementi finiti cresco ha proget-tato le strutture in calcestruzzo armato secondo le normative bs.

13. AUXILIARIES AND WTP FONDAZIONI AUSILIARIE E WTP

sti s.r.l. Gissi, italy (2006) task: Pe

cresco designed the civil works for some auxiliary equipment and for the water treatment plant.

cresco si è occupata delle progetta-zione di alcune fondazioni ausiliarie e di quelle dell’impianto di trattamento delle acque di processo.

16 15

14 13

Page 19: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

88 | CRESCO ISSUE 02

12. AUXILIARY FOUNDATIONS FONDAZIONI AUSILIARIE

sti s.r.l. wagerup, australia (2006) task: ca

cresco calculated the reinforced concrete foundations of all auxiliary equipment for the gas turbine of the plant.

oggetto dell’intervento è stata la relazione di calcolo delle fondazioni in calcestruzzo armato degli equipag-giamenti ausiliari della turbina a gas della centrale di produzione di energia elettrica.

11. TRANSFORMERS TRASFORMATORI

sti s.r.l. castejon, spain (2006) task: ca

cresco calculated the reinforced con-crete foundations for transformers and for the collection of accidental oil loss.

cresco si è occupata del calcolo dei basamenti in calcestruzzo armato dei trasformatori e delle vasche di raccolta olii per i trasformatori di potenza della centrale di produzione di energia elettrica.

10. HRSG BOILER FOUNDATIONS FONDAZIONI CALDAIA HRSG

sti s.r.l. ras abu fontas, qatar (2006) task: Pe

cresco designed the foundations of the HrsG boiler of its chimney and of the tanks for the desalination of the water.

cresco si è occupata del progetto esecutivo delle fondazioni della caldaia HrsG, del suo camino e dei serbatoi dell’acqua dell’impianto di dissalazione.

09. PIPERACK FOUNDATIONS FONDAZIONI PIPERACK

sti s.r.l. khursaniyah, saudi arabia (2006) task: ca

cresco calculated all the structural ele-ments for the piperack and flare line. the structure is composed by frames and each frame contains precast ele-ments: columns and main beams and steel structures (bracings and second-ary beams).

La progettazione ha riguardato il cal-colo di vari blocchi delle linee piperack e flare. La struttura si presenta come una serie di telai realizzati sia con elementi prefabbricati in calcestruz-zo (colonne e travi principali) sia in carpenteria metallica (controventature e travi secondarie).

12 11

10 09

PortfoLio 2006cresco GrouP

Page 20: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

ISSUE 02 CRESCO | 89

PortFolio 2005-2004cresco GrouP

08. NAVAL MUSEUM MUSEO NAVALE

soprintendenza per il Patrimonio storico artistico della Liguria La spezia, italy (2005) task: Pe

final and detailed structural design by aldo signorelli of the La spezia naval museum inside arsenal of the italian army.

Progetto strutturale definitivo ed esecutivo di aldo signorelli del museo tecnico navale di La spezia, all’interno dell’arsenale militare.

07. VARAZZE HARBOR PORTO DI VARAZZE

sider iteras s.p.a. varazze, italy (2005) task: Pe

structural project by aldo signorelli of the works of the marina of varazze (piers fixed in reinforced concrete based on poles in reinforced concrete).

Progettazione delle opere strutturali di aldo signorelli del Porto turistico di varazze (pontili fissi in c.a. fondati su pali in c.a. battuti.)

06. HARBOR BUILDINGS

EDIFICI PORTUALI

marina Porto antico s.p.a. Genova, italy (2005) task: dL

site works supervision by aldo signo-relli for buildings of the harbor at Porto antico di Genova.

direzione Lavori di aldo signorelli del complesso portuale e immobi-liare nell’ambito del Porto storico di Genova.

05. INDUSTRIAL BUILDING EDIFICIO INDUSTRIALE

duferco La Louvière s.a. La Louvière belgium (2005) task: Pe

cresco designed the extension (160 m) of an industrial building named H4 (4.800 m²) at the duferco La Louvière Plant. the building has steel structures on reinforced concrete piled plinths.

cresco si è occupata del progetto di estensione (160 m) del capannone H4 (4.800 m²) all’interno dello stabilimen-to duferco La Louvière. Le strutture dell’edificio sono state realizzate in carpenteria metallica e le fondazioni sono state eseguite su pali.

08 07

06 05

2005

Page 21: complete portfolio - CRESCO · carpenteria metallica delle gallerie ... SHAH UNIT 720 PIPERACK ... cresco has focused on the detailed design of steel structures and

90 | CRESCO ISSUE 02

PortfoLio 2005-2004cresco GrouP

2004

04 03

02 01

04. ALUMINIUM PLANT TURBINES TURBINE ALLUMINIFICIO

sti s.r.l. Puerto madryn, argentina (2005) task: ca

cresco assessed and resolved all critical issues relating to the complex vibrating machinery: resonance, cracks and differential settlements of supports. we used state-of-the art fem software to design the reinforced concrete structures in accordance with british standards.

sono state affrontate e risolte tutte le criticità legate alle macchine vibranti complesse: risonanza, fessurazioni e cedimenti differenziali degli appoggi. con l’ausilio dei più evoluti software agli elementi finiti cresco ha proget-tato le strutture in calcestruzzo armato secondo le normative bs.

03. GAS TURBINE FOUNDATIONS FONDAZIONI TURBINE A GAS

sti s.r.l. Petkim, turkey (2005) task: Pe

cresco assessed and resolved all critical issues relating to the complex vibrating machinery: resonance, cracks and differential settlements of supports. we used state-of-the art fem software to design the reinforced concrete structures in accordance with british standards.

sono state affrontate e risolte tutte le criticità legate alle macchine vibranti complesse: risonanza, fessurazioni e cedimenti differenziali degli appoggi. con l’ausilio dei più evoluti software agli elementi finiti cresco ha proget-tato le strutture in calcestruzzo armato secondo le normative bs.

02. ANNABA AIRPORT TERMINAL TERMINAL AEROPORTO DI ANNABA

arch. Giorgio stella annaba, algeria (2004) task: Pe

cresco supports the designing by producing final drawings both for the foundations and the above ground reinforced concrete and steel structures of the entire airport terminal (130.000 m2).

sono stati sviluppati gli elaborati grafici esecutivi delle strutture di fondazione e in elevazione in calce-struzzo armato e carpenteria metallica dell’intera stazione aeroportuale (130.000 m2).

01. HRSG TURBINES FOUNDATIONS FONDAZIONI TURBINE

sti s.r.l. termoli, italy (2004) task: ca

cresco calculated the foundations of the gas and steam turbines at termoli Plant. the calculation of the founda-tion has focused on both the static and dynamic aspects, with modal and harmonic analysis.

il progetto ha avuto come oggetto il calcolo delle fondazioni delle turbine a gas e a vapore della centrale elettrica a ciclo combinato di termoli. il calcolo della fondazione ha riguardato sia gli aspetti statici che quelli dinamici, con analisi modali ed armoniche.