27
-Tender No.: NHSRCL/BRC/2020/25 _i-E> - w#T5Fc-i Compensatory forestation in lieu of the trees to be cut in Kheda District for '{3dra`'cL``i ;/''<'""'j`tF'tiniar""" construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of NHSRCL. National High Speed Rail Corporation Limited (NHSRCL) (A Joint Sector Company of Govt. of India and Participating State Government) =_riE\:\ MHSR£L MatiaTla} H~i.Qn Speed RaL! Gtl[grounlhan Ltfi Compensatory forestation in lieu Of the trees to be cut in Kheda District for construction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project of NHSRCL. Tender No.: NHSRCL/BRC/2020/25 TENDER DOCUMENT (Single stage Two packet system) Part-1 Technical Bid Documents (NIT, Terms and Conditions, Tentative list of Tree Species) May-2020 National High Speed Rail Corporation Limited 3rd Floor, Productivity House, Productivity Road, Alkapuri, Vadodara -390007. Signature of the Bidder Page 1 I,`.t,I,ji`,ration Ltd. I.. i,i,,.fir,fa / I-I, " I,,clara

Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-Tender No.: NHSRCL/BRC/2020/25_i-E>- w#T5Fc-i Compensatory forestation in lieu of the trees to be cut in Kheda District for

'{3dra`'cL``i ;/''<'""'j`tF'tiniar""" construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

National High Speed RailCorporation Limited

(NHSRCL)

(A Joint Sector Company of Govt. of Indiaand Participating State Government)

=_riE\:\MHSR£L

MatiaTla} H~i.Qn Speed RaL! Gtl[grounlhan Ltfi

Compensatory forestation in lieu Of the trees to be cut inKheda District for construction of Mumbai Ahmedabad

High Speed Railway (MAHSR) Project of NHSRCL.

Tender No.: NHSRCL/BRC/2020/25

TENDER DOCUMENT

(Single stage Two packet system)

Part-1 Technical Bid Documents(NIT, Terms and Conditions, Tentative list of Tree Species)

May-2020

National High Speed Rail Corporation Limited3rd Floor, Productivity House, Productivity Road,

Alkapuri, Vadodara -390007.

Signature of the Bidder

Page 1

I,`.t,I,ji`,ration Ltd.

I.. i,i,,.fir,fa/ I-I, " I,,clara

Page 2: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-E> Tender No.: NHSRCL/BRC/2020/25- N#TEc-i Compensatory forestation in ueu of the trees to be cut in Kheda District for

ry#ck7,'-ift'n* tcarng'J3a`t`J'pr'-rfu`'x` construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL

PART-1TECHNICAL BID DOCUMENTS

National Hlgh SiierH ItuH Corporation Ltd.

{Tt=;D„ .`;-+` , .I:f{,:.,-`-:` fxp, {` fit ;iTfa

tFpfu/Vadodara

Page 2

Signature of the Bidder

Page 3: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-\NHSRCL

RI .(av.£ tt `ri3 ( !xi`irv lfai{ >`teF€x\i±*` I *

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstructlon of Mumbai Ahmedabad High-Speed Railway (MAHSR) Project ofNHSRCL.

' Notice Inviting Tender (NIT)

Name of work Tender No. NHSRCL/BRC/2020/25"Compensatory forestation in lieu of the trees to be cut

in Kheda District for construction of Mumbai AhmedabadHigh Speed Railway (MAHSR) Project of NHSRCL"

Place of Work Bhumel, Uttarsanda, Piplag, Dumral, Tundel, Davda,Dantali, Zarol, Dehgam, Gothaj, Bavara, Eyava,katakpura, Chapra, Virol, Vadadla, Malataj, Kanji, Mahij,Davada, Chaklasi of Kheda district. (from Ch. 442.452 toCh. 482.468)

Earnest Money Dep(EMD)osit Rs. 78,400.00

Tender Fees Rs. 5,900.00 (including 18 % GST)

Completion period 3 Months for the plantation and thereafter Maintenancefor a period of 2 years.

Validity of offer 90 DaysType ofTender ' Open TenderBid Submission Single stage Two packet systemPre-Bid meeting 29.05.2020Tender closing date & time 05.06.2020 @ 1400 hrsTender opening date & time 05.06.2020 @ 1430 hrsPlace of Pre-bid meetendersubmissionopeningofTenderting,&

Through online as described in the respective sections.

Designated Email and Marcontractl,brc®nhsrcl.inPhone Numbercommunication for Mobile: +91-7838437982

2. National High speed Rail corporation Limited invites tender for "Compensatoryforestation-in lieu of the trees to be cut in Kheda District for construction ofMumbai Ahmedabad High Speed Railway (MAHSR) Project Of NHSRCL:' .

3. All the participating/ prospective bidders fortender must convey their emailid and working mobile and landline telephone number to the designatedemail id provided by NHSRCL for regular communication purposes.

4. The completely filled up bid document shall be uploaded on NHSRCL'swebsite by the bidders latest by tender closing date and time mentioned atpara 1 above and will be opened on the same day at 2:30 PM (14:30 hrs). Thebidders shall seek an uploading link from NHSRCL through email and the bidders

\,I 'u`f,ri.1(]fation Ltd.- , `\frfe

Page 3

Signature of the Bidder

i `\ il (1 , c) n €` i 1 i

-- : ` ..+.,,-,

Page 4: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_iEZFrdNHSRCL

b.i a.I)..M tl 3r ` 7x^FX I¢a} ` '`wipe I ;mro I Z€

Tendel. No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

will be provided with a link through email with a user lD and password for uploadof bid documents. No tender will be accepted under any circumstances beyondthe stipulated date and time which may be noted. NHSRCL will not be responsiblefor any delay/ loss/ mis-delivery/ corrupted file of tender documents.

5. Tender fees and Earnest money deposit as mentioned at para 1 (unlessexempted) shall be deposited by the'bidder as per the Clause 3 & 4 of the Termsand Conditions.

6. Interested eligible Bidders may obtain further information from office of:Chief Project Manager,National High Speed Rail Corporation Ltd (NHSRCL),3rd floor, Productivity House,Productivity Road ,Alkapuri, Vadodara-390007Mobile: +91-7838437982Mail: mgrcontractl ,brc@nhsrcl. in

7. Tender documents can be downloaded from "www.nhsrcl.in" &"httDs://eDrooure.aov.in/eDublish/aoD" from 21.05.2020 to 04.06.2020.`

8. The pre-bid meetirtg shall be conducted onlinethrough video conferencingon 29.05.2020 @ 11:00 AM. Login credentials shall be provided to interestedeligible Bidders through email, who seeks for the same. Participation in this pre-Bid meeting is rot mandatory.

9. NHSRCL reserves the risht to cancel the tender at any time or amend/ withdrawany Of the terms and conditions contained in the Tender Document, withoutassigning any reason, thereof.

10. Any time prior to the deadline for submission Of Bids, NHSRCL on its own or inresponse to any clarification requested or suggested by any person including thatOf the tenderer may modfty the bid document at its sole discretion by issuingCorrigendum/ Addendum. Corrigendum/ Addendums (if any) will be uploaded inthe employer's website www. nhsrcl. in and "httDs://eDrocure.aov.in/eDublish/aDD"It will be the responsibility of the tenderers who had dowuloadec] thedocuments from the website to submit offer in the updated copy of the tenderdocuments and NHSRCL way may not consider the offers downloaded fromwebsite if offer is not submitted in updated tender documents.

11. Tenderer may note that the end of the Technical Bid document is marked as"END OF TECHNICAL BID DOCUMENT" and the end of the Price Bid document

is marked as "END OF PRICE BID DOCUMENT. The total document is to bedownloaded for submission of the offer otherwise the document will be treatedas incomplete and therefor invalid and summaraliy rejected.

12. All the pages of the tender documents, corrigendum/ addendum (if any), Bill ofQuantities and accompanying documents should be properly stamped and

`1~ \( `+I `i, il i `.1` iLI`

Pua{ioiial liigh Siji3Lj R.il C;orporation Ltd.

nItq RE TTftrta tapm faRE3i¥`;tap/\/aclodara Page 4

Signature of the Bidder

Page 5: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-LFfaL::nmdpeern::t.#:r::tat,::fn/::e2u°/o2f5thetreestobecutinKhedaDistrictfor

#2`'i'-.nltttl7;.<tg€~''3&iL`of'"*"" construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

signed by the authorized signatory holding the Power of Attorney on each page.

(The bidder shall enclose a copy of Power Of Attorney).13. However, NHSRCL reserves the rights to reject any or all of the tenders without

assigning any reason thereof, and is not liable to accept the lowest tender or anyof the tenders.

14. RIGHTS 0F NHSRCL TO DEAL WITH TENDERS:- The authority for theacceptance of the Tender will rest with the NHSRCL. It shall not be obligatory onthe said authority to accept the lowest tender or any other tender and no tenderersshall demand neither any explanations for the caLlse of rejection of his/ theirtender nor the NHSRCL to assign reasons for declining to consider or reject any

particular tender or tenders.15. If the Tenderer(s) deliberately gives/ give wrong information in his/their Tender or

creates/create circumstances for the acceptance of his/their Tender, theNHSRCL reserves the right to reject such Tender at any stage.

16. Tenderer(s) may please also note that if any change/ addition/ deletion with mala-fide intention is made by the bidder and the same is detected a.t any stage evenafter award of the tender, all necessary action including banning of business maybe taken against the bidder.

17. The validity of the tender offer should be 90 days from the date of the opening.18. Prior to the expiration of the period of Bid validity, the Employer shall notify the

successful Bidder, in writing, that its Bid has been accepted. The notification letter

(hereinafter called the "Letter of Acceptance") shall specify the sum that theEmployer shall pay to the Contractor in consideration of the execution andcompletion of the Works (hereinafter called ``the Accepted Contract Amount").

19. Until a formal contract is prepared and executed, the Letter of Acceptance alongwith all the tender conditions and corrigendum shall constitute a binding Contract.

20. The Bidder shall bear all costs associated with the preparati,on and submission ofits Bid, and the Employer shall not be responsible or liable for those costs,regardless of the conduct or outcome of the bidding process.

21. Eligibility criteria:21.1. The bidder(s) must have executed the Plantation (Horticulture/ Forest or

any other related) works in the past. (attach supporting documents).21.2. The Bidder(s) should not have been blacklisted by any Central/ State

Ministry/ Department/ PSUs or Banks etc. The bidding firm has to give aself-certificate to the effect that it has not been blacklisted by any Central/State Ministry/ Departmenv PSUs or Banks, etc. The certificate has to besubmitted along with the tender documents.

21.3. The bidder(s) have to submit the PAN, GST registration certificates (ifapplicable).

Page 5

Signature of the Bidder

Page 6: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-i-\MHSRCL

+Lzot5zid, Ii )T A p<.!rG lie I `cr=i".let.rl i i(`.

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstruction Of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

Terms and Conditions

1. The Tenderer (s) shall inspect the proposed site of work and acquaint/ themselveswith the site conditions, site location, availability of water during the plantation aswell as maintenance period, working hours, layout of trees, approach road,.

pathways available, etc. and all relevant items connected with the execution ofwork. No claim shall be entertained for the contractor(s) making his/their ownarrangements for approaches/ approach road from outside work area andcontractor(s) will bear entire expenses such as road taxes, payment for right of wayetc. to outsiders and for construction of approaches/approach roads, internal

pathways etc.2. Tenders containing erasures and/ or alternations of the tender documents are liable

to be rejected. Any correction made by the Tenderer(s) in his/their entries must beattested by him /them.

3. Tender Fee:3.1. The tender documents to be downloaded from the official website of National

High-Speed Rail Corporation Limited www. nhsrcl. in &https://eprocure.gov. in/epublish/app for submitting the tender.

3.2. The Tender fees (non-refundable & nan-transferable) must be deposited in theaccount of NHSRCL through Immediate Payment System (IMPS), NationalElectronic Fund Transfer (NEFT) or Real Time Gross Settlement (RTGS). Thedetails of the Bank in which the tender document cost is to be deposited is asunder.

BankAccountName: National High-Speed RailCorporation Limited

Name of the Bank:

Account No:

Indian FinancialSystem Code (lFSC):

MICR Code

HDFC Bank Ltd.

57500000079852

HDFC0000003

110240001

3.3. The Tender document cost (as applicable) has to be deposited at least a daybefore opening of bids by 14:00 hours (Indian Standard Time -GMT+5:30).

3.4. The acknowledgement/receipt of such payment of tender document cost shallbe emailed to the `Bid Administrator of the bidding process on the day ofsubmission of tender document cost in NHSRCL's account.

Signature qf

N3,t:o=a;\\;`:;j±:;:\\,i_;:t`t*[f€,at,_a+tLtdI, (` ` 1 -. 1,

L]§R6hager

Page 6

Signature of the Bidder

Page 7: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-E5ZFINHSRCL

Pdhi,d'a±,<{\`£\lufiA*ai`jj#`>c*-i,.HL&`ui~m

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL

3.5. Any bid submitted without Tender document cost shall be corisidered as invalidand shall not be opened (unless exempted).

3.6. You may please note that the documents being allowed to be downloaded withfurther condition that he/they agree to abide by the conditions laid downhereinafter in tender documents, before submitting his/their tender.

4. Earnest Money Deposit (END):4.1. Earnest Money deposit must be deposited in the account of NHSRCL

through Immediate Payment System (IMPS), National Electronic FundTransfer (NEFT) or Real Time Gross Settlement (RTGS). The details of theBank in which the tender document cost is to be deposited ls as under.

BankAccountName: National High-Speed RailCorporation Limited

Name of the Bank:

Account No:

Indian FinancialSystem Code (IFSC):

MICR Code

HDFC Bank Ltd.

57500000079852

HDFC0000003

110240001

4.2. The EMD (as applicable) has to be deposited at least a day before openingof bids by 14:00 hours (Indian Standard Time -GMT+5:30).

4.3. The acknowledgement/receipt of such payment of EMD shall be emailed'tothe `Bid Administrator' of the bidding process on the day of submission oftender document cost in NHSRCL's account.

4.4. Any bid submitted without EMD shall be considered as invalid and shall notbe opened (unless exempted).

4.5. Any deviation in EMD/ Bid Security with regards to amount shall beconsidered as material deviation and tender shall be dealt accordingly suchtender offer liable to be rejected without any reason.

4.6. Bid received without Earnest Money shall be summarily rejected (unlessexempted).

4.7. The Tenderer shall hold the offer open for the period of 90 days from thedate fixed for opening the same.

4.8. The Earnest Money of the unsuccessful tenderer(s) will, save as here-in-before provided, be returned to the unsuccessful tender(s) within 21 daysafter the finalization of successful tender.

"-t'°Vln±,i,(, i. ` F`:,:p,:\r(:_t:=Ltd.

Page 7

Signature of the Bidder

Page 8: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

Tender No.: NHSRCL/BRC/2020/25--N¥cJL Compensatory forestation in lieu of the trees .to be cut in Kheda District for

tyj/co`in.irj^<&o<w`Jta('``JrexytmseuL` construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

4.9. The Earnest Money deposited by the successful Tenderer will be returnedafter submission of Performance Security and Signing of ContractAgreement.

4.10. The technical bid must also contain the details of bank account of thebidder. This account will be used to credit the amount of EMD back into thebidders' account for the unsuccessful bidders, without any interest or anysuch levy.

4.11. The NHSRCL shall not be responsible forany loss ordepreciatio.n that mayhappen to the security for the due performance of the stipulation to keep theoffer open for the period specified in the tender documents or to the EarnestMoney while in their possession nor be liable to pay interes7t thereon.

4.12. Forfeiture of EMD: The EMD / Bid Security shall be forfeited as per the

provisions given in Tender documents:4.12.1.IfabidderwithdrawsitsbidduringtheperiodofBidvalidifyspecified

by the bidder on the letter of bids.4.12.2, lf a bidder misrepresents or causes to misrepresent or omits the

facts which are mentioned and reasonably should have beenfurnished in order to influence the procurement process.

4.12.3. If the successful bidder fails to:

(a) Sign the contract agreement as pertender conditions;(b) Accept the corrections of its bid price due to calculations

errors;

5. The procedure for submission/ Uploading of bids:5.1. The completely filled up bid document shall be uploaded on NHSRCL's

website by the bidders latest by tender closing date and time mentioned inNIT. The bidders shall seek an i!ploading link from NHSRCL through email.

5.2. A link along with user lD and password, to access the link, shall be providedto the prospective bidders, who so desire, using which the bid documentshall be uploaded to the designated site/server.

5.3. Both, technical (duly filled technical bid documents) as well as financial

proposal (duly filled price bid) .will be uploaded as two separate passwordprotected PDF documents. The documents will be password protectedindividually. Both these documents will be zipped together in one folder. The

passwords will not be shared by the bidders at the time of uploading.5.4. The link given for uploading the bid documents shall expire at a given time

and date and will no longer be available for uploading of documents. Thiswill ensure the bid document submission deadlines are honoured. In case

i-5I

a bidder uploads more than one bid document, the last one of the uploadeddocument will be considered for bid process.

Page 8

Sip,rature of`1

b\a\ic,r-,1`", ,, ` ,'\\ \ : ., -I

NHSRCLI ` \C\}

\ .,":,?f#`-td

Signature of the Bidder

Page 9: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

Tender No.: NHSRCL/BRC/2020/25_i-i-----M#Tinc-i Compensatory forestation in lieu of the trees to be cut in Kheda District for

rty,'^./JJtitJ.'ci`ex€Jd#fr`{xxpyanxp`'Lrf construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL

5.5. The bidders must ensure that their bid submissions to NHSRCL are freefrom virus/malware/ransomware or such similar unwanted software code.

6. Procedure of Submission of password, Opening and Evaluation of Bid6.1, Submission of Password and Opening of Technical Bids

6,1.1. For opening of the technical bids on a notified date, a virtual on-linemeeting (zoom/webex or other similar meeting platform) will be heldinviting the bidders who have submitted the bids. The invitations foronline meeting will be sent by email along with the information of thesoftware/platform to be used for meeting.

6.1.2. The `Bid Administrator', who will be conducting the meeting will benotified to the bidders over email.

6,1,3. A window of 30 minutes, from the time of commencement of onlinetender opening meeting, would be given to all the bidders who havesubmitted the bids to provide their password for opening of thesubmitted technical bid, to the `Bid Administrator' of the meeting

privately through chat or as an SMS/WhatsApp message on thenumber provided in advance through email.

6.1.4. All technical bids would be opened by the `Bid Administrator' forthemeeting, using the password so provided during the meeting, one byone.

6.1.5. In case it is not possible to open the file, which contains thetechnical bid, due to any reason whatsoever, the bid shall bedisqualified.

6.1.6. The entire online meeting of opening of Technical bid shall berecorded and kept for records and confirmation.

6.1.7. Foropening of the Technical Bid, the bidder must make every efforttobe present for the online technical bid opening meeting. However, forany reason whatsoever, the bidder is not able to join, but is able tosend his password, the bidder's offer would be considered as Valid.

6.1.8. The outcome of the Technical Bid evaluation will be informed toall the bidders through email.

6.2. Password submission and opening of Financial Bids6.2.1. For opening of the financial bids, procedure as outline in para 6.1.1 to

6.1,4 as illustrated above will be followed for the opening of financialbid.

6.2.2. The opened financial bids would be shown on the screen online to the

participating bidders.6.2.3. In case it is not possible to open the file, which contains the

financial bid, due to any reason whatsoever, the bid shall bedisqualified.

rl

Page 9

Si9nFftyfrof..rtltJS-i r`orrtoiat.Ion Ltd.

atior,a' ":t \ :, I,_\i:lT±g

Signature of the Bidder

Page 10: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-E> Tender No.: NHSRCL/BRC/2020/25- NflT5Fc-i Compensatory forestation in lieu of the trees to be cut in Kheda Distriet for

awl `'alJ{ttL. :<%ouf`'a'{~a"11-` construction of Mumbai Ahmedabad mgh speed Railway (MAHSR) Project of

NHSRCL.

6.2.4. The opened bids will be recorded on a summary sheet indicatingbidder's name and their financial quote. This summary sheet will bedisplayed on screen, in the meeting by the `Bid Administrator'.

6.2.5. The entire online meeting of opening offinancial bid shall be recordedand kept for records and confirmation.

6.2.6. For opening of the Financial Bid. the bidder must make every effort tobe present for the online financial bid opening meeting. However, it forany reason, the bidder is not able to join, but is able to send his

password, the bidder's offer would be considered as Valid.6.3. Other Instructions/Guidelines

6.3.1. The bidders must ensure that their bids are complete in all respectsand that their bids are password protected.

6.3.2. The bids so submitted must be capable of opening with 'AdobeAcrobat Reader' and/or Adobe Acrobat. Use of any proprietarysoftware for encrypti\ng PDF or passwords leading to non-opening orreadability of the submitted bid, will render the bid invalid.

6.3.3. The bidders must check the integrity of bids to be submitted beforeuploading the same.

6.3.4. The bidders mustensurethatthe bids are clearly marked as Technicaland Financial indicating the name of the bidding agency.

6.3.5. The bidders and/or their authorised representative(s) must makeevery effort to be present in the virtual online meeting (Zoom/V\febexor other similar meeting platform) while opening of the bids.

6.3.6. If a bidder has shared the password with the `Bid Administrator' forthe opening of financial bid dooument but is unable to be present inthe online financial bid opening process, the bid will be considered asvalid.

7. It shall be Contractor's exclusive responsibility to get approvals, permits orlicense required for the Contract from various government departments.However, the Employer may (where he is in a position to do so) providereasonable assistance to Contractor at the request and cost of the Contractor in

getting Permits, License or Approvals required during the Contract. Therendering of such assistance by the Employer shall not be interpreted as a pretextby the Contractor as condoning of any delay or non-performance of any of theContractors obligations. The following-up of all such applications shall be theresponsibility of the Contractor.

8. The Employer shall be fully entitled without the consent of the Contractor, toassign the benefit of the part thereof and any Interest therein or thereunder toany third party.

Page 10

Signature of the Bidder

Page 11: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-iNHSRCL

N)^„xedl £( ,r.t ``i)izeev; Rti (Xif u¥+zg<`un : u

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

9. Correction of Arithmetical Errors9.1. Provided that the bid is substantially responsive, the Employer shall

correct arithmetical errors on the following basis:9.1.1. if there is a discrepancy between the unit price and the total price

that is obtained by multiplying the unit price and quantify, the unit

price shall prevail and the total price shall be corrected, unless inthe opinion of the Employer there is an obvious misplacement ofthe decimal point in the unit price, in which case the total priceas quoted shall govern and the unit price shall be corrected;

9.1.2. if there is an error in a total corresponding ho the addition orsubtraction of subtotals, the subtotals shall prevail and the totalshall be.corrected ; and

9.1.3. if there is a discrepancy between words and figures, the amountin words shall prevail, unless the amount expressed in words isrelated to an arithmetic error, in which case the amount in figuresshall prevail subject to (9.1.1 ) and (9.1.2) above.

9.2. Bidders shall be requested to accept correction of arithmetical errors.Failure to accept the correction in accordance with 9.1, shall result in therejection of the Bid.

10. The Contractor shall not transfer his contract to third party.11. Briefscope ofthework: I

11.1. Location of the works: The work shall be carried out in the villages viz.Bhumel, Uttarsanda, Piplag, Dumral, Tundel, Davda, Dantali, Zarol,Dehgam, Gothaj, Bavara, Eyava, katakpura, Chapra, Virol, Vadadla,Malataj, Kanji, Mahij, Davada, Chaklasi of Kheda district. Land for the

plantation/ compensatory forestation will be provided in different pocketsin various villages as per the availability. Plantation may also be requiredto carry out along the Canals/ National Highways/ State Highways/ Roads/NHSRCL alignment as per the direction of the NHSRCL in Kheda district.

11.2. The contractor shall employ qualified and experienced and skilled, semi-skilled and unskilled workers depending upon the nature of job and takecare of pesticide application of fertilizer application as necessary and onthe sudden outbreak of any epidemic.

11.3. The scope of work includes Cleaning of area including removal ofunwanted material, debris, weeds, bushes, stones and masonry pieces,infertile soil etc. including disposal of the same outside the NHSRCL's

premises as per the prevailing rules and regulation of local authority(ies).The Contractor shall indemnify NHSRCL from any clairris/ penalties by thelocal authority(ies)/ individuals, which may arise due tot improper disposalof the aforementioned waste materials.

Page 11

Signature of the Bidder

Page 12: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-i-iNHSRCL

W3,*ix«8, I(zct ;io<>r¢ ;>b I ``QTs€*.ts`try { r!

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

11.4. Digging of pits of required size in soil for the plantation of trees as perlayout drawing prepared by the Contractor and finalized in consultationwith the NHSRCL/ local authority(ies).

11.5. Filling of good quality fertile soil including mixing good quality well rotten

Farm Yard Manure (FYM) at the rate of 30% by volume. F.Y.M. shall bemixed well in the soil of the pit while planting the saplings.

11.6. The soil manure filling shall be well watered in order to settle soil and toremove air pockets. Level of the pits shall be obtaihed by adding soil plusmanure mixture, wherever required.

11.7. Treating each pit for white ant treatment and other preventive pest/ insecttreatments as necessary.

11.8. Planting of well grown sapling / seedling /graft of desired species. Treesaplings of the recommended species / types should be approx.. 3 feetheight (settled in 5 x 7 Inch) and free of insect / pests diseases shall be

planted by the agency at his own cost.11.9. The planted trees shall be maintained for two years including its protection

from any causes whatso ever reason. The maintenance period shall bestarted only after the successful ccmpletion of the plantation at eachpocket of land. In case of plantation along the Canals/ National Highways/State Highways/ Roads/ NHSRCL alignment the maintenance period willstart after plantation of the tree. The maintenance shall include regularwatering, weeding, mulching, soil working, supporting and pruning,application of insecticides/ pesticides/ fertilizers/ fungicides etc. The treeshall be manured minimum twice in a year with F.Y.M. as per theinstructions of the in-charge officers.

11.10. Regular checking against insect / pest / f,ungus attack shall be done by thecontractor and the control measures shall be done by the Contractor at hisown cost during the entire maintenance period.

11.11. The Contractor shall be required to arrange planting materials / fertilizers/ soils for plantation work lf any plant dies during the maintenance periodsame shall be replaced by the Contractor at his own cost. Agency will haveto arrange all types of fertilizers insecticides / pesticides for treemaintenance at his own cost`

11.12. Contractor shall arrange the water facilities at their own cost. The wateringof the trees, shall be provided on regular basis as per the requirement

11.13.All cost wages of labours, transportation charges of tree saplings ofapprox. 3 ft. height / fertilizers etc. and equipment required for themaintenance will borne by the Contractor.

11.14. Cost of transport, food, accommodation and other welfare activities for hisemployees shall be borne by the Contractor.

Page 12

Signature of the Bidder

Page 13: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

Tendel. No.: NHSRCL/BRC/2020/25_EiF|-|f¥fCJL Compensatory forestation in lieu of the trees to be cut in Kheda District for

A/~t ^~Id'iJ\~' |\'xatJrfetLchnyrfu~y>`m construction of Mumbai Ahmedabad High speed Railway|i(MAHSR) Project of

NHSRCL.

tT.15.:::tnra;to°vre:amsatc°hj::r:nwg,:hsbuo¥C(i::i:ru:nbdeL:fn:°a?,I;dapnedrattaecdk)I,etsr;,:euycs|

secateures, hedge sheers, forest sheers, pruning sow, spades, kodali,khurpi, forking racks, takers, sprayers, sprinklers,rollers, hose pipes etc. required for the job at their ownthe work.

rwante*cans, lawn, lawnst before starting

11.16.Minimum wages act to be adhered & any injury during execution isContractor's responsibility. ,

tt.t7.::ree?o°r|ir:Cst:fre;h::'a:Ppme::yonw:t:n:ill,eadptp:i::b:en:ha:esq±::gu'atj°ns.take

11.18. The Contractor shall be wholly responsible for security pf the site and thematerials, consumables, tools etc. in the site.

12. Performance security: I12.1. The Contractor shall submit the Performance Security to the Employer

within 28 days after receiving the Letter of Acceptance. In the event theContractor fails to provide the Performance Security vyithin 28 days fromthe date of issue of the LOA, the Contractor may seek an extension of timefor providing the performance security for a period not exceeding a further15 days, duly extending the validity of bid securityof damages for such extended period in a sum

gly, on paymentat the rate of

0.005% of the Accepted Contract Amount for edph day until thePerformance Security is provided.

12.2. The successful bidder, is required to deposit an amount equal to 5 % ofthe accepted value of the work as performance securfollowing forms:12.2.1. Bank Draft in favor of National High Spee

Limited payable at New Delhi/Project H

in any one of the

Rail Corporationbranch from a

Scheduled Commercial Bank based in India, Or12.2.2.:#::sD::s°es:t:e:ne:E:°dfuiyspi:::::eincf°aTo|e::'aN'a%nnka,/:%Si

Speed Rail Corporation Limited or12.2.3. Irrevocable Bank Guarantee in the prescribed format issued by

a Scheduled Commercial Bank based in India or from a branchin India of a scheduled foreign bank.

12.2.4. A Performance Security from Co-operative Tanks shall not beacceptable, in any manner or form.

12 2 5. In case of a Joint Venture(JV)/Consortium] the performancesecurity is to be submitted in the name of tne JV/Consortium.However, splitting of the performance securky (while ensuringthe security is in the name of JV/Consortium) Pnd its submission

•`" 1,,--, I, -:`:!:.::.:-T;i:rat.,on Ltd.

Natl0i#``±v:a\i:,`L;`;<,``Fipra\ ( ,,., „-,I..-ts

I

Page 13

Page 14: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-EEzilNHSRCL

tyzlii*zal I . im '``m.nd 11:=1 1``;<rv`rx:so Ln

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

by different members of the JV/Consortium for an amountproportionate to their scope of work or otherwise is alsoacceptable.

12.3. The performance Guaranteewould bevalid fora period of60 days beyondthe Maintenahce Period.

12.4. Refund of Performance Security: The Employer may 'retum thePerformance Security to the Contractor within 21 days after the issue ofthe Performance Certificate (issued on expiry of Maintenance Period) andafter adjusting any amounts due by the Contractor to the Employer.

13. Contract price and payment:13.1. The payment shall be made on the basis of actual no of trees planted and

survived.13.2. All the statutory, contractual and other deductions shall be made from the

interim payments.13.3. Interim Payment (On pockeU area basis)

13.3.1. On completion of plantation 20% of the accepted rate shall be

paid on the monthly basis.13.3.2. Balance 80% of the accepted rates will be released during the

maintenance period as defined hereunder(a) Interim payment during the Maintenance period will be on

half yearly basis.

(b) The payment will be at 20% of accepted rates of thesurvived trees.

13.4. Final payment:13.4.1. Final payment will be made on the completion of the

maintenance period of all the pockets of the tree plantation.13.4.2. Final paymentwill be made on the basis of total survival of the

trees out of total No. of trees planted.13.5. Contractor shall maintain the log book for the trees planted, survived, died/

non-survived/ no. of trees planted in lieu of the non-survived trees,

photographs of the trees etc. and shall submit the same to the NHSRCLalong with the payment application.

13.6. No price variation/ price adjustment is applicable under this work /Contract.

14. The Contractor shall, when he is not personally present on the site of the works

place, keep a responsible representative at the works during working hours whoshall on receiving reasonable notice, present himself to the NHSRCL and orders

given by the NHSRCL's representative to the agent shall be deemed to have thesame force as if they had been given to the Contractor.

SRCL. 4|gerLr !/,. u .,-,

-a,|' `i 11` + ,, -I, - y. i ,, qi

i .--- I u[hh s;T.[3f I ra 1 Corpora_ti9n ltd.Natio&%ig£T;;±:`:i.:tiferi<in/Variodara-,-.:`.

Page 14

Signature of the Bidder

Page 15: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-i-\NHSRCL

N`i`,* fytl I (r¥t *o€.ve* iihi\l `>ca pe`Wth{xp : ..CI

Tender No.: NHSRCL/BRC/2020/25 I

:°n:tp::;::°oryf#:emsbfaa|'inhLne::uba°dfih,:htr:;:et:£:„:uaty|lMKAh:§:)D:::r]'::tf::NHSRCL

15. The Contractor should leave the whole of the site and Worksworkman like condition to the satisfaction of the Employer (N

16. The contractor should make their own arrangements for alrequired for the successful completion of the work in time.

17. Suspension of Work: The NHSRCL may at any time instrucsuspend progress of part or all of the Works, which may be reqor statutory requirement or for any other purpose wheunavoidable. During such suspension, the Contractor shallsecure such part or the Works against any deterioration, loss oshall be paid extra of what so ever nature due to such suspen

18. Indemnify: The Contractor shall at all times indemnify theclaims which may be made in respect of the said work forright protected by any breach of law Of land or breach of an

a clean, tidy andRCL)

plants and tools

the Contractor toired for the safetye suspension isrotect, store anddamage. Nothingion of work.

;nH::ITfrsnRgceLm:::i:fsta:;

overnment acts/rules etc.; provided always that in the event of any claim in respect of an allegedbreach of law of land or breach of any Government acts/ ruagainst the NHSRCL he shall notify the Contractor OfContractor shall be at liberty, but at his own expense, to consettlement or any litigation that may arise there from.

19. Force Majeure: ln the event of any unforeseen event directlywork arising during the currency of the contract, such aimposed by the Govt. act of legislative or other authoricommotion, fires, floods, explosion epidemics, quarantineGod, the Contractor shall, within a week from the commenthe same in writing to the NHSRCL with reasonable evidenmajeure condition(s) mentioned above be in force for a peri

etc., being madesame and thenegotiations for

nterfering with theirrection , restraint

EREjii

hostilities, civil

tions, or acts ofit thereof, notifyeof. If the force

90 days or moreat any times, the NHSRCL shall have the option to terminate the contract on

iiDHini

giving 14 days'damages shall

those which hadrmination.

expiry of 90 days of commencement of such force majeunotice to the Contractor in writing. In case of such terminatibe claimed by either party against the other, save and exoccurred under any other clause of this contract prior to su

20. Termination: NHSRCL may terminate, by not less than 7 (seven) days' writtennotice of termination to the Contractor, to be given after the occurrence of any of

I

20.3. If the Contractor is unable to perform the denot less than seven (7) days, or

-6.,\ \1 ., -`-i,:,r€.,,, `,1'ation ltd.

Page 15

remedy/ rectify aContract.

sired serv es for a period ofII

Signatur of the Bidder

Page 16: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-E> Teiider No.: NHSRCL/BRC/2020/25- w#T5Fc-i Compensatory forestation in lieu of the trees to be cut in Kheda District for

fy,J¢2^ed'ctaytS"atJ{grt'``J'ysyorty'`'# construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

20.4. If the NHSRCL, in its sole discretion, decided to.terminate the Contract atany stage.

20.5. In the event of a report of unsatisfactory service from the concernedNHSRCL officials, after taking into consideration any other fact as may berelevant on a case to case basis.

20.6. In the event of violation of any of th6 terms & conditions of Contract by theContractor, the Performance Security amount/ Retention Money shallstand'forfeited in addition to debarring the Service Providing Agency for a

period Of 3 years.21. Arbitration: All disputes, if any, arising amongst the contracting parties shall be

resolved by arbitration. The arbitration shall be conducted in English languageand the venue of the arbitration shall be in Delhi. The sole arbitrator will beappointed by the Managing Director, NHSRCL, New Delhi, whose decision in thisregard will be final & binding.

22. Jurisdiction: The parties hereby irrevocably consent to the sole jurisdiction ofthe Courts in Gujarat only in connection with any actions or proceedings arisingout of or in relation to this bid.

Tentative list of tree species

S.No Scientific Name Common Name Gujrati Name1 Ficus Benghalensis Baraad Tree VAD2 Terminalia Ariuna Ariun Sadad3 Ponqamia Pinnata Karanj Karan'4 Casia Fistula Amaltas Garmado5 Azadirachta lndica Limado Neem Limado6 Mimusops Elenqi Borsalli Borsalli

7 Saraca Asoca Sita Ashoka Sita Ashoka8 Aeale Marmelos Bail, Billi Billi

9 Pterocarpus Santalinus Rakt Chandan Rakt Chandan10 Bahunia Purpurea Kachnar Kachnar11 Ficus Religiosa Pi ado Pipado12 Albizia Lebbeck Siris Siris13 Albizia Procera White Siris Safed Siris14 Santelum Album Chandan Chandan15 Ficus Racemosa Umaredo Umaredo16 Maduca Longifolia Mahudo Mahudo17 Madhuca Longifolia Var. Latifolia Mahudo Mahudo18 Melia Azedarach Bakam Neem Bakam Neem

--,11",1,,-a - ` ,.,, "r,i::--t`,gtd' "I-,`,ira

Page 16

Signature of the Bidder

Page 17: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-\NHSRCL

N 1:,I:'st (i,Si `4a<``S i`f ut /`*ase!isects im

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu .of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

S.No Scientific Name Common Name Gujrati Name19 Diospyros Melanoxylon Tendu I Tendd20 Cardia Myxa Gundo I Gundo21 Atrocarpus Heterophvllus Fanash I Fanash22 Phyllanthus Emblica Amala I Amala23 Syzgium Cumini Jambu Jambu24 Butea Monosperma Palas Gesudo, Khakhro25 Bombax Ceiba Semal I Simado26 Magnifera lndica Mango I Ambo27 Putraniiva Roxburahi Putraniiva I Putraniiva

28 MorusAlba ' Sahtut Setur29 Terminalia Chebula Harde Harde

'30Terminallia Belerica Baheda Baheda

31 Semecarpus Anacardjum Cashew Kaiu

32 Boswellia Serrata Salai Salai33 Sapindus Mukorossi Aritha Aritha34 Alstonia Scholaris Saptparni Saptparni35 Gmelina Arborea Gamhar Sevan36 Tamarindus indica lmley KHATr AMLi

37 Acacia catechu Khair Khair

38 Delonix regia Gulmohar Gulmohar39 Dalbergia sissoo Sisam Sissoo40 Dalberaia latifolia Sisam Sisam (Mota)41 Casuarina equisetifolia Saru Saru42 Alanqium salviifolium Ankol Ankol43 Ficus elastica Roxb Rubber Plant Rubber Plant44 Manilkara hexandra (Roxb.) Rayan Rayan45 Tectona qrandis Sagwan Saag46 Annogeissus sericea Adrakh Adarakh47 Acacia leucoDhloea (Ftoxb) Pilo baval Samdi48 Acacia nilotica Bava I ) Bavar49 Holoptelea intearfolia (Roxb.) Kanii Kanio

50 Polyanthia Longifolia Ashoka Asopalav51 Ailanthus excelsa Arduso I Ardushi

52 Diospyros Montana Roxb. •Dheki Dheki

53 Leucaena leucocephala Subabul I Surbavar54 Cascabela thevetia Kaner I Karan55 Anthocephalus kadamba (Roxb.) Kadamb , Kadam

A

TI-,-i5.+-c`}

\ ,`,( ,ioration Ltd.Nat,odi||gq;":(`+,,Tr:``"g

Page 17

Page 18: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-LEL\>£::nmdpeern¥:t.;#osr::t:,::fn/i:e2u°/o2f5thetreestobecutinKhedaDlstnctfor

uJ<iJ"Jiii*i s©h`~''`J7erJr`7"i" construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

S.No Scientific Name Common Name Gujrati Name56 Ficus hispida L Dhedhumaro Dedhumdi57 Moringa concanesis nimmo Kadvo Saragavo Kaliyo sarag58 Zizyphus qlabrata heyne Bordi Bordi

59 Ricinus communis L. Aerandivo,Diveliyo Divelo

60 Salvadora persica L Piludo Piludo

61 Couroupita guianensis Cannon-ball Tree Kailashpati61 Terminalia catappa Badam Badam63 Vitex negundo L. Nagod, Narqund Naqod

END OF TECHNICAL BID DOCUMENT

` '1, ( ,, ,I: ,` 4i`1rin-

i\l`ilLrjnal 11 : , :-!>pt,,i R?Ii eoiporation Ltd.

`,(`.`:Fi`-{"ftrfe" .(I-clara

Page 18

Signature of the Bidder

Page 19: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-EEZ=HMHSRC:L

N 3tii».`* ti \ffi ``< (i-wx, ica`{ `XapF€`y\c~`ts I i(a

Tender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in Anand District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

National High Speed RailCorporation Limited

(NHSRCL)

(A Joint Sector Company of Govt. of Indiaand Participating State Government)

Compensatory forestation in lieu of the trees to be cut inKl-eda District for construction Of Mumbai Ahmedabad

High Speed Railway (MAHSF?) Project of NHSRCL.

May-2020

National High Speed Rail Corporation Limited3rd Floor, Productivity House, Productivity Road,

Signature of the Bidder

Page 19

Page 20: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-i-iNHSRCL

r{,^J)N)iI(TBt'`r*.M,`I1%}>:Orers::ox`ci}€

Tendei. No.: NHSRCL/BRC/2020/25Compensatory forestation ih lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR) Project ofNHSRCL.

PART-2PRICE BID DOCUMENTS

.€,' `(,I \

r..itlonc3l :i;gl`, :;.j\Lir`, ,\\, „ eoi r,t.ration Ltd.

I, L~*R,q -6-.{ `\[fu``, T '`` `ir {tTrFtt€

q5tan/Va€!r:f!arci

Page 20

Signature of the Bidder

Page 21: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

_i-E>MHSRCL

Pvi`~ ii`rdl i{ Slt `` {x\tfo lsA4 CidoiiLr*``It I .all

ITender No.: NHSRCL/BRC/2020/25Compensatory forestation in lieu of the trees to be cut in. Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway I(MAHSR) Project ofNHSRCL. I

General instructions to the Bidders for Filling Up and Submiss on of Price Bid:

::diesrsa::°::dn:I,`{,ounps:|adu::sbT,'t6tho:Tper:esb::dd::::t:::Ss'ann:C,Pt°hr:ra:rcoev.:.I::sthoefthe Tender Documents.

Page 21

SjgB?!V`r?:PfNFۤaehaanager

tat,t.na"`.;\;, FL . i TT.`:¥"t,o+n.Ltd.

Signature of the Bidder

Page 22: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-LELiL::nmdpeern¥:t.;#osr:Sfa|,¥fn'i:e2u°/o2f5thetreestobecutinKhedaDistnctfor

fa`argr>~~i'Ji¢b`givJi`a+`{Xmactwt71' construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

Letter of Price Bid

Date:To,The Chief Project Manager/ Vadodai.a,National High-Speed Rail Corporation Ltd,3rd floor, Productivity House,Productivity Road, Alkapuri,Vadodara-390007

Subject: Compensatoryfore§tation in lieu of the trees to be cut in Kheda District forconstruction of Mumbai Ahmedabad High Speed Railway (MAHSR)Project of NHSRCL

1. IAve (Name of the Bidden have exam.ined and haveno reservations to the Bidding Documents, including addenda issued inaccordance with Instructions to Bidders.

2. 'Ave (Name of the Bidden offer to exeoute .ir\conformity with the Bidding Documents and Technical Bid the following Works:-

``Compensatory forestation in lieu Of the trees to be cut in Kheda District

for construction Of Mumbai Ahmedabad High Speed Railway (MAHSR)Project Of NHSRCL"

3. The total price of our Bid is4. IAve

(in Figures & Words),(Name of the Bidden. have

read the various conditions to the Tender attached hereto and hereby agree toabide by the said conditions. I/V\le also to keep this tender open for acceptance fora period of 90 days from the date fixed for opening the same and in default thereof I/\/\/e will be liable for forfeiture of my/our earnest money deposit. I/\/\le offer todo the work for National High Speed Rail Corporation Limited (hereinafter re'ferredas "NHSRCL"), 3rd floor, Productivity House, Productivity Road, Alkapuri,Vadodara-390007, at the rates quoted in the attached Schedule and hereby bindmyself/ourselves to complete the work in all respect as per the time lines fixed inthe Tender conditions.

5. I/\/Ve also hereby agree to abide by the General Conditions of Contract and Tenderconditions.

6. If our Bid is accepted, we commit to obtain a Performance Security in accordancewith the Bidding Documents.

7. We understand that you are not bound to accept the lowest evaluated Bid or anyother Bid that you may receive.

€-i ``, i, -``,

`'.+`°di`;'Lfiu;:j`a`;I;a;r{rp:C±r{a:'\_%:"a

Page 22

Signature of the Bidder

Page 23: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

-LFfaL::nmdpeern¥:t.:#Hfosr::tat,:::n/::e2u°/o2f5thetrees{obecut!nKhedaDlstrlctfor

ey~<y'"'x „t`¢ ''\a`L`@'H¥of`m"' construction of Mumbai Ahmedabad High speed Railway| (MAHSR) Project of

NHSRCL.

8Thevalueoftheearnestmoneyshallstandforfeitedwithoutprej|rights or remedies if:

8.1. I/We do not execute the contract documents within seven dnotice issued by the NHSRCL that such documents are rea

OR

dice to any other

ys after receipt of

8.2. I/\^le do not commence the work within Ten days after receipt of orders tothat effect.

9. Until a formal agreement is prepared and executed, acceptance Of this Tender shallconstitute a binding Contract between us subject to modifications as may bemutually agreed to between us and indicated in the letter of acceptance of my/ouroffer for this work.

10. If, I/V\le do not execute the contract agreement, the NHSRCL may determine suchTenders has abandoned the contract, and there upon mwour Tender andacceptance thereof shall be treated as cancelled and the NHSRCL be entitled toforfeitfuMamountofEarnestMoneyDepositandtorecovertheliiuidateddamagesfor such default.

Signature of Vvjtness: -

sig_na.turefofapgucQ#|:;"acJer-' ,1_ \.\

Natlo#.`:i€t`.£,`„¢t\a`it:,:I;._:`:\::!O£Ltd.

o d ,. ,' aa`:to? ' VPage 23

Page 24: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

iE-a Tender No.: NHSRCL/BRC/2020/25- NFij=c-i Compensatory forestation in lieu of the trees to be cut in Kheda District for

win ~ul7rfd7i6exJueREtLtojp¥d:i"* construction of Mumbai Ahmedabad High speed Railway (MAHSR) Project of

NHSRCL.

1. Preamble:

a) The price schedules shall be read in conjunction with the NoticeInviting Tender, Terms and conditions, and the Addenda (if any).

b) The quantities given in the Bills of Quantities are estimated and

provisional, and are given to provide a common basis for bidding. Thebasis of payment will be the actual quantities Of work ordered andcarried out, as measured by the Engineer, (accepted by theContractor) and valued at the rates and prices bid in the priced Billsof Quantities, where applicable, and otherwise at such rates and

prices as the Engineer may fix within the terms of the Contract.c) The rates and prices in the priced Bill of Quantities are for complete

and finished items of the work in all respects. The rates and pricesshall, except insofar as it, is otherwise provided under the Contract,shall include all necessary survey work, plants, tools, labour,compliance of labour laws, supervision, materials, transportation,handling, loading & unloading, storage, fuel, oil, consumables,electric power, water, all leads and lifts, all temporary works, slacking,

provision & maintenance of all temporary works area, construction oftemporary stores, inspection facilities, safety measures for workmenand road users, mobilisation and demobilisation, establishment andoverhead charges, labour camps, contractor's profit, all taxes (exceptGST), insurance, royalties, duties, cess, Octroi and other levies andother charges together with all general risks, liabilities and obligationsset out or implied in the Contract.

d) The cost of all the items as detailed in the Tender conditions shall bedeemed to have been included in the rates and prices in the pricedBill of Quantities unless otherwise specified in the Contract.

e) A rate or price shall be quoted against each item in the PriceSchedules, whether quantities are stated or not. The cost of itemsagainst which the Bidder has failed to enter a rate or price shall bedeemed to be covered by other rates and prices entered in the Bill ofQuantities.

f) The whole cost of complying with the provisions of the contract shallbe included in the items provided in the priced Bill of Quantities, andwhere no specific items are provided, the cost shall be deemed to bedistributed among the rates and prices entered for the related itemsof the Work.

g) The description of items in the B0Q are not exhaustive, and hencethe Contractor shall be required to execute all necessary works

-a ,( `.,i J,, ,i `1 rl, ., cB r-\``b-

: ,'. t{ o il 'i 1 11 i rt ) , {`, f '., I, `J r` r\ i ` 1` r} r 13 0 ration Ltd.`\ i\ ;\ i ,`a` i-.`7m tclftl-ds

-,`r'7ra

Page 24

Signature of the Bidder

Page 25: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

Ezfda Tender No.: NHSRCL/BRC/2020/25- giv*T5ffc-i Compensatory forestation in lieu of the trees to be cut

^~T\^S`'`'l*t``Jae `'r';ry t'''""#``¢ construction of Mumbai Ahmedabad High speed Railway

NHSRCL.

required for completion of the concerned itemaccordance with the Contract.

h) The responsibility of removal of all the hurdles androads etc. for the tree cutting work would be with

of

District for

HSR) Project of

the B0Q in

tT!k:::tt.eaTpo:,r%

#:'Cchonat:ad:tt':r|aLOTh:::i:e:'r:Ss::,|'bdebpea,rde:ou;r:rdd:°thbeesdaemp::yedby

2. Measurement and payment

As already stated under Clause 1, Preamble, the Firices and rates

quoted shall be comprehensive and must include for complying in allrespects with the Bill of Quantities, Notice Inviting Tender, Terms andConditions and other relevant provisions of the Contfact.

::tea:lan:g::ruf:e::::n:::r::a;i:P::#a#:Wsg;:tr::h:::°r::i::ti°Q;u:am:ytl,:::r:?V:en::

;tahye::e[:::::,Pbre°V+S:::Sa:f:::Tce°:trsa:ndcondit|oni

3. Procedures for payment

a) The Employer shaH make interim payments to thtF Contractor inaccordance with the provisions of Clause 13 of Terms and Conditionsand other relevant provisions, as certified by the Engineer or such

person (NHSRCL's representative) on the basis Pf the progressachieved for the items of works/stages of the works. I

Page 25

Page 26: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

Idppre_ Tender No.: NHSRCL/BRC/2020/25---;ji+BE:cJi Compensatory forestation in lieu of the trees to be cut in Kheda District for

#~'x^^ca2ico`=pe.\`i`ife`*prd`'>" construction of Mumbai Ahmeclabad High speed Railway (MAHSR) Project of

NHSRCL.

Bill of Quantities

S.No Description of Item Unit QuantityOfferedRate(inRs.)

Offered Amount(inRs.)

NS-

Supplying of the suitable

each 28000

species of well developed,fresh & healthy plant/ treesapling having an approximateheight of 3 Feet (settled in 5 x7 Inch), Plantation of the sameat site/ location as directed bythe NHSRCL representative,maintenance of the plants/trees for 24 months includingwatering and supply &application of manure/fe rti I izer/ pestici de/

1 i nsecticides , su pply &application of anti-termitetreatment etc. all complete as

per the directions of NHSRCLrepresentative's. The scopealso includes the preparationof the site, removal & disposalof unserviceable material'sand protection of the trees asper direction of officer incharge(the Rates are excludingGST)

Total Amount (in figures) =Total Amount in Words:

Note:ST shall be paid extra at actuals on submission of documentary proof (such as1.G

G STR1, GSTR3, GST 828 invoice).

NjHuS`,PG8+wanageriIF|?p\zr``rui-i pijf.rq; --Na'I#'g#P:rfuRera';:*PifeLtd.

qS-ap/Var!oclara Page 26

Signature of the Bidder

Page 27: Compensatory forestation in lieu Of the trees to be cut innhsrcl.in/sites/default/files/tender/2020-05/202025 Tedner Doc... · forestation-in lieu of the trees to be cut in Kheda

Tender No.: NHSRCL/BRC/2020/25 i-iEFrdAoTas?+ ;:°i:-tp;i:.:i:i;o;;.j°-:.isi:i'iLh-lie-:I:-ub-:°:f-ih,:htr:::et: £:„:uatyi:MKAh:8:)D:::r,I::tf::

NHSRCL