COMPARATIVE STATEMENT OF TECHNICAL BIDS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017. S. No. Name of Bidder Company incorporati on letter Category Make of LEDs used and document for confirming Make of LED. SMT Setup ( in-house/ tie up) Equipments Annual Turnover ( In Lakhs) in last three years ending on 31.03.17 Net worth Experience ( in Lakhs) in last three years Certificate of not debarred Sr. number of item(s) quoted Sample submitted with HAREDA for item(s) 1 2 3 4 5 6 7 8 9 10 11 Requirement of the NIT To be submitted General/ Haryana SME ( for MSMEs, Haryana also required annexure in affidavit) LM-80 Report Supporting document To be Submitted Supporting document To be attached 900.00 Lakhs for General category & for Haryana MSMEs as per policy 2016 i.e. Micro Concession of 80% on Turnover Condition imposed as Qualifying Criteria Small Concession of 70% on Turnover Condition imposed as Qualifying Criteria Should be positive ( Yes/No) For General Rs. 1200.00 Lakhs with purchase order & satisfactory completion report from purchasers. For Haryana MSMEs Exempted in respect of past performance & experience as part of qualifying requirements of the tender subject to fulfillment of conditions as per eligibility. To be submitted To be submitted Required to submit by due date & time of bid, otherwise bid out rightly rejected. 1. M/s Alien Energy Pvt. Limited, Delhi Submitted General Osram, LM-80 submitted Not Submitted Submitted 747.00 lakhs Submitted Rs. 532.00 Lakhs Purchase Submitted 1to6 Submitted for 1 to 6

COMPARATIVE STATEMENT OF TECHNICAL BIDS …hareda.gov.in/writereaddata/news/hareda168859908.pdf · sales) Completion ... M/s Jaquor & Company Pvt. Ltd, Gurugram. ... 130 W LED Street

Embed Size (px)

Citation preview

COMPARATIVE STATEMENT OF TECHNICAL BIDS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

S. No.

Name of Bidder Company incorporation letter

Category

Make of LEDs used and

document for confirming Make of LED.

SMT Setup ( in-house/ tie up)

Equipments Annual Turnover ( In Lakhs) in last three years ending on 31.03.17

Net worth Experience ( in Lakhs) in last three years

Certificate of not debarred

Sr. number of item(s) quoted

Sample submitted with HAREDA for item(s)

1 2 3 4 5 6 7 8 9 10 11

Requirement of the NIT To be

submitted

General/

Haryana SME ( for MSMEs, Haryana also required annexure in affidavit)

LM-80 Report Supporting

document To be Submitted

Supporting

document To be attached

900.00

Lakhs for General category & for Haryana MSMEs as per policy 2016 i.e. Micro Concession of 80% on Turnover Condition imposed as Qualifying Criteria Small Concession of 70% on Turnover

Condition imposed as Qualifying Criteria

Should be

positive ( Yes/No)

For General

Rs. 1200.00 Lakhs with purchase order & satisfactory completion report from purchasers. For Haryana MSMEs Exempted in respect of past performance & experience as part of qualifying

requirements of the tender subject to fulfillment of

conditions as per eligibility.

To be

submitted

To be

submitted

Required

to submit by due date & time of bid, otherwise bid out rightly rejected.

1. M/s Alien Energy Pvt. Limited, Delhi Submitted General Osram, LM-80 submitted

Not Submitted

Submitted 747.00 lakhs

Submitted Rs. 532.00 Lakhs Purchase

Submitted 1to6 Submitted for 1 to 6

S. No.

Name of Bidder Company incorporation letter

Category

Make of LEDs

used and document for confirming Make of LED.

SMT Setup ( in-house/ tie up)

Equipments Annual Turnover ( In Lakhs)

in last three years ending on 31.03.17

Net worth Experience ( in Lakhs) in last three

years

Certificate of not debarred

Sr. number of

item(s) quoted

Sample submitted with

HAREDA for item(s)

1 2 3 4 5 6 7 8 9 10 11

2. M/s Atlas Industries, Sonepat Not submitted

Haryana SME (micro)

Unfilled annexure of affidavit Submitted

Seoul LM-80 not submitted

Tie up with Powerlite Submitted

Submitted 133.10 Lakhs

Not submitted

- Not submitted

1 to 3 Submitted 1 to 3

3. M/s Crompton Greaves Consumer

Electricals Limited, New Delhi.

Submitted General Osram

LM-80 submitted

Submitted Attached 3598.00

crores

submitted 3013.90

Lakhs Submitted 1825 lakhs EESL

Submitted 1to6 Submitted

for 1 to 6

4. M/s FIEM Industries Limited, Sonepat

Debarred / blacklisted by M/s Energy Efficiency Services Limited (a joint venture company of PSUs of Ministry of Power, Govt. of India vide no. EESL/03/2016-17/ NOTICE/0512020 dated 20th March, 2017 due to non-responsible practices / non-performance during execution of Delhi SDMC Street Light project.

5. M/s Glow Green Energy Limited, Shahibabad

Submitted General Osram and Seoul LM-80 submitted

Submitted Attached 806.18

submitted 1296.00 Lakhs ( purchase order & work completion document not submitted}

Submitted. 1to6 Submitted for 1 to 6

6. M/s Greenstar Research & Development Pvt. Ltd., Gurugram ISO certificate issued by Intertek for LED lighting valid up to 14.09.2018

Submitted Haryana SME (small), Annexture of affidavit

submitted

Osram LM-80 submitted

Submitted Attached 1226.00 Lakhs

Not submitted

707.05 Lakhs. Work completion report not

submitted

Submitted 1to6 Submitted for 1 to 6

7. M/s Halonix Technologies Pvt Limited, Noida

Submitted General Nichia LM-80 Submitted

submitted tie up of Kamal lamps Limited, Haridwar

Attached 31184.00 Lakhs

submitted 5300.00 Lakhs ( LED product sales) Completion report not submitted

Submitted 1to6 Submitted for 1 to 6

S. No.

Name of Bidder Company incorporation letter

Category

Make of LEDs

used and document for confirming Make of LED.

SMT Setup ( in-house/ tie up)

Equipments Annual Turnover ( In Lakhs)

in last three years ending on 31.03.17

Net worth Experience ( in Lakhs) in last three

years

Certificate of not debarred

Sr. number of

item(s) quoted

Sample submitted with

HAREDA for item(s)

1 2 3 4 5 6 7 8 9 10 11

8. M/s Hitech Lights Limited, Solan ( HP)

Submitted General Philips Lumileds LM80

submitted

submitted submitted 7156.92 Lakhs

submitted Not submitted

Submitted 1 to 3 Submitted 1 to 3

9. M/s HPL Electric & Power Pvt Limited, Sonepat

Submitted General Seoul LM 80 submitted

Attached Attached 11574.00 Lakhs

submitted 2458.00 EESL. Submitted 1to6 Submitted for 1 to 6

10. M/s INOT Power Technologies Pvt Limited, Vishakhapatnm ( AP)

Sample not submitted and as per DNIT, bid without sample liable to be out rightly rejected.

11. M/s Jaquor & Company Pvt. Ltd, Gurugram.

Submitted General Osram LM80 not submitted IEC attached

Submitted Submitted 128738.6 Lakhs

submitted 1569 Lakhs

Submitted 1to6 Submitted for 1 to 6

12. M/s Joonix Energy Pvt. Ltd. , Faridabad ISO issued by BSCIL valid up to 4.10.2020 BSCIL

Submitted Haryana SME ( micro) Annexure attached.

Osram LM80 submitted

Submitted tie up with M/s Plasma Impex , Noida

Submitted 200.78 Lakha

submitted 90.00 Lakhs Submitted 1to6 Submitted for 1 to 6

13. M/s Mansa Solar Energy, Karnal ISO issued by BIC Limited valid up to 3.07.2020

Submitted Haryana SME (small) Annexure attached.

Osram LM80 submitted

Submitted Submitted 9196.00 Lakhs

submitted 759.00 Lakhs Submitted 1to6 Submitted for 1 to 6

14. M/s Ojskar Vidyut I.I.P., Rewari Submitted Haryana SME ( micro)

Annexure attached.

Osram and Seoul LM80

submitted

Submitted tie up with M/s Glow

green

Attached 184.19 Lakhs

submitted - Submitted 1to6 Submitted for 1 to 6

15. M/s Opulus Electricals India Pvt. Ltd, New Delhi

Submitted General Osram LM80 submitted

Submitted Submitted 933.51 Lakhs

submitted 1254.00 Lakhs Submitted 1to6 Submitted for 1 to 6

S. No.

Name of Bidder Company incorporation letter

Category

Make of LEDs

used and document for confirming Make of LED.

SMT Setup ( in-house/ tie up)

Equipments Annual Turnover ( In Lakhs)

in last three years ending on 31.03.17

Net worth Experience ( in Lakhs) in last three

years

Certificate of not debarred

Sr. number of item(s)

quoted

Sample submitted with

HAREDA for item(s)

1 2 3 4 5 6 7 8 9 10 11

16. M/s Polycab Wires Pvt. Ltd., Noida Submitted General Cree and Osram LM80 submitted

Submitted tie up declaration

letter dated 13.02.2018 with M/s Techno Electromech Pvt. Ltd., Vadodra

Attached 5091.00 Lakhs

submitted 1600.00 Lakhs Work completion

certificate not attached

Submitted 1to6 Submitted for 1 to 6

17. M/s RG Buildimplex Pvt. Limited, Sonepat

Sample not submitted and as per DNIT, bid without sample liable to be out rightly rejected.

18. M/s R.K. Agencies, Billaspur (Chhatisgarh)

Submitted General Osram LM80 submitted

MOU of M/s Multiland Electronics Pvt. Ltd., Banglore attached but SMT not mentioned in MOU.

Attached 426.15 Lakhs

submitted No related experience. Bidder has submitted completion certificate of CREDA for project year 2016-17 of Rs. 743.25 lakhs of mix outdoor & indoor lighting.

Submitted 1to6 Submitted for 1 to 6

19. M/s Rudai Lighting Pvt. Ltd. , Jaipur Submitted General Cree/ Samsung Seoul,

LM80 submitted of CREE

Not attached

Submitted Not submitted

( bidder

has submitted ATO of a Korean firm)

submitted 1900.00 Lakhs Letter of Award

dated 15.02.17

of EESL Work completion & satisfactory report not attached.

Submitted 1 to 4 Submitted 1 to 4

20. M/s Sangwan Energy Systems Pvt. Limited, Sonepat

Submitted Haryana SME ( SMALL) Annexure attached.

Osram LM80 submitted

Submitted Tie Up with Tech On Electronics, Noida

Submitted 1169.00 Lakhs

submitted 1200.00 Lakhs Completion report not submitted

Submitted 1to6 Submitted 1 to 6

S. No.

Name of Bidder Company incorporation letter

Category

Make of LEDs

used and document for confirming Make of LED.

SMT Setup ( in-house/ tie up)

Equipments Annual Turnover ( In Lakhs)

in last three years ending on 31.03.17

Net worth Experience ( in Lakhs) in last three

years

Certificate of not debarred

Sr. number of item(s)

quoted

Sample submitted with

HAREDA for item(s)

1 2 3 4 5 6 7 8 9 10 11

21. M/s Servotech Power Systems Pvt Limited, Sonepat

Firm is debarred by HAREDA

22. M/s Surya Roshni Limited, New Delhi

Submitted General Osram and Everlite LM80 submitted

Having In House SMT certificate submitted

Submitted, also has In House testing facility approved by

NABL

212400.00 Lakhs

submitted 1510.00 Lakhs EESL

Submitted 1to6 Submitted 1 to 6

23. M/s SYSKA LED Lights Pvt Limited, New Delhi

Submitted General Nichia Samsung LM80 submitted

Not attached

Not attached Not attached

Not attached

Not attached Not Submitted

1to6 Submitted 1 to 6

24. M/s Energy Efficient Lights , Banglore

Sample not submitted and as per DNIT, bid without sample liable to be out rightly rejected.

25. M/s Autopal Industries Limited, Jaipur.

Bid not submitted. Yes submitted

26. M/s Amit India Name Plates Pvt. Ltd. EMD, sample and bid not submitted

27. M/s K.R.D. Energy Solutions Pvt Limited

Tender fee, EMD, sample and bid not submitted.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 1- M/s Alien Energy Private Limited, Delhi.

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Bharat test House Pvt. Limited, Sonepat issued on 06.06.2016

> 0.95 - Not submitted > 0.95 0.98 Bharat test House Pvt. Limited, Sonepat issued on 10.06.2016

2 System efficacy ( lumen/watt)

>100 lumens/ watt

104.71 >100 lumens/ watt

- >100 lumens/ watt

105.84

3 Color rendering Index (CRI)

>70 75.1 >70 - >70 75.2

4 Total Harmonic Distortion ( THD)

<10% Not submitted

<10% - <10% Not submitted

5 Color Temperature of Lamp

5000 or 5700 K

5464 5000 or 5700 K - 5000 or 5700 K 6428

6 Ingress Protection Level (IP Level)

IP65 Not submitted

IP65 - IP66 Not submitted

7 LED Driver Efficiency (in %)

>85% Not submitted

>85% - >85% Not submitted

8 Power Consumption of complete system

18+_5% 18.6 35+_5% - 70+_5% 70.16

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not submitted

>135 lumens/watt

- >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W - 1 to 3 W Not submitted

Name of the bidder:- 1- M/s Alien Energy Private Limited, Delhi.

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 - Not submitted

> 0.95 0.96 Bharat test House Pvt. Limited, Sonepat issued on 27.07..2016

> 0.95 0.96 Bharat test House Pvt. Limited, Sonepat issued on 27.07..2016

2 System efficacy ( lumen/watt)

>100 lumens/ watt

- >100 lumens/ watt

100.16 >100 lumens/ watt

107.96

3 Color rendering Index (CRI)

>70 - >70 80.8 >70 69.8

4 Total Harmonic Distortion ( THD)

<10% - <10% Not submitted <10% Not submitted

5 Color Temperature of Lamp

5000 or 5700 K

- 5000 or 5700 K 6026 5000 or 5700 K 5276

6 Ingress Protection Level (IP Level)

IP66 - IP66 Not submitted IP66 Not submitted

7 LED Driver Efficiency (in %)

>85% - >85% Not submitted >85% Not submitted

8 Power Consumption of complete system

130+_5% - 100+_5% 97.9 200+_5% 196.7

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

- >135 lumens/watt

Not submitted >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W - 1 to 3 W Not submitted 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 2- M/s Atlas Industries, Sonepat.

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.99 KC India Test Lab. , LLP, Gaziabad issued on 09.10.2017

> 0.95 0.97 KC India Test Lab. , LLP, Gaziabad issued on 09.10.2017

> 0.95 - Not submitted

2 System efficacy ( lumen/watt)

>100 lumens/ watt

97 >100 lumens/ watt

137 >100 lumens/ watt

-

3 Color rendering Index (CRI)

>70 72.4 >70 81.3 >70 -

4 Total Harmonic Distortion ( THD)

<10% 5.8 <10% 6.24 <10% -

5 Color Temperature of Lamp

5000 or 5700 K

5399 5000 or 5700 K 5422 5000 or 5700 K -

6 Ingress Protection Level (IP Level)

IP65 Not covered IP65 Not covered IP66 -

7 LED Driver Efficiency (in %)

>85% 84.5 >85% 87.2 >85% -

8 Power Consumption of complete system

18+_5% 17.67 35+_5% 34.49 70+_5% -

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not submitted

>135 lumens/watt

Not submitted >135 lumens/watt

-

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W -

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 3. M/s Crompton Greaves Consumer Electrical Limited, New Delhi

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Hi Physix Lab India Pvt. Limited, Pune issued on 10.2.2017

> 0.95 0.96 Hi Physix Lab India Pvt. Limited, Pune issued on 10.2.2017

> 0.95 0.97 Hi Physix Lab India Pvt. Limited, Pune issued on 10.2.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

114.33 >100 lumens/ watt

119.4 >100 lumens/ watt

120.58

3 Color rendering Index (CRI)

>70 71.2 >70 70.8 >70 71.3

4 Total Harmonic Distortion ( THD)

<10% 6.9 <10% 8.5 <10% 8.5

5 Color Temperature of Lamp

5000 or 5700 K

5572 5000 or 5700 K 5525 5000 or 5700 K 5552

6 Ingress Protection Level (IP Level)

IP65 Not covered IP65 Not covered IP66 Not covered

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

18+_5% 17.65 35+_5% 34.10 70+_5% 68.25

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not submitted

>135 lumens/watt

Not submitted >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W Not submitted

Test Report of item no. 4,5 & 6 not submitted.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 5. M/s Glow green Energy Limited, Shahibabad.

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.96 Alpha Test House , New Delhi Issued on 18.10.2017 Alpha Test House , New Delhi Issued on 13.02.2018

> 0.95 0.96 Alpha Test House , New Delhi Issued on 18.10.2017 Alpha Test House , New Delhi Issued on 13.02.2018

> 0.95 0.96 Alpha Test House , New Delhi Issued on 18.10.2017 Alpha Test House , New Delhi Issued on 13.02.2018

2 System efficacy ( lumen/watt)

>100 lumens/ watt

105.9 >100 lumens/ watt

117.5 >100 lumens/ watt

107.4

3 Color rendering Index (CRI)

>70 84.1 >70 84.5 >70 84.4

4 Total Harmonic Distortion ( THD)

<10% 8.5 <10% 8.8 <10% 7.8

5 Color Temperature of Lamp

5000 or 5700 K

5778 5000 or 5700 K 5704 5000 or 5700 K 5754

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 IP65 IP66 IP66

7 LED Driver Efficiency (in %)

>85% >85% >85% >85% >85% >85%

8 Power Consumption of complete system

18+_5% 19.7 35+_5% 34.6 70+_5% 69.6

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

139.1 >135 lumens/watt

139.1 >135 lumens/watt

139.1

10 Wattage of LED used in the system

1 to 3 W 1 watt* 1 to 3 W 1 watt* 1 to 3 W 1 watt*

* According to furnish in Annexure-I.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 5. M/s Glow green Energy Limited, Shahibabad.

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Alpha Test House , New Delhi Issued on 18.10.2017 Alpha Test House , New Delhi Issued on 13.02.2018

> 0.95 0.97 Alpha Test House , New Delhi Issued on 18.10.2017 Alpha Test House , New Delhi Issued on 13.02.2018

> 0.95 0.95 Alpha Test House , New Delhi Issued on 18.10.2017 Alpha Test House , New Delhi Issued on 13.02.2018

2 System efficacy ( lumen/watt)

>100 lumens/ watt

112.6 >100 lumens/ watt

106.9 >100 lumens/ watt

116.8

3 Color rendering Index (CRI)

>70 84.6 >70 72.9 >70 73.5

4 Total Harmonic Distortion ( THD)

<10% 8.3 <10% 8.3 <10% 8.6

5 Color Temperature of Lamp

5000 or 5700 K

5784 5000 or 5700 K 5838 5000 or 5700 K 5850

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% >85% >85% >85% >85% >85%

8 Power Consumption of complete system

130+_5% 125.7 100+_5% 98.25 200+_5% 197.2

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

139.1 >135 lumens/watt

139.1 >135 lumens/watt

139.1

10 Wattage of LED used in the system

1 to 3 W 1 watt 1 to 3 W 2 watt 1 to 3 W 2 watt

* According to furnish in Annexure-I.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 6. M/s Green star Research & Development Private Limited, Gurugram

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.95 Intertek India Private Limited, New Delhi issued on 13.10.2017

> 0.95 - Not submitted > 0.95 - Not submitted

2 System efficacy ( lumen/watt)

>100 lumens/ watt

114.5 >100 lumens/ watt

- >100 lumens/ watt

-

3 Color rendering Index (CRI)

>70 71.5 >70 - >70 -

4 Total Harmonic Distortion ( THD)

<10% Not covered <10% - <10% -

5 Color Temperature of Lamp

5000 or 5700 K

5669 5000 or 5700 K - 5000 or 5700 K -

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 - IP66 -

7 LED Driver Efficiency (in %)

>85% Not covered >85% - >85% -

8 Power Consumption of complete system

18+_5% 18.6 35+_5% - 70+_5% -

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not submitted

>135 lumens/watt

- >135 lumens/watt

-

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W - 1 to 3 W -

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 6. M/s Green star Research & Development Private Limited, Gurugram

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 - Not submitted

> 0.95 0.93 UL India Lab. Banglore

> 0.95 - Not submitted

2 System efficacy ( lumen/watt)

>100 lumens/ watt

- >100 lumens/ watt

90.8 >100 lumens/ watt

-

3 Color rendering Index (CRI)

>70 - >70 68.8 >70 -

4 Total Harmonic Distortion ( THD)

<10% - <10% Not covered <10% -

5 Color Temperature of Lamp

5000 or 5700 K

- 5000 or 5700 K 6060 5000 or 5700 K -

6 Ingress Protection Level (IP Level)

IP66 - IP66 Not covered IP66 -

7 LED Driver Efficiency (in %)

>85% - >85% Not covered >85% -

8 Power Consumption of complete system

130+_5% - 100+_5% 100.4 200+_5% -

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

- >135 lumens/watt

Not submitted >135 lumens/watt

-

10 Wattage of LED used in the system

1 to 3 W - 1 to 3 W Not submitted 1 to 3 W -

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 7. M/s Halonix Technologies Private Limited, Noida

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 03.03.17 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 10.10.2017

> 0.95 0.978 HTPL Laboratory, Haridwar Issued on 31.01.17 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 11.10.2017

> 0.95 0.98 HTPL Laboratory, Haridwar Issued on 10.04.17 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 13.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

112.2 >100 lumens/ watt

116.9 >100 lumens/ watt

108.9

3 Color rendering Index (CRI)

>70 72.2 >70 73.2 >70 74.5

4 Total Harmonic Distortion ( THD)

<10% 6.7 <10% 6.5 <10% 7.8

5 Color Temperature of Lamp

5000 or 5700 K

5798 5000 or 5700 K 5717 5000 or 5700 K 5868

6 Ingress Protection Level (IP Level)

IP65 IP66 IP65 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 88.7 >85% 88.9 >85% 88.7

8 Power Consumption of complete system

18+_5% 17. 91 35+_5% 34.9 70+_5% 69.7

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

>135* >135 lumens/watt

>135* >135 lumens/watt

>135*

10 Wattage of LED used in the system

1 to 3 W 1-3 watt* 1 to 3 W 1-3 watt* 1 to 3 W 1-3 watt*

*Vide confirmation letter dated 18.03.2018.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 7. M/s Halonix Technologies Private Limited, Noida

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 HTPL Laboratory, Haridwar Issued on 20.02.17 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 17.10.2017

> 0.95 0.97 HTPL Laboratory, Haridwar Issued on 31.10.2016 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 16.10.2017

> 0.95 0.97 HTPL Laboratory, Haridwar Issued on 14.04.2017 HTPL Laboratory, Haridwar ( In-house NABL approved) Issued on 19.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

108.2 >100 lumens/ watt

106.8 >100 lumens/ watt

115.9

3 Color rendering Index (CRI)

>70 73.3 >70 73.4 >70 72.2

4 Total Harmonic Distortion ( THD)

<10% 8.2 <10% 7.9 <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

5785 5000 or 5700 K 5742 5000 or 5700 K 5700

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 88.9 >85% 88.7 >85% Not covered

8 Power Consumption of complete system

130+_5% 129.78 100+_5% 99.8 200+_5% 198.8

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

>135* >135 lumens/watt

>135* >135 lumens/watt

>135*

10 Wattage of LED used in the system

1 to 3 W 1-3 watt* 1 to 3 W 1-3 watt* 1 to 3 W 1-3 watt*

*Vide confirmation letter dated 18.03.2018.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 8. M/s Hitech Lights Limited, Solan ( HP)

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 - Not submitted

> 0.95 0.97 Hiphysix Lab. India Pvt. Limited, Pune Issued on 23.08.16

> 0.95 - Not submitted

2 System efficacy ( lumen/watt)

>100 lumens/ watt

- >100 lumens/ watt

95 >100 lumens/ watt

-

3 Color rendering Index (CRI)

>70 - >70 83.1 >70 -

4 Total Harmonic Distortion ( THD)

<10% - <10% 9.3 <10% -

5 Color Temperature of Lamp

5000 or 5700 K

- 5000 or 5700 K 6004 5000 or 5700 K -

6 Ingress Protection Level (IP Level)

IP65 - IP65 Not covered IP66 -

7 LED Driver Efficiency (in %)

>85% - >85% 85.4 >85% -

8 Power Consumption of complete system

18+_5% - 35+_5% 34.4 70+_5% -

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

- >135 lumens/watt

Not submitted >135 lumens/watt

-

10 Wattage of LED used in the system

1 to 3 W - 1 to 3 W Not submitted 1 to 3 W -

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 9. M/s HPL Electric & Power Pvt. Limited, Sonepat

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Bharat Test House Pvt. Limited, Sonepat issued on 12.11.2016

> 0.95 0.95 Bharat Test House Pvt. Limited, Sonepat issued on 14.11.2016 Bharat Test House Pvt. Limited, Sonepat issued on 20.01.2016

> 0.95 0.96 Bharat Test House Pvt. Limited, Sonepat issued on 21.07.2016 Bharat Test House Pvt. Limited, Sonepat issued on 20.01.2016

2 System efficacy ( lumen/watt)

>100 lumens/ watt

106.2 >100 lumens/ watt

108.6 >100 lumens/ watt

115.5

3 Color rendering Index (CRI)

>70 72.7 >70 71.6 >70 75.6

4 Total Harmonic Distortion ( THD)

<10% Not covered <10% Not covered <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

5912 5000 or 5700 K 5890 5000 or 5700 K 6378

6 Ingress Protection Level (IP Level)

IP65 Not covered IP65 IP67 IP66 IP67

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

18+_5% 17.7 35+_5% 34.9 70+_5% 70

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

135-160* >135 lumens/watt

135-160* >135 lumens/watt

135-160*

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W Not submitted

* As per LED data sheet

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 9. M/s HPL Electric & Power Pvt. Limited, Sonepat

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Bharat Test House Pvt. Limited, Sonepat issued on 21.07.2016 Bharat Test House Pvt. Limited, Sonepat issued on 03.09..2016 Bharat Test House Pvt. Limited, Sonepat issued on 20.01.2016

> 0.95 0.97 Bharat Test House Pvt. Limited, Sonepat issued on 25.02.2017 Bharat Test House Pvt. Limited, Sonepat issued on 20.01.2016

> 0.95 0.97 Bharat Test House Pvt. Limited, Sonepat issued on 14.07.2017 Bharat Test House Pvt. Limited, Sonepat issued on 20.01.2016

2 System efficacy ( lumen/watt)

>100 lumens/ watt

112.3 >100 lumens/ watt

122.9 >100 lumens/ watt

105.9

3 Color rendering Index (CRI)

>70 73.5 >70 70.3 >70 70.3

4 Total Harmonic Distortion ( THD)

<10% 8.3 <10% Not covered <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

5972 5000 or 5700 K 5432 5000 or 5700 K 5684

6 Ingress Protection Level (IP Level)

IP66 IP67 IP66 IP67 IP66 IP67

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

130+_5% 125.2 100+_5% 99.8 200+_5% 202.6

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

135-160* >135 lumens/watt

135-160* >135 lumens/watt

135-160*

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W Not submitted

* As per LED data sheet

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 11. M/s Jaquor & Company Pvt. Limited, Gurugram

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.96 Alpha test House, Manesar issued on 04.10.2017

> 0.95 0.98 Alpha test House, Manesar issued on 04.10.2017

> 0.95 0.98 Alpha test House, Manesar issued on 04.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

115.3 >100 lumens/ watt

117.6 >100 lumens/ watt

112.4

3 Color rendering Index (CRI)

>70 75.8 >70 74.5 >70 76.9

4 Total Harmonic Distortion ( THD)

<10% 5.3 <10% 3.6 <10% 7.2

5 Color Temperature of Lamp

5000 or 5700 K

5500 5000 or 5700 K 5502 5000 or 5700 K 5522

6 Ingress Protection Level (IP Level)

IP65 Not covered IP65 Not covered IP66 Not covered

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

18+_5% 17.5 35+_5% 34.4 70+_5% 69.9

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not submitted

>135 lumens/watt

Not submitted >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 11. M/s Jaquor & Company Pvt. Limited, Gurugram

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Alpha test House, Manesar issued on 04.10.2017

> 0.95 0.98 Alpha test House, Manesar issued on 04.10.2017

> 0.95 0.97 Alpha test House, Manesar issued on 04.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

115.7 >100 lumens/ watt

121.6 >100 lumens/ watt

120.57

3 Color rendering Index (CRI)

>70 78 >70 72 >70 71.6

4 Total Harmonic Distortion ( THD)

<10% 9.8 <10% 5.9 <10% 7.5

5 Color Temperature of Lamp

5000 or 5700 K

5810 5000 or 5700 K 5536 5000 or 5700 K 5574

6 Ingress Protection Level (IP Level)

IP66 Not covered IP66 Not covered IP66 Not covered

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

130+_5% 129.78 100+_5% 99.1 200+_5% 197.59

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not submitted

>135 lumens/watt

Not submitted >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 12. M/s Joonix Energy Private limited, Faridabad.

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 0.98*

UL India Lab, Banglore issued on 02.02.2017 * Addl Test Report of Institute of Testing and Certification (I) Private Limited, Mohali issued on 13.02.2018

> 0.95 0.98 0.99*

Institute of Testing & certification Pvt. Limited, Panchkula issued on 18.05.16 * Addl Test Report of Institute of Testing and Certification (I) Private Limited, Mohali issued on 13.02.2018

> 0.95 0.99 0.97*

UL India Lab, Banglore/ Manesar issued on 02.02.2017 & 21.02.2017 * Addl Test Report of Institute of Testing and Certification (I) Private Limited, Mohali issued on 13.02.2018

2 System efficacy ( lumen/watt)

>100 lumens/ watt

77.6 121.35*

>100 lumens/ watt

95.6 134.77*

>100 lumens/ watt

92.7 115.4*

3 Color rendering Index (CRI)

>70 84.2 >70 73.6 >70 71.6

4 Total Harmonic Distortion ( THD)

<10% 14.96 <10% 0.74 <10% 8.08

5 Color Temperature of Lamp

5000 or 5700 K

5000 5000 or 5700 K 5890 5000 or 5700 K 5000

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 Ip66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 87.55 >85% 88.8 >85% 89.8

8 Power Consumption of complete system

18+_5% 18.54 18.40*

35+_5% 34.7 35.4*

70+_5% 68.52 68.8*

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

154** >135 lumens/watt

154** >135 lumens/watt

154**

10 Wattage of LED used in the system

1 to 3 W < 3watt ** ( 1.89-2.24)

1 to 3 W < 3watt ** ( 1.89-2.24)

1 to 3 W < 3watt ** ( 1.89-2.24)

* Date of sample submitted as recording in the Lab. was 08.02.2018. , **Confirmation letter dated 14/02/2018.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 12. M/s Joonix Energy Private limited, Faridabad.

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.99 UL India Lab, Banglore issued on 20.02.2017

> 0.95 0.99 0.99*

UL India Lab, Banglore issued on 20.02.2017 * Addl Test Report of Institute of Testing and Certification (I) Private Limited, Mohali issued on 13.02.2018

> 0.95 0.99 0.99*

UL India Lab, Banglore issued on 20.02.2017 * Addl Test Report of Institute of Testing and Certification (I) Private Limited, Mohali issued on 13.02.2018

2 System efficacy ( lumen/watt)

>100 lumens/ watt

103.3 >100 lumens/ watt

82.2 129.9*

>100 lumens/ watt

97.4 126.4*

3 Color rendering Index (CRI)

>70 74.8 >70 69.7 >70 74.8

4 Total Harmonic Distortion ( THD)

<10% 7.16 <10% 8.05 <10% 7.8

5 Color Temperature of Lamp

5000 or 5700 K

5000 5000 or 5700 K 5000 5000 or 5700 K 5000

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 89.5 >85% 90.39 >85% 89.6

8 Power Consumption of complete system

130+_5% 129.9 100+_5% 97.89 98.2*

200+_5% 195.5 193.1*

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

154** >135 lumens/watt

154** >135 lumens/watt

154**

10 Wattage of LED used in the system

1 to 3 W < 3watt ** ( 1.89-2.24)

1 to 3 W < 3watt ** ( 1.89-2.24)

1 to 3 W < 3watt ** ( 1.89-2.24)

* Date of sample submitted as recording in the Lab. was 08.02.2018. , **Confirmation letter dated 14/02/2018.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 13. M/s Mansa Solar Energy, Karnal

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Conformity Testing Lab., New Delhi issued on 23.10.2017 *Planet electro Labs, New Delhi dated 02.02.2018

> 0.95 0.95 Conformity Testing Lab., New delhi issued on 23.10.2017 *Planet electro Labs, New Delhi dated 02.02.2018

> 0.95 0.97 Conformity Testing Lab., New Delhi issued on 23.10.2017 *Planet electro Labs, New Delhi dated 02.02.2018

2 System efficacy ( lumen/watt)

>100 lumens/ watt

112.5 >100 lumens/ watt

116.9 >100 lumens/ watt

108.7

3 Color rendering Index (CRI)

>70 72.4 >70 77.6 >70 73

4 Total Harmonic Distortion ( THD)

<10% 8.21 <10% 7.59 <10% 7.5

5 Color Temperature of Lamp

5000 or 5700 K

5399 5000 or 5700 K 6311 5000 or 5700 K 5904

6 Ingress Protection Level (IP Level)

IP65 IP65* IP65 IP65* IP66 IP66*

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

18+_5% 17.78 35+_5% 34.21 70+_5% 69.8

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

>138 W LED data sheet

>135 lumens/watt

>138 W LED data sheet

>135 lumens/watt

>138 W LED data sheet

10 Wattage of LED used in the system

1 to 3 W 1 -3 # 1 to 3 W 1 -3 # 1 to 3 W 1 -3 #

# Intimated to use LED wattage, by letter dated 09.02.2018.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 13. M/s Mansa Solar Energy, Karnal

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Conformity Testing Lab., New Delhi issued on 23.10.2017 *Planet electro Labs, New Delhi dated 02.02.2018

> 0.95 0.98 Conformity Testing Lab., New Delhi issued on 23.10.2017 *Planet electro Labs, New Delhi dated 02.02.2018 **CPRI, Bangalore dated 22/09/2014

> 0.95 0.98 Conformity Testing Lab., New Delhi issued on 23.10.2017 *Planet electro Labs, New Delhi dated 02.02.2018 **CPRI, Bangalore dated 22/09/2014

2 System efficacy ( lumen/watt)

>100 lumens/ watt

113.2 >100 lumens/ watt

108.6 >100 lumens/ watt

103.2

3 Color rendering Index (CRI)

>70 72.6 >70 86.2 >70 70.3

4 Total Harmonic Distortion ( THD)

<10% 4.15 <10% 8.77 <10% 4.96

5 Color Temperature of Lamp

5000 or 5700 K

5046 5000 or 5700 K 6392 5000 or 5700 K 7818

6 Ingress Protection Level (IP Level)

IP66 IP66* IP66 IP66* IP66 IP66*

7 LED Driver Efficiency (in %)

>85% Not covered >85% 85.55** >85% 86.91**

8 Power Consumption of complete system

130+_5% 125.6 100+_5% 99.48 200+_5% 208.6

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

>138 W LED data sheet

>135 lumens/watt

>138 W LED data sheet

>135 lumens/watt

>138 W LED data sheet

10 Wattage of LED used in the system

1 to 3 W 1 -3 # 1 to 3 W 1 -3 # 1 to 3 W 1 -3 #

# Intimated to use LED wattage , by letter dated 09.02.2018.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 14. M/s Ojskar Vidyut LLP, Rewari

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.96 Alpha TEST HOUSE, New Delhi issued on 18.10.2017 Alpha TEST HOUSE, New Delhi issued on 13.02.18 ( In respect of earlier test report 18/10/2017)

> 0.95 0.96 Alpha TEST HOUSE, New Delhi issued on 18.10.2017 Alpha TEST HOUSE, New Delhi issued on 13.02.18 ( In respect of earlier test report 18/10/2017)

> 0.95 0.96 Alpha TEST HOUSE, New Delhi issued on 18.10.2017 Alpha TEST HOUSE, New Delhi issued on 13.02.18 ( In respect of earlier test report 18/10/2017)

2 System efficacy ( lumen/watt)

>100 lumens/ watt

103.47 >100 lumens/ watt

116.14 >100 lumens/ watt

111.272

3 Color rendering Index (CRI)

>70 84.7 >70 84.5 >70 84.1

4 Total Harmonic Distortion ( THD)

<10% 9 <10% 8.9 <10% 7.9

5 Color Temperature of Lamp

5000 or 5700 K

5768 5000 or 5700 K 5776 5000 or 5700 K 5752

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 IP65 IP66 IP66

7 LED Driver Efficiency (in %)

>85% >85% >85% >85% >85% >85

8 Power Consumption of complete system

18+_5% 19.44 35+_5% 34.62 70+_5% 69.51

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

139 >135 lumens/watt

139 >135 lumens/watt

139

10 Wattage of LED used in the system

1 to 3 W 1 W 1 to 3 W 1 W 1 to 3 W 1W

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 14. M/s Ojskar Vidyut LLP, Rewari

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Alpha TEST HOUSE, New Delhi issued on 18.10.2017 Alpha TEST HOUSE, New Delhi issued on 13.02.18 ( In respect of earlier test report 18/10/2017)

> 0.95 0.97 Alpha TEST HOUSE, New Delhi issued on 18.10.2017 Alpha TEST HOUSE, New Delhi issued on 13.02.18 ( In respect of earlier test report 18/10/2017)

> 0.95 0.95 Alpha TEST HOUSE, New Delhi issued on 18.10.2017 Alpha TEST HOUSE, New Delhi issued on 13.02.18 ( In respect of earlier test report 18/10/2017)

2 System efficacy ( lumen/watt)

>100 lumens/ watt

110.9 >100 lumens/ watt

106.95 >100 lumens/ watt

116.86

3 Color rendering Index (CRI)

>70 84.9 >70 72.9 >70 73.5

4 Total Harmonic Distortion ( THD)

<10% 8.3 <10% 8.3 <10% 8.6

5 Color Temperature of Lamp

5000 or 5700 K

5716 5000 or 5700 K 5838 5000 or 5700 K 5850

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% >85% >85% >85% >85% >85%

8 Power Consumption of complete system

130+_5% 125.9 100+_5% 98.25 200+_5% 197.24

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

139 >135 lumens/watt

139 >135 lumens/watt

139

10 Wattage of LED used in the system

1 to 3 W 1 W 1 to 3 W 2 W 1 to 3 W 2 W

Note : LED wattage to be used in the fixtures has been mentioned by bidder in the bid as for item no. 1 to4, 1 Watt and for item no. 5&6, 2W.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 15. M/s Opulus Electricals India Pvt. Ltd., New Delhi

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.96 Hi Physix lab, Delhi issued on 15.01.17 and Bharat Test House, New Delhi issued on 18.07.2017, Delhi Test House, Kundli Issued on 03.10.2017

> 0.95 0.95 DELHI TEST HOUSE , SONEPAT issued on 5.10.17 & 6.10.2017, Delhi Test House, Kundli Issued on 03.10.2017

> 0.95 0.97 DELHI TEST HOUSE , SONEPAT issued on 5.10.17 & 6.10.2017, Delhi Test House, Kundli Issued on 03.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

113.53 >100 lumens/ watt

115.7 >100 lumens/ watt

110.7

3 Color rendering Index (CRI)

>70 80 >70 78 >70 79

4 Total Harmonic Distortion ( THD)

<10% 8.6 <10% 8.9 <10% 8.2

5 Color Temperature of Lamp

5000 or 5700 K

6111 5000 or 5700 K 6187 5000 or 5700 K 6233

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 IP65 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 88.5 >85% 89.6 >85% 93.09

8 Power Consumption of complete system

18+_5% 17.68 35+_5% 34.87 70+_5% 69.85

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

143 >135 lumens/watt

143 >135 lumens/watt

142

10 Wattage of LED used in the system

1 to 3 W 1 1 to 3 W 2 1 to 3 W 2

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 15. M/s Opulus Electricals India Pvt. Ltd., New Delhi

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.95 DELHI TEST HOUSE , SONEPAT issued on 5.10.17 & 6.10.2017, Delhi Test House, Kundli Issued on 03.10.2017

> 0.95 0.96 DELHI TEST HOUSE , SONEPAT issued on 5.10.17 & 6.10.2017, Delhi Test House, Kundli Issued on 03.10.2017

> 0.95 0.97 DELHI TEST HOUSE , SONEPAT issued on 6.10.2017 & 12.10.17 , Delhi Test House, Kundli Issued on 03.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

111.9 >100 lumens/ watt

111.6 >100 lumens/ watt

111.4

3 Color rendering Index (CRI)

>70 81 >70 82 >70 81

4 Total Harmonic Distortion ( THD)

<10% 8.3 <10% 8.6 <10% 9.2

5 Color Temperature of Lamp

5000 or 5700 K

6195 5000 or 5700 K 6210 5000 or 5700 K 6344

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 89 >85% 90.8 >85% 91.6

8 Power Consumption of complete system

130+_5% 128.82 100+_5% 97.6 200+_5% 197.09

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

152 >135 lumens/watt

152 >135 lumens/watt

153

10 Wattage of LED used in the system

1 to 3 W 2 1 to 3 W 2 1 to 3 W 2

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 16. M/s Polycab Wires Pvt. Limited, Noida

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Hi Physix lab, Pune issued on 15.03.17

> 0.95 0.96 Hi Physix lab, Pune issued on 15.03.17

> 0.95 0.96 Hi Physix lab, Pune issued on 15.03.17

2 System efficacy ( lumen/watt)

>100 lumens/ watt

112.5 >100 lumens/ watt

109.6 >100 lumens/ watt

110.09

3 Color rendering Index (CRI)

>70 71.5 >70 71.5 >70 72.1

4 Total Harmonic Distortion ( THD)

<10% Not covered <10% Not covered <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

5705 5000 or 5700 K 5624 5000 or 5700 K 5725

6 Ingress Protection Level (IP Level)

IP65 Not covered IP65 Not covered IP66 Not covered

7 LED Driver Efficiency (in %)

>85% Not covered >85% Not covered >85% Not covered

8 Power Consumption of complete system

18+_5% 18.23 35+_5% 34.8 70+_5% 73.45

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

157 According to data sheet

>135 lumens/watt

157 According to data sheet

>135 lumens/watt

157 According to data sheet

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W Not submitted 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 16. M/s Polycab Wires Pvt. Limited, Noida

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Hi Physix lab, Pune issued on 15.03.17

> 0.95 - Not submitted > 0.95 0.98 Hi Physix lab, Pune issued on 15.03.17

2 System efficacy ( lumen/watt)

>100 lumens/ watt

110.43 >100 lumens/ watt

- >100 lumens/ watt

110.7

3 Color rendering Index (CRI)

>70 72.4 >70 - >70 72.4

4 Total Harmonic Distortion ( THD)

<10% Not covered <10% - <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

5666 5000 or 5700 K - 5000 or 5700 K 5739

6 Ingress Protection Level (IP Level)

IP66 Not covered IP66 - IP66 Not covered

7 LED Driver Efficiency (in %)

>85% Not covered >85% - >85% Not covered

8 Power Consumption of complete system

130+_5% 133.66 100+_5% - 200+_5% 199.30

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

157 According to data sheet

>135 lumens/watt

- >135 lumens/watt

157 According to data sheet

10 Wattage of LED used in the system

1 to 3 W Not submitted

1 to 3 W - 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 18. M/s R.K.Agencies, Bilaspur ( CG)

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.99 Conformity Testing lab, Delhi issued on 17.10.17 & 24.10.17

> 0.95 0.98 Conformity Testing lab, Delhi issued on 17.10.17 & 14.10.17

> 0.95 0.98 Conformity Testing lab, Delhi issued on 17.10.17 & 16.10.17

2 System efficacy ( lumen/watt)

>100 lumens/ watt

121.39 >100 lumens/ watt

120.6 >100 lumens/ watt

115.4

3 Color rendering Index (CRI)

>70 74.6 >70 79.7 >70 74.6

4 Total Harmonic Distortion ( THD)

<10% 5.18 <10% 4.51 <10% 5.3

5 Color Temperature of Lamp

5000 or 5700 K

5595 5000 or 5700 K 5951 5000 or 5700 K 5457

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 IP65 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 86.9 >85% 92.06 >85% 8720

8 Power Consumption of complete system

18+_5% 17.10 35+_5% 33.40 70+_5% 65.56

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

151* >135 lumens/watt

151* >135 lumens/watt

151*

10 Wattage of LED used in the system

1 to 3 W 3* 1 to 3 W 3* 1 to 3 W 3*

*Vide confirmation letter dated 30/01/2017.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 18. M/s R.K.Agencies, Bilaspur ( CG)

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.99 Conformity Testing lab, Delhi issued on 17.10.17

> 0.95 0.97 Conformity Testing lab, Delhi issued on 17.10.17 & 16.10.17

> 0.95 0.99 Conformity Testing lab, Delhi issued on 23.10.17

2 System efficacy ( lumen/watt)

>100 lumens/ watt

113.8 >100 lumens/ watt

115.9 >100 lumens/ watt

103.43

3 Color rendering Index (CRI)

>70 75 >70 75.3 >70 75.4

4 Total Harmonic Distortion ( THD)

<10% 4.58 <10% 4.61 <10% 7.45

5 Color Temperature of Lamp

5000 or 5700 K

5552 5000 or 5700 K 5849 5000 or 5700 K 5687

6 Ingress Protection Level (IP Level)

IP66 Ip66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 92.21 >85% 92.26 >85% 86.1

8 Power Consumption of complete system

130+_5% 124.46 100+_5% 97.25 200+_5% 191.84

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

151* >135 lumens/watt

151* >135 lumens/watt

151*

10 Wattage of LED used in the system

1 to 3 W 3* 1 to 3 W 3* 1 to 3 W 3*

*Vide confirmation letter dated 30/01/2017.

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder:- 19- M/s Rudai Lighting Private Limited, Jaipur

. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Alpha Test House, New Delhi dated 05.10.2017

> 0.95 0.97 Alpha Test House, New Delhi dated 05.10.2017

> 0.95 0.98 Alpha Test House, New Delhi dated 05.10.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

124.94 >100 lumens/ watt

123.4 >100 lumens/ watt

117.94

3 Color rendering Index (CRI)

>70 83.6 >70 84 >70 83.4

4 Total Harmonic Distortion ( THD)

<10% 6.9 <10% 6.3 <10% 6.3

5 Color Temperature of Lamp

5000 or 5700 K

5795 5000 or 5700 K 5855 5000 or 5700 K 5775

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 IP65 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 88.2 >85% 87.2 >85% 86.1

8 Power Consumption of complete system

18+_5% 17.6 35+_5% 34.1 70+_5% 68.6

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not covered >135 lumens/watt

Not covered >135 lumens/watt

Not covered

10 Wattage of LED used in the system

1 to 3 W Not covered 1 to 3 W Not covered 1 to 3 W Not covered

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder:- 19- M/s Rudai Lighting Private Limited, Jaipur

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Alpha Test House, New Delhi dated 05.10.2017

> 0.95 - Not submitted > 0.95 - Not submitted

2 System efficacy ( lumen/watt)

>100 lumens/ watt

115.74 >100 lumens/ watt

- >100 lumens/ watt

-

3 Color rendering Index (CRI)

>70 83.4 >70 - >70 -

4 Total Harmonic Distortion ( THD)

<10% 6.2 <10% - <10% -

5 Color Temperature of Lamp

5000 or 5700 K

5860 5000 or 5700 K - 5000 or 5700 K -

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 - IP66 -

7 LED Driver Efficiency (in %)

>85% 87.9 >85% - >85% -

8 Power Consumption of complete system

130+_5% 128.5 100+_5% - 200+_5% -

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

Not covered >135 lumens/watt

- >135 lumens/watt

-

10 Wattage of LED used in the system

1 to 3 W Not covered 1 to 3 W - 1 to 3 W -

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 20. M/s Sangwan Energy Systems Pvt. Limited, Sonepat

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Planet Electro lab, Delhi, Bharat test House, CPRI , Issued on 21.10.17, 25.5.2015

> 0.95 0.99 UL India lab, Gurugram on dated 10.02.16, Bharat Test House Pvt. Ltd., Rai on dated 29.01.2017

> 0.95 0.99 UL India lab, Gurugram on dated 10.02.16, Bharat Test House Pvt. Ltd., Rai on dated 29.01.2017

2 System efficacy ( lumen/watt)

>100 lumens/ watt

114.6 >100 lumens/ watt

115.3 >100 lumens/ watt

110

3 Color rendering Index (CRI)

>70 71.67 >70 74.1 >70 74.2

4 Total Harmonic Distortion ( THD)

<10% 5.3 <10% 7.63 <10% 5.59

5 Color Temperature of Lamp

5000 or 5700 K

5763 5000 or 5700 K 5763 5000 or 5700 K 5894

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 IP66 IP66 IP 66

7 LED Driver Efficiency (in %)

>85% 89.37 >85% 88.74 >85% 89.6

8 Power Consumption of complete system

18+_5% 18.45 35+_5% 35 70+_5% 70.8

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

140 >135 lumens/watt

140 >135 lumens/watt

140

10 Wattage of LED used in the system

1 to 3 W 3 1 to 3 W 3 1 to 3 W 3

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 20. M/s Sangwan Energy Systems Pvt. Limited, Sonepat

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.98 Bharat test House Pvt. Ltd., Sonepat issued on 29.01.17 & CPRI dated 25.05.15

> 0.95 0.99 Institute of Testing & Certification (I) Pvt. Ltd., Panchkula issued on dated 04.08.2014, Bharat Test House Pvt. Ltd., Rai issued on 29.01.17

> 0.95 0.99 Institute of Testing & Certification (I) Pvt. Ltd., Panchkula issued on dated 04.08.2014, Bharat Test House Pvt. Ltd., Rai issued on 29.01.17

2 System efficacy ( lumen/watt)

>100 lumens/ watt

110.28 >100 lumens/ watt

108.4 >100 lumens/ watt

117.23

3 Color rendering Index (CRI)

>70 72.6 >70 78.5 >70 77.4

4 Total Harmonic Distortion ( THD)

<10% 6.2 <10% 7.9 <10% 7.2

5 Color Temperature of Lamp

5000 or 5700 K

5761 5000 or 5700 K 5644 5000 or 5700 K 5682

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 1P66

7 LED Driver Efficiency (in %)

>85% 89.6 >85% 89.7 >85% 89.5

8 Power Consumption of complete system

130+_5% 130.9 100+_5% 100.5 200+_5% 201.3

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

140 >135 lumens/watt

140 >135 lumens/watt

140

10 Wattage of LED used in the system

1 to 3 W 3 1 to 3 W 3 1 to 3 W 3

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 21. M/s Servotech Power systems Pvt. Limited, Sonepat

Firm is debarred by HAREDA

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 22. M/s Surya Roshni limited, New Delhi

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.958 Surya Technology & Innovation Centre(STIC) , Surya Roshni Ltd., In House NABL issued on 15.07.2016 Surya Roshni Limited, type test report dated 18/08/2017. ( at STIC)

> 0.95 0.96 Surya Technology & Innovation Centre(STIC) , Surya Roshni Ltd., In House NABL issued on 12.09.2016

> 0.95 0.97 Surya Technology & Innovation Centre (STIC) , Surya Roshni Ltd., In House NABL issued on. Dated 23.05.2016.

2 System efficacy ( lumen/watt)

>100 lumens/ watt

100.95 >100 lumens/ watt

101.6 >100 lumens/ watt

100.9

3 Color rendering Index (CRI)

>70 70 >70 >70 Not covered

4 Total Harmonic Distortion ( THD)

<10% 8.6 <10% Not covered <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

5700 5000 or 5700 K Not covered 5000 or 5700 K Not covered

6 Ingress Protection Level (IP Level)

IP65 IP65 IP65 Not covered IP66 Not covered

7 LED Driver Efficiency (in %)

>85% 85.6 >85% Not covered >85% Not covered

8 Power Consumption of complete system

18+_5% 17.8 35+_5% 34.8 70+_5% 70.3

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

159 >135 lumens/watt

Not submitted >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W 2.64 1 to 3 W Not submitted 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: 22. M/s Surya Roshni limited, New Delhi

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 0.97 Surya Technology & Innovation Centre(STIC) , Surya Roshni Ltd., In House NABL issued on dated 05.10.2016 Surya Roshni Limited, type test report dated 18/08/2017. ( at STIC)

> 0.95 0.97 Surya Technology & Innovation Centre(STIC) , Surya Roshni Ltd., In House NABL issued on dated 11.07.2016 Surya Roshni Limited, type test report dated 15/10/2017 (at STIC)

> 0.95 0.97 Surya Technology & Innovation Centre(STIC) , Surya Roshni Ltd., In House NABL issued on dated 11.07.2016 Surya Roshni Limited, type test report dated 15/09/2017 (at STIC)

2 System efficacy ( lumen/watt)

>100 lumens/ watt

100.5 >100 lumens/ watt

101.8 >100 lumens/ watt

100.04

3 Color rendering Index (CRI)

>70 71.1 >70 80 >70 70

4 Total Harmonic Distortion ( THD)

<10% 7.6 <10% 7.6 <10% 7.6

5 Color Temperature of Lamp

5000 or 5700 K

5850 5000 or 5700 K 5700 5000 or 5700 K 5700

6 Ingress Protection Level (IP Level)

IP66 IP66 IP66 IP66 IP66 IP66

7 LED Driver Efficiency (in %)

>85% 86.7 >85% 87.5 >85% 86.5

8 Power Consumption of complete system

130+_5% 130.2 100+_5% 100.4 200+_5% 197.9

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

159 >135 lumens/watt

151 >135 lumens/watt

151

10 Wattage of LED used in the system

1 to 3 W 2.9 1 to 3 W 2.7 1 to 3 W 2.6

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS OF THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: - 23. M/s Syska LED Lights P Ltd., New Delhi

S. No.

Testing parameters Item no. 1 : 18 W LED Street light Fixture

Item no. 2 : 35 W LED Street light Fixture

Item no. 3 : 70 W LED Street light Fixture

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 - Not submitted > 0.95 - Not submitted > 0.95 0.94 Intertek India Pvt. Ltd., New Delhi issued on 19.12.16

2 System efficacy ( lumen/watt)

>100 lumens/ watt

- >100 lumens/ watt

- >100 lumens/ watt

114.9

3 Color rendering Index (CRI)

>70 - >70 - >70 73.2

4 Total Harmonic Distortion ( THD)

<10% - <10% - <10% Not covered

5 Color Temperature of Lamp

5000 or 5700 K

- 5000 or 5700 K - 5000 or 5700 K 6258

6 Ingress Protection Level (IP Level)

IP65 - IP65 - IP66 Not covered

7 LED Driver Efficiency (in %)

>85% - >85% - >85% Not covered

8 Power Consumption of complete system

18+_5% - 35+_5% - 70+_5% 79.06

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

- >135 lumens/watt

- >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W - 1 to 3 W - 1 to 3 W Not submitted

TECHNICAL COMPARATIVE REPORT OF TEST REPORTS OF THE BIDDERS THE TENDER FOR ARRANGING THE RATE CONTRACT OF ENERGY EFFICIENT OUTDOOR LIGHTING OPENED ON 24.10.2017.

Name of the bidder: 23. M/s Syska LED Lights P Ltd., New Delhi

S. No.

Testing parameters Item no. 4 : 130 W LED Street light Fixture

Item no. 5 : 100 W LED Flood light

Item no.6 : 200 W LED Flood light

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April,

2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

DNIT Requirement

Observations of test report

Test report details (Test Report

issued on or after 1st April, 2013)

1 Power Factor > 0.95 - Not submitted

> 0.95 - Not submitted > 0.95 0.99 UL India Lab. , Banglore issued on 06.07.2015

2 System efficacy ( lumen/watt)

>100 lumens/ watt

- >100 lumens/ watt

- >100 lumens/ watt

96.6

3 Color rendering Index (CRI)

>70 - >70 - >70 72

4 Total Harmonic Distortion ( THD)

<10% - <10% - <10% Not submitted

5 Color Temperature of Lamp

5000 or 5700 K

- 5000 or 5700 K - 5000 or 5700 K 6216

6 Ingress Protection Level (IP Level)

IP66 - IP66 - IP66 Not covered

7 LED Driver Efficiency (in %)

>85% - >85% - >85% Not covered

8 Power Consumption of complete system

130+_5% - 100+_5% - 200+_5% 184.5

9 LED Efficacy ( at operating current (design) and Tj=85 o C ) in Lumens/ watt

>135 lumens/watt

- >135 lumens/watt

- >135 lumens/watt

Not submitted

10 Wattage of LED used in the system

1 to 3 W - 1 to 3 W - 1 to 3 W Not submitted