COMPANY REPORT ON BECIL
Submitted By:
SHADMAN TAUHEED
A0101913051
MBA Class of 2015
Under the Supervision of
Professor Dr. Taranjeet Duggal
In Partial Fulfillment of the Requirements for the Degree of
Master of Business Administration
AMITY BUSINESS SCHOOL
AMITY UNIVERSITY UTTAR PRADESH
SECTOR 125, NOIDA - 201303, UTTAR PRADESH, INDIA
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 2/19
2
DECLARATION
The title of Company Report is BECIL - WITH EMPHASIS ON TENDERING.
I declare that the work presented for assessment in this Company Report is my original work,
that it has not previously been presented for any other assessment and that my debts (for words,
data, arguments and ideas) have been appropriately acknowledged; work conforms to the
guidelines laid by the University, and Plagiarism for this report has been checked using
__________ software and is ___________ %. The summary of report is attached along with for
reference.
Date: - 12 th March, 2014 Shadman Tauheed
A0101913051
M.B.A (Class of 2015)
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 3/19
3
CERTIFICATE
This is to certify that Shadman Tauheed student of Masters of Business Administration at
Amity Business School, Amity University Uttar Pradesh has completed the Company Report on
“BECIL - WITH EMPHASIS ON TENDERING ”, in Partial Fulfillment of the Requirements for
the Degree of Master of Business Administration under my guidance.
The report has been checked for the plagiarism and it is acceptable.
Professor Dr. Taranjeet Duggal
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 4/19
4
ACKNOWLEDGEMENT
This project was indeed a learning experience for me. I learnt a lot not only from the study and
its analysis but also from the insights given to me by my faculty guide. An Endeavour of this
kind cannot be successful without the guidance of elders and faculty concerned. I am thankful to
my Programme Leader Ms. Teena Bagga and my project mentor Professor Dr. Taranjeet Duggal
for their generous attitude and concern. I am grateful to them for the valuable suggestion,
inspiration and encouragement from time to time.
I also feel immense pleasure in expressing my gratitude to all those who provided or helped me
provide all the information I needed to complete this project. Also, I would like to thank all those
who have directly or indirectly helped me in completing this project successfully
Date: - 12 th March, 2014 Shadman Tauheed
A0101913051
M.B.A (Class of 2015)
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 5/19
5
CONTENT
TOPIC PAGE
ABOUT THE COMPANY 6
BECIL PROJECT MANAGEMENT SERVICES 7
SUPPLY CHAIN MANAGEMENT 8
PURCHASES/SUPPLY ORDER WORKS 9
TENDERING PROCESS 10
PROCEDURE AND TERMS & CONDITIONS 13
BIBLIOGRPHY 19
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 6/19
6
ABOUT THE COMPANY
Broadcast Engineering Consultants India Ltd. (BECIL) is the premier consultancy agency and
turnkey solution provider in the field of Broadcast Engineering, Communication and Information
Technology. It is a profit making undertaking of the Government of India, specially set up in
1995 to provide guidance and expertise to the fast growing fraternity of broadcasters. BECIL has
a pool of in-house expertise and a vast reservoir of experts drawn from various fields. BECIL,
thus, has under one roof the complete expertise to execute any project in the broadcast field and
has flexible, tailor made solutions meeting unique requirements of every customer.
BECIL provides consultancy services including turnkey solutions in the specialized fields ofAcoustics, Audio-Video Systems (SRS/Conferencing/Recording/Production and Post-production
System), MMDS, CATV Network, Terrestrial & Satellite Broadcasting and Data Broadcasting.
BECIL has been the first in many fields including satellite uplink stations and FM Broadcasting.
It has been the first in setting up of the first two private broadcasters’ uplink stations in the
country at Anna Salai, Chennai and Hyderabad for SUN TV and Eenadu TV respectively. As far
as FM Broadcasting is concerned, BECIL is already in forefront in this field. The first private
FM Radio Station to come up in India at Bangalore has been set up by BECIL,
which has been followed up by setting up of 16 of the 22 stations that have come up so far. It has
also set up the prestigious project of Common FM Transmission Infrastructure at Delhi, Chennai
and Kolkata -another first of its kind in the country.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 7/19
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 8/19
8
SUPPLY CHAIN MANAGEMENT
Supply chains encompass the companies and the business activities needed to design, make,
deliver, and use a product or service. Businesses depend on their supply chains to provide them
with what they need to survive and thrive. Every business fits into one or more supply chains and
has a role to play in each of them. The pace of change and the uncertainty about how markets
will evolve has made it increasingly important for companies to be aware of the supply chains
they participate in and to understand the roles that they play. Those companies that learn how to
build and participate in strong supply chains will have a substantial competitive advantage in
their markets.
According to the Council of Supply Chain Management Professionals (CSCMP), supply chain
management encompasses the planning and management of all activities involved in sourcing,
procurement, conversion, and logistics management. It also includes coordination and
collaboration with channel partners, which may be suppliers, intermediaries, third-party service
providers, or customers. Supply chain management integrates supply and demand management
within and across companies. More recently, the loosely coupled, self-organizing network of
businesses that cooperate to provide product and service offerings has been called the Extended
Enterprise.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 9/19
9
PURCHASES/SUPPLY ORDER WORKS
The Company adopts a system of formation of Committees/Sub-Committee of the different level
of officials for making Purchases and other miscellaneous petty works by following the purchase
procedure as prescribed under Rules 102,103 & 104 of the General Financial Rules of the Govt.
of India as amended from time to time and such decisions recommended by the Committee
members are approved by the Competent Authorities as per delegation of powers.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 10/19
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 11/19
11
Open Tendering Process in India:
This tendering process comprises various stages.
The first phase includes the pre-qualification stage, where the client lays down criteria for
qualifying for the work being tendered. This phase is considered as an important stage as it
drastically cuts the number of bidders and select only capable bidders.
The second stage is the tender invitation phase, where the client publishes or issues invitations to
shortlisted bidders or to the public. This may not require media channels for communication.
The third stage is the tender clarifications and addenda phase, in which the client responds to the
queries raised by the bidders in writing. It also engages possible issuance of tender addendumsamending parts of the tender documents.
The fourth stage is the tender offer/bid submission phase where bids are presented in the form
specified, mostly sealed envelopes and then there is the tender opening and the post tender
clarification phase whereby the client goes through the tenders and seeks any clarification from
the bidders.
The next stage is the award phase where the client issues an acceptance letter to the successful
bidder who is usually, but not always, the lowest bidder and the last stage includes
the formalization of contract phase where the necessary documents are signed to formalize the
agreement.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 12/19
12
Selective Tendering Process:
In selective tendering process, the client selects only contracts that have delivered excellent
results in previous similar tenders. This process includes three ways such as: an advertisement
may produce several interested contractors and suitable Firms are selected to tender; the
consultants may contact those they would wish to put on an ad-hoc list; and many local
authorities and national bodies keep approved lists of contractors in certain categories, such as
work type and cost range.
Negotiated Tendering Process: In this process the client holds a one-to-one discussion with contractors to negotiate the terms of
contract, as such tenders are mainly used for specialized projects like lift systems, airport
projects etc. at a larger level which includes a limited number of contractors who engage in these
kind of projects from the industry .
In the Indian tendering scenario, frameworks are determined by guidelines set by the relevant
international bodies including FIDIC or International Federation of Consulting Engineers for
engineering-related tenders like computer tenders, civil work tenders and generators tenders.
However, the Indian central and state governments, Indian municipalities and establishments
such as universities, the military and hospitals are governed by strict laws and only open
competition bids are accepted.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 13/19
13
PROCEDURE AND TERMS & CONDITIONS
1. The proposal is to be submitted in TWO BID SYSTEM with separate Technical and Financial
bid under separated sealed covers.
2. TWO BID SYSTEM
All bidders are required to submit their offer in two covers as under:-
2.1 Technical Bid should contain the following:-(i) Tender documents duly completed and signed BUT WITHOUT INDICATING
THE RATE QUOTED.
(ii) The technical details of the models offered along with the supporting original
technical literature, Leaflets, Brochure etc. in duplicate.
2.2 Financial bid should contain the following:-
(i) Details of rate, taxes, duties, discount, if any, quoted by the bidder. These
details should be submitted on their letter head.
(ii) FOR terms, delivery period quoted.
Both the above mentioned bids should be sealed separately and therefore be kept in a
third cover and sealed again.
This cover should also be super scribed with “Tender for SITC of Logging and Media
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 14/19
14
Monitoring facilities for Electronic Media Monitoring Centre at Soochna Bhawan, New
Delhi” against tender enquiry no. BECIL /EMMC/MEDIA MONITORING/2013-14 .
The composite bid i.e. rate indicated in the Technical bid openly in tender is liable to
be ignored. Only the first cover i.e. Technical bid shall be opened on the date of tender
opening.
The words “TECHNICAL BID” should be written clearly and prominently on the First
cover along with tender no. and date of opening. Similarly, the words “FINANCE BID”should be written clearly and prominently on the second cover along with Tender No.
and date of opening.
3. Bid Responses must be addressed to and submitted at the following address:
The Chairman & Managing Director The Chairman & Managing Director Chairman &
Managing Director
Broadcast Engineering Consultants India Ltd, Broadcast Engineering Consultants India Ltd,
C----56 A/17, Sector 56 A/17, Sector 56 A/17, Sector ----62, Noida 201 307 62, Noida 201 307
62, Noida 201 307
Tel: 0 Tel: 0120----4177850 4177850, Fax: 0 120 : 0 120----4177879 4177879 4177879
4. The Bids, both technical and the financial, should reach the office of BECIL, on the
above address, not later than the due date. Bids received beyond
the specified date will be rejected. It is the responsibility of the Bidder to confirm that
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 15/19
15
the bids have been received on time & to the proper place within the specified dates.
Facsimile and electronic replies are not acceptable.
5. All bids are to remain valid for Six months from the date of opening of Technical bid.
6. BECIL reserves the right to solicit additional information from Bidders to evaluate
which bid best meets the need of the Project. Additional information may include, but
is not limited to, past performance records, lists of available items of work will be done
simultaneously with the project, on-site visit and evaluations by BECIL personnel, orany other pertinent information. It will be System Integrator (S.I.)’s responsibility to
check for updated information on BECIL’s web site www.becil.com... .
7. Additional questions should be submitted in writing to the RFP Coordinator
addressed to
Mr. V.P. Singh Mr. V.P. Singh
Assistant General Manager Assistant General Manager
Broadcast Engineering Consultants India Ltd, Broadcast Engineering Consultants India Ltd,
C----56 A/17, Sector 56 A/17, Sector 56 A/17, Sector ----62, Noida 201 307 62, Noida 201 307
62, Noida 201 307
Tel: 0120- Tel: 0120---4177850 4177850 4177850 Fax: 0120 Fax: 0120 Fax: 0120----4177879
4177879 4177879
Mobile No. 9818666817/ 8130190432 Mobile No. 9818666817/ 8130190432 / 8130190432
e----mail: [email protected] [email protected]
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 16/19
16
8. BECIL will make its decision based on the ability of the Bidder(s) to meet our specific
needs, technical expertise of the Bidder(s), delivery capabilities, customer references,
past satisfactory performance experience, system completeness is must besides cost.
9. BECIL reserves the right to waive off any deviations, accept the whole or part thereof
or reject any or all bids and to select the Bidder(s) which, in the sole opinion of the
Project In charge , best meets the project’s interest. BECIL also reserves the right to
negotiate with potential bidders so that its best interest to fulfill the need of project isserved.
10. BECIL reserves the right to reject any and all proposals, to negotiate all terms of any
agreement resulting from this request for proposal, and to request additional
information from System Integrator (S.I.)s.
11. All information contained in this RFP, or provided in subsequent discussions or
disclosures, is proprietary and confidential. No information may be shared with any
other organization, including potential sub-contractors, without prior written consent
of the RFP Coordinator.
12. BECIL reserves the right to either increase or decrease the quantity of any or all the
items included in suggestive bill of material which are estimated requirements and
therefore open to variation.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 17/19
17
13. BECIL reserves the right to alter/modify the scope of work mentioned in this RFP
document at any state of the bidding process and contract.
14. BECIL reserves the right to terminate the contract at any stage of the work by giving
7 days’ notice if it is noticed that the delay occurred in any of the activities covered
under the contract cannot be made good and will affect the overall work schedule.
BECIL shall revoke the Performance Bank Guarantee of the bidder. The decision of
CMD, BECIL shall be final and binding.
15. In case Company goes into liquidation or change in business/management, it will be
intimated to BECIL & company will fulfill its commitment in case order is awarded to
them.
16. Indemnification:
Contractor agrees to indemnify BECIL from any and all claims, demands, losses,
cause of action, damage, lawsuits, judgments, including att orneys’ fees and costs,
arising out of or relating to the work of Contractor including the works as got done by
Contractor through Sub-Contractor(s),if so appointed by the Contractor. BECIL shall
have no role in engaging of sub-contractors by the Contractors and Contractor alone
shall be responsible to such Sub-Contractors.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 18/19
18
17. Arbitration:
Any dispute or difference or claim arising out of or in relation to this contract,
including the construction, validity, performance or breach thereof, shall be settled or
decided by arbitration to be conducted by CMD, BECIL or by any other person to be
nominated by CMD, BECIL. Arbitration shall be conducted as per Arbitration &
Conciliation Act, 1996.The seat of the arbitration shall be at New Delhi.
18. Jurisdiction
This Agreement shall be construed, interpreted and applied in accordance with, andshall be governed by, the laws applicable in India. The courts at Delhi shall have the
exclusive jurisdiction to entertain any matter arising out of or in relation to this
Agreement.
8/12/2019 Company Report on BECIL
http://slidepdf.com/reader/full/company-report-on-becil 19/19
19
BIBLIOGHRAPY
The above company report is based on the data collected by:
Direct Interview of the Managing Director of BECIL.
Also some data is taken from the company website which is www.becil.com.