PT. BESTINDO PUTRA MANDIRI
Company Reference
8/21/2019 Company reference List_2013.pdf
2/13
PPRROOJJEECCTT RREEFFEERREENNCCEESS
Bandung Institute of Technology
Water Treatment Plant ( 1997)
Capacity 20 liter/ second
Ground Water Water treatment plant for Iron and Mangganes
Removal for Banding Institute of Technology
Institute Technology Bandung
Heavy Metal Treatment Plant ( 1997)
for Faculty of Environmental
Institute Technology Bandung astewater Treatment Plant ( 1997)
PT. Panasia Indosintec
(Tangerang)
ater Softener ( 1997)
PT. Panasia Indosintec
(Semarang)
ater Softener ( 1997)
PT. Tridarma Megamitra
ater Softener Capacity : 50 m3/hour
PT. Indovon
Activated Carbon & Water Softener
Capacity : 288 m3/day
8/21/2019 Company reference List_2013.pdf
3/13
PT. Setia Kidji Red
Activated Sand Filter, Activated Carbon & Water Softener
Capacity : 288 m3/day
RS. Alihksan
ctivated Carbon Filter & Activated Sand Filter
Water Softener RO
Capacity 240 m3/day
Ron-88
PT. Trijaya
Activated Sand Filter & Water Softener
Capacity 240 m3/day
PT. Hexatex
Water Softener Capacity 480 m3/day
PT. Medika Griya Hospital
Reverse Osmosis System For Haemodialisys
Capacity : 28 m3/hour
PT. Arta Trimustika
Activated Carbon Filter And Softener
Capacity 50 m3/hour
8/21/2019 Company reference List_2013.pdf
4/13
PT. Intiroda - Tangerang
Filter Press
Savoi Homan Hotel
Sewage Treatment Plant
PT. Toyota
astewater Water
PT. Intiroda
Demineralization Plant was built to be used for electroplating
purpose.
The plant had meet the requirement of quality water below 1
mircroscm
PT. Bikasoga
Pressure Filter
PT. Digdaya
Demineralization Plant Capacity 24 m3/day
PT. Sinar Garuda
Activated Carbon Filter & Water Softener Capacity 12 m3/hour
PT. Panasia Indosintec
Carbon Filter, Water Softener, Sand filter
Bank Indonesia
Pressure Filter (1988)
PT. Melvin
Water Softener
Capacity : 240 m3/day
(1998)
PT. Melvin
Water Softener
Capacity : 60 m3/day
(1998)
Quality of water for textile dying is very important. One of the
parameter should be removed is hardness. Softener was installed
to remove calcium and magnesium from feed water. Lewatit wasused as media ion exchange resin.
8/21/2019 Company reference List_2013.pdf
5/13
PT. Biofarma
Ultraviolet Disinfections
PT. Tawakal Jaya I
Activated Carbon
Capacity : 75 m3/day
(2002)
PT. Medion
Water Softener (2002)
PT. Sari Sandang
Sand Filter Capacity : 75 m3/hour
PT. Tawekal Jaya II
Water Tretment Plant( 2004 ) Capacity 100 m3/Jam
PT. Sinar makin Mulya II
Water treatment Plant ( 2004 )Capacity 60 m3/Jam
PT. GS Battery
Demineralization Plant (2001)
Capacity : 120 m3/day
GS Battery is the biggest manufacturer of rechargeable batteries
in Indonesia.
The use of Lewatit combined with the counter-current process
give a big performance boost in demineralization water
efficiency , approx. 40% less regenerant chemicals, improved
final water quality, reduced filter sizing.
PT. Panasia
8/21/2019 Company reference List_2013.pdf
6/13
Gadjah Mada University
Wastewater Treatment Plant
(2002 – 2003)
Gadjah Mada University is one of the largest university in
Indonesia. The wastewater plant was needed for treating the
discharge water from laboratories. There were 9 (nine) wastewater
treatment plant for 7 deferent faculties.
Features:
Neutralization, aeration, sedimentation following with
filtration and disinfection.
Instrumentation
Faculties :Faculty Of Medicine, Faculty Of Dentistry, Faculty Of
Agriculture, Faculty Of Agricultural Technology, Faculty Of Forestry,
Faculty Of Veterinary Medicine, Faculty Of Animal Husbandry,
Integrated Labs
Gajah Mada University
Location : Yogyakarta Province
Java Island
Water Treatment Capacity 180
m3/hour (2003 - 2004)
Successful in built the wastewater treatment plant, we have been
given another responsibility to design and built of water treatment
plant. The plant was built for 2 locations of treatment plant for east
and west side of Gadjah Mada University.
Features:
Aeration, Iron & manganese removal, Activated carbon, ,
and chlorination.
Instrumentation and PLC
8/21/2019 Company reference List_2013.pdf
7/13
PDAM Kab. Pasir (Kaltim)
Location : East Kalimantan Province
Kalimantan Island
Water Treatment Capacity 180
m3/hour (2003 - 2004)
For the first time in history of indonesia, the water treatment plant
was build fully automatically operated by PLC and Scada System.
Bestindo’ s team involved in detail engineering and construction of
intake station, 11 Km Water transmission line, water treatment
plant 720 m3/hour, reservoir 2000 m3 complete with pumping
system, Distribution pipe line.
The project located in East Kalimantan, the owner,PDAM Tirta
Kandio ( The Indonesian Local Government Water Authority) will
operate the systems and supply clean water for 100.000
inhabitants.
PDAM Kab. Pasir (Kaltim)
Bottling Water Plant (2003)
Capacity : 300 Bottle per hour
PDAM Kab. Pasir (Kaltim)
Revese Osmosis
Capacity : 130 m3/day
(2004 - 2005 )
Deltamas Industrial Estate
astewater Treatment plant
Capacity 400m3/day
2003-2004The waste water treatment plant was built for Industrial waste
belonging of Deltamas industrial estate
The scope of work included the equalization tank, aeration tank,
sedimentation tank, sludge drying bed.
8/21/2019 Company reference List_2013.pdf
8/13
PDAM Kabupaten Cirebon
Upgrading Water Treatment Plant (2003)
Institute Technology Bandung
Heavy Metal Removal
(2003)
Institute Technology Bandung
Batch Acid – Base Neutralization (2003)
Basic Science Building A
Institute Technology Bandung
Batch Acid – Base Neutralization (2003)
Basic Science Building B
Aneka Tambang
Water Softener Capacity 2 x 50 m3/hour
Sand Filter capacity 2 x 50 m3/hour
Hyatt Hotel Bandung
Water Treatment Plant
Capacity 30 L/S
( 2005 )
Grand Hyatt Hotel is one of five star hotels in Bandung. The
plant was needed to improve standard quality of water.
The treatment consisted:
Clarifier unit, Pressure Sand Filter and Disinfection
8/21/2019 Company reference List_2013.pdf
9/13
Water Supply For Aceh
Recovery
( 2006 – 2007)
Awward Contract for Supply and Install 245 km PE 100 Pipe For
Aced From Glynweld Pipe Systems (as Main Contractor of JICS
(the Japan International Cooperation System)).
Water Supply For Nias
Eartquake Recovery
( 2006 – 2007)
Awward Contract for Supply and Install 25 km PE 100 Pipe For
Nias and WTP 10 Liter/second From Glynweld Pipe Systems (as
Main Contractor of JICS (the Japan International Cooperation
System)).
Dago Butik Apartment
Bandung
Sewage Treatment Plant ( STP ) Capacity 50 m3/day (2005)
PDAM Banjarmasin
Water Treatment Plant
Capacity : 500 l/s
(2006 – 2007 )New water treatment plant was built for PDAM Bandarmasih ( The
Indonesian Local Government Water Authority), the treatment plant
consisted of 2 clarifloculators (capacity 720 m3/hours each) and 8
rapid sand filter.
Fully automation by SCADA system
Bendang 3
Water Supply System For Samarinda
City
Capacity : 400 l/s
8/21/2019 Company reference List_2013.pdf
10/13
(2009 – 2010)
New water supply systems Project , Owner PT. Davindo . The
systems consisted of intake station, 400l/s WTP and Reservoir.
PT. Swing Indonesia
Water Supply System For PT. Swing
Indonesia
Capacity : 10 l/s
(20012 – 2012)
New water supply systems 10 l/s, complete with Intake, reservoir
and Distribution.
Fully automation by PLC and HMI system
PT. Biofarma
Waste Water Effuent Recycling Plant
Capacity : 30 m3/h
(20010 2011)
Recycling plant by Ultrafiltration Membrane, water will be used for
Raw water for Biopharma Industry
Fully automation by PLC & HMI system
PT. Moya Indonesia
Water Treatment Plant
Capacity : 230 Liter/Second
(20010 2011)
UpRate Water Treatment Plant from 40 L/Sec to 230 Liter/Sec by
Hi Gate Clarifier, Loading Rate 24 m/h.
Fully automation by SCADA system
8/21/2019 Company reference List_2013.pdf
11/13
Tanjung Redep Regency
Water Supply
Capacity : 150 Liter/Second
(20010 2011) New Water Supply System included Dam, Intake, 4 km Raw Water
Transmition, WTP (Concrete), 2500 m3 Reservoir and and 60 km
Distribution Pipe Line.
Fully automation by SCADA system
PT. Swing Indonesia
Water Supply
Capacity : 80 Liter/Second
(2012 2013)
New Hi Rate Water WTP Plant, Reservoir 3000 m3 and Other
Fasilities.
Fully automation by SCADA system
PT. Moya Indonesia
Water Supply
Capacity : 500 Liter/Second
(2012 2014) On Going
EPC Contract for New Hi Rate Water WTP Plant, Reservoir 6000
m3. Power House, Chemical Injection Plant Other Fasilities.
Fully automation by SCADA system
8/21/2019 Company reference List_2013.pdf
12/13
PT. Wijaya Karya
Basic Design
Capacity : 5000 Liter/Second
(2014 .......) On Going
Basic Design for Jatiluhur Water Treatment Plant Total
Cap. 5000 Liter/Sec. Reservoir 38000 m3 and others Facilities.
Fully automation by SCADA system
PT. Darco Indonesia
Water Supply
Capacity : 100 Liter/Second
(2014 .......) On Going
EPC Contract for New Hi Rate Water WTP Plant, Reservoir 3000
m3. Power House, Chemical Injection Plant Other Fasilities.
8/21/2019 Company reference List_2013.pdf
13/13
PT. BESTINDO PUTRA MANDIRIWater & Process Technologies
Bandung
Terusan Buah Batu 248, West Java, Indonesia
tel: +62 22 7562836, fax: +62 21 7562820