321
WS1 - IP Address Management 1.01 * 4/30/2015 1.02 * 4/30/2015 1.03 1.04 1.05 1.06 * 4/30/2015 1.07 Are you in implementing? 1.08 Are you testing? 1.09 Is the project complete? 1.10 * 4/30/2015 1.11 WS1 - AD Migration (TBD) 2.01 * 5/29/2015 2.02 * 5/29/2015 2.03 2.04 Reference Document Central IT Critical Item (*) Critical Date for Central IT Do you have a complete and accurate list of all your existing network IP Addresses? IP Address Inventory Have you reviewed the IP Address scheme that has been provided for your company by the IT Consultants (see attached reference doc)? IP Address Allocation Have all "Hardcoded" IP Addresses/ and IP Address conflicts been resolved or have a possible solution? Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns? Do you have the necessary resources to complete the project? Do you have a project plan for this with aligned dates to the RBC3 move? Please attach your IP Address inventory file (please save your updated file in google drive and share)? Remarks: If any of the above is a "no" or "?" please specify ? Do you have a complete and accurate list of your Active Directory users and data Have you reviewed the AD plans that has been provided for your company Migration Plan (c/o Have all AD issues or conflicts been resolved or have a possible resolution Have you communicated to IT Consultants/IaaS/Accenture regarding your decisions, plans and concerns

Company Readiness Assessment Checklist Ver 4.21

Embed Size (px)

DESCRIPTION

ar

Citation preview

Page 1: Company Readiness Assessment Checklist Ver 4.21

WS1 - IP Address Management

1.01 * 4/30/2015

1.02 * 4/30/2015

1.03

1.04

1.05

1.06 * 4/30/2015

1.07 Are you in implementing?

1.08 Are you testing?

1.09 Is the project complete?

1.10 * 4/30/2015

1.11

WS1 - AD Migration (TBD)

2.01 * 5/29/2015

2.02 * 5/29/2015

2.03

2.04

2.05

2.06 Do you have a budget

Reference Document

Central IT Critical Item

(*)

Critical Date for Central IT

Do you have a complete and accurate list of all your existing network IP Addresses?

IP Address Inventory

Have you reviewed the IP Address scheme that has been provided for your company by the IT Consultants (see attached reference doc)?

IP Address Allocation

Have all "Hardcoded" IP Addresses/ and IP Address conflicts been resolved or have a possible solution?Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns?Do you have the necessary resources to complete the project?

Do you have a project plan for this with aligned dates to the RBC3 move?

Please attach your IP Address inventory file (please save your updated file in google drive and share)?

Remarks: If any of the above is a "no" or "?" please specify ?

Do you have a complete and accurate list of your Active Directory users and dataHave you reviewed the AD plans that has been provided for your company

AD Migration Plan (c/o DA)

Have all AD issues or conflicts been resolved or have a possible resolutionHave you communicated to IT Consultants/IaaS/Accenture regarding your decisions, plans and concerns

Do you have the necessary resources to complete the project

Page 2: Company Readiness Assessment Checklist Ver 4.21

2.07 Do you have management's approval

2.08

2.09

2.10 * 5/29/2015

2.11 Are you in implementing

2.12 Are you testing

2.13 Is the project complete

2.14

WS1 - Firewall for Remote Sites to RBC3

3.01 * 6/1/2015

3.02

3.03

3.04

3.05 Do you have an approved budget

3.06 Do you have management's approval

Do you have a Scope Of Work in place

Are your contracting/procurement docs signed

Do you have a project plan with aligned dates to the RBC3 move?

Remarks: If any of the above is a "no" or "?" please specify

Do you have a complete and accurate information on your existing firewall systems

Firewall Recommendation

Have you reviewed the firewall requirements for remote sites to connect to RBC3Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns

Do you have the necessary resources to complete the project

Page 3: Company Readiness Assessment Checklist Ver 4.21

3.07 Do you have a SOW in place

3.08

3.09 * 6/1/2015

3.10 Are you in implementing3.11 Are you testing3.12 Is the project complete

3.13

3.14

WS1 - Stand Alone Printers

4.01 * 5/15/2015

4.02 * 5/15/2015

4.03

4.04

4.05

4.06

4.07 * 5/15/2015

4.08 * 5/15/2015

4.09

WS1 - Existing IT Equipment 6/30/2015

5.01 * 6/30/2015

5.02 * 6/30/2015

5.03 * 6/30/2015

5.04 * 6/30/2015

Are your contracting/procurement docs signed Do you have a project plan with aligned dates to the RBC3 move?

Please attach IaaS Firewall Connectivity Certification

Remarks: If any of the above is a "no" or "?" please specify

Do you have a complete and accurate information on all your standalone printers that will be moved to RBC3Have you reviewed the floor plans where these printers will be placed. (Please check and verify with your HR)

3-26-15 Floor Plans (PDF)

Have you informed your HR/Management/Users where these printers will be locatedAre you capable to support all of your standalone printersFor those with Management Printing Services: Have you reviewed your pre-Termination contract and Penalties (if any)Do you have a project plan with aligned dates to the RBC3 move?

Please attach Floor Plan with location of stand alone printers

Please attach signed conforme of your company executives on the AUP and AUP Exemption forms

Remarks: If any of the above is a "no" or "?" please specify

Pls insert your file here and label as AUPExempt ## (exemption) ex AUPExempt01(Printer)

Have you planned on relocation/redeployment/disposition of your Equipment Cabinets/RacksHave you planned on relocation/redeployment/disposition of your LAN & WAN EquipmentHave you planned on relocation/redeployment/disposition of your Security EquipmentHave you planned on relocation/redeployment/disposition of your Servers (not relocated in RBC3)

Page 4: Company Readiness Assessment Checklist Ver 4.21

5.05 * 6/30/2015

5.06 * 6/30/2015

5.07 * 6/30/2015

5.08 * 6/30/2015

5.09 * 6/30/2015

5.10 * 6/30/2015

5.11 * 6/30/2015

5.12 * 6/30/2015

5.13 * 6/30/2015

5.14

5.15

WS2 - Transfer of OCC Data Center

6.01 DC Plan * 3/30/2015

6.02 * 5/22/2015

6.03

6.04

6.05

6.06 Do you have a budget

6.07 Do you have management's approval6.08 Do you have a SOW in place

Have you planned on relocation/redeployment/disposition of your non-branded/old/defective desktops and laptops

Have you planned on relocation/redeployment/disposition of your PBX (IP or Digital) EquipmentHave you planned on relocation/redeployment IP Phones (Cisco)Have you planned on relocation/redeployment/disposition IP Phones (Non-Cisco)Have you planned on relocation/redeployment Analog & Digital phonesHave you planned on relocation/redeployment/disposition Fax MachinesHave you planned on relocation/redeployment/disposition Access PointsHave you planned on relocation/redeployment/disposition Tape Drives, CDs, Manuals Have you planned on relocation/redeployment/disposition Other IT Equipments, cables, defective devices and partsHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Do you have a complete and accurate list of all your servers that will be transferred to the new DC

Have you reviewed the Server Migration plan that has been provided for your companyHave all Server issues or conflicts been resolved or have a possible resolutionHave you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns

Do you have the necessary resources to complete the project

Page 5: Company Readiness Assessment Checklist Ver 4.21

6.09

6.10 * 6/15//2015

6.11 Are you in implementing6.12 Are you testing6.13 Is the project complete6.14 Please attach IaaS acceptance Doc

6.15

WS3 - Telco (Internet)

7.01

7.02

7.03

7.04 * 6/15//2015

7.05

WS3 - Telco (E1)

8.01

8.02

8.03

8.04 * 6/15//2015

8.05

WS3 - Telco (Direct Lines) not to be transferred

9.01

9.02

9.03

Are your contracting/procurement docs signed

Do you have a project plan with aligned dates to the RBC3 move?

Remarks: If any of the above is a "no" or "?" please specify

Have you started your circuit termination discussion with all your Telco providersHave you negotiated your penalty clause if anyFor with Penalty Clause: Have you an approved budgetHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Have you started your circuit termination discussion with all your Telco providersHave you negotiated your penalty clause if anyFor with Penalty Clause: Have you an approved budgetHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Have you started your circuit termination discussion with all your Telco providersHave you negotiated your penalty clause if anyFor with Penalty Clause: Have you an approved budget

Page 6: Company Readiness Assessment Checklist Ver 4.21

9.04 * 6/15//2015

9.05

WS3 - Telco (Direct Lines) transfer to RBC3

10.01

10.02 * 5/29/2015

10.03

10.04 Do you have a budget10.05 Do you have management's approval

10.06 * 4/30/2015

10.07

10.08 * 6/15//2015

10.09 Are you in implementing10.10 Are you testing10.11 Is the project complete

10.12

10.13

10.14

WS3 - Telco (CATV)

11.01

11.02

11.03 * 4/30/2015

11.04 * 6/15//2015

11.05

WS3 - Connectivity - Migration to MPLS of sites

12.01

Have you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Do you have a complete and accurate information on all your existing Direct Lines and Contracts

Direct Line Configuration

Have you filled out and completed the Exemption Waiver Form (Telco)Have you started your circuit redirect discussion with all your Telco providers

Please identify location of the Direct Lines on the floors planAre your contracting/procurement docs signed Do you have a project plan with aligned dates to the RBC3 move?

Please attach Telco certificate of completionHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Have you started your cable service provider relocation to RBC3Have you negotiated your penalty clause if you are terminating Have you identified location of your executives, special users the location on the floor planHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Do you have a complete and accurate list of your MPLS sites that will be connected to RBC3

MPLS Telco Plan

Page 7: Company Readiness Assessment Checklist Ver 4.21

12.02

12.03

12.04

12.05

12.06 Do you have an approved budget12.07 Do you have management's approval12.08 Do you have a SOW in place

12.09

12.10 * 6/15//2015

12.11 Are you in implementing12.12 Are you testing12.13 Is the project complete

12.14

12.15

WS4 - Legacy Mail Server

13.01

13.02

13.03

13.04

13.05

13.06

13.07 * 6/15//2015

13.08

WS5 - Review of RBC3 Acceptable Use Policy

Have you reviewed the Telco plans that has been provided for your companyHave all MPLES/Telco issues or conflicts been resolved or have a possible resolutionHave you discussed with the the Telcos your MPLS plans and concernsHave you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns

Are your contracting/procurement docs signed

Do you have a project plan with aligned dates to the RBC3 move?

Please attach your MPLS Contract summary

If any of the above is a "no" or "?" please specify

Have you planned on decommissioning your Legacy Mail ServerAre there applications still integrated to your legacy Mail ServersHave you migrated important email/data of your critical users/executives to the Gmail systemFor those requiring historical email data, have you planned on a local offline copy on their PCWill there be any business impact if legacy mail server are decommissioned before the RBC move?Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concernsHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Page 8: Company Readiness Assessment Checklist Ver 4.21

14.01

14.02

14.03

14.04

14.05 Do you have management's approval14.06 Do you have a SOW in place

14.07 * 6/15//2015

14.08 Are you in implementing14.09 Are you testing14.10 Is the project complete

14.11

14.12

WS5 - Shared Services Guidelines

15.01

15.02

15.03

15.04

15.05

15.06

Do you have the latest Acceptable Use Policy

Acceptable Use Policy Doc

Have you reviewed the document and see no problems implementing itHave you reviewed the technical requirements to implement the Acceptable Use Policy in your end-point devices

Have you discussed with management the impact to non-compliance as well as Exceptions Form

AUP Exemption Form

Pls insert your file here and label as AUPExempt ## (exemption) ex AUPExempt01(Macintosh)

Do you have a project plan with aligned dates to the RBC3 move?

Please attach signed conforme of your company executives on the AUP and AUP Exemption forms

If any of the above is a "no" or "?" please specify

Do you agree and comply : Every employee should be mindful of the "Information Classification" when sharing company information.

Do you agree and comply : Only authorized devices will be allowed to connect to the company network. Visitors will be provided guest connectivity to the internet.

Do you agree and comply : Jail-broken devices will not be allowed to connect to the network

Do you agree and comply : Native e-mail access on personal devices requires a wipe waiver to automatically wipe information once the hardware is compromised.

Do you agree and comply : End-user devices should have end-point security software installed. Only official licensed software may be installed on end-user devices.

Do you agree and comply : The use of non-company, non-cloud storage is highly discouraged.

Page 9: Company Readiness Assessment Checklist Ver 4.21

15.07

15.08

15.09

15.10 * 5/15/2015

15.11

WS5 - Upgrading of OS to Windows 7

16.01

16.02

16.03

16.04

16.05 Do you have a budget16.06 Do you have management's approval

16.07 * 6/15//2015

16.08 * 6/15//2015

16.09 Are you in implementing16.10 Are you testing16.11 Is the project complete

16.12 * 8/14//2015

16.13

WS5 - Upgrading to Branded Laptops/Desktop

17.01

17.02

17.03

Do you agree and comply : Social Networking is not permitted unless officially authorized.

Do you agree and comply : Video-streaming websites are not permitted unless officially authorized. Pornographic, malicious and torrent-related websites will be blocked by the company.

Do you agree and comply : Every laptop and desktop must be from a branded manufacturer and have at least the following:- Anti-virus protection- Minimum OS version of windows 7- Macs will be on an exception basis

Have you filed your Acceptable Use Policy Waiver Forms

AUP Exemption Form

Remarks: If any of the above is a "no" or "?" please specify

Pls insert your file here and label as AUPExempt ## (exemption) ex AUPExempt01(Macintosh)

Do you have a complete and accurate list of your Desktops and Laptops OSHave you filled out and completed the Exemption Waiver Form (Below Windows 7)

AUP Exemption Form

Have you reviewed the upgrade path required for your Desktops and LaptopsHave you requested quotes for the OS upgrades

Are your contracting/procurement docs signed Do you have a project plan with aligned dates to the RBC3 move?

Please attach your MS Certificate of Authenticity summary

Remarks: If any of the above is a "no" or "?" please specify

Do you have a complete and accurate list of your Desktops and LaptopsHave you filled out and completed the Exemption Waiver Form (Mac/Unbranded)

AUP Exemption Form

Have you reviewed the allowed Desktops and Laptops brands and have gotten quotes from suppliers

Page 10: Company Readiness Assessment Checklist Ver 4.21

17.04

17.05

17.06 Do you have a budget17.07 Do you have management's approval

17.08 * 6/15//2015

17.09 * 6/15//2015

17.10 Are you in implementing17.11 Are you testing17.12 Is the project complete

17.13 * 8/14//2015

17.14

WS6&7 - Auxilliary Equipment

18.01

18.02

18.03

18.04

18.05

18.06

18.07

18.08

18.09 * 6/15//2015

18.10

WS 6 & 7- Timekeeping

Have you filed the Exception request for apple Macintosh laptops Have you discussed with management the Security Policies with respect to the need to upgrade to branded PCs and Macs

Are your contracting/procurement docs signed Do you have a project plan with aligned dates to the RBC3 move?

Please attach your Supplier's Certificate of Completion

Remarks: If any of the above is a "no" or "?" please specify

Have you planned on relocation/redeployment/disposition of your existing CCTV equipment

Have you planned on relocation/redeployment/disposition of your existing Card Access and Control system

Have you planned on relocation/redeployment/disposition of your existing TVs'Have you planned on relocation/redeployment/disposition of your existing Projector EquipmentHave you planned on relocation/redeployment of your existing videocon equipmentDo you have plans in acquiring Video Con end-points for your offsite connected to MPLSHave you planned on relocation/redeployment/disposition of your existing cable TV equipmentHave you planned on relocation/redeployment/disposition of your existing Radio Comms EquipmentHave you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Remarks: If any of the above is a "no" or "?" please specify

Page 11: Company Readiness Assessment Checklist Ver 4.21

19.01

19.02 * 4/30/2015

19.03

19.04

19.05

19.06 Do you have a budget19.07 Do you have management's approval

19.08 * 4/30/2015

19.09 * 6/15//2015

19.10 * 6/15//2015

19.11 Are you in implementing19.12 Are you testing19.13 Is the project complete

19.14 * 8/14//2015

19.15

19.16

Have you reviewed your existing Timekeeping system that you will/may bring to RBC3Have you reviewed the floor plans to see the location of where you will place your timekeeping device

Have you checked with your existing Timekeeping vendor the requirements for integration/Data collection needed by your system to integrate with the Door Access System in RBC3

Have you discussed with management these detailsDo you have the necessary resources to complete the project

Have you reviewed the floor plan and defined your Time keeping standalone system in itAre your contracting/procurement docs signed Do you have a project plan with aligned dates to the RBC3 move?

Please attach contractors project completion certificate

Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns

Remarks: If any of the above is a "no" or "?" please specify

Please attach your updated project plan MS Project 2013

Project Plan Template (MS Project)

Please attach your updated project plan xls (those w/o MS Project)

Project Plan Template (MS Excel)

Page 12: Company Readiness Assessment Checklist Ver 4.21

FPH FGEN FPIP FPIC

FPIC List of IP

seconded assigned

No IP Conflict, PI System (Servers) cannot be replaced

Internal discussion/ planning - based on changes in server IPs communicated last May 08

Of course there should be testing, considering the IP changes to be done

IP address already provided and reflected in the IP Address inventory

Already submitted previously, is this a new requirement?

PI conflict has cost implication

Until RBC Tower 3 move

FPIC will not change current IP

??? No alignment discussion yet with WSOwner.If manpower/ staffing is being asked here, FGen is so far rolling along with the pilot migration

Page 13: Company Readiness Assessment Checklist Ver 4.21

????

100 %

None yet.

Approval of the AD migration? By all means, yes, because we all have to align with the RBC Move. Approval of the budget? Yes, indicative onlyYes, as far as what has been communicated with FGen IT Technical Lead is concerned. But if you mean 'formal, signed-off Scope statement' that is FGen-specific, then none. Scope is only based on overall RBC Move programNo contracting with any party yet that is FGen-specific - as far is this workstream is concerned

Of course there should be testing, considering the changes done, and yet to be done

This project is sponsored by FPH, and test phase is being worked with Accenture

have informed management but have no approval yet; working with Accenture for test phase

Internall, we have a PM and technical lead for this, but the main implementor will be the vendor to be selected. So answer is yes.None yet. But will request for it. Proposals for remote site FWs just came in for our consideration/ evaluation.

Page 14: Company Readiness Assessment Checklist Ver 4.21

c/o Marlon

c/o Jojo Not yet

Yes

Yes

c/o Marlon Already submitted

c/o Jojo In process

YEs to site offices

Yes to site offices

Yes to site offices

MPLS (Phase 2) Project Plan

The FWs are imputed in the MPLS (Phase 2) Project Plan (see link given above)

Prepared PR. This is for approval and then PO

List of FGen Stand-Alone Printers

Already emailed to J Somontina

To be verified with FGen Admin, as they handle Managed Print Services

List has already been provided via link given above

Standalone printers/scanner for Executives, Purchasing and HR, Dot matrix Accounting

Standalone printers/scanner for the President and Comptroller,Plotter for O&M, Dot matrix for HR and Accounting - No final word yet from the Design Team. They produced a lay out 2 weeks ago. Apparently, it didn't reflect the correct manning we submitted.

Retire servers older than 3 yrs

Page 15: Company Readiness Assessment Checklist Ver 4.21

c/o Jojo

Yes Wil bring to RBC

No

No

Yes to Site office

for disposition

for disposition

These are IT/Comm controlled equipment

These are IT/Comm controlled equipment

First Gen's DC Move Worksheet

Workplan/ Migration Plan has not yet been shared by the Work Stream in charge

Yes, we believe so - until we get to see the Migration Workplan and see and discuss the RACI. It depends. For now, yes.

Yes, indicative figures only

Page 16: Company Readiness Assessment Checklist Ver 4.21

???

???

No

No

No

No

No

No

No

No

Yes, but a raw one based on historical implementation approach and some assumptions; Alignment with overal Migration Plan yet to be done

Critical is the WSO training for the supplier. Will do the walk though of transfer sched on 7 Aug 2015.

Yes - mostly with Bayantel

Telco-intenet contract is beyond holding period (Bayantel and PLDT)

Yes - with Bayantel and PLDT

We do not have E1's. Our phones are analog. Updated 15 May 2015

Page 17: Company Readiness Assessment Checklist Ver 4.21

???

Provision needed for e

FGen List of Analog Direct LinesHave yet to verify with some users in the list above (link given) if they still need these to be transferred to RBC. The 'unassigned' will most likely be terminated.

This is c/o our HR/GS group (To be coordinated)

FGen List of Analog Direct Lines

Submitted exemption form through JJ

This is c/o Fgen Admin

This is c/o our HR/GS group (To be coordinated)

Page 18: Company Readiness Assessment Checklist Ver 4.21

???

yes

yes

yes

yes

yes

No

no

Only for Bayantel; For PLDT & Globe, it is being progressed, with timing being aligned with RBC MPLSMPLS (Phase 2) Project Plan

Signed MPLS contract to follow (Aleady in FGen IT's Shared Folder)

First Gen's MPLS project still ongoing

MPLS was Up last Jan 2015. Initial discussion with PLDT re: transfer of MPLS to OCC done in Feb and 24 July 2015

Server will be transferred to GPS3.All historical email data are located offline on local PCs. Cut off Sep 2014 (google mail migration)

Page 20: Company Readiness Assessment Checklist Ver 4.21

With exemptions

With exemptions

With Mac units

For Macs

For submission

For Mac

To comply re: branded desktop requirement incl. licenses

Clone PCs need to be upgraded

Page 21: Company Readiness Assessment Checklist Ver 4.21

These are FGen Admin scope

In coordination with HR/GS and Comm.

Page 22: Company Readiness Assessment Checklist Ver 4.21

Need to integrate existing timekeeping system w RBC3

Need to integrate existing timekeeping system w RBC3

Will bring our own TK device

Page 23: Company Readiness Assessment Checklist Ver 4.21

FPEC Therma FB EDC

FPEC IP Firewall Config

Not moving

To confirm with Trends if Thermaprime will change IP add range from 172.31.201.0/24 to 10.111.0.0/16

We are just waiting for the move in

Page 24: Company Readiness Assessment Checklist Ver 4.21

25 % = 15 computersNo migration will be done. All users will be created to new AD

We will use current resources

Page 25: Company Readiness Assessment Checklist Ver 4.21

fb floor plan

we will use current firewall and connect to RBC thru IP-Sec configuration

for co-location at Bayantel

FPEC Printer location & Accounting Workgroup Server

Dot matrix printer for check voucher printing and workgroup server for accounting system (2 users access)

Need to check the floor plan for identifying no. of printers needed for Thermaprime's operation.

Page 26: Company Readiness Assessment Checklist Ver 4.21

these will be relocated to off-site branch

Stand alone server for accounting will be moved to RBC

We will plan for the disposal of these IT equipment and peripherals

Page 27: Company Readiness Assessment Checklist Ver 4.21

All telco contract is out of locking period. Can request service termination month before the transfer

Discussed with AM - Abie last week. Just need the exact date of transfer.

Page 28: Company Readiness Assessment Checklist Ver 4.21

All telco contract is out of locking period. Can request service termination month before the transfer

Provision for TV power/cable provisioning

Page 29: Company Readiness Assessment Checklist Ver 4.21
Page 31: Company Readiness Assessment Checklist Ver 4.21
Page 32: Company Readiness Assessment Checklist Ver 4.21
Page 33: Company Readiness Assessment Checklist Ver 4.21

Will use whatever is installed

Will bring our own TK device

Need to integrate existing timekeeping system w RBC3

Page 34: Company Readiness Assessment Checklist Ver 4.21

Rockwell Asian Eye

LEGEND

Not moving Not moving

Yes (Completed)

No (Not Started)

In Progress (On Track)

In Progress (Delayed)

Not Applicable

Page 35: Company Readiness Assessment Checklist Ver 4.21
Page 36: Company Readiness Assessment Checklist Ver 4.21
Page 37: Company Readiness Assessment Checklist Ver 4.21
Page 38: Company Readiness Assessment Checklist Ver 4.21
Page 39: Company Readiness Assessment Checklist Ver 4.21
Page 40: Company Readiness Assessment Checklist Ver 4.21
Page 42: Company Readiness Assessment Checklist Ver 4.21
Page 43: Company Readiness Assessment Checklist Ver 4.21
Page 44: Company Readiness Assessment Checklist Ver 4.21
Page 45: Company Readiness Assessment Checklist Ver 4.21

Item AUP Shared Guidelines Specific Items

1 Websites

Corporate Website YesStock Websites (PSE) Yes

News Websites Yes

Yes

Bank Sites YesGovernment Sites Yes

Law Sites Yes

2 Social Media

Facebook yes

Twitter No

LinkedIn yes

Pinterest NoGoogle Plus + No

Tumblr No

Instagram No

Flickr NoVine No

Others No

3 Chat

WhatsApp No

Facebook Messenger No

Skype No

Viber No

Google Hangouts Yes 2016

YM No

Others

4 Browsers

Chrome Yes

Safari Yes For mac users

Firefox Yes

IE No

IT Core Decision (Yes/No)

IT Core Approval, with Condition(s)

Allow specific websites to be accessed

Pornographic, terrorist, malicious and torrent-related websites will be blocked.

Trading Websites (OLX, Amazon, Ebay...)

Social Networking is not permitted unless officially authorized.

limited to responding to viewing news feeds

only, posting comments (for

technical validation)

Chat is not permitted unless officially authorized

Google Chrome as standard Browser, other browsers will need to be approved

Page 46: Company Readiness Assessment Checklist Ver 4.21

4 Browsers

TOR Browser No

Opera No

Others

5

Youtube No

Vimeo No

Metacafe No

Torrent No

Others

6 Please specify app No

7

Symantec Yes

Kaspersky No

Sophos No

Bitdefender No

Mcafee Yes

Eset No

No

F-Secure No

Panda No

Google Chrome as standard Browser, other browsers will need to be approved

Video Streaming

Video-streaming websites are not permitted unless officially authorized.

Applications that needs to be installed in

PC

Only official licensed software may be installed on end-user devices. Software installations will be executed by official company IT administrators.

All computers should be locked except for company IT Admin

Endpoint Security

End-user devices should have endpoint security software installed.

Units without anti-virus protection / Outdated or expired antivirus

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated versions

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated versions

Microsoft Security Essential

Page 47: Company Readiness Assessment Checklist Ver 4.21

7

Avast No

Trend Micro Yes

8 Native Email

Ms Outlook NoLotus NoInky No

Windows Email NoMozilla Thunderbird No

Others No

9 Cloud Storage

10 No

11

IOS No

Android No

Windows CE No

Blackberry No

12 Yes

13 Guest Laptops No No access by default

14 No

15 No

Endpoint Security

End-user devices should have endpoint security software installed.

Units without anti-virus protection / Outdated or expired antivirus

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated versions

Native e-mail access on personal devices requires a wipe waiver to automatically wipe information once the hardware is compromised.The use of non-company, non-cloud storage is highly discouraged.

All company information must be stored and backed-up only on the company approved storage

Google drive preferred as standard cloud drive

Apple Macintosh

Macs will be on an exception basis

Tablets & Smartphones

Only company issued end-user devices will be allowed to connect to the company network.

Jail-broken devices will not be allowed to connect to the network

Windows 7 OS & Branded WS

Every laptop and desktop must be from a branded manufacturer and have at least the following:- Anti-virus protection- Minimum OS version of windows 7 Professional

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated

Only authorized devices will be allowed to connect to the company network. Visitors will be provided guest connectivity to the internet.

Windows 8 Service Pack

Only official licensed software may be installed on end-user devices.

Not advised, Not Recommended

Other OS ie. Linux etc

Page 48: Company Readiness Assessment Checklist Ver 4.21

16 No

17 No

18 Plotters No

19 Direct Lines No

20 Fax No

21 Cable TV No

22 Tethering & Wifi No Cisco MSE Adaptive Wireless Intrusion Prevention System (wIPS)

AUP List

Sample Acceptable Use Policy Template. One sheet per event.

External HDD and USB

Use of non-company issued external storage is restricted

Standalone printers

Standalone printers will not be connected to the network (USB only) but will require space & powerPlotter will require space & power

Direct Lines that are not connected to the IP Telephony System and will be handled by each company. Cat6 provision to the Tel Room will be provided by fitout

Faxes that are not connected to the IP Telephony System and will be handled by the company. Cat6 provision to the Tel Room will be provided by fitout

Cable TV provision will be provided in each Executive / VP Room by fitout contractor but will be handled by each company. RG6 Cable provision to the Tel Room will be provided by fitoutTethering and wifi sharing devices will only be allowed for BCP purposes.

Page 49: Company Readiness Assessment Checklist Ver 4.21

FPH FGEN FPIP FPIC

Present Policy Present Policy Present Policy Present Policy

Firewall URL Filtering Allow All Users Allow All Users Allow All Users Allow All UsersFirewall URL Filtering Allow All Allow All Allow All Allow AllFirewall URL Filtering Allow All Allow All Allow All Allow All

Firewall URL Filtering Allow All Allow All Allow All Allow All

Firewall URL Filtering Allow All Allow All Allow All Allow AllFirewall URL Filtering Allow All Allow All Allow All Allow AllFirewall URL Filtering Allow All Allow All Allow All Allow AllFirewall URL Filtering Allow All Allow All Allow All Allow All

Allow All Allow All Allow All MCC, IT

Firewall URL Filtering Allow All Allow All Allow All MCC, IT

Firewall URL Filtering Allow All Allow All Allow All MCC, IT

Firewall URL Filtering Allow All Allow All Allow All MCC, ITFirewall URL Filtering Allow All Allow All Allow All MCC, ITFirewall URL Filtering Allow All Allow All Allow All MCC, IT

Firewall URL Filtering Allow All Allow All Allow All MCC, IT

Firewall URL Filtering Allow All Allow All Allow All MCC, ITFirewall URL Filtering Allow All Allow All Allow All MCC, ITFirewall URL Filtering Allow All Allow All Allow All MCC, IT

Allow All Allow All

Allow All Allow All Allow All MCC, IT

Allow All Allow All Allow All IT

Allow All Allow All

Allow All Allow All Allow All Allow All

Allow All Allow All YM Blocked

Allow All

Allow All Allow All Allow All Allow All

Allow All Allow All Allow All

Allow All Allow All Allow All Allow All

Allow All Allow All Allow All Allow All

Addressed by Technology or Process

Firewall URL Filtering, Applicaiton Visibility and Control (AVC)

Application Visibility and Control (AVC)

Executives, IT, Guest,

consultantsApplication Visibility and Control (AVC)

Application Visibility and Control (AVC),

Network Access Control (NAC)

Application Visibility and Control (AVC).

Network Access Control (NAC)

Executives, IT, Guest,

consultants

Application Visibility and Control (AVC)

Application Visibility and Control (AVC),

Network Access Control (NAC)

Application Visibility and Control (AVC),

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Page 50: Company Readiness Assessment Checklist Ver 4.21

Blocked Blocked Blocked

Allow All Blocked

Blocked Blocked

Firewall URL Filtering Allow All Allow All MCC, IT

Firewall URL Filtering Allow All MCC, IT

Firewall URL Filtering Blocked Blocked Blocked

Blocked Blocked

Blocked Blocked Blocked

MS Project Adobe pdf viewer Adobe pdf viewer

cisco VPN Teamviewer Teamviewer - IT

MS VisioVNC

Symantec altiris

Installed

Installed

Installed

Installed Installed

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Executives, IT, Guest,

consultantsExecutives, IT,

Guest, consultants

Application Visibility and Control (AVC),

Network Access Control (NAC), Firewall

URL Filtering

Executives, IT, Guest,

consultants

Application Visibility and Control (AVC),

Network Access Control (NAC), Firewall

URL Filtering

Network Access Control (NAC)

SAP (HR & Acctg. System)

SAP, Lotus Notes, Acrobat

Reader, MS Office,

ERP-ERIC, Great Plains

ERP-Platinum 4.8a,

middlewares

Network Access Control (NAC)

Docu1/Globodox (Digitization/Archi

ving System)Network Access Control (NAC)

Acrobat Professional

Network Access Control (NAC)

Olympus Recorder (for transcribing)

Network Access Control (NAC)

Legal System (Jurisprudence/L

aws/Taxation, etc.)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

Page 51: Company Readiness Assessment Checklist Ver 4.21

For Archive For ArchiveAllow All For Archive

ProcessProcessProcessProcessProcessProcess

Process

1 - HC + 1

2 - HC, VCM 1 - AMM

Allow All

For Verification

25-Win7-SP2, 25-Win7-SP2,

20-guest laptop 5-guest laptop

NAC 15-Win8.1 1-Win8.1

NAC

Network Access Control (NAC)

Network Access Control (NAC)

Network Access Control (NAC)

3 - FRL, ORL, GCR

Executives, FRL, SCH,VBS, JR, CJF, EPS,APG

Network Access Control (NAC)

Executives & Managers

Executives & Managers

Network Access Control (NAC)

Executives & Managers

Executives & Managers

Network Access Control (NAC)

Executives & Managers

Network Access Control (NAC)

Executives & Managers

Executives & Managers

Network Access Control (NAC)

Recently upgraded OS but Still a number of

Clone PCs

IBM Lenovo - Company issued

Wireless Security, NAC

Guests and Consultants

Guests and Consultants

Page 52: Company Readiness Assessment Checklist Ver 4.21

NAC, AD Group Policy Allow all 10 - 1 TB Various

NAC 21 Printers 13 printers 4 Printers

For Verification

process 6 -For Verification

Process 1 - OPs 1 -For Verification

Process 1 -For Verification

Cisco MSE Adaptive Wireless Intrusion Prevention System (wIPS)No Control No Control No Control No Control

FPH Printers List

FGEN DL List

AUP FPH AUP FGEN AUP FPIP AUP FPIC

Comptrollership, Finance, Legal, Audit, Admin,

HR, CorpComm, Executive Offices

19 - USB HDD, 21 - External

Drives

5 Dot Matrix Printers, AMM

14 DID/NDD w Lock

For Verification with Admin

5 - IAR, AMM, ASR, RRL, ROS

6 - Critical Functions/Operati

ons

For Verification with Admin

6 - Executives, Corp Com, Admin

Gym, FRL, VBS3

FGEN Printers List

Page 53: Company Readiness Assessment Checklist Ver 4.21

FPEC Therma FB EDC Rockwell

Present Policy Present Policy Present Policy Present Policy Present Policy

Allow All Users Allow All Users Allow All UsersAllow All Allow All Allow AllAllow All Allow All Allow All

Allow All Allow All Allow All

Allow All Allow All Allow AllAllow All Allow All Allow AllAllow All Allow All Allow AllAllow All Blocked Limited

Executives

Executives BlockedExecutives Allow All Allow AllExecutives Blocked

Executives Blocked

Executives BlockedExecutives BlockedExecutives Blocked

Executives Blocked Blocked

Executives Blocked Blocked

Executives. IT Allow All

Executives Blocked Blocked

Executives Allow All Allow All

Executives Allow All Blocked

Allow All Allow All Allow All

Allow All Allow All Allow All

Allow All Allow All Allow All

Accounting Allow All Allow All

Executives, HR, IT

Blocked - Allow during Lunch

Executives, HR, Corpcom, IT

Blocked - Allow during Lunch

Executives, HR, Corpcom, IT

Executives, HR, IT

Blocked - per Request

Executives, HR, Corpcom, IT

Executives, HR, Corpcom, IT

Blocked - per Request

Page 54: Company Readiness Assessment Checklist Ver 4.21

Blocked Blocked

Blocked Blocked

Blocked Blocked

Blocked Blocked Blocked

Blocked Blocked Blocked

Blocked Blocked Blocked

Blocked Blocked Blocked

Teamviewer

Adobe pdf viewer Adobe pdf viewer Teamviewer

Teamviewer Sketchup

GIMP ACAD - Selected

Winrar

Installed

Installed

Installed

Executives, HR, IT

Blocked - Allow during Lunch

Executives, HR, Corpcom, IT

ERP-ERIC, Great Plains

ERP - Quicknet (port 8795)

Page 55: Company Readiness Assessment Checklist Ver 4.21

Installed

Installed

Installed For Archive

Doc EstuarInstalled For Archive

2 - RCG, JB

2 - ADG, ACO Executives

2 - ADG, ACO IT

16-Win7-SP2, 65-Win7-SP2, 2-Win7-SP2,

10-guest laptop 5-guest laptop 10-guest laptop

1-Win8.1 For Downgrade 8-Win8.1

Synology Linux

3 - ADG, ACO, JMG, LDT

5 - JCT, FRE, ALS, AAI, XXX

Executives & Managers

Page 57: Company Readiness Assessment Checklist Ver 4.21

Asian Eye

Present Policy

Page 58: Company Readiness Assessment Checklist Ver 4.21
Page 59: Company Readiness Assessment Checklist Ver 4.21

Allow All Allow AllAllow All Allow AllAllow AllAllow AllAllow AllAllow All

Page 61: Company Readiness Assessment Checklist Ver 4.21
Page 62: Company Readiness Assessment Checklist Ver 4.21
Page 63: Company Readiness Assessment Checklist Ver 4.21

Allow All Allow All Selected Allow All Allow AllAllow All Allow All Selected Selected Allow AllAllow All Allow All Selected Allow AllAllow All Allow AllAllow All Allow All

Allow All

Autodesk Digital Ocean

Page 64: Company Readiness Assessment Checklist Ver 4.21
Page 65: Company Readiness Assessment Checklist Ver 4.21

Company AUP Request

FPH

Video Streaming

Endpoint Security

Tablets & Smartphones (question Windows 7 OSWindows 8 Service PackExternal HD and USB

Standalone printers

Exemption access News web sites (local & global), PSE, Lopez Group web sites and FB accounts (Lopez Link etc.), Dropbox -

Access to bank sites, government sites, news sites, search engines, Dropbox -

Allow access to all search engines (google, yahoo, etc), government agencies web sites (PSE, BIR, etc), Law sites, & Universities(U.P. Ateneo , Lawphil etc), Dropbox -

Allow access to all search engines, all government agencies (LGU, DOLE, BIR, PAGASA), Safety, environment related web sites (PCAPI, ASSPI etc), Sulit, Buy and Sell, Ayos Dito, Dropbox -

Allow access to all government agencies, all search engines, FB accounts of other Lopez Group companies (Fgen, Lopez Link), YouTube, LinkedN, Dropbox -

Exemption to access social media site (Facebook, Twitter, Youtube & other related channels) -

Non-Standard Applications that needs to be installed in PC

Allow the Use of Mac desktop computers for the following offices:

Page 66: Company Readiness Assessment Checklist Ver 4.21

FPH

Standalone printers

Direct Lines

Fax Machines

CATV

FPIC

All WEB ACCESS for MCC & IT.

Allow to open ports for external drive.

Allow to have access for video streaming.

Page 67: Company Readiness Assessment Checklist Ver 4.21

FPIC

Allow to install Timekeeping Machine

1 plotter1 scanner

FPEC

Allow use of mac book laptop

IBM stand alone desktop server

Allow use of Internet Explorer browser

Use of USB hard disk

Therma

FB

BIR, SSS, Philhealth, PAGIBIG (other Government sites) & BDO /Epayroll/Mypayroll (for payroll transactions) requires Mozilla Firefox browser.

Retain existing 6 direct line numbers (assigned to officers & Crisis Room)

Computer (Windows XP standalone) with Oil Accounting Software in DOS.Allow to bring two (2) colored laser printer,

Allow access to Facebook, Linkedin, Dropbox, Sendspace, Youtube for Marketing, HR, Executives & IT

Allow access to Skype, RDP, Teamviewer

Allow use of free software GIMP, adobe reader, winrar

Remote connection to Batangas office thru IP-Sec configuration - Already discussed with JosephAllow use of Windows 8.1 operationg system

Use of dot matrix printer Epson FX-2175 132cpi for cheque voucher printingAllow access to Skype, RDP, Teamviewer

Personal iPad and Company issued Samsung Android

Page 68: Company Readiness Assessment Checklist Ver 4.21

Therma

Allow to use Mac book laptop

Printer - HPNetwork Printer for HR group

Plotter - HP Designjet 510

Standalone Printers (8 units)

TV Screens (6 units)

Fax Machine ***** for confirmationCable TV

Timekeeping Machine

FB

Chat, SkypeQuicknetTeam ViewerSophos antivirus

Other OS ie. Linux

Standalone Printers (8 units)

Fax Machines

Cable TV

Biometrics

FGEN

Allow the company provided USB Flash Drives

Policy 10 Apple Macintosh for Executives

Guest Laptops, up to 10 machines for Guest users

Allow the use of the following video-streaming and file-sharing websites for Youtube & Dropbox

Page 69: Company Readiness Assessment Checklist Ver 4.21

FGEN

Fax Machines & Numbers

Direct Lines

Allow the use of the following video-streaming and file-sharing websites for Youtube & Dropbox

Allow the use of the following video-streaming, social media and file-sharing websites for HR Group workstations:-YouTube-Facebook-Twitter-Dropbox

Allow the use of Encrypted USB Flash Drives (with Anti-virus) which are company-provided.

Allow Apple Mac workstations of authorized users to connect to the company network.Allow access to all video streaming, social networking and file sharing websites for Mancom members.

Page 70: Company Readiness Assessment Checklist Ver 4.21

FGEN

Direct Lines

FPIP

Asian Eye

Rockwell

EDC

Page 71: Company Readiness Assessment Checklist Ver 4.21

Business Justification

For research, social media, web update, news circulation

For research, reference, Information and regulatory compliance

Used for research and information gathering and regulatory compliance.

Used for research and information gathering

For internet browsing, video/photo editing, and development of presentation materials

Used for research work, bank rates information, SAP uploads and regulatory compliance

For Research (price research - property,) regulatory compliance, safety & health networking

For HR related research (training, lectures, facilities etc.), for checking applicant's profile and sample work, etc.

Page 72: Company Readiness Assessment Checklist Ver 4.21

For management group (MCC & IT) need for research & technical support.

Needed for research, training, including foreign training w/c hosts locally.

Needed for transfer of files (pictures, heavy files, etc)

Page 73: Company Readiness Assessment Checklist Ver 4.21

Timekeeping/PayrollUsed in by oil accounting

Plotter - for large format printing of designs/plans & TO, etc.Scanner - for Document Management System (volume jobs)

Company assigned laptop

Accounting Software Great Plains for printing cheque and accounting transactions

Access to ERIC ERP application and online leave approval

Company issued laptop. OEM bundled

Accounting requirement in printing bank cheque thru accounting software Great Plains

Company issued storage for data backup

Access to email and google apps

Remote Sites thru RBC (Thermaprime network)

Required by some sites for fast access & other related transactions like BIR EFPS filing/payment .

Delay in receiving and outdoing calls during peak hours due to congestion. Emergency calls might not reach FPIC. Old numbers are in database of crisis team (comprises of stakeholders).

Laser colored printer - (needed for immediate printing of materials like for Board meeting, plans & drawings, other presentation).

Recruitment, big file sharing to consultant and business partners, Youtube - download trainings, best practices and IT troubleshooting,

Remote access for off-site server, remote desktop and chat facility when communicating to consultant or business partners

GIMP - free photo editor installed to Robert; Adobe reader & Winrar for all windows users

BPI Corporate Online approval using cryptokit, RCBC BIR approval, report generation in Great Plains

Remote access for off-site server, remote desktop and chat facility when communicating to consultant or business partners

Page 74: Company Readiness Assessment Checklist Ver 4.21

Note: Personal Laptop

Finance requirement for check printing.For HR use - confidentiality of documentsPlotter - for large format printing of designs/plans & TO, etc.

Printing needs for Managers

Company's Dashboard

For Timekeeping/payroll

For team collaborationFirst Balfour Accounting SoftwareRemote SupportProtection for Viruses and Trojans

Executives are Mac Users and need full internet access

Guest Laptops will be used for temporary Internet Connection.

File server currently on a dedicated desktop has Linux as its OS

Printer for Executives

for Document Transmittal

cable TV for Executives

We use it for time keeping.Youtube - need to research on technology and instructional materials for learning and updating of knowledge and skills.

Dropbox - the groups frequently deals with external contractors and agencies for their projects and exchange files such as designs, documentations and other materials; these files are mostly big files and in their experience, Dropbox is easier to use for them and their external contacts.

Page 75: Company Readiness Assessment Checklist Ver 4.21

Mancom members require access to these sites.

Required for international calls, for external contacts

Youtube - need to research on technology and instructional materials for learning and updating of knowledge and skills.

Dropbox - the groups frequently deals with external contractors and agencies for their projects and exchange files such as designs, documentations and other materials; these files are mostly big files and in their experience, Dropbox is easier to use for them and their external contacts.Youtube - HR Group needs YouTube access to upload and monitor company's Youtube-hosted videos.

Facebook - HR Group maintains the company's HR Facebook account which is used mainly for recruitment and announcements.

Linkedin - HR Group maintains the company's HR Linkedin account which is used mainly for recruitment and announcements.

Twitter - HR Group maintains the company's HR Twitter account which is used for announcements. It has been proven that updates are much faster on Twitter than on other Social Media Websites.

Dropbox - HR group deals with external agencies and shares files like AVP production, publications and other materials. These files are mostly large files and in their experience, Dropbox is easier to use for both them and their external contacts.

Employees who require to transfer files to another device or to bring with them the files when they travel (using a portable storage device) will be provided by the company the encrypted USB Flash Drive with Anti-Virus Software. Being encrypted, files on the flash drive can be accessed only by the user who knows the password to decrypt the files. This addresses the security issue with the data on the flash drive. With the anti-virus software on the device, infection of malwares will be prevented.

Selected Mancom members are used to and comfortable with Apple Mac laptops. Their Apple Mac laptops enable them to navigate through and work with the different applications faster.

Used by the different departments for FAX communication, and outside contacts are familiar with these numbers

Page 76: Company Readiness Assessment Checklist Ver 4.21

Required for international calls, for external contacts

Page 77: Company Readiness Assessment Checklist Ver 4.21

Users / Count Decision (Y/N) Conditional ApprovalDanny Gozo

Ricky CarandangDeedee AgustinesNiña ZialcitaHazel VelascoKevin KisonEmelita d. SabellaMercedita RosaldoFergie SantiagoAbegail CabreraEsmeraldo C. Amistad

Lorraine DychiaoLianne M. Bacorro

Sonia M. RaymundoFarley A. Cuizon

Oscar R. Lopez, Jr.,Ralf D. NabongCeleste ConsibidoJo JuanNelson TorioMarinet LaxamanaArlene SabellaJo Ann De la CruzAnna Karina P. GerochiMila D. FadriKara GandiongcoRoss HamoIlene EstradaFlorian CabudolJehan YusopAyesha A. VolpaneDanny GozoRicky CarandangDeedee AgustinesNiña ZialcitaHazel VelascoKevin KisonAll

All

AllOscar M. LopezOscar R. Lopez, Jr.CorpComm StaffExecutives & ManagersRecently upgradedGuests and ConsultantsAll

OMLopez

Agnes Le. Casabar Oxales

Elsa Maria Pureza E. Silvino

Page 78: Company Readiness Assessment Checklist Ver 4.21

FRLopez

ELIbañezGBPunoESCoSetengDAGozoRACarandangEDSabella

VBSantosAPGerochiORLopezRIMacatangayBKLiboroEMCanlasAgnes De Jesus

OMLopezFRLopezELIbañezGBPunoESCoSetengDAGozoRACarandangEDSabella

VBSantosAPGerochiORLopezRIMacatangayBKLiboroEMCanlasAgnes De Jesus

MAWienekeSCMiguel

Ana Maria S. Del RosarioIT Team (3 members)

Anthony M. Mabasa Ana Maria S. Del Rosario

Anthony M. MabasaIreneo A. Raule Jr.Ana Maria S. Del Rosario

Rafael O. SantosMarivic F. MiniozaAnthony C. Cepillo

New Group Head Comptroller

New Group Head Comptroller

Anthony M. Mabasa

MCC group (13 members)

MCC group (w/ 13 members) Other assigned to projects (for non-MCC froup)

Robert Vincent R. Ledesma

Page 79: Company Readiness Assessment Checklist Ver 4.21

All Employees

Anthony M. Mabasa Ireneo A. Raule, Jr.Ana Maria S. Del Rosario

Rafael O. SantosCrisis Room c/o Admin

Ma. Celeste M. Tan

PresidentComptroller

Robert IsonTrinidad BinuaJen GarciaArt De GuiaOddie MadatuAriel OngDerick DegayLuis TrinidadRommel Bolus

Art de Guia Ariel OngLuis TrinidadJen GarciaRobert Ison

Rita Capucao Judy NaragMANCOMRobert Ison

Trinidad Binua

Rita Capucao Judy Narag

Rita Capucao Judy Narag Robert Ison

MANCOM

Robert Ison

Art De Guia Ariel Ong

Remote Site Users

Robert Vincent R. Ledesma

Page 80: Company Readiness Assessment Checklist Ver 4.21

Romerico C. Gonzales

Lea Navia Alfredo C. SamanAlfredo C. Saman Cecilia F. Uy

Eric J. MontesManuel RoxasJohn M. GozoWilfredo T. CapilMelchor T. MarianoRonald TablanteJoey R. RomeroAlfredo C. SamanAlfredo C. Saman

with HRAdmin

Alfredo C. Saman

AllAllAllAll

Albert Ignacio

10 Guests

AllAlbert Ignacio

Juliet De Castro

Charleen Paraon

AllBDG

Alfonso G. Baena

Condrado M. Abanilla

Jonathan C Tansengco

Anthony Paul De Leon FernandezFlorello Del Rosario Estuar

Anthony Paul De Leon FernandezFlorello Del Rosario EstuarMaria Carmela Lozada Hombrebueno

Maria Carmela Lozada Hombrebueno

Anthony Paul De Leon FernandezFlorello Del Rosario Estuar

Page 81: Company Readiness Assessment Checklist Ver 4.21

HR

Selected users

Mancom

Mancom

Admin Fax 637-8366BDG Telefax 638-4706Central Fax 631-4691

Legal Fax 910-4846OC TelefaxFRL TelefaxMancomCZU 910-0252DHV 635-2755EPS 635-3426

GBP 910-0661Val Dy Sun 638-3023OOCFRL DSLOCC c/o Sarah MateJosette MendozaFRLSCHOther Users

TSD Groups workstations:

ax Machines required with Direct Lines:

Corp Comm Fax 914-5146Finance Telefax 635-2322

Estela Dela Paz 637-3955

Page 82: Company Readiness Assessment Checklist Ver 4.21

Denise Fajardo (Treasury) 638-4705Venie Villanueva (Accounting) 633-1300

Page 83: Company Readiness Assessment Checklist Ver 4.21

Item Specific Items

1 Websites

Yes

Yes

Yes

Yes

AUP Shared Guidelines

IT Core Decision (Yes/No)

Allow specific websites to be accessed

Pornographic, terrorist, malicious and torrent-related websites will be blocked.

Access News web sites (local &

global), PSE, Lopez Group web sites (Lopez Link etc.),

Dropbox -

Access to bank sites

Allow access to all search engines, all

government agencies (LGU,

DOLE, BIR, PAGASA),

Allow access to all search engines (google, yahoo,

etc), government agencies web sites

(PSE, BIR, etc), Law sites, &

Universities(U.P. Ateneo , Lawphil

etc)

Page 84: Company Readiness Assessment Checklist Ver 4.21

1 Websites

Yes

Yes

2

yes

No

3 Chat

Google Hangouts Yes

Allow specific websites to be accessed

Pornographic, terrorist, malicious and torrent-related websites will be blocked.

Allow access to all search engines (google, yahoo,

etc), government agencies web sites

(PSE, BIR, etc), Law sites, &

Universities(U.P. Ateneo , Lawphil

etc)

Safety, environment related web sites (PCAPI, ASSPI etc), Sulit,

Buy and Sell, Ayos Dito, Dropbox -

Social Media

Social Networking is not permitted unless officially authorized.

Exemption to access social

media site (Facebook, Twitter

& Linked In) -

Pinterest, Google Plus +, Tumblr,

Instagram, Flickr, Vine

Chat is not permitted unless officially authorized

Page 85: Company Readiness Assessment Checklist Ver 4.21

3 Chat

Skype, Viber, No

No

4 Browsers

Chrome Yes

Safari YesFirefox Yes

IE No

Chat is not permitted unless officially authorized

Facebook Messenger,

WhatsApp, YM, Teamviewer , RDP

Others

Google Chrome as standard Browser, other browsers will need to be approved

PROSFast. Voice search. No ads. Leading support for HTML 5. Good security. Syncing with drive. Built-in Flash player and PDF reader.

Page 86: Company Readiness Assessment Checklist Ver 4.21

4 Browsers

IE No

Opera NoTOR Browser No

5

Youtube No

Vimeo NoMetacafe NoTorrent No

Others No

6 Please specify app No

Google Chrome as standard Browser, other browsers will need to be approved

PROSFast. Voice search. No ads. Leading support for HTML 5. Good security. Syncing with drive. Built-in Flash player and PDF reader.

Video Streaming

Video-streaming websites are not permitted unless officially authorized.

Applications that needs

to be installed in

PC

Only official licensed software may be installed on end-user devices. Software installations will be executed by official company IT administrators.

Page 87: Company Readiness Assessment Checklist Ver 4.21

7

Symantec Yes

Kaspersky No

Sophos No

Bitdefender No

Mcafee Yes

Eset No

No

F-Secure NoPanda NoAvast No

Trend Micro Yes

8

Ms Outlook NoLotus NoInky No

Windows Email NoMozilla Thunderbird No

Others No

9

Endpoint Security

End-user devices should have endpoint security software installed.

Units without anti-virus protection / Outdated or expired antivirus

Microsoft Security Essential

Native Email

Native e-mail access on personal devices requires a wipe waiver to automatically wipe information once the hardware is compromised.

Cloud Storage

The use of non-company, non-cloud storage is highly discouraged.

All company information must be stored and backed-up only on the company approved storage

Google drive preferred as

standard cloud drive

Page 88: Company Readiness Assessment Checklist Ver 4.21

9

10 No

11

IOS NoAndroid No

Windows CE No

Blackberry No

Cloud Storage

The use of non-company, non-cloud storage is highly discouraged.

All company information must be stored and backed-up only on the company approved storage

Google drive preferred as

standard cloud drive

Apple Macintosh

Macs will be on an exception basis

Tablets & Smartphone

s

Only company issued end-user devices will be allowed to connect to the guest network upon request.

Jail-broken devices will not be allowed to connect to the network

Page 89: Company Readiness Assessment Checklist Ver 4.21

12 Yes

Yes

Windows 8 SPK2 Yes

13 No

15 No

16 No

17 No

Windows 7 Pro

Every laptop and desktop must be from a branded manufacturer and have at least the following:- Approved Anti-virus (latest updated patch) protection- Minimum OS version of windows 7 Professional

Windows 7pro SPK2

Branded WS &

Laptops

Dell, IBM, HP, Lenovo, Asus, Sony

Guest Laptops

Only authorized devices will be allowed to connect to the company network. Visitors will be provided guest connectivity to the internet.

Other OS ie. Linux etc

External HDD and

USB

Use of non-company issued external storage is restricted

Standalone printers

Standalone printers will not be connected to the network (USB only) but will require space & power

Page 90: Company Readiness Assessment Checklist Ver 4.21

17 No

18 Plotters No

19 Direct Lines No

20 Fax Lines No

21 Cable TV No

Standalone printers

Standalone printers will not be connected to the network (USB only) but will require space & power

Plotter will require space & power

Direct Lines that are not connected to the IP Telephony System and will be handled by each company. Cat6 provision to the Tel Room will be provided by fitout

Faxes that are not connected to the IP Telephony System and will be handled by the company. Cat6 provision to the Tel Room will be provided by fitout

Cable TV provision will be provided in each Executive / VP Room by fitout contractor but will be handled by each company. RG6 Cable provision to the Tel Room will be provided by fitout

Page 91: Company Readiness Assessment Checklist Ver 4.21

22 No

23 No

24 Others

Tethering & Wifi

Tethering and wifi sharing devices will only be allowed for BCP purposes.

Time Keeping

Time keeping used for payroll shall be standalone and not connected to network

Page 92: Company Readiness Assessment Checklist Ver 4.21

FPH

Reason Users

Danny GozoRicky CarandangDeedee AgustinesNiña ZialcitaHazel VelascoKevin Kison

Mila D. FadriKara GandiongcoRoss HamoIlene EstradaFlorian CabudolJehan YusopAyesha A. Volpane

Emelita d. SabellaMercedita RosaldoFergie SantiagoAbegail Cabrera

Oscar R. Lopez, Jr.,Ralf D. NabongCeleste Consibido

Jo JuanNelson TorioMarinet LaxamanaArlene Sabella

Jo Ann De la Cruz

Lorraine Dychiao

Lianne M. Bacorro

Sonia M. Raymundo

FPH Business Justification

IT Core Decision

(Y/N)

For research, social media, web update,

news circulation. For HR related research (training, lectures, facilities etc.), for

checking applicant's profile and sample

work, etc.

Anna Karina P. Gerochi

Used for research work, bank rates information, SAP

uploads and regulatory

compliance

For research, reference,

Information and regulatory

compliance

For research, reference,

Information and regulatory

compliance

Esmeraldo C. AmistadAgnes Le. Casabar Oxales

Elsa Maria Pureza E. Silvino

Page 93: Company Readiness Assessment Checklist Ver 4.21

Farley A. Cuizon

Oscar R. Lopez, Jr.,Ralf D. NabongCeleste ConsibidoJo JuanNelson TorioMarinet LaxamanaArlene SabellaJo Ann De la CruzDanny GozoRicky CarandangDeedee AgustinesNiña ZialcitaHazel VelascoKevin Kison

Mila D. FadriKara GandiongcoRoss HamoIlene EstradaFlorian CabudolJehan Yusop

Ayesha A. VolpaneDanny GozoRicky CarandangDeedee AgustinesNiña ZialcitaHazel VelascoKevin Kison

2016 All

For research, reference,

Information and regulatory

compliance

For Research (price research - property,)

regulatory compliance, safety &

health networking

limited to responding to viewing news feeds only, posting comments (for technical validation c/o Joseph)

Used for research and information gathering and

regulatory compliance..

For HR related research (training, lectures, facilities etc.), for checking

applicant's profile and sample work, etc.

Anna Karina P. Gerochi

real risks to using social media, ranging from damaging the

brand to exposing proprietary information.

Social Media thru apps carry malicious software Sometimes hackers go right to the source, injecting malicious code into a

social networking site, including inside advertisements and via

third-party apps

Page 94: Company Readiness Assessment Checklist Ver 4.21

All

All

All

For mac users AllAllAll

The bandwidth rate during a Viber call is approximately 240 KB per minute up and down, 14

MB per hour up and down.

You talk for 1 Minute – 240KB data is consumed

You talk for 1 hour on a call – 14MB data is consumed

real risks to using social media, ranging from damaging the

brand to exposing proprietary information. Social Media thru apps carry malicious software Sometimes hackers go right to the source, injecting malicious code into a social networking

site, including inside advertisements and via third-

party apps

Chrome is designed with security in mind. It has a suite

of security features in place that means that even if attackers find a hole in one layer they

have to bypass other security measures that are in place.

Hackers and cybercriminals are using flaws in Microsoft’s

Internet Explorer to search computers to discover what

kinds of security software they are running and how to take

control of them, security researchers claim.

The exploits are allowing digital reconnaissance to be

performed on a massive scale, across whole companies,

computers, web servers and users without their knowledge, exposing holes in their security

and allowing criminals to intelligently attack vulnerable

machines.

Page 95: Company Readiness Assessment Checklist Ver 4.21

All

AllAllDanny GozoRicky CarandangDeedee AgustinesNiña ZialcitaHazel VelascoKevin KisonAll

All

Hackers and cybercriminals are using flaws in Microsoft’s

Internet Explorer to search computers to discover what

kinds of security software they are running and how to take

control of them, security researchers claim.

The exploits are allowing digital reconnaissance to be

performed on a massive scale, across whole companies,

computers, web servers and users without their knowledge, exposing holes in their security

and allowing criminals to intelligently attack vulnerable

machines.

in case of downloading/watching, the data

would range more or less between this for "1 HOUR" of

VIDEO -

240p ~ 150 MB360p ~ 250 MB480p ~ 400 MB

720p ~ 800-900 MB1080p ~ 1.2 -1.4 GB

Used for research and information

gathering

All computers should be locked except for company IT Admin

For internet browsing, video/photo editing, and development of

presentation materials

Page 96: Company Readiness Assessment Checklist Ver 4.21

No 4

No 5

Not in top quadrant

Not in top quadrantAll Users

Not in top quadrantNot in top quadrantNot in top quadrant

Dropbox, Icloud

All

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated versions

No 1 in Gartner Magic Quadrant

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated versions

No 2 in Gartner Magic Quadrant

Problems with previous Endpoint security

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated versions

No 3 in Gartner Magic Quadrant

integration with other Google services and ease of use. It

boasts a great design, and is accessible to anyone with a

Google account. Google Drive is linked with Google's full suite

of apps, allowing users to create and store documents,

spreadsheets, and Powerpoint presentations.

Google Drive is designed to do two things: create and share

documents, and share files. By default you can create a new

document, presentation, spreadsheet, form or drawing,

and you can also connect third-party apps to add features such as note-taking, mind mapping, diagramming and even interior

design.

Dropbox (popular, 50 million users) is more for personal than enterprise grade drive, security,

frequent downtime, sync issues. integration with google

apps. Icloud for mac integration and sync issues with

google

Page 97: Company Readiness Assessment Checklist Ver 4.21

Dropbox, Icloud

Oscar M. LopezOscar R. Lopez, Jr.CorpComm Staff

integration with other Google services and ease of use. It

boasts a great design, and is accessible to anyone with a

Google account. Google Drive is linked with Google's full suite

of apps, allowing users to create and store documents,

spreadsheets, and Powerpoint presentations.

Google Drive is designed to do two things: create and share

documents, and share files. By default you can create a new

document, presentation, spreadsheet, form or drawing,

and you can also connect third-party apps to add features such as note-taking, mind mapping, diagramming and even interior

design.

Dropbox (popular, 50 million users) is more for personal than enterprise grade drive, security,

frequent downtime, sync issues. integration with google

apps. Icloud for mac integration and sync issues with

google

Social Media thru apps carry malicious software Sometimes hackers go right to the source, injecting malicious code into a

social networking site, including inside advertisements and via

third-party apps

Executives & ManagersExecutives & Managers

Page 98: Company Readiness Assessment Checklist Ver 4.21

All

Clone desktops

No access by default

All

OMLopez

FRLopezELIbañez

GBPuno

ESCoSeteng

Forescout NAC will only accept updated versions. Quarantine

will be applied to outdated

For security verification with Joseph

Guests and Consultants

Company issued / encrypted USB

Page 99: Company Readiness Assessment Checklist Ver 4.21

DAGozoRACarandangEDSabella

VBSantosAPGerochiORLopezRIMacatangayBKLiboroEMCanlasAgnes De Jesus

OMLopezFRLopezELIbañezGBPunoESCoSetengDAGozoRACarandangEDSabella

VBSantosAPGerochiORLopezRIMacatangayBKLiboroEMCanlas

Agnes De Jesus

MAWieneke

SCMiguel

OMLopez

New Group Head Comptroller

Company Responsibility (except conduits and wires)

New Group Head Comptroller

Company Responsibility (except conduits and wires)

Company Responsibility (except conduits and wires)

Page 100: Company Readiness Assessment Checklist Ver 4.21

Interference to RBC3 Wifi

RACarandang

Company Responsibility

DAGozo

CorpComm Area

Admin Area

Company Responsibility (except conduits and wires)

Page 101: Company Readiness Assessment Checklist Ver 4.21

FPH FPIC

Users

Anthony M. Mabasa Ana Maria S. Del RosarioIT Team (3 members)MCC group (13 members)

Anthony M. Mabasa Ana Maria S. Del RosarioMCC group (13 members)

AllAnthony M. Mabasa Ana Maria S. Del Rosario

All

Anthony M. Mabasa Ana Maria S. Del Rosario

All

Conditional Approval

FPIC Business Justification

IT Core Decision

(Y/N)

For management group (MCC & IT) need for research & technical support.

For management group (MCC & IT) need for research & technical

support.

For management group (MCC & IT) need for research & technical

support.

Required by some sites for fast access & other

related transactions like BIR EFPS

filing/payment .

MCC group (13 members) & IT Group (3)

For management group (MCC & IT) need for research & technical

support.

MCC group (13 members) & IT Group (3)

Page 102: Company Readiness Assessment Checklist Ver 4.21

Anthony M. Mabasa Ana Maria S. Del RosarioIT Team (3 members)MCC group (13 members)

Anthony M. Mabasa Ana Maria S. Del RosarioIT Team (3 members)MCC group (13 members)

Anthony M. Mabasa Ana Maria S. Del RosarioIT Team (3 members)MCC group (13 members)

Anthony M. Mabasa

For management group (MCC & IT) need for research & technical

support.

For management group (MCC & IT) need for research & technical

support.

For management group (MCC & IT) need for research & technical

support.

For management group (MCC & IT) need for research & technical

support.

For management group (MCC & IT) need for research & technical

support.

Page 103: Company Readiness Assessment Checklist Ver 4.21

Ana Maria S. Del Rosario

IT Team (3 members)

Anthony M. Mabasa Ana Maria S. Del RosarioIT Team (3 members)

For management group (MCC & IT) need for research & technical

support.

For management group (MCC & IT) need for research & technical

support.

Page 104: Company Readiness Assessment Checklist Ver 4.21

Anthony M. Mabasa Ana Maria S. Del Rosario

For management group (MCC & IT) need for research & technical

support.

Needed for research, training, including

foreign training w/c hosts locally.

Page 105: Company Readiness Assessment Checklist Ver 4.21

Selected users

Selected users

Page 106: Company Readiness Assessment Checklist Ver 4.21
Page 107: Company Readiness Assessment Checklist Ver 4.21

Ma. Celeste M. Tan

Anthony M. MabasaIreneo A. Raule Jr.Ana Maria S. Del RosarioRobert Vincent R. LedesmaRafael O. SantosMarivic F. Minioza

Anthony C. Cepillo

PresidentComptroller

Computer (Windows XP standalone) with Oil Accounting Software in

DOS.

Needed for transfer of files (pictures, heavy

files, etc)

MCC group (w/ 13 members) Other assigned to projects (for non-MCC froup)

Laser colored printer - (needed for immediate printing of materials like

for Board meeting, plans & drawings, other

presentation). 1 scanner Scanner - for

Document Management System

(volume jobs)

Page 108: Company Readiness Assessment Checklist Ver 4.21

Engineering

Anthony M. Mabasa Ireneo A. Raule, Jr.Ana Maria S. Del RosarioRobert Vincent R. LedesmaRafael O. SantosCrisis Room c/o Admin

Laser colored printer - (needed for immediate printing of materials like

for Board meeting, plans & drawings, other

presentation). 1 scanner Scanner - for

Document Management System

(volume jobs)

Plotter - for large format printing of designs/plans & TO, etc.

Delay in receiving and outdoing calls during

peak hours due to congestion. Emergency

calls might not reach FPIC. Old numbers are

in database of crisis team (comprises of

stakeholders).

Page 109: Company Readiness Assessment Checklist Ver 4.21

Timekeeping/Payroll

Payroll Accounting

Page 110: Company Readiness Assessment Checklist Ver 4.21

FPIC FPEC

Users

Robert IsonTrinidad BinuaJen GarciaArt De GuiaOddie MadatuAriel OngDerick DegayLuis TrinidadRommel BolusHRITAll

Conditional Approval

FPEC Business Justification

IT Core Decision (Y/N)

Allow access to websites for Marketing,

HR, Executives & IT

Research and information

Page 111: Company Readiness Assessment Checklist Ver 4.21

Robert IsonTrinidad BinuaJen GarciaArt De GuiaOddie MadatuAriel OngDerick DegayLuis TrinidadRommel Bolus

Robert Ison

Allow access to websites for Marketing,

HR, Executives & IT

Research and information

Allow access to Facebook, Linkedin,

Dropbox, Sendspace, Youtube for Marketing,

HR, Executives & IT

Recruitment, big file sharing to consultant

and business partners, Youtube - download

trainings, best practices and IT troubleshooting,

Allow access to Skype, RDP, Teamviewer.

Remote access for off-site server, remote desktop and chat

facility when communicating to

consultant or business partners

Page 112: Company Readiness Assessment Checklist Ver 4.21

Robert Ison

Rita Capucao

Allow access to Skype, RDP, Teamviewer.

Remote access for off-site server, remote desktop and chat

facility when communicating to

consultant or business partners

BPI Corporate Online approval using

cryptokit, RCBC BIR approval, report

generation in Great Plains

Page 113: Company Readiness Assessment Checklist Ver 4.21

Judy Narag

Robert IsonTrinidad BinuaJen GarciaArt De GuiaOddie MadatuAriel OngDerick DegayLuis TrinidadRommel Bolus

Robert Ison

BPI Corporate Online approval using

cryptokit, RCBC BIR approval, report

generation in Great Plains

Allow access to Facebook, Linkedin,

Dropbox, Sendspace, Youtube for Marketing,

HR, Executives & IT

Recruitment, big file sharing to consultant

and business partners, Youtube - download

trainings, best practices and IT troubleshooting,

GIMP - free photo editor installed to

Robert; Adobe reader & Winrar for all windows users

Page 114: Company Readiness Assessment Checklist Ver 4.21

Selected users

Selected users

Selected users

Page 115: Company Readiness Assessment Checklist Ver 4.21

Art de Guia Ariel OngLuis Trinidad

Jen Garcia

Art De Guia Ariel Ong

Company assigned laptop

Personal iPad and Company issued

Samsung Android.

Access to email and google apps

Page 116: Company Readiness Assessment Checklist Ver 4.21

Rita Capucao

Judy Narag

Trinidad Binua

MANCOM

Robert Ison

Rita Capucao

Judy Narag

IBM stand alone desktop server.

Accounting Software Great Plains for

printing cheque and accounting transactions

Allow use of Windows 8.1 operationg system

Company issued storage for data

backup

Use of dot matrix printer Epson FX-2175

132cpi for cheque voucher printing

Accounting requirement in printing

bank cheque thru accounting software

Great Plains

Page 117: Company Readiness Assessment Checklist Ver 4.21

Use of dot matrix printer Epson FX-2175

132cpi for cheque voucher printing

Accounting requirement in printing

bank cheque thru accounting software

Great Plains

Page 118: Company Readiness Assessment Checklist Ver 4.21

MANCOM

Robert Ison

Remote connection to Batangas office thru IP-

Sec configuration - Already discussed with

Joseph. Access to ERIC ERP application

and online leave approval

Page 119: Company Readiness Assessment Checklist Ver 4.21

FPEC Therma

Conditional Approval Users

For research and general info

ManagmentAll StaffRemote

Therma Business Justification

Page 120: Company Readiness Assessment Checklist Ver 4.21

For research and general info

AllRemotes

Remote Sites thru RBC (Thermaprime network)

Page 121: Company Readiness Assessment Checklist Ver 4.21
Page 122: Company Readiness Assessment Checklist Ver 4.21
Page 123: Company Readiness Assessment Checklist Ver 4.21

All

Page 124: Company Readiness Assessment Checklist Ver 4.21

Note: Personal Laptop

Romerico C. Gonzales Alfonso G. Baena

Page 125: Company Readiness Assessment Checklist Ver 4.21

All

Alfredo C. Saman

Lea Navia

Network Printer for HR group Alfredo C. Saman

Printing needs for Managers

Eric J. MontesManuel Roxas

Allow the use of company issued USB & External HD

Finance requirement for check printing.

Condrado M. Abanilla

Page 126: Company Readiness Assessment Checklist Ver 4.21

Printing needs for Managers

John M. GozoWilfredo T. CapilMelchor T. MarianoRonald TablanteJoey R. Romero

Plotter - HP Designjet 510

Alfredo C. Saman

Cecilia F. Uy

HRAdmin

Page 127: Company Readiness Assessment Checklist Ver 4.21

For Timekeeping/payroll Alfredo C. Saman

Alfredo C. SamanTV Screens (6 units) Company's Dashboard (company responsibility)

Page 128: Company Readiness Assessment Checklist Ver 4.21

FB

Conditional Approval FB Business JustificationIT Core Decision

(Y/N)

Research and general information

Page 129: Company Readiness Assessment Checklist Ver 4.21

Research and general information

Page 130: Company Readiness Assessment Checklist Ver 4.21

For team collaboration

Remote Support

Page 131: Company Readiness Assessment Checklist Ver 4.21

Quicknet First Balfour Accounting Software

Page 132: Company Readiness Assessment Checklist Ver 4.21

Protection for Viruses and Trojans

Page 133: Company Readiness Assessment Checklist Ver 4.21

Executives are Mac Users and need full internet

access

Page 134: Company Readiness Assessment Checklist Ver 4.21

Printer for Executives

Guest Laptops will be used for temporary Internet

Connection.

File server currently on a dedicated desktop has

Linux as its OS

Page 135: Company Readiness Assessment Checklist Ver 4.21

Printer for Executives

for Document Transmittal

cable TV for Executives

Page 136: Company Readiness Assessment Checklist Ver 4.21

We use it for time keeping.

Page 137: Company Readiness Assessment Checklist Ver 4.21

FB

Users

ManagementIT

All Staff

IT Core Decision (Y/N)

Conditional Approval

Page 138: Company Readiness Assessment Checklist Ver 4.21
Page 139: Company Readiness Assessment Checklist Ver 4.21

All

All

Page 140: Company Readiness Assessment Checklist Ver 4.21

All

Page 141: Company Readiness Assessment Checklist Ver 4.21

All

Page 142: Company Readiness Assessment Checklist Ver 4.21

Jonathan C TansengcoAlbert Ignacio

Florello Del Rosario Estuar

Anthony Paul De Leon Fernandez

Page 143: Company Readiness Assessment Checklist Ver 4.21

10 guest users

Albert Ignacio

Florello Del Rosario Estuar

Juliet De Castro

Anthony Paul De Leon Fernandez

Maria Carmela Lozada Hombrebueno

Page 144: Company Readiness Assessment Checklist Ver 4.21

Charleen Paraon

Florello Del Rosario Estuar

Maria Carmela Lozada Hombrebueno

Charleen Paraon

Anthony Paul De Leon Fernandez

Page 145: Company Readiness Assessment Checklist Ver 4.21

admin

Page 146: Company Readiness Assessment Checklist Ver 4.21

FGEN

FGEN Business Justification Users IT Core Decision (Y/N)

Page 147: Company Readiness Assessment Checklist Ver 4.21

BDG TSD Groups workstations:HR

Youtube - need to research on technology and instructional

materials for learning and updating of knowledge and

skills.

Dropbox - the groups frequently deals with external contractors and agencies for their projects and exchange

files such as designs, documentations and other materials; these files are

mostly big files and in their experience, Dropbox is easier

to use for them and their external contacts.

Page 148: Company Readiness Assessment Checklist Ver 4.21
Page 149: Company Readiness Assessment Checklist Ver 4.21
Page 150: Company Readiness Assessment Checklist Ver 4.21

All

Page 151: Company Readiness Assessment Checklist Ver 4.21

Mancom

Selected Mancom members are used to and comfortable

with Apple Mac laptops. Their Apple Mac laptops enable

them to navigate through and work with the different

applications faster.

Page 152: Company Readiness Assessment Checklist Ver 4.21

Selected usersEmployees who require to

transfer files to another device or to bring with them the files

when they travel (using a portable storage device) will be provided by the company

the encrypted USB Flash Drive with Anti-Virus Software.

Being encrypted, files on the flash drive can be accessed only by the user who knows the password to decrypt the

files. This addresses the security issue with the data on the flash drive. With the anti-virus software on the device, infection of malwares will be

prevented.

Page 153: Company Readiness Assessment Checklist Ver 4.21

MancomCZU 910-0252DHV 635-2755EPS 635-3426Estela Dela Paz 637-3955GBP 910-0661Val Dy Sun 638-3023OOCFRL DSLOCC c/o Sarah MateJosette MendozaFRLSCH2 Other Users

Admin Fax 637-8366BDG Telefax 638-4706Central Fax 631-4691Corp Comm Fax 914-5146Finance Telefax 635-2322Legal Fax 910-4846OC TelefaxFRL Telefax

Denise Fajardo (Treasury) 638-4705Venie Villanueva (Accounting) 633-1300

Used by the different departments for FAX

communication, and outside contacts are familiar with these

numbers

Page 154: Company Readiness Assessment Checklist Ver 4.21
Page 155: Company Readiness Assessment Checklist Ver 4.21

FGEN FPIP

Conditional Approval FPIP Business Justification Users

Henry CoJun LizardoNoel CustodioJaninna MendozaVic MontinolaEr SensonKat SantosLala FuentesLynn OngPaolo Asis

Lydia PotestadesCris BronLiezl Sawali

Aime ValleSheena CarisoJocelyn Plaza

Research, News monitoring Social Media Updates /

monitoring Regulatory compliance Online company related financial transactions

Presentations support / tech support search for suppliersInternet research in support of business development

Internet research in support of business development

Support to Ofc of the President, presentation support, search for info, images, travel info, etc.

Supplier search / research in supprt of accrediationAllow the use of the following:

Government sites (BIR, PEZA, BSP, etc.), financial institutions websites (BPI,

Metrobank, etc.), philippine dealing system

(http://www.pds.com.ph/), Dropbox, OneDrive,

Sendspace, YouTube, http://www.weatherlink.com/user/fpip, www.fpip.com

"Allow the use of the

following: FB / LinkdIn / job search sites / kalibrr /

Government sites (DOLE, PagIBIG, SSS, etc.) / online

traiing sites, educational instituion sites, SaaS sites (HRIS, recruitment, etc.),

Dropbox, OneDrive, Sendspace, YouTube,

http://www.weatherlink.com/user/fpip, www.fpip.com,

PAGASA

Page 156: Company Readiness Assessment Checklist Ver 4.21

Precy Belgira

Aime ValleSheena CarisoJocelyn Plaza

Allow the use of the following: Govt sites (LRA, HLURB,

Google Maps, PEZA, etc.), Dropbox, OneDrive,

Sendspace, http://www.weatherlink.com/user/fpip, www.fpip.com

"Allow the use of the following: FB / LinkdIn / job

search sites / kalibrr / Government sites (DOLE,

PagIBIG, SSS, etc.) / online traiing sites, educational

instituion sites, SaaS sites (HRIS, recruitment, etc.),

Dropbox, OneDrive, Sendspace, YouTube,

http://www.weatherlink.com/user/fpip, www.fpip.com,

PAGASA"

Page 157: Company Readiness Assessment Checklist Ver 4.21
Page 158: Company Readiness Assessment Checklist Ver 4.21
Page 159: Company Readiness Assessment Checklist Ver 4.21

All

Page 160: Company Readiness Assessment Checklist Ver 4.21

Henry CoJun LizardoNoel CustodioJaninna Mendoza

Vic Montinola

Execuive use/preferred hardware/personal use

Compay issued equipment, executive use / preference

Henry CoJun Lizardo

Noel CustodioJaninna Mendoza

Vic Montinola

Kat SantosAime Valle

Lydia PotestadesPrecy Belgira

Page 161: Company Readiness Assessment Checklist Ver 4.21

Henry Co

Jun LizardoNoel Custodio

Janinna Mendoza

Vic Montinola

Allow the use of the following: Guest Laptops (10)

Alex RoqueShigeo Fukuda (Macbook

personal)Kendrick Yu

Kazumi CarpenaJeff Panado

Mark Caluag Others (4)

For file sharing with Batangas, back up to online

file sharing, files back up

Henry CoJun Lizardo

Noel CustodioJaninna Mendoza

Vic MontinolaEr SensonKat Santos

Lala FuentesLynn OngPaolo AsisAime Valle

Sheena CarisoJocelyn Plaza

Lydia PotestadesCris Bron

Liezl Sawali Precy Belgira

Confidential files, presentations

Page 162: Company Readiness Assessment Checklist Ver 4.21

Lynn OngCris BronLiezl Sawali Precy Belgira

Lynn Ong

Confidential files, presentations

Company transactions, commuications / file

transmittal back up with Batangas

Page 163: Company Readiness Assessment Checklist Ver 4.21

Timekeeping, payroll

Aime ValleSheena Cariso

Page 164: Company Readiness Assessment Checklist Ver 4.21

FPIP

Conditional ApprovalIT Core Decision

(Y/N)

Page 165: Company Readiness Assessment Checklist Ver 4.21
Page 166: Company Readiness Assessment Checklist Ver 4.21
Page 167: Company Readiness Assessment Checklist Ver 4.21
Page 168: Company Readiness Assessment Checklist Ver 4.21
Page 169: Company Readiness Assessment Checklist Ver 4.21
Page 170: Company Readiness Assessment Checklist Ver 4.21
Page 171: Company Readiness Assessment Checklist Ver 4.21
Page 172: Company Readiness Assessment Checklist Ver 4.21
Page 173: Company Readiness Assessment Checklist Ver 4.21

Asian Eye

Page 174: Company Readiness Assessment Checklist Ver 4.21
Page 175: Company Readiness Assessment Checklist Ver 4.21
Page 176: Company Readiness Assessment Checklist Ver 4.21
Page 177: Company Readiness Assessment Checklist Ver 4.21
Page 178: Company Readiness Assessment Checklist Ver 4.21
Page 179: Company Readiness Assessment Checklist Ver 4.21
Page 180: Company Readiness Assessment Checklist Ver 4.21
Page 181: Company Readiness Assessment Checklist Ver 4.21
Page 182: Company Readiness Assessment Checklist Ver 4.21

Item AUP Guideline1a Workstation

1b Endpoint Security

1c Windows 7 OS

1d MAC Macs will be on an exception basis

1e

1f Browsers

Every laptop and desktop must be from a branded manufacturer : Dell, IBM, HP, Lenovo, Asus, Sony

End-user devices should have prescribed endpoint security software installed.

Every laptop and desktop must have at least the following minimum OS version of windows 7 Professional

Applications that needs to be installed in PC

Only official licensed business-related software may be installed on end-user devices. Software installations will be executed by official company IT administrators.

* - open for discussion. (Admin Rights to be centralized with company IT)

Google Chrome as standard Browser, other browsers will need to be approved

PROSFast. Voice search. No ads. Leading support for HTML 5. Good security. Syncing with drive. Built-in Flash player and PDF reader.

Page 183: Company Readiness Assessment Checklist Ver 4.21

2a Websites

2b Video Streaming

2c Social Media

2d Chat

3a

3b Guest Laptops

Allow specific websites to be accessed

Pornographic, terrorist, malicious and torrent-related websites will be blocked.

websites to avoid and are typically some people are more tech savvy than others. Guidance and safety measures should be applied to protect the network from malicious and viruses etc.

Block: abortion, alcohol, death/gore, drugs, gambling, mature, nudity, pornography, provocative, proxy, suicide, tobacco, and weapons.

Video-streaming websites are not permitted unless officially authorized.

Social Networking is not permitted unless officially authorized.

Chat is not permitted unless officially authorized

Tablets & Smartphones

Only company issued end-user devices will be allowed to connect to the guest network upon request.

Jail-broken devices will not be allowed to connect to the network

Accessing company email on personal devices will require the user to sign a wipe waiver form

Only authorized devices will be allowed to connect to the company network. Visitors will be provided guest connectivity to the internet.

Page 184: Company Readiness Assessment Checklist Ver 4.21

3c

3d Tethering

4a Cloud Storage

4b

5 Remote Sites

6

Stand Alone Printers

Standalone printers will not be connected to the network (USB only) but will require space & power

Tethering and wifi sharing devices will only be allowed for BCP purposes.

The use of non-company, non-cloud storage is highly discouraged.

All company information must be stored and backed-up only on the company approved storage

External HDD and USB

Use of non-company issued external storage is restricted

Company issued workstations will have the USB ports and CD ROMs disabled

Remote sites connecting to the group MPLS must comply with the following:-100% compliance with the RBC3 shared guidelines

-Enterprise-grade Firewall-Web Filtering-Network Access Controls

Direct Lines & Faxes

Direct Lines that are not connected to the IP Telephony System and will be handled by each company. Cat6 provision to the Tel Room will be provided by fitout

Page 185: Company Readiness Assessment Checklist Ver 4.21

7 Cable TV Cable TV provision will be provided in each Executive / VP Room by fitout contractor but will be handled by each company. RG6 Cable provision to the Tel Room will be provided by fitout

Page 186: Company Readiness Assessment Checklist Ver 4.21

RationaleTo maintain a minimum standard for workstations and guarantee that the information on the workstations and the network will not be compromised by:- Unverified hardware configurations for clone PCs- Threats hidden in unverified software installers

To maintain a minimum standard for workstations and guarantee that the information on the workstations and the network will not be compromised by:

- Viruses, Malware and external attacks

Prescribed Entrprise Edition AV : Gartner Top 5: Symantec, Mcaffee, TrendMicro, Sophos, Kaspersky.

To maintain a minimum standard for workstations and guarantee that the information on the workstations and the network will not be compromised by:- Outdated operating system vulnerabilities- Threats hidden in unverified software installers

Support for the MAC hardware, OS and its applications are at the early stages

Unauthorized softwares may contain viruses and Malware that may slow down or bring down the entire system

Chrome is designed with security in mind. It has a suite of security features in place that means that even if attackers find a hole in one layer they have to bypass other security measures that are in place.

Hackers and cybercriminals are using flaws in Microsoft’s Internet Explorer to search computers to discover what kinds of security software they are running and how to take control of them, security researchers claim.

The exploits are allowing digital reconnaissance to be performed on a massive scale, across whole companies, computers, web servers and users without their knowledge, exposing holes in their security and allowing criminals to intelligently attack vulnerable machines.

Page 187: Company Readiness Assessment Checklist Ver 4.21

Only business related websites will be allowed. Firewall URL filtering will be applied to obvious business related sites.

Apply proper business ethics and Code of internet conduct.

in case of downloading/watching, the data would range more or less between this for "1 HOUR" of VIDEO -

240p ~ 150 MB360p ~ 250 MB480p ~ 400 MB720p ~ 800-900 MB1080p ~ 1.2 -1.4 GB

Social networking affects people's work time and productivity.

Certain allowed time of use can be applied

Chatting (Social networking) affects people's work time and productivity.

Certain allowed time of use can be applied

Social Media thru apps carry malicious software Sometimes hackers go right to the source, injecting malicious code into a social networking site, including inside advertisements and via third-party apps

Unknown OS versions and appllcations are susceptible to viruses and vulnerabilities

Page 188: Company Readiness Assessment Checklist Ver 4.21

Tethering will affect the central IT WIFI system

Users are encouraged to use the shared network printer.

In cases where AUP Exemption is approved, location of the printers are needed for power provision, hence its location of the printer in the floor layout has to be provided

integration with other Google services and ease of use. It boasts a great design, and is accessible to anyone with a Google account. Google Drive is linked with Google's full suite of apps, allowing users to create and store documents, spreadsheets, and Powerpoint presentations.

Google Drive is designed to do two things: create and share documents, and share files. By default you can create a new document, presentation, spreadsheet, form or drawing, and you can also connect third-party apps to add features such as note-taking, mind mapping, diagramming and even interior design.

Dropbox (popular, 50 million users) is more for personal than enterprise grade drive, security, frequent downtime, sync issues. integration with google apps. Icloud for mac integration and sync issues with google

Each employee should treat corporate information as a company asset and manage them responsibly

Objectives:

To protect company information against risks associated with external drives such as malware infections, data leakage and physical damage.

To leverage on the reliability that cloud storage provides, and protect against against intentional and unintentional data loss.

To allow the FPH Group to collaborate on a greater scale by storing and sharing information on the cloud.

To harden our network and ensure that network integrity is maintained.

Users are encouraged to use the unified communications systems.

In cases where AUP Exemption is approved, location of the DL & Faxes are needed for cat6 provision, hence its location the floor layout has to be provided for the conduiting and cabling

Page 189: Company Readiness Assessment Checklist Ver 4.21

To assist the company in the move provisions are already in place in VP and Executive rooms.

For specific locations requiring Cable TV an AUP form has to presented and approved, as well as the location needs to be provided where the Cable TV will be installed. Processing of Cable TV contract will be done by each company

Page 190: Company Readiness Assessment Checklist Ver 4.21

Consequences of non-compliance

Security vulnerabilities are know in IE and Other nonCommon browsers

Workstation will not be migrated to the AD.

Will not be connected to the FPH network

Potentially lose information and data due to unexpected hardware and software failures.

No hardware support for non-branded PC.

No QA

Units without anti-virus protection / Outdated or expired antivirus will not be allowed to connect to the network

Forescout NAC will only accept updated versions. Will not be allowed access to the network.

No troubleshooting support for MACs from central IT/IaaS.

Exemptions to be submitted on or before the scheduled AD migration.

Employees who are able to to install non-company software on their workstations will no longer be able to do so.

Non-IT administrators will no longer be able to run software installations.

Page 191: Company Readiness Assessment Checklist Ver 4.21

No access by default

No access by default

IT resources such as connection bandwidth ans speed will not be ioptimized for business use

Network abuse may lead to bandwidth starvation

Personal and Company reputation may be affected.

Productivity of staff will be affected due to non-business related browsing

Video Streaming will take much bandwith and can slow clog the internet bandwidth especially when more than a few are watching streaming videos (especially high resolution).

Will affect others users especially the Google apps

Productivity of users will be affected due to social networking.

Time and productivity will be affected by the abuse. Access to this sites especially those opening videos posted in FB may result in bandwidth starvation

Productivity of users will be affected due to social networking.

Time and productivity will be affected by the abuse. Access to this sites especially those opening videos posted in FB may result in bandwidth starvation

Page 192: Company Readiness Assessment Checklist Ver 4.21

If not provided to WS9 by 6-30-15 power provisioning as well as space may not be available

Employees who connect to the internet via tethering and wifi sharing devices without business need will not be allowed to do so

Use of unauthorized USBs and External storages may contain Malware and Viruses especially since it can be used on all other devices outside of the network. Home PCs or laptops...family members borrowing external drives can be contaminated

Employees who are able to connect USB drives, external harddrive and the like to their workstations will no longer be able to do so.

No remote sites will be allowed to connect to the RBC3 network unless fully complied

If location is not provided by 6-30-15 conduit and cabling provision will not be provisioned by the fitout

Page 193: Company Readiness Assessment Checklist Ver 4.21

Group will be exposed to reputational and legal risks of unlicensed software.

No Exemptions for workstation AUP

If location is not provided by 6-30-15 conduit and cabling provision will not be provisioned by the fitout

Page 194: Company Readiness Assessment Checklist Ver 4.21

WS1 - IP Address Management

1.03

YES

1.04YES

1.05YES

1.09 Target Date for completionYES 16-Jul

WS1 - AD Migration (TBD)

2.01

YES

2.02

YES

2.13 Target Date for completionYES 31-Jul

WS1 - Firewall for Remote Sites to RBC3

3.02

YES

Reference Document

Critical to Central IT

Deliverable (YES)

Critical Date for Central IT

Have all "Hardcoded" IP Addresses/ and IP Address conflicts been resolved or have a possible solution?

Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns?

Do you have the necessary resources to complete the project?

Have you reviewed your AD plans? Indicate percentage completion

Have you completed your AD migration Plan and actions

AD Migration Plan (c/o DA)

Have you reviewed the firewall requirements for remote sites to connect to RBC3

Page 195: Company Readiness Assessment Checklist Ver 4.21

3.04

YES

3.05 Do you have an approved budget

YES

3.12 Target Date for completion

YES 9/15/2015

WS1 - Stand Alone Printers

4.02

YES

4.08

YES

4.12 Target Date for completionYES 7/15/2015

WS1 - Existing IT Equipment

5.07

YES

5.09

5.10

YES

5.15 Target Date for completionYES 7/15/2015

WS2 - Transfer of OCC Data Center

Do you have the necessary resources to complete the project

Have you reviewed the floor plans where these printers will be placed. (Please check and verify with your HR)

July 21 2015 Floor Plan

Please attach signed conforme of your company executives on the AUP and AUP Exemption forms

Have you planned on relocation/redeployment IP Phones (Cisco)

Have you planned on relocation/redeployment Analog & Digital phones - for direct lines

Have you planned on relocation/redeployment/disposition Fax Machines

Page 196: Company Readiness Assessment Checklist Ver 4.21

6.05

YES

6.06 Do you have a budget

YES

6.13 Target Date for completion YES 9/30/2015WS3 - Telco (E1) 7/9/2015

8.04

YES

8.12 Target Date for completion YES 15-SepWS3 - Telco (Direct Lines) transfer to RBC3

10.06

YES

10.13

YES

10.14 Target Date for completion YES 7/15/2015WS6/7 - CATV

11.03

YES 7/15/2015

11.12 Target Date for completionYES 7/15/2015

Do you have the necessary resources to complete the project

Have you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

* Central IT to share actions required from

company owning E1 Contract

Please identify location of the Direct Lines on the floors plan

Have you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Have you identified location of your executives, special users the location on the floor plan

Page 197: Company Readiness Assessment Checklist Ver 4.21

WS3 - Connectivity - Migration to MPLS of sites

12.04

YES

12.13 Target Date for completion YES 15-SepWS5 - Review of RBC3 Acceptable Use Policy

14.04

YES

14.11YES

14.12 Target Date for completionYES 5/15/2015

WS5 - Upgrading of OS to Windows 7

16.02

YES

16.06 Do you have management's approval

16.11 Target Date for completionYES 7/7/2015

WS5 - Upgrading to Branded Laptops/Desktop

17.02YES

17.06 Do you have a budgetYES

17.12 Target Date for completionYES 7/7/2015

WS5 End-Point Security - workstation anti-virus software

17.02

YES

17.06 Do you have a budget

YES

17.12 Target DateYES 7/7/2015

Have you discussed with theTelcos your MPLS plans and concerns

* Central IT to share plan of when MPLS should be in

place per company (July

23)

Have you discussed with management the impact to non-compliance as well as Exceptions Form

AUP Exemption

Form

Pls insert your file here and

label as AUPExempt ## (exemption) ex AUPExempt01(

Macintosh)

Please attach signed conforme of your company executives on the AUP and AUP Exemption forms

Have you filled out and completed the Exemption Waiver Form (Below Windows 7)

AUP Exemption

Form

Have you filled out and completed the Exemption Waiver Form (Mac/Unbranded)

AUP Exemption

Form

Have you completed the process of procurement for the AV software

AUP Exemption

Form

Page 198: Company Readiness Assessment Checklist Ver 4.21

WS5 - Use of External Devices

17.02YES

17.06 Do you have a budgetYES

17.10 Target DateYES 7/7/2015

Have you filled out and completed the Exemption Waiver Form (External Devices)

AUP Exemption

Form

Page 199: Company Readiness Assessment Checklist Ver 4.21

FPH FGEN FPIP FPIC FPEC

YESYES YES YES

YES YES YES YES YES

YES YES YES YES YES

COMPLETED

8/28/2015 8/28/2015 8/28/2015 TBD

0\

YES

FPIC Server & Network 192.168.5.0 conflicts with FPEC. FPEC IP Address

changed to another block (indicate block)

YES

FPIC Server & Network 192.168.5.0 conflicts with FPEC. FPEC IP Address

changed to another block (indicate block)

7/16/2015 - COMPLETED

7/16/2015 - COMPLETED

7/16/2015 - COMPLETED

7/16/2015 - COMPLETED

7/16/2015 - COMPLETED

YES.

54% (31/57) complete

YES

95% (223/235) complete

YES

18% (4/22) complete

YES

(22/22) 100%

YES

54% (7/13) complete

NO.

46% (26/57) - 8/28/2015

NO

5% (12/235) - 8/28/2015

NO.

82% (18/22) - 8/28/2015

NO.

46% (6/13) - TBD

ON-HOLD - Awaitng AV approval & updated list of

resources who will move to RBC based

on re-org

7/31/2015 - COMPLETED

NA

No remote site to be connected to RBC

YES

Part of the MPLS implementation

NA

No remote site to be connected to RBC

YES.

Trends as vendor of choice.

YES.

There is a need to configure the IPSec between FPEC RBC to Batangas prior to

move to RBC.

F1
Updated 8/11
H1
Updated 8/11
J1
Updated 8/11
Page 200: Company Readiness Assessment Checklist Ver 4.21

NA YES NA

NA YES NA P240,000

NA NA 9/15/2015

FPIP Floor Plan FPEC Floor plan

8/31/2015 - TBC 9/30/2015 8/28/2015

YES YES No IP Phones No IP Phones No IP Phones

c/o ABG YES No DL No DL

Not yet YES No Fax

8/31/2015 - TBC Upon Move-in NA

YES.

Via Trends managed service for Firewall

YES.

Via Trends managed service for Firewall

YES

Via Trends managed service for Firewall

9/25/2015 - for MPLS

implementation completion

9/15/2015 - IPSec configuration completion

YES

Identified 12 units. List provided to HR

YES

Identified 12 units. List provided to HR

YES

Submitted Floor plans July 31 2015

YES

Pending due to unavailability of the

floor plan

YES

Submitted Floor plans June 29 2015

NO

IT Lead to prepare form and follow up

HR's approval

YES

IT Lead to follow up HR's approval

Working on floor plans

7/31/2015 - COMPLETED

7/31/2015 - COMPLETED

Telcos have been officially informed and will notify of transfer 1 month

move

YES

Submitted Floor plans June 29 2015

Identified movement to sites

7/15/2015 - COMPLETED

7/15/2015 - COMPLETED

Page 201: Company Readiness Assessment Checklist Ver 4.21

YES YES c/o IaaS.

NA YES NA NA

NA 8/28/2015 NA 8/28/2015 NA

YES No E1 No E1 No E1

TBD 9/15/2015 - TBC NA NA NA

Not yet YES NA NA

8/31/2015 - TBC Move-in Date NA Move-in date NA

TBD Move-in date

NA

No servers to be transferred

NA

No servers to be transferred

NA

No servers to be transferred at OCC.

However, a stand-alone Great Plains

server will be relocated at RBC at

locat IT support arrangement

YES

All costs c/o FGEN except Insurances. Insurances to be

filed to have server & OS replacements

(est 300,000 per server , 7 servers)

Forwarded to ABG the details. Further action required. For Charlie's intervention

Forwarded to ABG the details. Further action required. For Charlie's intervention

No locations yet but users (23) have

already been identified but needs

validation on location with HR

No DL to be transfered

FPIC Personel Positioning in floor

not yet completed by HR

No DL to be transfered

Coordinated. For execution one month

before actual transfer

YES

Forwarded to ABG the details. Further

action required.

YES

VBS. FRL. Meeting Room

YES

All VP in the room has provisions

Crisis room has not been identified. Needed there

YES

All managers in the room has provisions

7/15/2015 - COMPLETED

7/15/2015 - COMPLETED

7/15/2015 - COMPLETED

Page 202: Company Readiness Assessment Checklist Ver 4.21

YES

NA 9/25/2015 NA 9/15/2015 NA

YES YES YES YES

AUP FPH AUP FGEN AUP FPIP AUP FPIC AUP FPEC

TBD

Not yet YES YES YES

Not yet YES YES YES YESTBD

Not yet YES Laptop and Os YES

TBD YES YES

TBD 7/7/2015

YES YES

YES YES P1,400 per unit TBD

8/12/2015 9/30/2015 TBD

No MPLS connection.

No MPLS connection. possible

future requirement

YES

PLDT to be provided notice 1 month before transfer

No MPLS connection. All connection to Remote site is

through IPSec. c/o RCI

Forwarded to ABG the details. Further action required. For Charlie's intervention

6/8/2015 - COMPLETED

6/8/2015 - COMPLETED

6/8/2015 - COMPLETED

6/26/2015 - COMPLETED

YES.

1 unit c/o Oil Accounting System.

7/3/2015 - COMPLETED

7/3/2015 - COMPLETED

7/3/2015 - COMPLETED

7/7/2015 - COMPLETED

YES. Mac waiver (4) complete

1.4 M requested for 27 units

Will use available equipment

7/31/2015 - COMPLETED

7/3/2015 - COMPLETED

7/7/2015 - COMPLETED

YES

Awaiting delivery of Symantec Endpoint

YES

Kaspersky 10 has been "approved"

until 9/30/15

NO

Awaiting approval

No for other AV but have budget of Php

62,000 for Kaspersky 10 - 3

years

7/7/2015 - COMPLETED

7/7/2015 - COMPLETED

Page 203: Company Readiness Assessment Checklist Ver 4.21

YES YES YES YES YES

YES YES P20,000 Existing with AUPwith budget and existing HDDs

8/5/2015 - COMPLETED

7/7/2015 - COMPLETED

8/7/2015 - COMPLETED

7/7/2015 - COMPLETED

7/7/2015 - COMPLETED

Page 204: Company Readiness Assessment Checklist Ver 4.21

Therma FB EDC Rockwell Asian Eye

YES

YES YES

YES YES

7/16/2015 - TBC

8/28/2015 - TBC 8/25/2015 - TBC

YES

IP Conflict w FPIC on weroam has been

resolved

7/16/2015 - COMPLETED

YES

38% (23/60) complete

YES

73% (11/15) complete

NO.

62% (37/60) - 8/28/2015

NO.

27% (4/15) -8/25/2015

YES

Bayantel proposal stage (co-locate)

NA

No remote site to be connected to RBC

Page 205: Company Readiness Assessment Checklist Ver 4.21

YES NA

NA

9/15/2015 NA

FB Floor Plan

8/28/2015 7/31/2015

No IP Phones

No DL No DL

9/15/2015 TBD

YES

30k per month

NOT YET

Will coordinate with HR

YES

Submitted Floor plans July 31 2015

Not yet.

Will coordinate with Jonathan

No plans will check w HR

Need to get updated plan from HR for fax

to be located

Page 206: Company Readiness Assessment Checklist Ver 4.21

NA NA

NA NA

No E1

9/15/2015 - TBC

NA

NA

9/15/2015

NA

No servers to be transferred

No servers to be transferred

1 x E1 via Bayantel (15 channels

activated)

No DL to be transfered

No DL to be transfered

YES

Video Wall Dashboard

YES

All managers in the room has provisions

Page 207: Company Readiness Assessment Checklist Ver 4.21

YES Ongoing discussion.

AUP Therma AUP FB AUP EDC AUP Rockwell AUP AsianEye

TBD

YES

YES YES8/28/2015 - TBC

YES YES

YES YES

7/7/2015 - TBC 7/7/2015 - TBC

YES TBD

10/30/2015 1/30/2016

No MPLS connection. possible

future requirement

6/8/2015 - COMPLETED

YES

Downgrading from 8 to 7 as per Lenovo

7/7/2015 - COMPLETED

YES

Kaspersky 10 has been "approved"

until 10/30/15

YES

Sophos 10.03 has been "approved" until 1/30/2016

Page 208: Company Readiness Assessment Checklist Ver 4.21

YES YES

existing HDD Existing with AUP

7/7/2015 - COMPLETED

7/7/2015 - COMPLETED

Page 209: Company Readiness Assessment Checklist Ver 4.21

LEGEND

Not Applicable

In Progress (On Track)

In Progress (Delayed)

Page 210: Company Readiness Assessment Checklist Ver 4.21
Page 211: Company Readiness Assessment Checklist Ver 4.21
Page 212: Company Readiness Assessment Checklist Ver 4.21
Page 213: Company Readiness Assessment Checklist Ver 4.21
Page 214: Company Readiness Assessment Checklist Ver 4.21
Page 215: Company Readiness Assessment Checklist Ver 4.21
Page 216: Company Readiness Assessment Checklist Ver 4.21
Page 217: Company Readiness Assessment Checklist Ver 4.21
Page 218: Company Readiness Assessment Checklist Ver 4.21
Page 219: Company Readiness Assessment Checklist Ver 4.21
Page 220: Company Readiness Assessment Checklist Ver 4.21
Page 221: Company Readiness Assessment Checklist Ver 4.21
Page 222: Company Readiness Assessment Checklist Ver 4.21
Page 223: Company Readiness Assessment Checklist Ver 4.21
Page 224: Company Readiness Assessment Checklist Ver 4.21

1.03

1.04

1.05

1.09 Target Date

1.10

2.01 Have you reviewed your AD plans

2.02 Have you completed your AD migration Plan and actions

2.03

3.02

3.04

3.05 Do you have an approved budget

3.12 Target Date

4.02

4.08

4.12 Target Date

5.07

Reference Document

WS1 - IP Address Management

Have all "Hardcoded" IP Addresses/ and IP Address conflicts been resolved or have a possible solution?

Have you communicated to IT Consultants/IaaS regarding your decisions, plans and concerns?

Do you have the necessary resources to complete the project?

Please attach your IP Address inventory file (please save your updated file in google drive and share)?

WS1 - AD Migration (TBD)

AD Migration Plan (c/o DA)

Have all AD issues or conflicts been resolved or have a possible resolution

WS1 - Firewall for Remote Sites to RBC3

Have you reviewed the firewall requirements for remote sites to connect to RBC3

Do you have the necessary resources to complete the project

WS1 - Stand Alone Printers

Have you reviewed the floor plans where these printers will be placed. (Please check and verify with your HR)

July 21 2015 Floor Plan

Please attach signed conforme of your company executives on the AUP and AUP Exemption forms

WS1 - Existing IT Equipment

Have you planned on relocation/redeployment IP Phones (Cisco)

Page 225: Company Readiness Assessment Checklist Ver 4.21

5.09

5.10

5.15 Target Date

6.05

6.06 Do you have a budget

6.13 Target Date

7.01

7.02 Have you negotiated your penalty clause if any

7.03 For with Penalty Clause: Have you an approved budget

7.05

WS3 - Telco (E1)

8.04

8.12 Target Date

10.06

Have you planned on relocation/redeployment Analog & Digital phones - for direct lines

Have you planned on relocation/redeployment/disposition Fax Machines

WS2 - Transfer of OCC Data Center

Do you have the necessary resources to complete the project

WS3 - Telco (Internet)

Have you started your circuit termination discussion with all your Telco providers

Remarks: If any of the above is a "no" or "?" please specify

Have you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

WS3 - Telco (Direct Lines) transfer to RBC3

Please identify location of the Direct Lines on the floors plan

Page 226: Company Readiness Assessment Checklist Ver 4.21

10.13

10.14 Target Date

WS3 - Telco (CATV)

11.03

11.12 Target Date

12.04

12.13 Target Date

14.04

14.11

14.12 target date

16.02

16.06 Do you have management's approval16.12 Target Date

17.02

17.06 Do you have a budget

17.12 Target Date

Have you coordinated/endorsed all of the items for relocation/redeployment/disposition to its proper owners

Have you identified location of your executives, special users the location on the floor plan

WS3 - Connectivity - Migration to MPLS of sites

Have you discussed with theTelcos your MPLS plans and concerns

WS5 - Review of RBC3 Acceptable Use Policy

Have you discussed with management the impact to non-compliance as well as Exceptions Form

AUP Exemption Form

Please attach signed conforme of your company executives on the AUP and AUP Exemption forms

WS5 - Upgrading of OS to Windows 7

Have you filled out and completed the Exemption Waiver Form (Below Windows 7)

AUP Exemption Form

WS5 - Upgrading to Branded Laptops/Desktop

Have you filled out and completed the Exemption Waiver Form (Mac/Unbranded)

AUP Exemption Form

WS5 End-Point Security - workstation anti-virus software

Page 227: Company Readiness Assessment Checklist Ver 4.21

17.02

17.06 Do you have a budget17.12 Target Date

19.03

19.06 Do you have a budget

17.02

17.06 Do you have a budget

Requirement for resource

Major Priority Actions1. Is it applicable?

2. Gap exists?

5. Detailed work plan to remediate gap

Have you completed the process of procurement for the AV software

AUP Exemption Form

WS 6 & 7- Timekeeping

Have you checked with your existing Timekeeping vendor the requirements for integration/Data collection needed by your system to integrate with the Door Access System in RBC3

WS5 - Use of External Devices

Have you filled out and completed the Exemption Waiver Form (External Devices)

AUP Exemption Form

3. Determine resources and budget required to address gap

4. Schedule required by the Central IT deliverable dependent on it on when gap should be remediated

Page 228: Company Readiness Assessment Checklist Ver 4.21

FPH

Is it applicable Gap that exists Action Plan

YES Yes

YES

YES

YES 16-Jul

4/30/2015

YES (25/57) 47.37%

YES Ongoing

YES

YES

YES

YES 9/15/2015

YES

YES

YES 7/15/2015

YES

Critical to Central IT

Deliverable (YES)

Critical Date for Central IT

No Gaps exist will comply with RBC standard

Page 229: Company Readiness Assessment Checklist Ver 4.21

YES

YES 7/15/2015

YES

YES

YES 9/30/2015

7/9/2015

YES

YES 15-Sep 9/15/2015

YES

* Central IT to share actions required from company owning E1

Contract

Page 230: Company Readiness Assessment Checklist Ver 4.21

YES

YES 7/15/2015

YES 7/15/2015

YES 7/15/2015

YES

YES 15-Sep

YES

YES AUP FPH

YES

YES 7/7/2015

YES

YES

YES 7/7/2015

* Central IT to share plan of when MPLS

should be in place per company (July 23)

Pls insert your file here and label as AUPExempt ## (exemption) ex AUPExempt01(Macintosh)

Clone PCs need to be upgraded

Page 231: Company Readiness Assessment Checklist Ver 4.21

YES

YESYES 7/7/2015

YES

YES

YES

Page 232: Company Readiness Assessment Checklist Ver 4.21

FPH FGEN

Target Date Completion Date Notes & Remarks Is it applicable

Yes

Yes

Yes

7/16/2015

Yes

(199/209) 95%

Ongoing

0\

Yes

Yes

Ongoing

9/25/2015

c/o Jojo

7/27/2015

Yes

Resource & Budget needed to address

the Gap

Identified 12. Seat plan c/o HR

Identified 12. Seat Plan c/o HR

Page 233: Company Readiness Assessment Checklist Ver 4.21

No information

No information

7/27/2015

Yes c/o IaaS.

Yes

9/30/2015

No

No

1xE1 via Bayantel

9/15/2015

Yes - mostly with Bayantel

No locations yet but users (23) have already been identified but needs validation on location with HR

Page 234: Company Readiness Assessment Checklist Ver 4.21

No

7/27/2015

7/15/2015

Yes

9/25/2015

Yes

AUP FGEN

Yes

Yes7/3/2015

Yes

Yes

7/7/2015

VBS. FRL. Meeting Room

Page 235: Company Readiness Assessment Checklist Ver 4.21

Yes

7/7/2015

Yes

Yes

Yes

7/15/2015

Yes

Technical support from HP for storage/fiber-based

Alignment with HR on Personnel Planning

Page 236: Company Readiness Assessment Checklist Ver 4.21

FGEN

Gap that exists Action Plan Target Date Completion DateResource & Budget needed to address

the Gap

Page 237: Company Readiness Assessment Checklist Ver 4.21
Page 238: Company Readiness Assessment Checklist Ver 4.21
Page 239: Company Readiness Assessment Checklist Ver 4.21
Page 240: Company Readiness Assessment Checklist Ver 4.21

FGEN FPIP

Notes & Remarks Is it applicable Gap that exists Action Plan

Yes

Yes

7/16/2015

0

Not started, no AV

No remote site

FPIP Floor Plan

7/31/2015

No IP Phones

Resource & Budget needed to address

the Gap

May need extra hands for support

Already submitted previously, is this a new requirement?

Yes. Submitted Floor plans July 31 2015

Page 241: Company Readiness Assessment Checklist Ver 4.21

7/15/2015

No E1

Yes. Submitted Floor plans June 29 2015

Yes. Submitted Floor plans June 29 2015

No servers to be transferred

No DL to be transfered

Page 242: Company Readiness Assessment Checklist Ver 4.21

7/15/2015

Yes

AUP FPIP

Yes

Yes7/3/2015

Laptop and Os

7/31/2015

All VP in the room has provisions

No MPLS connection. possible future requirement

1.4 M requested for 27 units

Page 243: Company Readiness Assessment Checklist Ver 4.21

Symatec

8/7/2015

Yes

PM

Yes

1.4 Million

Yes

with budget and exsiting HDDs

IBSI Interconnection

Need clarification on IBSI Plans

Page 244: Company Readiness Assessment Checklist Ver 4.21

FPIP FPIC

Target Date Completion Date Notes & Remarks Is it applicable Gap that exists

YEs

Yes.

Yes.

7/16/2015

FPIC List of IP

(22/22) 100%

Ongoing

240,000

9/15/2015

7/15/2015

No IP Phones

Yes. Server & Network 192.168.5.0 conflicts w FPEC however, JL has recommended to change FPEC IP Address to another block

Yes. Trends as vendor of choice.

Yes. Via Trends managed service for Firewall

Users identified but personnel positioning pending

Working on floor plans

Page 245: Company Readiness Assessment Checklist Ver 4.21

7/15/2015

Yes c/o IaaS.

No E1

Telcos have been officially informed and will notify of transfer 1 month move

Identified movement to sites

All costs c/o FGEN except Insurances. Insurances to be filed to have server & OS replacements (est 300,000 per server , 7 servers)

8/14-15/2015 (noncritical)8/21-22/15 (critical)

Telco-intenet contract is beyond holding period (Bayantel and PLDT)

FPIC Personel Positioning in floor not yet completed by HR

Page 246: Company Readiness Assessment Checklist Ver 4.21

7/15/2015

7/15/2015

9/15/2015

AUP FPIC

Yes7/3/2015

Yes

Yes

7/3/2015

Coordinated. For execution one month before actual transfer

Crisis room has not been identified. Needed there

Yes. PLDT to be provided notice 1 month before transfer

Ongoing discussion. FPIC Security is still in-force.

Yes. 1 unit c/o Oil Accounting System.

Page 247: Company Readiness Assessment Checklist Ver 4.21

9/30/2015

Yes

20000

PM

Yes

312,000

9/30/2015

Yes

Yes. Kaspersky 10 has been "approved" until 9/30/15

AV & Remote Connectivity

Page 248: Company Readiness Assessment Checklist Ver 4.21

FPIC

Action Plan Target Date Completion Date Notes & RemarksResource & Budget needed to address

the Gap

Page 249: Company Readiness Assessment Checklist Ver 4.21
Page 250: Company Readiness Assessment Checklist Ver 4.21
Page 251: Company Readiness Assessment Checklist Ver 4.21
Page 252: Company Readiness Assessment Checklist Ver 4.21

FPEC

Is it applicable Gap that exists Action Plan Target Date

Yes.

Yes.

7/16/2015

(1/8)12.5%

Ongoing

IPsec configuration

No Cost

9/15/2015

FPEC Floor plan

7/31/2015

No IP Phones

Resource & Budget needed to address

the Gap

Yes. No conflict however there is a need to configure IPSec between FPEC RBC to Batangas.

FPEC IP Firewall Config

Yes. Via Trends managed service for Firewall

Yes. Submitted Floor plans June 29 2015

Page 253: Company Readiness Assessment Checklist Ver 4.21

No DL

No Fax

7/15/2015

No E1

No servers to be transferred

All telco contract is out of locking period. Can request service termination month before the transfer

No DL to be transfered

Page 254: Company Readiness Assessment Checklist Ver 4.21

7/15/2015

Yes

AUP FPEC

Yes

Yes7/7/2015

7/7/2015

All managers in the room has provisions

No MPLS connection. All connection to Remote site is through IPSec. c/o RCI

Yes. Mac waiver (4) complete

Will use available equipment

Page 255: Company Readiness Assessment Checklist Ver 4.21

Yes7/10/2015

Yes

Existing with AUP

Technical Support

Yes

AV budget approval

28,200

7/10/2015

Yes

Setup TrendMicro Server and Endpoint with updates

Page 256: Company Readiness Assessment Checklist Ver 4.21

FPEC Therma

Completion Date Notes & Remarks Is it applicable Gap that exists Action Plan

Yes.

Yes.

Yes.

7/16/2015

(13/53) 23.64%

Ongoing

Yes.

Yes. 30k per month

9/15/2015

No info from HR

Getting HR details

7/15/2015

Yes. Bayantel proposal stage

Will coordinate with Jonathan

Page 257: Company Readiness Assessment Checklist Ver 4.21

No DL

7/15/2015

9/15/2015

No plans will check w HR

Will set meeting with Bayantel to discuss circuit termination in line with the RBC transfer

1 x E1 via Bayantel (15 channels activated)

No DL to be transfered

Page 258: Company Readiness Assessment Checklist Ver 4.21

7/15/2015

Ongoing discussion.

AUP Therma

Yes7/31/2015

Yes

Yes

7/7/2015

No. Video Wall Dashboard

Downgrading from 8 to 7 as per Lenovo

Page 259: Company Readiness Assessment Checklist Ver 4.21

10/30/2015

Yes

existing HDD

Yes

7/24/2015

Yes

Yes. Kaspersky 10 has been "approved" until 10/30/15

Technical support for AD from Trends

Windows 8 downgrade

Page 260: Company Readiness Assessment Checklist Ver 4.21

Therma FB

Target Date Completion Date Notes & Remarks Is it applicable

Yes

Yes

7/16/2015

(6/8) 75%

Ongoing

FB Floor Plan

7/31/2015

No IP Phones

Resource & Budget needed to address

the Gap

Yes. IP Conflict w FPIC on weroam has been resolved

No connection with Sucat HO

Yes. Submitted Floor plans July 31 2015

Page 261: Company Readiness Assessment Checklist Ver 4.21

No DL

7/15/2015

No E1

Need to get updated plan from HR for fax to be located

No servers to be transferred

No DL to be transfered

Page 262: Company Readiness Assessment Checklist Ver 4.21

Ongoing discussion.

AUP FB

Yes

Yes7/7/2015

Yes

Yes

7/7/2015

All managers in the room has provisions

No MPLS connection. possible future requirement

Page 263: Company Readiness Assessment Checklist Ver 4.21

7/7/2015

for confirmation

Existing with AUP

Technical Support

Yes

No gaps

Yes

Yes. Sophos 10.03 has been "approved" until 1/30/2016

Page 264: Company Readiness Assessment Checklist Ver 4.21

FB

Gap that exists Action Plan Target Date Completion DateResource & Budget needed to address

the Gap

Page 265: Company Readiness Assessment Checklist Ver 4.21
Page 266: Company Readiness Assessment Checklist Ver 4.21
Page 267: Company Readiness Assessment Checklist Ver 4.21
Page 268: Company Readiness Assessment Checklist Ver 4.21

FB EDC

Notes & Remarks Is it applicable Gap that exists Action PlanResource & Budget needed to address

the Gap

Page 269: Company Readiness Assessment Checklist Ver 4.21
Page 271: Company Readiness Assessment Checklist Ver 4.21
Page 272: Company Readiness Assessment Checklist Ver 4.21

EDC Rockwell Asian Eye

Target Date Completion Date Notes & Remarks

Page 273: Company Readiness Assessment Checklist Ver 4.21
Page 275: Company Readiness Assessment Checklist Ver 4.21
Page 276: Company Readiness Assessment Checklist Ver 4.21

Item Priority Action Gap that exists

FGEN

1.1

1.2 AD Migration

1.3 Remote Site Connectivity Remote sites has to connect to OCC server

1.4 Move of Servers to OCC risks on server migration

1.5 Telco Lines (Termination and/or Move)

1.6 Move E1 Telco coordination and project plan

1.7 Time keeping

FPH

2.1 Replace Branded PC, Win OS 7, AV Actual inventory of PCs for compliance

2.2

2.3 AD Migration No AD due to Item 1

2.4 Telco Lines (Termination and/or Move)

2.5 AD Migration

2.6 Move E1

2.7 Time keeping

FPIC

3.1

3.2 Remote Site Connectivity

3.3 Move of Servers to OCC

3.4 Telco Lines (Termination and/or Move)

3.5 Crisis room systems

FPIP

4.1 Replace Branded PC, Win OS 7, AV

4.2 AD Migration4.3 IBSI Connectivity for backend4.4 Telco Lines (Termination and/or Move)4.5 Time keeping

FPEC5.1 Replace Branded PC, Win OS 7, AV5.2 AD Migration5.3 Sikat Foundation5.4 Telco Lines (Termination and/or Move)5.5 Time keepingFB

6.16.2 AD Migration6.3 Telco Lines (Termination and/or Move)6.4 Time keeping

Therma

7.17.2 AD Migration7.3 Telco Lines (Termination and/or Move)7.4 Move E17.5 Dashboard Video Wall7.6 Telco Lines (Termination and/or Move)7.7 Time keeping

Floor Plan showing DL, Standalone Printers, CATV

No information from HR on locations (outside of VP rooms)

10 units for conversion.  MAC issues on AD

Coordination of bldg CACS to timekeeping system

Floor Plan showing DL, Standalone Printers, CATV

No location for systems outside the VP rooms

Floor Plan showing DL, Standalone Printers, CATV

Floor Plan showing DL, Standalone Printers, CATV

Floor Plan showing DL, Standalone Printers, CATV

Page 277: Company Readiness Assessment Checklist Ver 4.21
Page 278: Company Readiness Assessment Checklist Ver 4.21

Action Plan Target Date

8/7/2015

Accenture & Test Unit

Ces to provide DA actual number 8/30/2015

8/15/2015

Resource & Budget needed to address the Gap

Request from HR Ms.Bunny the final locationsAccenture and Trends to provide resolution on MAC issues on ADDetailed MOP & Run sheet for the remote connectivity

CRV offered CC to help in the conversion to complete the conversionCes has provided Ms. Bunny the list of IT

equipment for the users. 

Page 279: Company Readiness Assessment Checklist Ver 4.21
Page 280: Company Readiness Assessment Checklist Ver 4.21

Completion Date Notes & Remarks