Upload
others
View
42
Download
0
Embed Size (px)
Citation preview
COMPANY PROFILE
SUBMITTED BY:
U DEAL (U) LIMITED pP.O BOX 30895, KAMPALA.
Janruary 2015
INTRODUCTION:
We are a building and civil engineering company based at Plot No 291 Mawanda Road Kampala
Uganda.
M/S UPDEAL (U) LTD. is a company with limited liability founded by a group of Ugandan
engineers and administrators. The company has brought together a number of engineers who
have extensive local and international working experience with reputable international
engineering practices spanning over a period of ten years
The aim of the firm is to offer a comprehensive range of engineering services backed by a core
of professional, competent and dedicated team with a range of skills and access to the latest
technology.
UPDEAL (U) LTD seeks to meet the constant growing demands of clients in Uganda and
elsewhere in East Africa with maximum flexibility, and with expert knowledge of engineering,
economic and environmental issues of vital importance in the region
SCOPE OF SERVICES:
We offer the following services
1) CIVIL AND STRUCTURAL ENGINEERING
Construction and maintenance of roads, bridges, tunnels and other works.
Building construction of high buildings and industrial plants.
Housing estates
Drainages
2) ELECTRICAL ENGINEERING
Electrical services for the domestic and industrial buildings, hospitals and high
rise office blocks and flats (comprise of electrical installations, fire and security
alarms and communication systems etc.)
Power supply(overhead and underground transmission and distribution)
Solar lighting
Street lighting
Installation of electrical fittings and motor control panels for water supply and
treatment systems.
Refrigeration & Air conditioning
3) WATER RESOURCE AND ENVIRONMENTAL ENGINEERING
Water resources and environmental engineering services
Urban and rural water supply and sanitation systems
Industrial water supply
Irrigation
Urban and rural waste disposal systems
Ranching and other related water supply systems
4) NETWORK INSTALLATION
Supply, maintenance of hardware Solution
Network designs, installation , maintenance
Office power solutions –UPS and invertors
Heavy power solutions
As indicated in our company profile, we have successfully completed a number of projects with
various clients, and thus have the capacity to handle any volume of work. We are willing and
able to work in any part of the country.
Many thanks for your consideration.
Yours truly,
ENG. ALI KISITU
MANAGING DIRECTOR
GENERAL INFORMATION ABOUT UPDEAL (U) LIMITED :-
1. Name of firm:
UPDEAL (U) LTD
2. Legal status:
LIMITED LIABILITY COMPANY
3. Place of Registration:
KAMALA (copy off registration /Incorporation enclosed)
4. Tax Information
TIN No. 1000145187
VAT Registration No. 24952-J
5. Principal place of Business:
POLT No.291 MAWANDA ROAD (Near Conner House off Kira Rd.
Kamwokya)
6. Postal address:
P. O. Box 30895 Kampala
7. Telephone contact:
0414-344951
8. Contact persons:
Eng. Ali Kisitu Mobil No. 0782023852
Mr. Mustafa Ssengendo Mobil No.0772595293/0701595293
Following are the Directors of UPDEAL (U) LIMITED.:
1. ENGINEER ALI KISITU - UGANDAN
2. MR. MUSTAPHER SSENGENDO - UGANDAN
COMPANY BANKERS:
Description of Banks
Name of Bank dfcu BANK
Branch Name Impala House
Branch code 03 050147
Street address 13 Kimathi Avenue
Postal Address P.O. Box 70, Kampala
Name of Manager Ms Ester Mayanja
Telephone number 041 256891/3
Fax Number 041 231697/344260
Account Number 2505780900
Description of Banks
Name of Bank Tropical Africa Bank Ltd.
Branch Name Kampala Branch
Branch code 09 060147
Street address Kampala Road
Postal Address P.O. Box 7292, Kampala
Name of Manager Mr. L.O. Oryema
Telephone number 041 231992
Fax Number 041 232296
Account Number 0010004993
CURRENT WORK BEING EXECUTED BY THE COMPANY:
NO PROJECT NAME AND
COUNTRY
NAME OF CLIENT AND
CONTACT PERSON
SCOPE OF WORKS AND %
COMPLETED
VALUE OF
CONTRACT
1 Sewer Upgrade at Katego road
KWCC 173.14
National Water & Sewerage
Corporation
P.O.Box: 7053 Kampala
Eng. Angelo Kwitonda
Laying of 76m of DN200mm uPVC,
construction of 900mm diameter concrete
manholes benching the manholes
Ongoing 60% Complete
14,869,239/=
2 Sewer Expansion of
Nakulabye – Kiyindi Pro. Ref.
NWSC-KW/WORKS/14-
15/1360281
National Water & Sewerage
Corporation
P.O.Box: 7053 Kampala
Eng. Angelo Kwitonda
Laying of 500m of DN200mm uPVC,
construction of 900mm diameter concrete
manholes and benching the manholes
Ongoing 20% Complete
31,852,920/=
3 Construction of Buwuni Town
Water supply system Pro-Ref
MWE/WSDF-E/WRKS/13-
14/00031
Ministry of Water and
Environment Water and
Sanitation Development
Facility East
P.O.Box: Mbale
Eng. Paul Kato
Laying of 19,000m of water mains and
distribution line, Construction of Pump house,
Guard house, Public water borne toilets, water
office Extending 11km of 3 phase power line,
erecting of 175m3 level water tank, Extending a
3-phane power line
Ongoing 70% Complete
1,986,386,812/=
4 Construction of Kyamulibwa
Water Supply sytem Pro. Ref.
MWE/WSDF-13-14/00062
Ministry of Water and
Environment Water and
Sanitation Development
Facility Central
Eng. Felix Twinomucunguzi
Construction of 21,000m water mains and
distribution line installation reinforced concrete
tanks of 100m3 level water tank, Extending a 3-
phane power line
Ongoing 80% Complete
3,005,575,685/=
4 Expansion and improvement of
Lyantonde Town council piped
water supply and sanitation
scheme – phase II
MWE/WSDF-
SWB/WRKS/2013-2014/00016
Ministry of Water and
Environment Water and
Sanitation Development
Facility South Western Branch
Eng. Mutabazi Hillary
Construction of water mains and distribution
line installation; erecting steel tank of 250m3
water tank, raised on a 6m high tower.
Ongoing 99% Complete
1,926,187,631/=
The work performed as prime Contractor over the last Past Years is:
No Project Name and Country Name of Client and Contact
person
Type of work performed and year of
completion
Value of Contract
1 Construction of Office Building
for water Resource Regulation
Department Ref No.
MWE/WRKS/08-09/00346
Ministry of water &
Environment P.O. Box 20026
Kampala
Dr. Callist Tindimugaya
Setting out, Earthworks and foundation works,
construction of substructure and main structure,
roofing, internal and external finishes electrical
and plumbing installation, I.T installations
JANUARY 2015
3,352,174,472/=
2 Construction of a Reinforced
Concrete Slab at UNEB
Printery Kyambogo
Sub contract from Typotech
Imaging Systems Ltd
P.o.Box: 1595 Kampala
Mr. Cajetan Amimo
Setting out, Demolition, excavation works, steel
cutting, bending and fixing, casting of concrete,
screed works and curing
JANUARY 2015
64,227,400/=
3 Sewer extension Naguru Katale
NWSC-KW/WRKS/13-
14/1359834
National Water & Sewerage
Corporation
P.O.Box: 7053 Kampala
Eng. Angelo Kwitonda
Laying of 300m of DN200mm uPVC,
construction of 900mm diameter concrete
manholes benching the manholes
JANUARY 2015
22,818,840/=
4 Over lauling of Luzira
Sewerage System Lines A-F,
For staff Quarters and
Murchison bay Prison
Pro-Ref UPN/WKS/13-
14/00501
Uganda Prisons Service HQ
P.O. Box 7182 Kampala
Mr. Okiror
Laying of 3000m of DN200mm uPVC,
construction of 900mm diameter concrete
manholes benching the manholes
DECEMBER 2014
247,804,089/=
5 Painting, Installation of
Telemetry Equipment and
Providing Signage at 12No.
Newly constructed Stations in
Lake Kyoga Basin Pro-Ref
No.13.2201.5-003.00
Giz Office Plot 23 Nakasero
Road P.O. Box 10346
Kampala
Mr. Daniel Opwonya
Painting works, Fabrication and installation of
signage
DECEMBER 2014 60,184,222/=
6 Proposed Rehabilitation of Car
Park at Nile Basin Initiative
NBI Secretariat
NBI/WORKS/PY/11/2014/050
Nile Basin Initiative (NBI)
Secretariat
P.O.Box: 192, Entebbe
Mr. Innocent Yotkum
Demolition works, laying of 150 thick layer of
stabilized murram base, laying of asphalt
concrete wearing course, laying of kerb stones
and drainage works
DECEMBER 2014
68,428,200/=
7 Stoppage of Office Leakage &
treatment of water gutters for
Unilever Nyondo Road As per
purchase order No. 7967994
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Renovation Works: Demolition, water proofing,
replacing of roofing sheets
NOVEMBER 2014 5,060,000/=
8 Rehabilitation 11.3km access
roads Nakaseke sub-county
Nakaseke District Ref.
MoLG/DLSP/wrks/Nakaseke/1
3-14/ Lot 51
Nakaseke Local Government
P.O Box 451, Luwero
Setting out, Earthworks, establishing a borrow
pit, dumping of Murram Spreading of Murram,
Grading of the road corridal, compaction and
drainage works
NOVEMBER 2014
394,355,942/=
9 Potholes filing with compacted
murram for Unilever (U) Ltd
As per Purchase order No.
Unilever (U) Ltd P.O. Box
3315 Kampala
Renovation works: Excavating the potholes,
shaping, backfilling and compacting with
stabilized Murram, applying a fore coat of
tarmac
3,810,000/=
Mrs. Nakabulwa Bilabwa
NOVEMBER 2014
10 Fabrication of 100 new pallets
for Unilever(U) Ltd as per
order No. 4507656483
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Supply and installation of pallets
SEPTEMBER 2014 8,100,000/=
11 Aluminum Office Partitioning
for the MD Unilever Office
Nyondo Road as per order
NO.4507436688
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Shoplifting: Setting out, cutting and installation
35m2 of both Aluminum Frames and glass
AUGUST 2014
17,668,968/=
12 Repair of Old and supply of
new furniture for Unilever
(U)Ltd Purchase order NO.
4506929573 Nyondo Road
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Repair works: replacing of hydraulic pumps,
chair wheels, arm rests e.t.c
MAY 2014
15,060,800/=
13 Construction of 5No. Telemetry
Station Structures and
Protective Houses on Rivers
mplologoma,Kapir and Lake
Victoriabat Jinja Pier Contract
No.831661847
Giz Office Plot 23 Nakasero
Road P.O. Box 10346
Kampala
Mr. Daniel Opwonya
Foundation works , Construction of
Substructure, Superstructure, roof, finishes
MAY 2014 59,042,400/=
14 Construction of Abim Town
Water Supply system
contract No. MWE/WRKS/10-
11/01074
Ministry of Water and
Environment
Eng. Paul Kato
Construction of water mains and distribution
line installation; erecting of 175m3level water
tank, Extending a 3-phane power line
April 2014
1,986,386,812/=
15 Supply and Fixing Window
Blinds of Unilever offices
Nyondo Road Purchase Order
No. 45068218445
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Supply and installation of vertical blinds to 3
windows
APRIL 2014
6,760,000/=
16 Drainage System Repairs as per
order No. 4506413922 Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Repair works: Unblocking blocked drainage
systems.
FEBRUARY 2014 10,538,000/=
17 Painting of Unilever Premises
Nyondo Road as per Purchase
order No 4506413921
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Renovation works: scraping off lose materials,
applying two coats of undercoats and then apply
two coats of vinyl silk
FEBRUARY 2014
23,952,288/=
18 Plumbing and Carpentry works
at Unilever (U)Ltd Nyondo
close Order No. 450602795
Unilever (U) Ltd P.O. Box
3315 Kampala
Mrs. Nakabulwa Bilabwa
Repair works: repair of taps and sinks, then
broken carbinets
NOVEMBER 2013
2,395,000/=
19 Repair works at Unilever
Premises Nyondo close No.
4505354107
Unilever (U) Ltd P.O. Box
3315 Kampala
Repair works
OCTOBER 2013 8,748,591/=
Mrs. Nakabulwa Bilabwa
20 Effective Disconnection of
Suppressed Accounts and Data
Capture in NWSC Territory
Ref No.NWSC Kanyanya and
Ntinda Branch Territory Pro-
Ref NWSC –KW/SRVCS/12-
13/1358837
National water & Sewerage
Corporation P.O. Box 7053
Kampala
Uprooting illegal connects and Suppressed water
accounts
Completed 2013 29,547,200/=
21 Effective Disconnection of
Suppressed Accounts and Data
Capture in NWSC Territory
Ref No.NWSC Kireka Branch
Territory Pro-Ref NWSC –
KW/SRVCS/12-13/1358837
National water & Sewerage
Corporation P.O. Box 7053
Kampala
Uprooting illegal connects and Suppressed water
accounts
Completed 2013 29,547,200/=
22 Disilting of Under ground
channels at unilever (U)Ltd
Nyondo close Order No.
4505334431
Unilever (U)Ltd P.O. Box
3515 Kampala
Mrs. Nakabulwa Bilabwa
Renovation works
JULY 2013 24,400,000/=
23 Kako water supply system Ministry of Water, Lands, &
Environment
Eng. Felix Twinomucunguzi
Laying 18,000m of uPVC water mains and
HDPE distribution lines ; erecting of 100m3
raised on a 3m tower level water tank, 100 No.
consumer connects
COMPLETE April 2013
1,687,790,807/=
24 Construction of Multipurpose
Hall and Renovation works.
KHS/WRKS/2013/001
Kitante Hill School P.O. Box
7102 Kampala
Demolition, walling installation of windows and
door, tiling of floor electrical works e.t.c
MAY 2013
134,347,654/=
25 Alteration and Refurbishment
of computer Laboratory
toilet,and office Building Ref
KHS/WRKS/2012-13/001
Kitante Hill school school
P.O. Box 7102 Kampala
Demolition, walling installation of windows and
door, tiling of floor, electrical works, Plumbing
works e.t.c
JANUARY 2013
213,387,984/=
26 Bwaise water project Phase II
NWSC/HQRS/WORKS/2011-
12/157496
National Water & Sewerage
Corporation
Eng. Paddy B. Twesigye
Construction of 3,000m of uPVC main
distribution and HDPE minor distribution line
installation, installation of 145No. Pre-paid
meters
MARCH 2013
677,949,470/=
27 Infrastructure Pedestrian
crossing repairs at Unilever
(U)Ltd Nyondo Road Ref
Order 4505786494
Unilever (U)Ltd P.O. Box
3515 Kampala
Excavation works, casting of concrete, painting
MARCH 2013 63,516,000/=
28 Sewer Network
Rehabilitations- cleaning and
Unblocking of Gravity sewers
in Kampala
Sub contract from Spencon
services limited, P.O.Box: 926
kampala
V.A. Samanarayana
General cleaning, siphons and washing out of
the entire network system
Euros 95,000
29 Construction of 100No. Public
points with Prepaid water
meters in Kampala Pro-Ref
NWSC/WRKS/2011
National water & Sewerage
Corporation
Eng. Jude Mwoga
Casting of concrete slabs and erecting pedestal
supports
June 2012 15,000,000/=
30 Demacation of ware house at
Unilever (U)Ltd order No.
4503941143
Unilever (U)Ltd P.O. Box
3515 Kampala Demolition, alteration, walling and finishing
works 2,220,000/=
June 2012
31 Construction of Nakaseke
Town Water Supply &
Sanitation system
MWE/WRKS/09-10/00812
Ministry of Water and
Environment
Eng. Felix Twinomucunguzi
Laying of 19,000m of water mains and
distribution line installation; erecting high level
200m3 reservoir tank; sitting on dwarf wall;
Extending a 3 phase power line to run
submissive water pump, 200 No. Consumer
connections.
April 2012
1,935,793,045/=
32 Refurbishment of Laboratories
in Mubende, Fortportal, Mbale
& Masaka
MWE/WRKS/11-12/01303
Ministry of Water, Lands, &
Environment
Painting works, Plumbing Works and supply
and installation of laboratory furniture
June 2012
79,972,000/=
33 Alteration and Refurbishment
of computer laboratory, Toilet
and Office building
KHS/WRK/2012-3/001
Kitante Hill school
Construction included Demolitions, repairs,
brick work, painting works, plumbing works
June 2012
153,399,225/=
34 Construction of a storied office
Block on Yusuf Lule Road
Mr. & Mrs John Mugyenyi
M. Lubowa Architects
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
April 2011
3,600,500,000/=
35 Construction of Kikumadungu
– Lutunku water supply
Contract no.MWE/WRKS/08-
09/00551
Ministry of Water, Lands, &
Environment
Eng. Twinomasiko Vivian
Laying of 15,000m of water mains and
distribution line, erecting a 50m3 reservoir tank
on a 5m raised tank, connecting 100No.
consumer connections installation of solar
powered pumps
DECEMBER 2010
856,062,583/=
36 Office /ware house roof repairs
for Unilever (U)Ltd Nyondo
close order No. 4504572932
Unilever (U)Ltd P.O. Box
3515 Kampala
Repair works
DECEMBER 2010 26,349,400/=
37 Construction of a five storied
office block on plot 5 Lourdel
rd.
Col.& Mrs. Mugenyi
M. Lubowa Architects
Construction of a five-storied office block on
plot 5 Lourdel rd. (opp. Ministry of Health
Wandegeya).
AUG. 2010
3,600,500,000/=
38 Nakinyuguzi – Kyamula roads
reinforcement mains
National Water & Sewerage
Corporation
Eng. Jude Mwoga
Reinforcement of mains 2100m CC No. 11.08
13,410,000/=
39 Mulimira - Bukoto
Roads reinforcement mains
National Water & Sewerage
Corporation
Eng. Jude Mwoga
Reinforcement of main
DEC. 2009
14,306,700/=
40 Construction of a storied office
Block on Yusuf Lule Road Mr. & Mrs John Mugyenyi
M. Lubowa Architects
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
April 2009
2,265,013,584/=
41 Fixing granite floor tiles
100mm thickness
British American Tobaco
P.O. BOX 7100
Fixing granite floor tiles 100mm thickness
JAN. 2009 21,300,475/=
42 Construction of Bujenje,
Bwijanga &Kyatiri Water
Supply System.
Ministry of Water, Lands, &
Environment, Directorate of
Water Development
Eng. Chris Tumusiime
Construction of Bujenje, Bwijanga & Kyatiri
Water Supply System. (For Bujenje two
cylindrical tanks sitting on the dwarf walls were
constructed)
2008
1,240,394,085/=
43 Wakaliga main reinforcement
and Rd. crossing.
National Water & Sewerage
Corporation
Eng. Jude Mwoga
Laying of 500m of uPVC pipe line,
reinstatement works, construction of manhole
DEC. 2008
16,178,508/=
44 Installation Rwimi Prisons
Farm at
Fort Portal
Uganda International Red
Cross
Mr. Jϋrg Eglin
Construction of water mains and distribution
line installation at Rwimi Prison Farm
DEC. 2008
48,816,300=
45 Pipe laying for a network
reinforcement main along
Gayaza Rd. from Gayaza
roundabout to Kanyanya
National Water & Sewerage
Corporation
Eng. Jude Mwoga
Pipe laying, manhole construction and
connection to existing mains.
JUNE 2008
51,161,674/=
46 Civil work for Thermal
Generation, substation at Kiira
Uganda Electricity
Transmission Co. Ltd.
Eng. Kasendwa
Construction of generator platform, plinth, water
channels, plumbing works and fencing.
2007
269,635,224.80/=
47 Construction of New Office
and Workshop extension.
Uganda
M/s "The Monitor"
Publication Ltd.
P. 0. Box 12141 Tel. 232367,
Kampala
Mr. Kimanth Peter or
Mr. Mukwaya
Setting out, construction of substructure and
main structure consisting of four floors, roofing,
internal and external finishes electrical and
plumbing installation.
2005
727,922,875=-
48 Refurbishment of factory for
M/S UNILEVER on Nyondo
Road
Uganda
M/s UNILEVER (U) LTD.
P. 0. Box 3515, Kampala
Mr. Kenneth Nganzi
Refurbishment of offices for M/S UNILEVER
on Nyondo Road
2005
368,125,000/=
49 Construction of Serere Water
Supply System.
Uganda
Ministry of Water, Lands and
Environment,
P. O. Box 20026, Kampala
Eng. Chris Tumusime
Construction of Serere Water Supply System.
2004
426,736,516/=
50 Construction of New Office
and Workshop extension
M/S “The Monitor”
Publication Ltd,
P.O. Box 12141
Tel:0414232367,Kampala
EI-arhs partnership
P.O. Box.21968,Kampala
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
December 2004
727,922,875/=
51 Refurbishment of factory for
M/S UNILIVER on Nyondo
Road.
M/S UNILEVER (U)
LTD
M/s Starcon Associated
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
September 2004
368,125,000/=
52 Construction of Serere Water
Supply System.
Cont.No. DWD/RWS/WKS-
SERO1/2003
Ministry of Water, Lands and
Environment,Directorate of
Water Development
M & E Associates Ltd
Consulting Engineers
P.O. Box 4052,Kampala
Construction of Serere Water Supply System.
May 2004
510,526,300/=
53 Construction of Kyenjojo Town
Water Office.
Contract.No.
DWD/SNRT/C/01/2001.
Ministry of Water, Lands and
Environment,Directorate of
Water Development
Setting out, construction of Sustructure,
Superstructure, roofing fittings and fixture and
finishes
May 2004
96,912,580/=
54 Construction of Mubende Town
Water Office
Contract No.
MWTWSP/DWD/01-03
Ministry of Water, Lands and
Environment,Directorate of
Water Development
Setting out, construction of Sustructure,
Superstructure, roofing fittings and fixture and
finishes
Apirl 2014
88,006,540/=
55 Construction of Kalangala
District Police Station.
Uganda
Ministry of Internal Affairs
P.O. Box 7055, K’la
Mr. Richard Edyeg (ASP)
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
2004
256,439,064/=
56 Construction of New Office
and Workshop extension
M/S “The Monitor”
Publication Ltd,
P.O. Box 12141
Tel. 0414232367
Technical Consultancy
Services.
P.O. Box 4043, Kampala
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
February 2003
727,922,875/=
57 Routine Mechanised
Maintenance of Buhimba-
Mubende Boardet Road (16km)
Ministry of Works, Housing
and Communications P
P.O. Box 10, Entebbe
Scarifying, spreading of murram, compacting of
murram
February 2003
115,874,946/=
58 Buyobo water Supply
SCHEME Contract No.
2001/GFS/06 Sironko District
Ministry of Water, Lands and
Environment,Directorate of
Water Development.
Kagga and Partners
Consulting Engineers
Laying of transmission and distribution lines,
construction of manhole, Construction of
reservoir tanks
September 2002
280,179,250/=
59 Chebinyiny Water Flow
Scheme Contract
No.2001/GFS/08 Kapchorwa
district.
Ministry of Water, Lands and
Environment,Directorate of
Water Development.
Kagga and Partners
Consulting Engineers
Eng. D Ssozi
Laying of transmission and distribution lines,
construction of manhole, Construction of
reservoir tanks.
September 2002
248,412,360/=
60 Construction of 150mm sewer
line from US Ambassador’s
residence to the main sewer
American Embassy
NWSC
Excavation ,Laying of pipes and Backfilling.
August 2002 92,511,050/=
61 Busano Water Flow Scheme
Contract No.2001/GFS/06
Mbale District
Ministry of Water, Lands and
Environment,Directorate of
Water Development.
Excavation ,Laying of pipes and Backfilling.
Construction of water Reservoir
95,959,362/=
Kagga and Partners
Consulting Engineers
Eng. D Ssozi
May 2002
62 Construction of
Kachonga/NabigandaWater
Supply Scheme.
Contract No.
DWD/KACHONGA/3
Ministry of Water, Lands and
Environment,
P. O. Box 20026, Kampala
Eng. D. Kavutse
Excavation ,Laying of pipes and Backfilling.
Construction of water Reservoir
April 2002
293,227,570/=
63 Routine Mechanised
Maintenance of Wakyato-
Ngoma Road (58km)
Ministry of Works, Housing
and Communications P.O.
Box 10 Entebbe
Scarifying, spreading of murram, compacting of
murram
December 2001
241,484,958/=
64 Routine Mechanised
Maintenance of Wakyato –
Ngoma Road (58km)
Ministry of works ,Housing
and Communications P.O.
Box 10,Entebbe
Scarifying, spreading of murram, compacting of
murram
December 2001
241,484,958/=
65 Kalangala District Police
Station Contract No.
SWP/UG/PTB/99/193C
Ministry of Internal Affairs
Uganda Police Force,Estates
Department
Site clearance ,excavations, Substructure,
Superstructure.
September 2001 256,439,064/=
66 Remodification to Ginning and
Press Building with a floor area
of 758m2 at Busitema Ginning
School
Busitema Ginning School
Seka Associates
Flooring
September 2001 105,779,200/=
67 Construction of Pallisa Town
water Office Cont.No.
ECOBWKS/011/99
Ministry of Water , Lands and
Environment,Directorate of
Water Development
DWD Eastern Centres P.O.
Box 200026 Kampala
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
August 2001
57,728,274/=
68 Water for livestock-
Construction of Tutui Dam.
Matheniko county, Moroto
Ministry of Water, Lands and
Environment, Directorate of
Water Development
Sub-Contract from M/S Mec
international Ltd
Construction of Reinforced concrete structures
July 2001
US$ 247,435.70
69 Bududa Water Scheme
Contract No. 1999/GFS/08
Bududa
Ministry of Water, Lands and
Environment, Directorate of
Water Development
Construction of Bududa Water Supply Scheme
June 2001
350,000,000
70 Construction of Kaliro Water
Office
Ministry of Water, Lands and
Environment, Directorate of
Water Development
Setting out, construction of substructure and
main structure, roofing, internal and external
finishes solar electrical and plumbing
installation.
Cont. No. ECOBKS/07/99
2001
61,853,308/=
71 Routine Mechanized
Maintenance of Luwero-
Nakasongola Road.
Ministry of works ,Housing
and Communications P.O.
Box 10,Entebbe
Scarifying, spreading of murram, compacting of
murram
November 2000
171,000,000
72 Periodic maintenance and Spot
improvement of roads in
Kalangala:
Kalangala-Bendero Rd;
Kalangala Local Government.
ADF/Rural Feeder Roads
Maintenance Program
Scarifying, spreading of murram, compacting of
murram
July 2000
525,000,000/=
Kalangala-Luku Rd;
Kalangala-Lutoboka Rd;
Kiwungu-Nakibanga Rd.
73 Periodic maintenance and Spot
improvement of roads in
Nakasongola
Lwampanga-Lwabyata-
Nabiswera Road.
Nakasongola-Nakitoma Road
Nakasongola Local
Government
ADF/Rural Feeder Roads
Maintenance Program
Scarifying, spreading of murram, compacting of
murram
July 2000
285,000,000/=
Total Renovation of House at
Plot 12 Loudel Road, Kampala.
British American Tobacco
BAT(In house Engineers)
Renovations
February 2000 60,000,000/=
74 Rehabilitation of Water and
Sewerage System for
UNILEVER (U) LTD
UNILEVER (U) LTD Water and sewerage rehabilitation
March 2000 86,400,800/=
75 Construction of Staff Canteen
and Rehabilitation of factory
for M/S UNILEVER on
Nyondo Road.
M/S UNILEVER(U) LTD
M/S Ssentoogo and Partners
Kampala
Site Clearance, Substructure, Superstructure,
roofing, finishes.
December 1999 68,125,000/=
77 Construction of Mr. Issa
Kizito’s Three Storey
apartments at kampala.
Mr. Issa Kizito
M/S Habitata Consultants Plot
3, Pilkington road Tel:
0414259874, Kampala
Site Clearance, Substructure, Superstructure,
roofing, finishes.
December 1999
750,625,000/=
78 Construction of three storey
office block on Lumumba
Avenue, Kampala
Mr. Mugenyi
M/S Muju Consulting
Engineers and Lubowa
Architects
Site Clearance, Substructure, Superstructure,
roofing, finishes.
Apirl 2001
730,000,000/=
79 Construction of Machine
foundation and Boiler House.
British American Tobacco
Symbol Indternational
Site Clearance, Substructure, Superstructure,
roofing, finishes.
July 1999
265,758,000/=
80 Periodic Maintenance & Spot
improvement of Muwolwe-
kibuye-Lwampanga Road
Nakasongola District Local
Government P.O.Box: 1
Nakasongola
Scarifying, spreading of murram, compacting of
murram
July 1999
140,184,505/=
81 Consolidating of base and
Laying paving blocks on
Uganda Development Bank
Head Office yard
Sub Contract M/S China
Nanjing International P.O.
Box 2698 Tel: 0414220462
M/S Associated Architects
Tel:0414235788 Kampala
Surplying, spreading and compacting of Marram
to MDD
July 1999
59,000,000/=
82 Construction of Mr. Lwanga,s
Executive Maisonettes at
Muyenga
Mr. Lwanga
M/S LineR Consultants Plot 2,
Parliament Av. Tel:
0414259659,Kampala
Site Clearance, Substructure, Superstructure,
roofing, finishes.
November 1998
230,985,000/=
83 Re-roofing of Uganda
Polytechnic Kyambogo Schools
and workshops
M/S China Nanjing
International P.O. Box 2698
TEL: 0414220462,Kampala
M/S Habitat Consultants Plot
3, Plikington road Tel:
0414259874,Kampala
Roofing structures
July 1998
116,830,000/=
84 Fore-coat resealing of yards for
Uganda polytechnic Kyambogo
schools and workshops
Sub contract M/S China
Nanjing International
P.O.Box: 2698 Kampala
M/S Associated Architects
Kampala
Site clearing, filling of port holes and laying
new fore-coat
February 1998 60,000,000/=
The total annual volume of construction work performed in each of the last five years is:
Year Volume of Construction Work
2014 7,102,487,325/=
2013 5,610,462,296/=
2012 3,357,805,870/=
2011 3,573,275,000/=
2010 2,173,667,000/=
2009 2,021,215,245/=
2008 1,861,475,250/=
2007 2,181,215,245/=
2006 1,898,275,000/=
2005 1,404,212,000/=
COMPLETION CERTIFICATE
KEY PERSONNEL PERMANATELY EMPLOYED BY THE COMPANY:
Qualifications and Experience of key personnel EmpLoyed by the firm for the
administration and excecution of contracts
Position Name Years of experience
Contrcat Manager Eng. Ali Kisitu
B. SC Civil Eng(China)
27yrs
Quantity Surveyor Nabucha Alosius
B. SC Civil /MSC-Water Eng (MUK)
10yrs
Project Engineer Mpanga Farooq
B.SC. Civil Eng(MUK)
5yrs
Electrical Engineer Muwayira Washington Christopher
B.SC Electrical Engineering (Ndejje
University)
7yrs
Quantity Surveyor Kalule David
B.SC Quantity Surveying (MUK
5yrs
Site Engineer Mateega Henry
Dip.Building/Civil (UPK)
B.SC. Civil Eng (UPK)
6yrs
Sueveyor Oleke John Ogola
B.SC. Surv
20yrs
Health and Satety
officer
Foreman Omio Odere
Dip. Water Eng
10yrs
Foreman Salim Sam
Dip. Civil Eng
10yrs
Electrical Engineer Mukuye Kagwa
BSC. ENG (Electrical)
10yrs
MPANGA FAROOQ
PERSONAL INFORMATION
SUR NAME: MPANGA
FIRST NAME: FAROOQ
DATE OF BIRTH: 15th/AUGUST/1987
NATIONALITY: UGANDAN
COUNTRY OF RESIDENCE: UGANDA
AREAS OF COMPETENCE
1. CONSTRUCTION MANAGEMENT AND SUPERVISION
2. SURVEYING
3. DESIGNING
4. TEAM LEADERSHIP
5. RESEARCH AND DEVELOPMENT
6. HEALTH AND SAFETY
ADDRESS
PHYSICAL ADDRESS: KISAASI
Kampala, Uganda.
POSTAL ADDRESS P. O Box: 30895,
Kampala, Uganda.
EMAIL ADDRESS: 1. [email protected]
PHONE CONTACT: +256-775-786-878 (main line)
+256-756-096-349
WORK EXPERIENCE
Period Place/Project Responsibilities/Scope of works
(Nov)
2014-To
date
(Sept) 2014-
To date
UPDEAL (U) LTD P.O.Box : 30895 Kampala (U)
Construction of Buwuni Town water supply
system
UPDEAL (U) LTD P.O.Box : 30895 Kampala (U)
Construction of Kyamulibwa Town
water supply system
POST: PROJECT ENGINEER
Key areas of Responsivities/supervision
1) Laying of a total 1,500m of HDPE OD
90mm of transmission line
2) Laying of a total of 11,400m from uPVC OD110mm to 50mm HDPE of
distribution line
3) Construction of 1No. pump houses 4) Construction of 1No. 176m3 of Hot
pressed steel reservoir tanks on a
reinforced concrete Dwarf walls 5) Construction of a water office block
6) Extending a 8km of 3 phase power line
7) Installation of 1No. water pumps 8) Installation of 1 No. 30KVA generator
9) Connecting 130No. domestic stand taps
10) Construction of 3No. Public water kiosks
11) Construction of 1No. water borne toilet
12) Construction of 1No. Ecosan toilet
POST: PROJECT ENGINEER
Key areas of Responsivities/supervision
13) Laying of a total 9,500m of HDPE OD 75mm of transmission line
14) Laying of a total of 16,400m of uPVC
OD150mm to 20mm HDPE of distribution line
15) Construction of 2No. pump houses,
guard house and Ecosan toilets 16) Construction of 2No. 100m3 of
reinforced concrete reservoir tanks
17) Construction of a water office block 18) Construction of a chlorine dosing house
19) Extending a 16km of 3 phase power
line 20) Installation of 2No. water pumps
21) Installation of 1 No. 30KVA generator
22) Connecting 300No. domestic stand taps 23) Construction of 3No. Public water
(Sept) 2014-
To (Dec)
2014
(Aug) 2012- (Aug) 2014
UPDEAL (U) LTD P.O.Box : 30895 Kampala (U)
Improvement and Expansion of
Lyandonde town
council piped water Supply and Sanitation
scheme phase II
STANBIC BANK P.O.Box : 7131 Premises, Operation
Department
kiosks
POST: PROJECT ENGINEER
Key areas of Responsivities/supervision
24) Laying of a total of 14,000m of uPVC
OD 160 transmission line
25) Construction of 250m3 steel tank
elevated on a 6m tower
26) Construction of an 8m3 reinforced
concrete Break pressure tank
POST: PREMISES SUPPORT OFFICER Key areas of responsibility
1) Ensure proper Maintenance of all Bank premises and signage compliant with
Corporate Image
2) Supervise modifications of bank premises in liaison with Stanbic Africa
Premises Manger, MOA and The Business.
3) Ensure that accurate bills of quantities
are drawn up for premises works 4) Ensure that the necessary approvals are
obtained for premises projects/repairs
and executed to set standards 5) Ensure that premises projects are
completed within approved deadlines
and budgets 6) Ensure that rented premises are
prepared for handover at the time of
vacating 7) Liaise with MOA and Procurement
manager on work quotations and
tendering of premises jobs 8) Liaise with MOA and Procurement
manager for procurement of
construction materials, consumables and furniture.
9) Serve as a member on negotiation
committee on premises and others formed from time to time
(June)
2012-to
(Aug)
(Jan) 2012-
To Aug
2012
UPDEAL (U) LTD P.O.Box : 30895 Kampala Uganda
Water Supply for the
Urban Poor in
Bwaise II Parish,
Kampala
UPDEAL (U) LTD P.O.Box : 30895
Kampala Uganda
Office Block
Construction for
Directorate of water Resource Management
Entebbe
10) Ensure proper maintenance of gensets,
ACs, utilities and related equipment. 11) Ensure that Contracts and SLAs are
renewed timeously
12) Liaise with Procurement Manager to ensure that service and maintenance
contracts for premises-related
equipment and machinery are in place 13) Monitor the movement of premises
equipment, especially gensets
14) Supervise, motivate and evaluate staff
within Premises Unit
15) Participate in planning and budgeting
for Operations 16) Participate in cross-functional teams
and management committeeand their
maintenance.
POST: PROJECT ENGINEER
Key areas of Responsivities/supervision
1) Laying of a total 1,090m of uPVC OD
110mm-225mm of distribution mains
2) Laying of a total of 6,900m from of HDPE from OD90mm to 32mm HDPE
of distribution line 3) Construction of man holes
4) Installation of service lines
5) Installation of 145No. Pre-paid water consumer taps
POST: SITE ENGINEER
Key areas of responsibility
A. PROCUREMENT AND
LOGISTICS
1. Developing material store control
system 2. Carrying out market surveys
3. Prepare periodical procurement reports
4. Prepare, review specifications for
competences.
5. All procurement assignments as given by supervisor
B. SURVEYING 1. Setting out (lay out) for main
(Nov)2010-
(Sept)2011
UPDEAL (U) LTD P.O.Box : 30895
Kampala (U)
Construction of
kikumadungu –
Lutunku water
supply system
excavation works using a theodolite,
total station and dumpy level. 2. Checking elements for accuracy after
the placement of concrete. These were
elements such as columns, beams, slabs, the lift shat and the shear walls.
3. Ensuring consistency between paper
work and groundwork by measuring and recording deviations
C. STEEL REINFORCEMENT
WORKS
1. Monitoring bending schedules for all
elements such as the beams, columns 2. Monitoring steel fixing to various
elements
3. Monitoring the markings for the different spaces between bars, and
different allowances.
4. Examining in detail the process of cutting, bending and delivery of steel
to ensure consistency with the
bending schedules and on site demand.
D. CONCRETE WORKS
1. Designing concrete mixes of various
grades(C35, C25, C20) that were used on site
2. Carrying out tests on concrete to
ensure consistency in designed specifications
3. Monitoring methods of delivery,
placing(pumping, hand, standing skip), curing
POST: SITE SUPERVIOR
Key areas of responsibility 1. Laying of water mains
2. Laying of Distribution line installation
3. Erecting a 500m3 water reservoir tank 4. Installation of solar power to run
submissive water pump
(may)2009-(Aug.)2010
EGYPRO (U) LTD.
Orange Project Uganda
Construction of GSM sites at Namayumba
and Bukuya
POST: A TRAINEE ENGINEER Key areas of responsibility
A. FOUNDATION AND EARTH
WORKS 1. Excavation of the access road
2. Excavation of road side open channel
drainages 3. Prepare periodical procurement reports
4. Estimating the volume of the
earthworks for the access road
5. Construction of the GSM tower
foundations
B. SURVEYING 1. Setting out (lay out) for main
excavation works using a theodolite, total station and dumpy level.
2. Checking elements for accuracy after
the placement of concrete. These were elements such as pad foundations and
anchor bolts
3. Ensuring consistency between paper work and groundwork by measuring and
recording deviations
C. STEEL REINFORCEMENT
WORKS
1. Monitoring of bar bending schedules for
all elements such as the beams, columns 2. Monitoring steel fixing to various
elements
3. Monitoring the markings for the different spaces between bars, and
different allowances.
4. Examining in detail the process of cutting, bending and delivery of steel to
ensure consistency with the bending
schedules and on site demand.
D. CONCRETE WORKS
1. Designing concrete mixes of various
grades(C35, C25, C20) that were used
on site 2. Carrying out tests on concrete to ensure
consistency in designed specifications
3. Monitoring methods of delivery, placing(pumping, hand, standing skip),
curing
E. GSM TOWER ERECTION
1. GSM tower rigging or assembling of
the tower braces and members to
create a stable tower
2. Torque impact test on the bolts
3. Tower finishing (painting)
2009(May-
August) M & E Associates
LTD.
Kampala Integrated
Environmental
Planning and
Management
Project.(KIEMP) in
Kisenyi II, Bwaise
III and Katwe I
POST: A TRAINEE ENGINEER
Key areas of responsibility
A. FLEXIBLE PAVEMENT
CONSTRUCTION 1. Fill /Bed road treatment , especially in
water logged area using French drains
2. Laying the sub base layer using murrum
3. Stabilization of the base using lime as a
binder
4. Nuclear gauge testing using a troxler to
obtain the finished road parameters 5. Road priming and paving using prime
and asphalt concrete
B. STORM AND ROAD SIDE
DRAINAGES 1. Setting out (lay out) for main
excavation works using a theodolite,
total station and dumpy level. 2. Checking elements for accuracy after
stone pitching of the of the drainage
3. Placing of culverts drains
C. WATER TRANSMISSION AND
DISTRIBUTION
1. Setting out for the trench excavations
using a dumpy level
2. Pipe laying and jointing, installation of anchor blocks and critical bends
3. Testing PVC pressure pipe
EDUCATION BACKGROUND
PERIOD INSTITUTION AWARD
2007-2011 MAKERERE
UNIVERSITY
P.O.BOX 7062,
KAMPALA,
UGANDA.
Bsc CIVIL AND ENVIROMENTAL
ENGINEERING
2005-2006 KYAMBOGO
COLLEGE SCHOOL
UGANDA ADVANCED CERTIFICATE OF
EDUCATION(UACE)
2001-2004 KYAMBOGO
COLLEGE SCHOOL
UGANDA CERTICATE OF
EDUCATION(UCE)
LANGUAGES
LANGUAGE SPEAKING WRITING LISTENING
ENGLISH VERY GOOD VERY
GOOD
VERY GOOD
LUGANDA VERY GOOD VERY
GOOD
VERY GOOD
RUNYANKOLE FAIR FAIR FAIR
COMPUTER LITERACY
Package Programs Proficiency
A. WORD
PROCESSING
1. MICROSOFT WORD
VERY HIGH
B. PROJECT
MANAGEMENT
1. MS PROJECT
2. PERT CHART
EXPERT
3.
VERY HIGH
C. DATA ANALYSIS 1. MICROSOFT EXCEL
2. SPSS, EPIDATA
VERY HIGH
D. DRAFTING 1. AUTOCAD
2. AUTOCAD LAND
DEVELOPMENT
3. ARCHICAD
VERY HIGH
E. DESIGNING
SOFTWARE
PACKAGES
1. PROKON 2.4
2. EPANET
3. MASTER SERIES
4. ETABS.9
5. ADOBE
PHOTOSHOP
HIGH
F. ADVANCED
COMPUTER
MANAGEMENT
4. SOFTWARE
INSTALLATION
AND REPAIRS
5. DATA RECOVERY
6. COMPUTER
SECURITY
HIGH
PERSONAL SKILLS AND ABILITIES
A. SOCIAL AND ORGANIZATIONAL SKILLS
1. Effective communication
2. Result oriented
3. Ability to work with minimum supervision
4. Mobilization skill
5. Ability to work efficiently under emergency situations
B. TECHNICAL SKILLS
1. Sports( badminton, athletics, soccer, board games(chess,
scrabble, draft
REFEREES
1. Mr. FRANCIS OGWANG.
PROJECT ENGINEER
NATIONAL HOUSING AND CONSTRUCTION
COMPANY
Tel: +256-752-615-958
2. Mr. PAUL MUJUGUMBYA
LECTURER DEPARTMENT OF CIVIL AND
EVIROMENTAL ENGINEERING MAKERERE
UNIVERSITY
Tel: +256-772-838-691
3. Eng. ALI KISITU
MANAGING DIRECTOR
UPDEAL (U) LTD
Tel: +256-782-023-852
DECLARATION
I declare that the information I have provided in this curriculum vitae
is to the best of my knowledge and believe it is correct and complete.
MUWAYIRA WASHINGTON CHRISTOPHER JUNIOR
Curriculum Vitae
Personal: Born 07th October 1981
Contact: c/o P.O.Box 33487 Kampala Email:[email protected]
Tel: 0717-888833 / 0752-984093 /0772-494426
Objective: To obtain a position in the field of Electrical Engineering
Personal To enhance existing knowledge, skills, and attitude towards work leading
Objective: to a career in development in the face of a changing technology.
Key Attributes: Have developed and continue to strengthen the following vital skills,
Among others:-
Ability to work under pressure with minimum supervision with tight
deadlines
A high level of attention to details
Ability to balance priorities.
Strong report writing and presentation skills
Self discipline and strong work ethics
Ability to delegate appropriately and supervise
Team player and ability to work in multi-cultural environment.
Work Experience April 2014 - to date UPDEAL (U) Ltd – Electrical Foreman
Project: Kyamulibwa town water supply system
Installation of electrical conduits
Extending a 20km 3-phase power line
Installation of 2No. water pumps
Installation of a 30KVA standby Generator
Installation and fixing of electrical fittings at the office block, pump house chlorine
dosing house
Installation of lightening arrestors
Work Experience Feb 2013 – Apirl 2014 UPDEAL (U) Ltd – Electrical Foreman
Project: Abim town water supply system
Installation of electrical conduits
Extending a 8km 3-phase power line
Installation of 2No. water pumps
Installation of a 30KVA standby Generator
Installation and fixing of electrical fittings at the office block, pump house chlorine
dosing house
Installation of lightening arrestors
Work Experience Feb 2011 – to Dec 2013 STANBIC BANK (U) Ltd - Maintenance Officer.
Design Electrical layouts for new builds.
Draw BOQs for new builds
Carry out Electrical project supervision and Evaluation for new build in the bank
network.
Power Generator Maintenance supervision and troubleshooting.
Advise the bank on Electrical layouts in the bank network.
Monitor bank electrical assets e.g. overlook the machinery inventory system in the
bank network.
Deliver Projects as per stated timelines.
March 2008 - 2010: SCI/ NCR UGANDA- RESIDENT ENG.STANBIC
NCR/SCI Stanbic Bank ATMs Rollout Engineer
Troubleshooting UPSs and Inverter systems for all clients
Heavy Voltage stabilizer Installations from (30-100)KVA
Electrical power, voice and data network Integrator.
Senior UPS and inverters power instillation and maintenance.
IP addressing
LAN network planning and site survey.
June 18th 2006 –Feb. 2007-UMEME LTD- Trainee Technician
Distribution Transformer Maintenance
Electrical power transformer Maintenance and installation
Maintenance planning
Earthing of Electrical power systems
Overhead Lines Construction and Maintenance
Installation of change over Switches
Electrical Installation and Surveys
Meter Installation, tests and KVA meter repair and calibration.
Switch gear maintenance and trouble shooting
Report writing on faults in the field.
Installation of isolators, Feeder pillars, cable cripping and grading
Underground cable works and maintenance
Customer care and supervisory Skills.
June 2005 - May 2006:- Quick Band Network- Trainee
Electrical power installation and termination on company sites
Site Generator Installations.
Fault diagnosis and rectification in customer site plants i.e. generating set, Air
conditioning plant,CCTV,PABX
Attending to faults on Ericsson base stations. i.e.2106, 2206, 2207 including cutovers.
Earthing of all Equipment’s on client sites.
Routine maintenance and installation of BTS systems.
Industrial training in basic practical electronic principles and proper handling of
electrical equipments.
Site testing and commissioning of finished sites
Installation of switches,sockets,fluorescent fittings and main switches at customer
sites
Installation of Auto changeover switches
Education
Year Institution Award
2012-2014 Ndejje University BSC. Electrical Engineering
2007-2009 Kyambogo University Higher Diploma in Electrical Engineering
2003-2005 Uganda Polytechnic kyambogo Diploma in Electrical engineering
2002-2003 Mengo Technical Institute Certificate in Electronics
1999-2001 Bombo High school Uganda Advanced certificate of Education
1995-1998 Makindye Secondary School Uganda certificate of Education
Professional skills
Electrical power installation and site surveys.
Power line Construction, testing and commissioning
Clean power Supply installations i.e. UPS and Inverter Installation and maintenance
Project Supervision monitoring and Evaluation.
Computer skills
Dell compatible PCs running Microsoft windows
Ms DOS
Word, Excel, Access, Power point
Competencies and personal attributes
Rising communications professional; enthusiastic about applying new technologies and
enhancing current technical expertise.
Creative troubleshooter/problem solver that works hard and loves a challenge.
Open minded individual and flexible under any situation.
Dedicated, self motivated achiever who is committed to success and adopt at juggling multiple
tasks in a high pressured environment.
Proven relationship-builder with exceptional interpersonal and communication skills.
Highly trustworthy under any circumstance, involving any kind of parameters.
Referees:
Mr.OPolot Rock fell Opedun
Quality Management and Verification Engineer
Umeme Ltd
Tel +256 782 690 606
Email. [email protected]
Mr.LUZINDA CHARLES
Tax Consultant
Tullow Oil Ug.
Tel. +256 776-221466
E-mail [email protected]
Mr.Kambazza John Paul
Account Manager
Huaweii Technologies (U) co., Ltd
Tel +256 772 521522.
Email: [email protected]
I declare that the information I have provided in this curriculum vitae is to the best of my knowledge and
believe it is correct and complete
Signature:
Muwayira Washington Christopher
Date: 05th/02/2015
CURRICULUM VITAE
BIO DATA
Name : DAVID KALULE
Date of birth : 26th May 1988
Marital status : Single
Nationality : Ugandan
Gender : Male
Contact address : P.O Box 10709, Kampala
Email address : [email protected]
Contact number : +256 782 016 520/ +256 704 132 549 ACADEMIC PROFILE YEAR SCHOOL QUALIFICATION 2008-2011 Makerere University Kampala Bsc. Quantity Surveying (Hons)
2005-2006 Ndejje Senior Secondary School Uganda Advanced Certificate of Education (U.A.C.E)
2001-2004 Ndejje Senior Secondary School Uganda Certificate of Education (U.C.E)
1993-2000 Kampala Parents School Primary Leaving Examination (P.L.E)
SKILLS AND ACHIEVEMENTS I hold a second upper degree in Bsc. Quantity Surveying from Makerere University Kampala. I have worked with both consultants and contractors as a Quantity Surveyor. I undertook a research project on “The impact of cost estimating in the building sector in the construction industry in Uganda” at my final year at University. I have good financial and numeracy management skills. I also demonstrate excellent communication and negotiation skills and can make effective contribution as both team leader and team member. I am computer literate and can comfortably use Microsoft Excel, Word, Power Point, AutoCAD, and ArchiCAD among others. I have worked on projects like the Uganda Police Forensic Laboratory, District Offices in Lira, Acacia Shopping Mall, Bugolobi Shopping Mall, DFCU Bank Offices, MTN Switch Centre among other residential structures.
I have strong analytical skills. I am also a highly motivated, trustworthy and hardworking person, with a high sense of duty and loyalty both professionally and personally. Extremely flexible and can easily adapt to the surrounding without compromising with any of my principles and responsibilities. WORKING EXPERIENCE
UPDEAL (U) LTD: (QUANTITY SURVEYOR)
April 2013 – Todate
Project: Expansion and improvement of Lyantonde Town council piped water supply and sanitation
scheme – phase II
Preparation of Bills of Quantities for quotation purposes
Preparation of monthly valuations for payment of works done
Negotiating with sub-contractors
Appointing, supervising and measuring sub-contractors works
Preparation of sub-contractor payment certificates
Preparation of monthly progress reports
Preparation of planned and actual cash flow comparisons
Placing material and equipment orders
Supervising and monitoring material delivery and consumption on site
Preparation of monthly company turnover reports for the Chairman and the Board
Preparation and recording of wages and salaries for workers on site
UPDEAL (U) LTD: (QUANTITY SURVEYOR)
April 2013 – April 2014
Project: Abim Town Water Supply system
Preparation of Bills of Quantities for quotation purposes
Preparation of monthly valuations for payment of works done
Negotiating with sub-contractors
Appointing, supervising and measuring sub-contractors works
Preparation of sub-contractor payment certificates
Preparation of monthly progress reports
Preparation of planned and actual cash flow comparisons
Placing material and equipment orders
Supervising and monitoring material delivery and consumption on site
Preparation of monthly company turnover reports for the Chairman and the Board
Preparation and recording of wages and salaries for workers on site
UPDEAL (U) LTD: (QUANTITY SURVEYOR)
August 2010 – April 2013
Project: Nakaseke water supply and sanitation project
Preparation of Bills of Quantities for quotation purposes
Preparation of monthly valuations for payment of works done
Negotiating with sub-contractors
Appointing, supervising and measuring sub-contractors works
Preparation of sub-contractor payment certificates
Preparation of monthly progress reports
Preparation of planned and actual cash flow comparisons
Placing material and equipment orders
Supervising and monitoring material delivery and consumption on site
Preparation of monthly company turnover reports for the Chairman and the Board
Preparation and recording of wages and salaries for workers on site
ROKO CONSTRUCTION LTD: (QUANTITY SURVEYOR)
April 2010 – August 2010
Preparation of Bills of Quantities for quotation purposes
Preparation of monthly valuations for payment of works done
Negotiating with sub-contractors
Appointing, supervising and measuring sub-contractors works
Preparation of sub-contractor payment certificates
Preparation of monthly progress reports
Preparation of planned and actual cash flow comparisons
Placing material and equipment orders
Supervising and monitoring material delivery and consumption on site
Preparation of monthly company turnover reports for the Chairman and the Board
Preparation and recording of wages and salaries for workers on site
SPACE-DOK CONSULTS & CONTRACTORS (U) LTD: (QUANTITY SURVEYOR)
June 2011– April 2012
Preparation of monthly progress reports
Preparation of planned and actual cash flow comparisons
Interpreting and preparing tender documents
Preparation of Bills of Quantities for quotation purposes
Placing material and equipment orders on site
Appointing, supervising and measuring sub-contractors works
Preparation of sub-contractor payment certificates
Making measurements and preparing interim and final valuations
Making weekly and monthly progress reports
Attending site meetings and preparing reports
Supervising and monitoring material delivery and consumption
EAST AFRICAN CONSULTING SURVEYORS AND VALUERS: INDUSTRIAL TRAINING
(QUANTITY SURVEYOR)
June 2010 - May 2011
Making site visits and supervisions
Preparing Bills of Quantities and cost estimates
Designing simple plans for clients
Making measurements and evaluating work done
PEARL OILS CONTRACTORS: INDUSTRIAL TRAINING (QUANTITY SURVEYOR)
June 2009 - August 2009
Doing site supervision
Interpreting Bills of Quantities and plans
Supervising sub-contractors works
Making weekly and monthly reports to Site engineer
Attending site meetings
RESPONSIBILITIES HELD
Chairman(Organising Committee)-Makerere University Technology Sports Gala, 2011
President- Makerere University Association of Surveying Students, 2010
Chairman(Organising Committee)-Makerere University Technology Exhibition, 2010
Vice President- Makerere University Association of Surveying Students, 2009
Publicity Secretary-Makerere University Association of Surveying Students, 2008
General Secretary-Art and Designers Club (Ndejje Senior Secondary School), 2005
HOBBIES
Reading Interacting Swimming Playing and watching soccer
LANGUAGES
English (excellent) Luganda (excellent)
REFEREES
1) Mr. Derek Claassen
Chief Quantity Surveyor
Roko Construction Ltd.
P. O Box 172
Kampala, Uganda
Tel: +256 772 767471/ 414 567 305
Email: [email protected]//[email protected]
2) Mr. Henry M. Alinaitwe (PhD)
Associate Professor & Dean
School of Built Environment,
Makerere University Kampala
Room 5016 New Building
P.O Box 7062, Kampala (U)
Tel: +256 772 504 870
Email: [email protected]
3) Ms. Maery Mungati (Msc UoR, UK)
Senior Quantity Surveyor
East African Consulting Surveyors and Valuers
Plot 9, Kampala, Road
Agip House
First Floor Room 15
Tel; +256 757 800 202
Email: [email protected]
CURRICULUM VITAE
MR. OTUKEI CHRISTOPHER
TEL: 0706314357,0772546951
CAREER GOAL.
To find a challenging position to meet my capabilities, competence, skills education and
experience as well as further a career in planning and development, research and participatory
monitoring and public administration, to obtain a position with growth oriented firm where new
ideas are welcome, apply skills to an environment making significant impact and delivering
maximum safety and health performance so as to minimize risks to injury at work, subsequently
achieving carrier satisfaction.
KEYS OF SUCCESS
Integrity and ethics
Self starting and result oriented
Team work
Leadership
Facilitation and training skills
Flexibility and excellent communication
Creative and strategic thinking, training skills, open mindedness, people oriented.
SUMMARY
Otukei Christopher attended training in urban and regional planning (URP) and a bachelor’s
degree course from Makerere University Kampala.
Christopher has on hand experience in publicity, mobilization and organizing associations such
as Teso student Development Association (TESDA) and was a student representative in the
urban planning class. I have experience in data collection, research and report writing: I am
also equipped with excellent communication and writing skills, representation skills,
interpersonal skills and a great team player. Christopher is also a computer literate, I am trained
in risk assessment and hazard analysis and recognition, crafting and reviewing method
statements.
WORK EXPERIENCE
Work Experience November 2013 – April 2014 UPDEAL (U) Ltd – Health and safety officer
Project: Expansion and improvement of Lyantonde Town council piped water supply and
sanitation scheme – phase II
DUTIES
Prepare progressive detailed method statements and risk assessment and management
plan for the project.
Prepare daily work permits for site under takings.
Arrange for information, intervention and tool box talks as Necessary.
Ensure safe work methods on site through routine supervision.
Ensure appropriate provision of emergency and first aid facilities.
Weekly and monthly report preparation.
To carry out induction of all new workers/ visitors who come to the site.
Attend internal and external safety meetings of the company.
Work Experience November 2013 – April 2014 UPDEAL (U) Ltd – Health and safety officer
Project: Abim town water supply system
DUTIES
Prepare progressive detailed method statements and risk assessment and management
plan for the project.
Prepare daily work permits for site under takings.
Arrange for information, intervention and tool box talks as Necessary.
Ensure safe work methods on site through routine supervision.
Ensure appropriate provision of emergency and first aid facilities.
Weekly and monthly report preparation.
September 2013 to November 2013; Health and Safety Officer ROKO. Construction LTD.
DUTIES
Prepare progressive detailed method statements and risk assessment and management
plan for the project.
Prepare daily work permits for site under takings.
Arrange for information, intervention and tool box talks as Necessary.
Ensure safe work methods on site through routine supervision.
Ensure appropriate provision of emergency and first aid facilities.
Weekly and monthly report preparation.
To carry out induction of all new workers/ visitors who come to the site.
Attend internal and external safety meetings of the company.
Carry out periodic checks of the machinery and other hand tools on site and ensure that
they are in good working condition.
Conduct weekly tool box talks.
Conduct, provide instructions or arrange training of all personnel on sit for the
establishment of safe and healthy working methods.
Shall cause for statement inspection and certification of plant and equipment.
Undertake investigation of accidents and Dangerous occurrences and preventing
reoccurrences.
Ensure that the safety, health, environment files are prepared and maintained and that
the returns are made available to the company for an onward transmission to the
responsible authorities.
Ensure the provision, adequacy and proper use of appropriate personal protective
equipment (PPE).
Tran workers on health safety matters example fire Drills, emergency procedures.
Carry out periodic checks of the machinery and other hand tools on site to ensure that
the equipments are in good working condition.
November 2011 –May 2012 Health and Safety Officer Seyani International Co.LTD.
DUTIES
To carry out health and safety induction for new workers and visitors who come to the
site.
To carry out incident and accident investigation and prevention.
To identify potential hazards and finding solutions for them.
To ensure that there is good housekeeping in the site.
Supervise and enforce health and safety rules and regulations.
Preparation of method statement based on work plan, risk assessment and evaluation
and maintaining.
Application for daily work permits for site under takings.
To ensure that working platform are properly anchored by a qualified and competent
personnel.
Formulation of emergency action plan and communicating/ briefing staffs on the same.
Prepare and maintain daily, weekly and monthly safety reports.
June – July 2010, worked as research assistant for communication for development foundation
Uganda (CFDU).
DUTIES
Interviewing people and collecting data.
Writing a report for focused group findings.
Translating and interpreting questionnaires to vernacular.
May – July 2010, Research assistant-Health Communication Partnership (HCP) where I was
presenting family planning “Un met Need” campaign concept in Soroti District.
DUTIES
Collecting data through questionnaires.
Conducted several focused group discussions.
Writing a report for focused group findings.
ACADEMIC QUALIFICATIONS
YEAR INSTITUTE AWARD
2011 Kampala International College Certificate in Health and Safety
Construction
2010 Sports View Hotel, Kireka Certificate of participation
2005-2008 Makerere University Kampala
2003-2004 St.Augustine’s College Wakiso UACE
PRACTICAL SKILLS AND ABILITIES
Skills in risk assessment, hazard recognition, identification and prevention.
Knowledge in formulating work method statement.
Team player.
Excellent communication skills.
Hardworking.
Ability to carry out safety training.
POSITION OF RESPONSIBILITY
Assistant Chief Judge St. Augustine’s College Wakiso.
INTERST
Reading and writing literature.
Travelling and sports.
Socializing and making new friends.
Voluntary service.
LANGUAGES SPOKEN
LANGUAGE COMPREHENSION SPOKEN WRITTEN
English Expert Expert Expert
Swahili Very good Very good Very good
Luganda Good Good Good
Ateso Excellent Excellent Excellent
REFEREES
1. Mr. Kawuki Bisase Geoffre,
Health and Safety Manager,
Rook Construction Ltd,
Tel: 0703-691322
Email: [email protected]
2. Mr.Odongo James,
Health and Safety Officer
Rook Construction Ltd
NSSF U30 Project
0702926639
Email: [email protected]
3. Mr. Omoding David
Communications Consultant
Tel: 0772-546951/ 0701-546951
LIST OF PLANT, EQUIPMENT AND MACHINERY AVAILABLE FOR THE EXECTUTION OF CONTRACTS
EQUIPMENT MAKE & AGE CONDITION & No. OWNERSHIP
Tippers (10 tonnes) Isuzu & Fuso
Good 3 No. Owned
Pick-up trucks (1 ton) Nissan Good 3 No. Owned
Batch Concrete Mixers 1m³ Good 3 No. Owned
Batch Concrete Mixers 0.5 m³ Good 1 No. Owned
Plumbers’ Tools Various Good 4 sets Owned
Concrete Vibrators Honda Good 2 No. Owned
Dewatering pump Wacker, HP 8 Good 3 No. Owned
Dumpy Level Top-Con AT –G4 Good 1 No. Owned
Grader CAT 130G 1998 Good 2No. Leased
Bitumen Boiler 2000 litres Good 1 No. Leased
Wheel loader TEREX 72 - 51 Good 2 No. Hired
Vibrating Roller Bomag 10Tons 1980 Good 1 No. Hired
Pedestrian Roller 1.5 tonnes Good 2No. Owned
Water Tank 6000 litres Good 2 No. Hired
Dumpy Level Quick set & Wild Good 4 No. Owned
Track Excavator CAT 943 1998 Good 1 No. Leased
Tipper Dumper Isuzu 15 tonnes Good 4 No. Owned
Tipper Dumper Fuso 10 tonnes Good 2 No. Leased
Tractor Massey Ferguson Good 2 No. Hired
Tippers (7 tonnes) Isuzu & Fuso Good 3 No. Owned
Concrete Vibrators Honda Good 2 No. Owned
Batch Concrete Mixers 1m³ Good 3 No. Owned
Batch Concrete Mixers 0.5 m³ Good 1 No. Owned
Pick-up trucks (1 ton) Nissan Good 3 No. Owned
Pick-up trucks (0.5 tonnes) Mitsubishi, Toyota Good 2 No. Owned
Air Compressor with 2 Breakers Good 2 No. Hired
Theodolite Wild Good 1 No. Owned
Dumpy level Top –Con At G4 Good 1 No. Owned
Plumbers’ Tools Good 4 sets Owned
Pressure Testing Equipment Good 3 sets Owned
Dewatering pump Wacker, HP 8 Good 3 No. Owned
Electric Circular Saws Portable Good 2 No. Owned
Electric plane Portable Good 2 No. Owned
Generator High Power Good 1 No. Owned
Photocopier Xerox Good 1 No. Owned
Fax machine Hp (Hewlett Parkard) Good 1 No. Owned
Water Recourse Works
Road works
Build and Structural works
Electrical and Network works
END