Upload
trifika-bina
View
276
Download
18
Tags:
Embed Size (px)
DESCRIPTION
PT Trifika Bina Engineering is Company based at Jakarta, country Indonesia specializing for Installation Power Plant, Substation, Construction and Maintenance Service. We have many experience around Project PLN in Indonesia.
Citation preview
Power PlantSubstationConstructionMaintenance
www. trifika-engineering.com
Office : PTC Pulogadung Blok 8B No. 36 Jakarta 13920 Phone : 46832932, 70207590Warehouse : Jl. Raya Cakung Cilincing Km 6.3 Jakarta Utara Phone : 4403932
01 Our Company BusinessBuilding with Quality and Achievement for Better WorldPT Trifika Bina Engineering established from 2005 is NationalPrivate Company specializing in Mechanical, Electrical,Construction and Maintenance Service.
About PT Trifika Bina Engineering
Name ofCompany
: PT. TRIFIKA BINA ENGINEERING
Type of Company : Private CompanyType of Company : Private Company
Notaris ACT :DR. M. M. RIDWAN INDRA R.A. SH.Spn. MM. MKn
NPWP : 02 . 313 . 190 . 7 – 004 . 000TDP : 09. 04 . 1 . 51 . 27750SIUP : 861 / 13 - 1. 824 . 51SIUJK : 1 . 604095 . 3171 . 00682JAMSOSTEK NO : 0600000001001KADIN : 20203 . 83785 - 4 / 27 - 02 - 2006GAPENSI : 09 . 71. 10 . 1297 . 06 . 12635SKT ( MIGAS ) : 599 / SKT / Daf / DMT / 2006
SKT (PERTAMBANGAN)
: 2394/30DJB/2011
SKA APEI(ELEKTRIKAL)
: 1.4.100.2.28.09.079380
ACCOUNT BANK :MANDIRI BANK, PERMATA BANK andBANK RAKYAT INDONESIA
02 Vision and Mision
We are PT Trifika Bina Engineering had vision to becomeNational Private Company specializing service InstallationPower Plant, Substation, Construction and Maintenance.
With best skill, knowledge and experience we movingforward to service our customer to got best result and ontime in target schedule project.
With Mission our Motto : Quality and Reality, we alwayschallenges our company to become innovative, efficient,effective, integrity and commitment to our client.We keep satisfaction our customer to become our priority.
We are PT Trifika Bina Engineering had vision to becomeNational Private Company specializing service InstallationPower Plant, Substation, Construction and Maintenance.
With best skill, knowledge and experience we movingforward to service our customer to got best result and ontime in target schedule project.
With Mission our Motto : Quality and Reality, we alwayschallenges our company to become innovative, efficient,effective, integrity and commitment to our client.We keep satisfaction our customer to become our priority.
03 Company AssetA. Machine Equipment
1. Machine Pipe Threading Rigid 16. Welding Arc 400 A Tick & Mig ( Miller)2. Machine Pipe Threading 17. Cutting Torch & Regulator3. Electrical Compressor 18. Machine Roll Alum4. Electrical Grinder 19. Vacuum Cleaner5. Electrical Drill 20. Portable Air Blower 20”6. Electrical Hammer Drill 21. Chisel7. Magnetic Base Drill Stand 22. Hot Jet (PVC)8. Electrical Cutting 23. Generator Set 20 Kva ( Silent Type)9. Pipe Bender 24. Generator Set 50 Kva10. Gun Ramset 25. Torque Moment 500 – 800 N11. Jig Saw 26. Drilling Portable Machine12. Gun Ramset 27. Container Office13. Bending Roll Plate 28. Welding Transformer 400 A14. Hydraulic Punch
B. Heavy Lift/ Lifting Equipment
1. Different Chain Block 10. Hand Pallet 2.5 T2. Rope Fuller 11. Sling Nylon 3 T3. Universal Pulling Lifting 12. Forklift 3 T4. Cable Jack 25 T 13. Electric Pump 4 Channel (1 pcs) Hypo see 900 Bar5. Rachet and Lowering 14. Electric Pump Sun Ran Two Channel 700 Bar6. Level Block 15. Jack Vertical 50 T ( 4 pcs)7. Chain Block 16. Jack Horizontal 32 T (4 pcs)8. Hydraulic Jack 15 T 17. Jack Pad 5 T (2 pcs)9. Enerpac Jack 25 T 18. Roll Tank Capacity 30 T (4 pcs)
President DirectorH. CHAERUL ANWAR
General ManagerIr. SULTONI ARSYAD
Marketing Engineering ProjectMechanical,Electrical &Construction
ProjectMaintenance
& Service
QA / QC HSE Finance Procurement HRD
04 Structure Organization
SIMON
TANUTAMA
ProjectMechanical,Electrical &Construction
ProjectMaintenance
& Service
ProjectManager
CHAMDI D.S.
MechanicalEngineer
DWIMARGIANTO
SESEP H.A,S.T
Site ManagerYAKOBUS PATTI
Electrical EngineerABDUL HARRIS
SOLEHSOBARI
UJANGRAHMAT
Finance ManagerTASMONO
DONNYSUTARNO
FIRDA NINGSIH
BETY ANNAVONNY D.
Project Maintenance & ServiceDWI MARGIANTO
Spv ElectricalAbdul Haris
AdminSugiyanto
Spv MechanicalHery Iskandar
05 Structure Organization
Spv ElectricalAbdul Haris
Staff ElectAri Adrian
Staff ElectJoko Susilo
AdminSugiyanto
Spv MechanicalHery Iskandar
Staff MechMartin
Staff MechAhmad Hardi
Key Personnel
No. CLASIFICATIONS PERSONEL
1 Constructions Manager 1
2 Constructions Mechanical Manager 1
3 Constructions Electrical Manager 1
4 Maintenance & Service Engine 3
5 Project Supervisor Mechanical 4
6 Project Supervisor Electrical 4
7 Estimator Engineer 2
8 Process Engineer 2
9 Instrument Engineer 1
06 Key Personel
10 Marketing Department 2
11 Draftmen 2
12 Quality Control 2
13 Project Administration 4
14 Project Finance 2
15 Computer Operator 4
16 General Staff 5
Best Regards,PT. TRIFIKA BINA ENGINEERING
H. CHAERUL ANWARDIRECTOR
07 Completed ProjectsPT Bukit Muria Jaya PT Sumatera Prima Fiber
Area : Karawang West JavaModification and Installation Bale ConveyorWork : Installation, Erection Work ,Alignments Work,
Area : Tanjung Seteko – PalembangModification and Instalation Hate ExchangerUnit
Area : Karawang West JavaModification and Installation Bale ConveyorWork : Installation, Erection Work ,Alignments Work,
Area : Tanjung Seteko – PalembangModification and Instalation Hate ExchangerUnit
PT Indo Matra Power PT Trakindo Utama Singapore
Area : Pesanggaran BaliInstallation Mechanical and Electrical DieselEngine Sulzer 16VZA40SA 3 Unit x 10.5 MW
Area : Republic of Timor LesteInstallation Diesel Engine CAT 3616 1 X 4.2 MW
08 Completed ProjectsPT Trakindo Utama PT Yamaha Indonesia
Area : Kuala Kencana , Timika PapuaInstallation Exhaust Gas System
Area : Karawang West JavaDismantling, Unwiring Melting Furnace LC.21
Area : Kuala Kencana , Timika PapuaInstallation Exhaust Gas System
Area : Karawang West JavaDismantling, Unwiring Melting Furnace LC.21
PT Wartsila Indonesia PT Inco Sarowako
Area : Bukit Asam, South SumateraDismantling Engine 12 ZVA40 6.3 MW
Area : Sarowako, Makasar South SulawesiInstallation Diesel Engine CAT 3515 X 32Unit
09 Completed ProjectsPT Iradat Aman PT Freeport Indonesia
Area : PLTD Tello MakasarProject BOO 80 MWWork : Installation and Leveling Engine Sulzer16ZAV40s x 8 Unit
Area : Tanjung Seteko – PalembangModification and Instalation Hate ExchangerUnit
Area : PLTD Tello MakasarProject BOO 80 MWWork : Installation and Leveling Engine Sulzer16ZAV40s x 8 Unit
Area : Tanjung Seteko – PalembangModification and Instalation Hate ExchangerUnit
PT Daya Esa Mandiri
Area : Kawasan Industri Jababeka II Cikarang-West JavaWork : Installation of Expansion Joint &Booster For Turbine Gas 1 x 60 MW
Area : Sulutenggo, Silae – PaluWork : Installation of Mechanical Electrical 3 x6,5MW Deutz & 1 x 10,5 MW Sulzer
PT Phak-phak Bumi Energy
10 Completed ProjectsMingken Engineering
Area : Tallasa – MakasarWork : Installation of Mechanical Electrical 4 x6,5 MW Deutz 16 BV 640
Vpower HK
Area : PLTG, Teluk Lembu – RiuWork : Installation of Mechanical Electrical GasEngine 12 MW
Area : Tallasa – MakasarWork : Installation of Mechanical Electrical 4 x6,5 MW Deutz 16 BV 640
Area : PLTG, Teluk Lembu – RiuWork : Installation of Mechanical Electrical GasEngine 12 MW
PT. AREVA T & D
Area : Ranca Kasumba West JavaWork : KE 3 LOT 3 Gardu Induk 150 KV
PT. ABB
Area : Pesanggaran – BaliWork : Gardu Induk 150 KV
11 Completed ProjectsPT. Daya Esa Mandiri Project CV. Putri Salju
Area : Kawasan Industri Jababeka 1 Cikarang,West Java
Area : PLTD PLN (PERSERO) Hative Kecil AmbonWork : Stork Warsila 9TM410
CV. Putri Salju
Area : PLTD PLN (PERSERO)Hative KecilAmbonWork : Stork Warsila 9TM410
PT. Sri Rejeki
Area : Jatisari,Karawang – West JavaWork : Installation for N-Line Continous Dryer
12 Certificate
13 Certificate
14 Certificate
15 Certificate
16 Certificate
17 Certificate
18 Project HistoryYear Milestone Year Milestone
Power plant2012 Installation of Mechanical & Electrical
diesel engine deutz 16 BV 640 capacity4 x 6,5 Mw , Tallasa, MakassarClient: Mingken Engineering Co Ltd
Installation of Mechanical & ElectricalDiesel Engine Sulzer 16 ZAV 40 S,Capacity 3 x 10,5 Mw , Likupang, ManadoClient : PT. Humbahas Bumi Energi
Installation of Mechanical and ElectricalGas Engine MTU BR 4000 Capacty 12 x1600 Kw, PLTD PLN(Persero) TelukLembu, Pekanbaru, RiauClient : PT. Hutan Alam
2011 Installation Of Mechanical Diesel EngineWartsila 18 V 32, Capacity 1 x 10 Mw,Cikupa, Tanggerang, BantenClient : PT.Nikomas Gemilang
Installation of Mechanical ElectricalEnginee Deutz 16 BV 640 and Sulzer 18 VZAV 40 s Capacity 3 X 6,5 Mw And 1 x10,5 Mw , Silae, Palu Sulutenggo.Clien: PT. Phakpak Bumi Energi
2010 Installation Of Mechanical ElectricalEngine Sulzer 16 ZA V 40 s ,Capacity 3 x10,5 Mw. PLTD PT. PLN (Persero)Pesanggaran BaliClient : PT. Sri Rejeki Power/ PT. IndoMatra Power
Installation and Allignment DieselEnginee Sulzer 16 ZA V 40 s, Capacity 8 X10,5 Mw, PT. PLN(Persero)Tello,MakassarClient : PT. Assindo PerniagaanInternasional
2009 Modification System Mfonisasi EngineSWD Capacity 4 x 1,2 Mw PLTDPLN(Persero) Meulaboh, SenabouhNADClient : PT. Tandon Citra Murti/Wartsilla
Modification System Mfonisasi EngineSWD Capacity 3 x 3,2 Mw, PLTDPLN(Persero) Pulo Pisang, Sigli NADClient: PT. Tandon Citra Murti/Wartsilla
2006 Installation of Diesel Engine ContainerCAT D 3516 B,Capacity 32 x 1200Kw.PT. Inco Sorowako, Sulawesi Selatan,
Client: PT. Trakindo Utama
Installatiom of Mechanical ElectricalDiesel Engine CAT 3616, Capacity 1 x4,2 Mw. Power Plant Comoro DilliRepublik Timor LesteClient: TUSSPL Singapore
Installation and Modification ExhaustDuct Silencer and Tank Modular UreaServices tank for Diesel Engine CAT3616, PLTD Koala Kencana, FreeportTimika,PapuaClient : PT. Trakindo Utama
2005 Installation of Expantion Joint & BelowTurbin Gas 1 x 60 Mw, Kawasan IndustriJababeka I, Cikarang-West JavaClient: PT. Cikarang Listrindo
Installation of Diesel Generator(Genset)CAT 250 Kva, PT. PLN(Persero) Kediri,East JavaClient: PT. Samapta Nusantara
Power plant2012 Installation of Mechanical & Electrical
diesel engine deutz 16 BV 640 capacity4 x 6,5 Mw , Tallasa, MakassarClient: Mingken Engineering Co Ltd
Installation of Mechanical & ElectricalDiesel Engine Sulzer 16 ZAV 40 S,Capacity 3 x 10,5 Mw , Likupang, ManadoClient : PT. Humbahas Bumi Energi
Installation of Mechanical and ElectricalGas Engine MTU BR 4000 Capacty 12 x1600 Kw, PLTD PLN(Persero) TelukLembu, Pekanbaru, RiauClient : PT. Hutan Alam
2011 Installation Of Mechanical Diesel EngineWartsila 18 V 32, Capacity 1 x 10 Mw,Cikupa, Tanggerang, BantenClient : PT.Nikomas Gemilang
Installation of Mechanical ElectricalEnginee Deutz 16 BV 640 and Sulzer 18 VZAV 40 s Capacity 3 X 6,5 Mw And 1 x10,5 Mw , Silae, Palu Sulutenggo.Clien: PT. Phakpak Bumi Energi
2010 Installation Of Mechanical ElectricalEngine Sulzer 16 ZA V 40 s ,Capacity 3 x10,5 Mw. PLTD PT. PLN (Persero)Pesanggaran BaliClient : PT. Sri Rejeki Power/ PT. IndoMatra Power
Installation and Allignment DieselEnginee Sulzer 16 ZA V 40 s, Capacity 8 X10,5 Mw, PT. PLN(Persero)Tello,MakassarClient : PT. Assindo PerniagaanInternasional
2009 Modification System Mfonisasi EngineSWD Capacity 4 x 1,2 Mw PLTDPLN(Persero) Meulaboh, SenabouhNADClient : PT. Tandon Citra Murti/Wartsilla
Modification System Mfonisasi EngineSWD Capacity 3 x 3,2 Mw, PLTDPLN(Persero) Pulo Pisang, Sigli NADClient: PT. Tandon Citra Murti/Wartsilla
2006 Installation of Diesel Engine ContainerCAT D 3516 B,Capacity 32 x 1200Kw.PT. Inco Sorowako, Sulawesi Selatan,
Client: PT. Trakindo Utama
Installatiom of Mechanical ElectricalDiesel Engine CAT 3616, Capacity 1 x4,2 Mw. Power Plant Comoro DilliRepublik Timor LesteClient: TUSSPL Singapore
Installation and Modification ExhaustDuct Silencer and Tank Modular UreaServices tank for Diesel Engine CAT3616, PLTD Koala Kencana, FreeportTimika,PapuaClient : PT. Trakindo Utama
2005 Installation of Expantion Joint & BelowTurbin Gas 1 x 60 Mw, Kawasan IndustriJababeka I, Cikarang-West JavaClient: PT. Cikarang Listrindo
Installation of Diesel Generator(Genset)CAT 250 Kva, PT. PLN(Persero) Kediri,East JavaClient: PT. Samapta Nusantara
19 Project HistoryYear Milestone Year Milestone
Substation 150 KV2010 Installation and Treatment oil
Transformer Capacity 70 Mva,PLTDPLN(Persero) Pesanggaran Bali,Client : PT. ABB
2008 Installation and Erection Switchyard150Kv Line Bay Trafo I,PT. PLN(Persero)Gardu Induk , Dawuan. CikampekClient: PT. Areva T & D
Installation and Erection Switchyard150 Kv Line Bay Trafo III,PT.PLN(Persero) Gardu Induk ,Rancakusumba. Bandung SelatanClient: PT. Areva T & D
Supply and Fabrication2008 Dismantling, Reinstall and Moulding
Melting Furnance LC. 20.PT. YamahaKIIC Karawang BaratClient: PT. Andika Mitra Teknik
2005 Supply and Installation of HeatExchanger and piping system Thermaloil, Manufacture fiberboard, IndralayaKM, 32 South Of SumateraClient: PT. Sumatera Prima Fiberboard
2005 Installation of Mechanical EquipmentProces Papermill II, PT. Bukit Muria JayaKarawang BaratClient: PT. Bina Rasano Engineering
Shutdown & Reinstallation Krofta Tank,papermill II PT. Bukit Muria JayaKarawang BaratClient: PT. Bina Rasano Engineering
2011 Supply Engineering SupervisiMechanical & Electrical DieselEnginee 3 x 4,2 Mw GosowongMining Halmahera Utara.Client : PT. Trakindo Utama
Pipe Line Gas2006 Installation and Fabrication
Condensate pipe Injection Hook UpLine, AW 5 Geothermal ChevronDarajat 12 Garut-West JavaClient : PT. Bina Rasano Engineering
Installation and FabricationCondensate Pipe and WeldingServices , AW 2 Power PlantGeothermal ,Magma NusantaraLimited Pengalengan, West JavaClient : Magma Nusantara Limited
Testing and Commissioning2013 Trouble shooting and Services Engine
CAT 3616 Capacity 4,2 Mw PT. PLN(Persero) Kayu Merah Maluku UtaraClient: CV. Putri Salju
2012 Commissioning Diesel Enginee Sulzer1 x 16 ZAV 40 s. PLTD PLN(Persero)Silae- Palu, Sulutenggo.Client : PT. Phakpak Bumi Energi
Substation 150 KV2010 Installation and Treatment oil
Transformer Capacity 70 Mva,PLTDPLN(Persero) Pesanggaran Bali,Client : PT. ABB
2008 Installation and Erection Switchyard150Kv Line Bay Trafo I,PT. PLN(Persero)Gardu Induk , Dawuan. CikampekClient: PT. Areva T & D
Installation and Erection Switchyard150 Kv Line Bay Trafo III,PT.PLN(Persero) Gardu Induk ,Rancakusumba. Bandung SelatanClient: PT. Areva T & D
Supply and Fabrication2008 Dismantling, Reinstall and Moulding
Melting Furnance LC. 20.PT. YamahaKIIC Karawang BaratClient: PT. Andika Mitra Teknik
2005 Supply and Installation of HeatExchanger and piping system Thermaloil, Manufacture fiberboard, IndralayaKM, 32 South Of SumateraClient: PT. Sumatera Prima Fiberboard
2005 Installation of Mechanical EquipmentProces Papermill II, PT. Bukit Muria JayaKarawang BaratClient: PT. Bina Rasano Engineering
Shutdown & Reinstallation Krofta Tank,papermill II PT. Bukit Muria JayaKarawang BaratClient: PT. Bina Rasano Engineering
2011 Supply Engineering SupervisiMechanical & Electrical DieselEnginee 3 x 4,2 Mw GosowongMining Halmahera Utara.Client : PT. Trakindo Utama
Pipe Line Gas2006 Installation and Fabrication
Condensate pipe Injection Hook UpLine, AW 5 Geothermal ChevronDarajat 12 Garut-West JavaClient : PT. Bina Rasano Engineering
Installation and FabricationCondensate Pipe and WeldingServices , AW 2 Power PlantGeothermal ,Magma NusantaraLimited Pengalengan, West JavaClient : Magma Nusantara Limited
Testing and Commissioning2013 Trouble shooting and Services Engine
CAT 3616 Capacity 4,2 Mw PT. PLN(Persero) Kayu Merah Maluku UtaraClient: CV. Putri Salju
2012 Commissioning Diesel Enginee Sulzer1 x 16 ZAV 40 s. PLTD PLN(Persero)Silae- Palu, Sulutenggo.Client : PT. Phakpak Bumi Energi
20 Project HistoryYear Milestone Year Milestone
Services and OverHaul2012 Major Overhaul Engine GMT unit #3
PLTD PT. PLN(Persero), Pokka AmbonClient : CV. Putri Salju
2012 Major Overhaul Engine SWD 410,unit #1 PLTD PT. PLN(Persero) HativeKecil, AmbonClient : CV. Putri Salju
2011 Major Overhaul Engine SWD 410unit #2, PLTD Hative Kecil, AmbonClient : CV. Putri Salju
Major Overhaul Engine SWD 410 unit#3, PLTD Hative Kecil, AmbonClient : CV. Putri Salju
Services and OverHaul2012 Major Overhaul Engine GMT unit #3
PLTD PT. PLN(Persero), Pokka AmbonClient : CV. Putri Salju
2012 Major Overhaul Engine SWD 410,unit #1 PLTD PT. PLN(Persero) HativeKecil, AmbonClient : CV. Putri Salju
2011 Major Overhaul Engine SWD 410unit #2, PLTD Hative Kecil, AmbonClient : CV. Putri Salju
Major Overhaul Engine SWD 410 unit#3, PLTD Hative Kecil, AmbonClient : CV. Putri Salju
21 Completed Project Map
Year Location Year Location
2012 Ambon , MalukuPalu, Center of SulawesiPekanbaru, RiauMakasar , South of SulawesiManado, North of Sulawesi
2011 Ambon, MalukuTangerang , Banten
2010 Halmahera Utara, Maluku UtaraKarawang, West of JavaPesanggaran, BaliMakasar, South of Sulawesi
2009 Sigli, Nangroe Aceh Darusalam
2008 Rancakusumba, Dawuan, West ofJavaKarawang, West of JavaDarajad, West of Java
Year Location Year Location
2007 Sorowako, South of Sulawesi
2006 Hative Ambon, MalukuComoro, Republic of Timor LesteTimika, PapuaDarajad, West of Java
2005 Cikarang, West of JavaKediri , East of JavaInderalaya, South of SumateraKarawang, West of Java