25
Rev 01 09.01.2020 Company Profile We are the leading global supplier of solutions protecting people and equipment from fire, blast and radiant heat hazards for the offshore and onshore oil and gas, nuclear, renewable energy, chemical and petrochemical industries. And we have been doing it since 1969.

Company Profile - Mech-Tool Engineering Ltd · 2020. 8. 10. · Committee and Management Review. ... GSP Offshore Midio Gas DevelopmentBlack Sea Oil & Gas 2019 Blast Walls Equinor

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • Rev 01 09.01.2020

    Company Profile

    We are the leading global supplier of solutions

    protecting people and equipment from fire, blast and

    radiant heat hazards for the offshore and onshore oil

    and gas, nuclear, renewable energy, chemical and

    petrochemical industries.

    And we have been doing it since 1969.

  • 2

    Contents

    Brief Overview Page 3

    Mission & Values Page 4

    Company Facilities Page 5 MTE Organisation Chart Page 6 Quality Certification Page 7 MTK Quality Certification Page 8

    Health & Safety & Environmental Certification Page 9

    CE Certification Page 10 FPAL Approved Page 11

    Achilles JQS Approved Page 12

    DSME Certificate Page 13

    Management Policy Statement Page 14

    HSE Policy Statement Page 15 Safety Awards Page 16

    MTE Products & Key Service Areas Page 17

    Project Experience Page 18 - 25

  • 3

    Brief Overview

    Mech-Tool Engineering Ltd [MTE] is a technology company with a global reputation for the protection of people

    and equipment from fire, blast and radiant heat hazards in on-shore and off-shore oil & gas, nuclear,

    renewable energy and petrochemical industries.

    We devote a unique wealth of specialist skills and 50 years’ experience to design, build and deliver individual

    and dependable solutions.

    • Location Darlington, North East of England

    • Established 1969

    • Quality Approval ISO 9001:2015, EN1090 EXC 4, ISO3834

    • Health & Safety Approval ISO 45001:2018

    • Environmental Approval ISO 14001:2015

    • Number of Employees 220

    • Registered with FPAL Supplier No. 10040137

    • Registered with Achilles JQS Supplier No. 20917

    • Safety Awards RoSPA Order of Distinction

  • 4

    Mission & Values

    MTE strives to use its expertise and experience to provide reliable solutions to protect people and equipment

    from explosion, heat, and fire hazards.

    The company provides design and engineering consultancy services for hydrocarbon fire and blast rated

    structures. It also supplies bespoke turnkey solutions for ranges of Fire wall and Blast wall, Modular, and

    Thermal Defence products.

    The company seeks to conduct its business activities with a highly professional and ethical approach at

    all times. MTE aims to foster for all its staff, safe and agreeable working conditions, a supportive and friendly

    culture and a stimulating and rewarding working environment.

  • 5

    Company Facilities

    MTE provide one of the UK's foremost facilities for the preparation, fabrication and surface preparation of

    Modular and Fire & Blast Protection Equipment enabling us to serve our clients on a worldwide basis.

    Our internationally recognised fire and blast testing has enabled us to develop innovative engineering

    solutions with techniques and software fully validated by third party authorities.

    Darlington

    The 7200m2 production facility and outside storage area

    at our Darlington site ensure that we are equipped to

    cater for the widest variety of work possible.

    Supporting the production facilities are our

    administrative, sales, estimating, in-house design and

    state-of-the-art engineering functions, housed within

    1700m2 of dedicated office space at our Darlington

    facility.

    Riverside facility (Middlesbrough)

    The 11000m2, 35m high covered riverside facility with

    three 20 tonne overhead cranes located by the River

    Tees, in Nearby Middlesbrough, has the flexibility to

    assemble modules up to 33m long x 20m wide x 480

    tonnes. These are loaded out on to barges for shipping

    to their final destination.

    Mech-Tool Korea, Busan

    MTK’s design, engineering, sales, estimating and

    administration functions are independent to the 6200m2

    production facility in the Busan region.

    The facility provides a large flexible unit to cater for a

    wide variety of work with easy access to all main routes

    and nearby construction yards.

  • 6

    MTE Organisation Chart

  • 7

    Quality Certification

  • 8

    MTK Quality Certification

  • 9

    Health & Safety & Environmental Certification

  • 10

    CE Certification

  • 11

    FPAL Approved

  • 12

    Achilles JQS Approved

  • 13

    DSME Certificate

  • 14

    MANAGEMENT POLICY/OBJECTIVES AND VALUES SHEQ Policy Statement based on the requirements of the business, ISO9001 & the MTE QMS

    We will realise our company mission by active pursuance of the following:

    1. Top Management have identified and documented

    • Risks and Opportunities to the business

    • Interested parties internal and external

    • Issues internal and external

    • Objectives including documented evidence to aid generation

    • Customer feedback

    • High level process maps

    2. Conduct regular reviews of QMS via the Executive Team monthly Reports and Annual Management Review.

    3. Sustained financial growth in accordance with the business plan (budget) to achieve our corporate goals. 4. Guide our course with financial discipline, accountable/responsible management and personal

    accountability. 5. Awareness of the company’s reputational risks. 6. Listening and understanding our customer’s requirements, responding promptly to their needs and

    keeping our promises. 7. Remaining at the forefront of those industries we supply to through superior quality products and

    outstanding service. 8. Creating and maintaining a personal and professional environment for ourselves and our families,

    enhance safety, diversity, fulfilment and success on the foundations of our business. 9. The company will maintain and continually improve its processes, procedures and the QMS (Quality

    Management Systems) in accordance with the requirements of ISO9001. 10. The integrity of the products produced by MTE will be in line with the requirements of the

    Construction Products Regulations (EU) No. 305/2011.

  • 15

    Safety, Health & Environmental Statement

    The Health, Safety & Environmental Manual and all associated procedures detail the lines of responsibility and communications for Health, Safety & Environmental matters and the company’s requirements for revisions to be brought to the notice of all company employees, other interested parties and the General Public. It is the responsibility of the CEO (Managing Director) and the Executive Team to ensure enough financial resources are made available to meet the requirements of the Health, Safety and Environmental management systems and their associated procedures and to also ensure the efficient implementation as required by the Health and Safety at Work etc. Act 1974 (HSWA), the Environmental Protection Act 1990, the Management Health and Safety at Work regulations and any other legislation and regulations applicable to our company’s activities. This legislation provides the minimum standard required to ensure compliance with Health; Safety & Environmental law, the aim throughout the company is to exceed these minimum standards. It is the duty and responsibility, or where appropriately delegated by the CEO (Managing Director) of the company to ensure that this Health, Safety, Environmental Policy and its associated Procedures, along with any relevant revisions, are implemented and maintained (by annual monitoring and auditing). To ensure that any deviations, or consistent refusal to follow this Health, Safety & Environmental Policy and associated processes/procedures, are brought to the attention of the Managing Director for the decision as to the appropriate action to be taken.

    MTE Ltd is committed to objectives list below (not an exhaustive list) to establish an incident free operation –

    • Achieve an injury free workplace and Prevent Injury and ill health.

    • SHEQ Risks and Opportunities to the business.

    • Interested parties internal and external.

    • Awareness of the company’s reputational risks.

    • Allocate both physical and financial resources to aid SHEQ.

    • Conduct regular reviews of HS&E management systems via the Project Governance Steering Committee and Management Review.

    • Promote a healthy work place and mitigate significant health risks.

    • Creating and maintaining a personal and professional environment for ourselves and our families, enhance safety, diversity, fulfilment and success on the foundations of our business.

    • Eliminate spills, environmental incidents, identify and mitigate key environmental risks.

    • To exercise all due care in the disposal of waste produced by the company’s activities.

    • Develop plans/actions to reduce waste, energy consumption, encourage recycling and good housekeeping.

    • To implement & maintain an effective Environmental Management system to eliminate the potential risk of polluting the environment.

    • Continuously strive to reduce its environmental impact to as low as is reasonably practicable.

    • The company will maintain and continually improve its HS&E processes, procedures in accordance with the requirements of ISO45001 & ISO14001.

  • 16

    Safety Awards

  • 17

    MTE Products & Key Service Areas

    Highly accurate designs, engineering and cost projections at FEED stage using bespoke and fully validated MTE design tools and systems. MTE’s early involvement on projects has proved particularly effective in optimum weight and cost savings for operators and EPC’s.

    50 years of knowledge and experience; all MTE fully certified fire and blast walls are designed, engineered, manufactured and supplied to provide the most cost-effective and weight optimised solution to the specific requirements of each individual project however challenging. MTE ventilated heat shield, solar shield and wind wall cladding designs are proven and provide protection for people and equipment against the effects of radiant heat and extreme weather.

    For five decades MTE has pioneered the design of modules providing fire and blast protection. Using MTE

    latest technology and modelling techniques modules can be cost effectively purpose designed to meet the

    clients’ specified explosion, seismic, thermal, fire and acoustic performance criteria.

  • 18

    Project Experience Fire & Blast Walls

    Client Operator Project Year Scope of Work

    Fluor Shell Penguins Field Development

    2020 Fire & Blast Cladding

    Drydocks World-Dubai

    TenneT HKZ Beta 2020 Fire Walls

    McDermott QMW Novatek Arctic LNG 2 2020 Fire & Blast Walls

    Sarens Novatek Arctic LNG 2 2020 Blast Walls

    Cosco Novatek Arctic LNG 2 2020 Fire & Blast Walls

    PJOE Novatek Arctic LNG 2 2020 Blast Walls

    KBR BP Azeri Central East 2019 Internal Partitions & Ceilings

    Bomesc Novotek Arctic LNG 2 2019 Fire & Blast Walls

    GSP Offshore Black Sea Oil & Gas

    Midio Gas Development 2019 Blast Walls

    Kaefer Energy Equinor (Statoil) Johan Sverdrup–Phase 11 2019 Under Deck Cladding

    KBR BP Azeri Central East 2019 Doors & Windows

    Drydocks World-

    Dubai

    TenneT HKZ Alpha 2019 Firewalls

    KBR BP Azeri Central East 2019 Blast & Internal Walls, Cladding & Doors (Topsides & Drilling)

    BP BP Clair Ridge 2019 Replacement Duct Unit

    Sejin Technical

    Industries Co

    Malaysian Royal Navy

    Carrier Ships 2019 Corrugated Fire Walls

    ASK JV Equinor (Statoil) Johan Sverdrup 2019 External Pre-Fabricated Walls

    Shell UK Shell UK Leman Delta 2019 Blast Wall

    PD&MS Energy Chrysaor

    Aberdeen

    Lomond Platform 2019 Blast Wall

    Aker Solutions Conoco Phillips

    M&M

    Eldfisk

    2019 Replacement Wall

    Cladding Panels

    Kaefer Energy Nexen Buzzard Phase 2 2019 Fire Rated Blast Wall

    Fluor Shell Penguins Field

    Development

    2019 External Cladding

    Petrofac Spirit Energy &

    Neptune Energy

    Cygnus Gas Field 2018 Fire Wall Cladding & Weather Shields

    Aibel AS Equinor

    Snorre Expansion (SEP) 2018 Fire & Blast Wall Panels

    AAF Ltd Storengy Stublach Gas Storage 2018 Stainless Steel Blast Relief System

    Aker Solutions Statoil Mariner HUC 2017 Offshore installation of HUC panels and door commissioning

    Petrofac Galloper Wind

    Farm Ltd

    Galloper 2 2017 Offshore Door Commissioning

    JKC Inpex LNG Ichthys 2017 Onshore door repairs and commissioning

    SHI Statoil Johan Sverdrup 2017 Site Services (SHI Yard So. Korea)

    Worley Parsons Exxon Mobil Hebron 2017 Offshore Door Commissioning

  • 19

    Statoil Frame Agreement, Johan Sverdrup Project - 2016

    Client Operator Scope of Work

    Aibel Statoil Drilling Platform

    Fire and blast walls, heat shields, wind walls, blast relief panels and windows

    Aker/SHI Statoil Process Platform

    Fire and blast walls, heat shields, wind walls, blast relief panels and windows

    Aker/SHI Statoil Riser Platform

    Fire and blast walls, heat shields, wind walls, blast relief panels and windows

    Client Operator Project Year Scope of Work

    BiFab BP BP Kinneil 2016 Fire and Blast relief walls and specialist fire louvres

    Heerema Fabrication Group

    Petrofac Galloper II 2016 Firewalls and Louvres.

    Internal and External Doors and windows

    SHI Petronas Petronas FLNG 2015 Blast walls

    NPCC/Technip ADMA-OPCO Umm Lulu 2015 Blast walls

    Sembmarine

    SLP

    Dudgeon Offshore

    Dudgeon Offshore

    Wind Farm

    2015 Fire and blast walls

    DSME Statoil Mariner 2014 Fire and blast walls

    SHI Total Martin Linge 2014 Fire and blast walls

    HHI BP Clair Ridge 2013 External blast resistant ducting

    AG&P Inpex Ichthys 2013 Fire and blast rated cladding

    Worley Parsons Exxon Mobil Hebron 2013 Blastwalls, doors & windows

    AMEC Gaz de France Cygnus 2012 External walls, doors & windows

    EnQuest EnQuest Knightsbridge 2012 Fire & blast walls

    AMEC BG Armada 2012 Blast walls

    Burntisland Chrysoar Solan 2012 Fire walls

    SLP Nexen Golden Eagle 2012 LQ Blast walls

    HHI BP Clair Ridge 2012 Fire & Blast walls

    Wood Group

    PSN

    Hibernia Hibernia 2012 Blast relief panels

    Harland &Wolff RWE Gwynt y Mor 2011 Blast relief panels

    Scottish Power Scottish Power Longannet 2011 Blastwalls

    PTSC M&C Petro Vietnam Su Tu Trang 2011 Blastwalls

    MMHE Exxon Mobil Telok A & B 2011 Firewalls

    Sime Darby Petronas Kebabangan 2011 Fire & blastwalls

    Conoco

    Phillips

    Conoco

    Phillips

    Britannia LTC 2011 Firewalls & windwalls

    OGN Apache Forties 2011 Fire & blastwalls and doors

    Dragados Hess South Arne 2011 Fire & Blastwalls and doors

    Worley

    Parsons

    Exxon Mobil Sakhalin I

    Arkutun-Dagi

    2010 22300m2

    Cladding, blast relief, doors

    and windows

    McNulty Centrica Lincs Offshore Wind 2010 Fire & blastwalls and Louvre walls

    MT Corp PTSVP Tortoise 2010 120m2

    Fire & blastwalls

    PFC Eng Petronas Cili Padi F23R-A 2010 920m2

    Fire & blastwalls

    Kencana HL

    Sdn

    Newfield

    Exploration

    East Piatu 2010 300m2 Blastwalls

    Centrica

    Energy

    Centrica

    Energy

    Ensign 2010 Fire & Blastwalls

  • 20

    McNulty

    SSE/RWE Galloper Offshore

    Windfarm

    2009 1058m2 Fire & blastwalls, louvre walls & doors

    Wood Group Statoil Hydro Sheringham Shoal 2009 1220m2 Fire & blastwalls

    PSN

    (Melbourne)

    Esso Australia Marlin ‘A’ 2009 440m2

    Fire & blastwalls and doors

    SLP Eng Vattenfall Thanet 2009 Cladding, louvres & doors

    SBM Asia Encana Deep Panuke 2009 2300m2 Blastwalls

    Sime Darby Petronas Kumang 2009 1893m2 Blastwalls

    SLP Eng BP Valhall 2008 5000m2 Fire & blastwalls and doors

    SLP Eng Conoco

    Phillips

    Ensign 2008 230m2

    Fire & blastwalls and doors

    NPCC Maersk Al Shaheen 2008 1640m2

    Fire & blastwalls

    Gusto Eng Talisman YME Mopustor 2008 1500m2 Blastwalls

    SLP Eng Maersk Qatar A

    Al Shaheen 2007 Cladding, windows & doors for living

    quarters BF1700m2

    GC1400m2

    EF1100m2

    CF1100m2

    AJS Shell Bacton Safety Upgrade

    2007 Control room explosion protection. Design, supply and installation of the CREP structure, blastwall and doors

    Lyondell Lyondell Fos-sur-mer 2006 Control room blast protection. Design, supply and supervision of installation of blastwalls at site

    Aker BP Ula 2006 560m2

    Fire & blastwalls SLP Eng ATP Venture 2006 Fire & blastwalls and doors

    SLP Eng CH4 Energy Chiswick 2006 Fire & blastwalls and doors

    SLP Eng ConocoPhillips Kelvin 2006 Fire & blastwalls and doors

    Heerema ConocoPhillips Britsats 2005 MEG Module 230m2

    & 150m2

    blastwalls

    PT Technip

    ConocoPhillips Kerisi 2005 670m2

    Fire & blastwalls

    KBR Petro Canada

    Terra Nova FPSO 2005 143m2

    Lifeboat enclosure blastwalls

    Heerema Conoco Phillips Britsats 2005 710m2

    blastwalls & 1030m2

    heatshields

    SLP Eng ATP Kilmar 2005 270m2

    Fire, blastwalls & doors MMHE Shell E11PB 2005 400m

    2 Blastwalls

    Enterprise Eng BP Forties Alpha 2005 570m2 Blastwalls, 570m

    2 cladding & doors

    SLP Eng Conoco Munro 2005 170m2 Blastwalls, windwalls & doors

    IHI Chevron Sanha LNG FPSO 2004 148m2 Blast relief panels

    Heat Shields and Wind Shields

    Client Operator Project Year Scope of Work

    Aibel Equinor (Statoil) Johan Sverdrup P2 2020 Heat Shields

    North Sea Energy Services

    Dana Petroleum Triton 2020 Heat Shields

    Global Energy Group

    BP Clair Ridge 2020 Windwall Cladding

    Archer Equinor (Statoil) Snorre 2020 Heat Shield Panels

    Samsung Heavy Industries

    Total S.A Martin Linge 2019 Heat Shield Panels

    Kiewit Offshore Services

    Husky Energy Inc White Rose 2019 Stair Tower Wind Walls

    Wood plc BP BP ETAP 2019 Stairwell Heat Shield

    Worley Parsons

    Rosenberg

    Total S.A Martin Linge 2019 Wind Walls

    Aibel Equinor (Statoil) Johan Sverdrup 11 2019 Wind Shields

  • 21

    Jurunature Petronas Carigali Sabah Oil & Gas

    Terminal Integrated

    2019 Radiation Heat Shield

    Kiewit Offshore

    Services

    Husky Energy

    Inc

    White Rose WHP –

    Living Quarters

    2019 Wind Shields

    Hanmaek TCO TCO Future Growth

    Project

    2019 Cladding Colour Coat

    Egger UK Ltd 2018 Stainless Steel Heat shield

    R&M Oil & Gas

    Services

    Montrose Production

    Deck

    2018 Stainless Steel Windwall Cladding

    Petrofac Spirit & Neptune

    Energy

    Cygnus Gas Field 2018 Stainless Steel Weather Shields & Fire Wall Cladding

    Fluor Shell Penguins Field

    Development

    2018 Weather Protection

    Aibel AS Equinor

    Snorre Expansion (SEP) 2018 Wind & Heat Shields

    Suncor Energy Suncor Terra Nova FPSO 2018 Stainless Steel Flare Tower Heatshields

    Wood PLC BP Clair Ridge 2018 Stainless Steel Heatshields

    Total E&P Congo

    Total N’Kossa Offshore Oil Field

    2018 Flare Platform Heat Shield

    Jurunature SDN BHD

    Petronas Carigali Sdn Bhd

    East Belumut 2018 Heatshields

    Hanmaek TCO TCO Future Growth Project

    2018 Profiled Steel Walls

    Hanmaek TCO TCO Future Growth Project

    2018 Heatshield Panels & Profiled Steel Walls

    R & M Engineering Ltd

    Conoco Phillips Judy Riser Platform 2018 Stanless Steel Heatshields

    Jurunature SDN BHD

    Petronas Carigali Sdn Bhd

    Duyong Gas Comples 2018 Stainless Steel Heatshields

    HHI Adma Opco Abu Dhabi

    NASR Offshore Field Development – Phase 2

    2017 Heatshield for Life Buoy-Bridge

    RIG Services S.A

    OMV Petrom S.A

    OMV Petroma Heatshields

    2017 Double Skin Thermal Heatshields

    Daewoo Shipbuilding Marine Engineering

    TCO TCO 2017 Design, engineering and manufacture of heatshields

    Jurunature SDN BHD

    Murphy Sapa Water 2017 Design, engineering and manufacture of roof and wall heatshields

    Greig Engineering Ltd

    ConocoPhillips Jade & Judy Operations & Maintenance (J-Block)

    2017 Windwalls 1 of 2

    Greig Engineering Ltd

    ConocoPhillips Jade & Judy Operations & Maintenance (J-Block)

    2017 Windwalls 2 of 2

    HHI Statoil Aasta Hansteen 2017 Design, engineering and manufacture of windshields

    HHI Adma Ocpo Al Nasr 2017 Design, engineering and manufacture of stair tower heatshields

    SHI Total Martin Linge 2016 Louvered walls, flare tower heatshields and an embarkation area

    Saipem Kaombo 2016 Heatsheilds with a 23% open area on a span of up to 7.8m long

    SHI Total Egina FPSO 2016 Heatshields

    PCMC SAMAC MMA PMMA 2015 Solar radiation heat shields

  • 22

    HHI Total Moho Nord 2015 Heatshields

    SHI Total Egina FPSO 2015 Heatshields

    SHI Total Martin Linge 2015 Windshields

    Kaefer Statoil Snorre A 2014 Heatshields

    Dragados Total Vega Pleyade 2014 Windwalls

    Aker Solutions ZPMC 2014 Windwalls Aker Solutions CIMC JU2000E 2014 Windwalls

    Rosetti Marino Total West Franklin 2014 Heatshields

    Ranhill Worley Parsons

    Exxon Mobil Telok Gas 2013 Heatshields

    Jurunature Petronas Kinalabu 2013 Heatshields

    Aker Solutions Statoil Songa CAT D 2013 5000m2

    Windwalls

    Aker Solutions CIMC Jack Up Rig 2013 320m2 Windwalls

    Worley Parsons Exxon Mobil Hebron 2013 Windwalls

    AMEC Gaz de France Cygnus 2012 Stairtowers Heatshields and windwalls

    Jacobs Shell Bacton 2012 Heatshields

    AMEC Conoco Phillips

    Britannia 2012 Heatshields

    OGN Group Apache Forties Alpha 2011 Heatshielding to bridge

    Dragados Hess South Arne 2011 Heatshields

    Suncor Energy Suncor Terra Nova 2011 Flare stack heatshield modification

    WD Close Apache Forties Alpha 2011 Heatshields

    KBR BP Chirag 2011 Heatshielding

    PD&MS Energy Transocean 2011 Heat shields

    KCA Deutag BP East Azeri 2011 Heatshielding

    PFC Eng Petronas Cili Padi F23R-A 2010 Flare stack heatshields

    Wood Group Statoil Sheringham Shoal 2009 Windwalls

    Wood Group Total Elgin 2009 Heatshields

    Ramunia Fab Woodside Pluto 2009 200m2

    Heatshields

    Heerema Zwijndrecht

    BP Valhall 2009 1950m2

    Windwalls

    Hoogvliet BP Valhall 2009 1450m2 Heatshields

    Ramunia Newfield Belumut 2008 770m2

    Heatshields & blastwalls

    Maersk Maersk HE jack up Derrick 2008 800m2 Derrick heatshields

    SHI SeaDrill West Eminence & West E-drill

    2007 6700m2 Heatshields / weather walls

    PT Technip Conoco Phillips North Belut 2007 330m2 Heatshields

    MMHE Woodside Angel 2007 430m2 Stairtower heatshields

    MMHE Clough Maari 2007 270m2 Heatshields

    AMEC Shell E&P Corrib 2007 350m2 Heatshields – pipe rack

    Marine Accomm Conoco Phillips Bohai Bay 2006 876m2 Heatshields

    Heerema ConocoPhillips Britsats 2005 1030m2 Heatshields

    Chemit ELF Amenam 2005 550 m2 Heatshields

    Transocean Offshore

    Deepwater Drilling

    T9 2004 100m2 Heatshields

    DSME Exxon Mobil Sable Tier II 2004 1330m2 Heatshields

    Malaysia Shipyard

    Shell Sarawak F13W & E11KA 2004 340m2 Heatshields

  • 23

    Maritime Hydraulics

    Sakhalin Energy

    Lunskoye & Piltun 2004 3900m2 Derrick Heatshields

    SBM Husky/ Petro Canada

    White Rose FPSO 2003 1844m2 Turret heatshields

    KCA Drilling AIOC/BP Azeri East & West 2003 1200m2 Heatshields

    Modular Solutions

    Client Operator Project Year Scope of Work

    ABB Sellafield 2020 Modular Substation

    Barrier Architectural Siemens Moray East 2018 Stainless Steel Module

    Woodgroup Mustang

    TCO Future Growth Project/Wellhead Pressure Management

    2017 Phase 2 - Multi-well pad enclosures, metering station & large standalone enclosures

    Amec Foster Wheeler

    Sellafield Sellafield Modular Switchrooms

    2017 Design, engineering and manufacture of 2 EPD101 Containerised Switchrooms

    Mustang TCO Crude Shipment capacity 2016 Multi-well pad enclosures, metering station & large standalone enclosures and a field operating office.

    Atlas Copco Tengizchevroil CSC (Crude Shipment Capacity)

    2015 Substation module

    ABB Tengizchevroil CSC 2015 LER/E-House

    Mustang Tengizchevroil CSC 2015 Remote Instrument Enclosures (RIE)

    Sulzer Pumps Statoil Ivar Aasen 2014 Acoustic enclosure

    Wood Group ETAP Mungo 2014 Additional Living Quarters (ALQ)

    Siemens Total Optara 2014 500te Substation/E-House

    ABB Sakhalin I Odoptu Field 2013 LER (Local Equipment Room)

    Arcadion BP Clair Ridge 2012 Blast rated module

    Turner EPS Chrysoar Solan 2012 Blast and fire rated generator modules

    Hertel Stena Drilling Stena Spey 2012 Additional Living Quarters (ALQ)

    Allseas Eng Total Laggan & Tormore 2012 Beach valve control cabin

    Hertel Talisman Montrose 2012 16 No. Accommodation modules

    Nexen Nexen Golden Eagle 2012 Laboratory module

    HSM Steel EOG Conwy 2011 LER module

    Hertel Nexen Buzzard 2011 16 No. Accommodation modules

    Scheneider INEOS Grangemouth 2011 Substation module

    Hertel ConocoPhillips Britannia 2011 LER module

    Cameron Maersk Perigrino FPSO 2011 Equipment room module

    Heerema BP Andrew 2011 LER module

    Atlas Copco Tengizchevroil TCO Plant 2011 4 No compressor modules

    McNulty Centrica Lincs Offshore

    Wind Farm

    2010 Substation modules consisting of control

    room, 33KV room, fire fighting room & day refuge room

    McNulty

    Offshore

    SSE/RWE Galloper Offshore

    Wind Farm

    2009 Electrical control room & day rooms

    (temporary accommodation modules)

  • 24

    AMEC BG Armada 2009 Laboratory module including HVAC &

    electrical fit-out

    Shell E&P

    Ireland

    Shell E&P

    Ireland

    Corrib 2009 Instrument cabin designed to fit HVAC &

    electrical components in a tight space internally

    Wood Group Total Dunbar 2009 VSD module

    AMEC Black &

    McDonald

    ExxonMobil

    Canada

    Thebaud 2009 4 No. Additional living quarters designed to fit in with existing living quarters and rig layout

    Heerema SSE Greater Gabbard 2009 LER & accommodation modules

    BBESL Sellafield Sellafield 2009 Design, manufacture & supply of a multi services processing module. Both seismic and fire rated to protect personnel/equipment for up to 30 min

    Foster Wheeler ExxonMobil Fawley Refinery 2009 Blast resistant building

    IV Oil & Gas NAM NAM L02 2008 Acoustic enclosure

    MAN Turbo BP Valhall 2008 Acoustic enclosures

    McGill

    Sea Dragon Oban B 2008 41 No Fire rated accommodation modules combined into 3 sections for transport. Overall dimension 75m x 11m x 4m

    McGill

    ConocoPhillips Britannia 2008 Fire rated modules & structures, comprising 10 modules and supporting steelwork, unique design of carbon steel frame with stainless steel insulated walls

    Whessoe Volker Stevin

    Dragon LNG Dragon LNG 2007 Jetty monitoring building

    McGill

    BP Valhall 2006 11 No. 4-man temporary accommodation modules

    ABB BP Saqqara 2006 Fire and blast rated LER module complete with Electrics & HVAC

    Shell UK E&P Shell UK E&P Shearwater 2006 Flat pack LER module for offshore assembly

    SLP Engineering

    ATP Wenlock Inde 2006 Blast rated workshop and sampling module including electrics & HVAC

    Aiken Group BG Armada 2006 4 No H60 fire rated accommodation modules c/w 2 No H60 fire and blast rated covered stairtower modules and module support frame (MSF)

    KBR Chevron Captain 2006 3 No A60 Fire rated accommodation modules complete with all electrics, HVAC and internal fit-out of furniture

    Sulzer Pumps BP Ula 2006 Acoustic enclosure (3 stage compressor chain)

    Enterprise Apache Alpha 2005 Transformer room

  • 25

    Design Consultancy

    Client Operator Project Year Scope of Work

    Shell Ineos Grangemouth

    Clipper Platform 2020 Design of Blast Walls

    Mustang TCO RIE (Remote Instrument Enclosures)

    2014 Design and engineering study

    AG&P INPEX Ichthys 2014 Thermal insulation study

    Hertel British Gas Lomond ALQ 2012 Feasibility study

    Hertel Stena Drilling Stena Spey 2012 FEED study accommodation upgrade

    Hertel Talisman Montrose ALQ 2011 Design consultancy services

    Hertel British Gas Lomond FEED 2011 Engineering services

    General Fabrication

    Client Operator Project Year Scope of Work

    DMC Mining Services

    Sirius Mines Polyhalite North Yorkshire 2020 General Fabrication

    DMC Mining Services

    Sirius Mines Polyhalite North Yorkshire 2019 General Fabrication

    EEW Offshore Structures (Britain) Ltd

    Dong Energy Offshore Wind Farm Hornsea Project Two

    2018 Suspended Internal Platforms

    Able UK Orsted Offshore Wind Farm Hornsea One

    2018 General Fabrication of transportation cradles