COMPANY PROFILE
HUME CONCRETE INDONESIA
a member of Nippon Hume Group, Japan
Established since 1991
PT. HUME CONCRETE INDONESIA
Established:
August 2nd, 1991
Office / Factory :
Cikarang Industrial Estate
Jl. Jababeka V Block G
Cikarang, Bekasi, West Java
INDONESIA
Phone: +62-21 8934024
Fax : +62-21 8934222
www.humeconcrete.com
email:
PRODUCT LIST
1. PC SPUN PILES
2. PHC SPUN PILES
3. PRECAST CONCRETE
4. GROUTING MATERIAL
5. FIREPROOFING MATERIAL
6. CLEANSET CEMENT
7. PRODUCT APPLICATOR
PROJECTS : CUSTOMERS :
EXOR-1 PLANT , BALONGAN-WEST JAVA : JGC CORPORATION SEMARANG GTPP, WEST JAVA : HAZAMA CORPORATION TANJUNG PRIOK POWER PLANT, JAKARTA : PT. PPTAISEI CONSTRUCTION POLYPROPHYLENE FACTORY : JGC CORPORATION SERAYA ISLAND PROJECT, SINGAPORE : CHIYODA CORPORATION TAMBAK LOROK PROJECT, CENTRAL JAVA : PT. PP (PERSERO) MUARA TAWAR CCPP, JAKARTA : KONSTRUKSI MUARA TAWAR CONSORTIUM TRAIN G PLANT, EAST KALIMANTAN : IKPTCHIYODA JOINT OPERATION KODECO CEMENT PLANT, KALIMANTAN : HAZAMAHABINDO J.O. AMMAMAPARE POWER PLANT, WEST PAPUA : PT. FREEPORT INDONESIA PENI MERAK WORK EXPANSION, WEST JAVA : JGC CORPORATION MIGAS CENTRE BUILDING, JAKARTA : KSO PP-WIKA TANJUNG JATI B POWER PLANT, CENTRAL JAVA : MITSUI ENGINEERING AMURANG POWER PLANT, CELEBES : DAELIM UTAMA CONSTRUCTION PHU MY POWER PLANT, VIETNAM : MITSUBISHI HEAVY INDUSTRIES CALTEX GATHERING STATION, SUMATERA : IKPTKWARTADAYA KALTIM PRIMA INDUSTRY, BONTANG : SHINWA ENGINEERING &CONSTRUCTION UBS-4 PLANT, BONTANGEAST KALIMANTAN : REKAYASA INDUSTRI BETARA COMPLEX DEVELOPMENT, PETROCHINA : IKPTCHIYODA, MEINDO ELANG
INDAH
BRIDGESTONE FACTORY, KARAWANG-WEST JAVA : PT. TAKENAKA INDONESIA SMR-2 PLANT, MERAKWEST JAVA : PT. SUMICON UTAMA KALTIM PRIMA COAL, EAST KALIMANTAN : PETROSEA INDONESIA, KALTIM PRIMA COAL TANJUNG PRIOK TANK TERMINAL : SSANGYONG - SSKI JOINT OPERATION
PRECAST CONCRETE AND CONSTRUCTIONS MATERIAL
In 1991, PT. Hume Concrete Indonesia established Head Office and PC Spun Pile Factory, started commercial pro-duction in 1992.
With Nippon Hume Corporation con-crete spun pile construction technology since 1962, PT. Hume Concrete Indone-sia literally form the foundation for many industrial structure, multi story building and infrastructure projects.
Pile installation division set-up in 1994 to observe piling work in technical and smooth implementation work at site to gained a highest quality and time foun-dation work.
In 1996, Construction Material Division established its factory, producing ce-ment non-shrink grout (brand name : HUMEX FIVE STAR ) under license by International Construction Products Re-search Co., Ltd. in USA (ICPR), fire
Throughout the year of experiences in foundation work brought us to de-velop a product of cement based stabilizing agent for soil stabilization material to replace weak soil achieve the target strength, the division set-up
CORPORATE HISTORY
HUME CONCRETE INDONESIA 1
PC & PHC Spun Pile
are Pretension Concrete Spun Piles using special mixed concrete compacted by cen-trifugal force and applied with steam curing method.
The product is manufactured under strictly quality control. The process creates a pile of great stability and reliability with numerous outstanding features which are summarized below:
ECONOMICAL, RELIABILITY, PUNCTUAL DE-LIVERY, ADVANCED PRETENSIONING METHOD, EASY HANDLING, HIGH RESIS-TANCE TO SHOCK AND BENDING
Long Length Driving
HUMEX PC SPUN PILES have end plate type welding splices. In this type of splice the fittings installed on the top and bot-tom of the piles allow easy and efficient welding of the joints, and long length pile driving. The strength of welded splices is designed in order to assure having the same greater strength of main body.
Precast Concrete Manufacturing
HUMEX PILES PC & PHC ECONOMICAL, RELIABILITY, PUNCTUAL DELIVERY, ADVANCED PRETENSIONING METHOD, EASY HANDLING, HIGH RESISTANCE TO SHOCK AND BENDING
reduce unnecessary expenses for import-ing the material.
Hopefully, HUMEX Five Star Grout will be good news to answer all the problems and difficulties which happened before to every grouting user, HUMEX Five Star Grout can be purchase with an advan-tage price and best international quality.
Construction Material Product
HUMEX FIVE STAR GROUT MATERIAL
International Construction Product Research Inc., located in Fairfield, Connecticut, USA, has appointed and authorized PT. Hume Concrete Indonesia to hold their licenses for producing and selling Five Star Grout prod-uct in Indonesia. The achievement was taken into consideration to facilitate all the grout users in producing the material easier, faster and to mention its beneficial point of view in aiding to
FIRE PROTECTION Four decades ago Mandoval pioneered the development of a range of Passive Fire Protection systems which is based on Ver-miculite and Portland Cement that were to revolutionize industrys approach to light weight structural Fire Protection Technology. Today Mandoval remains at the forefront of passive fire protection development. Interna-tionally recognized in the design and manu-facture of an increasing range of specialist coatings and system into a diverse range of industrial disciplines, Mandovals activities encompass general construction, offshore oil and gas processing, onshore hydrocarbon and chemical processing, transportation, power generation, mining and tunelling. As a market driven organization, Mandoval has invested millions of pound sterling in the development and testing of products and system specific to customer or market need. Mandovals Research and Development Cen-
Steel quickly loses its load bearing ca-pacity when exposed to high heat. As steel reaches 1000-1200OF (537-648OC). Its strength (both compressive and tensile) decrease to half its original value. Because of this, building codes, insurance company and owners have required fire protection on steel struc-ture. The protection by fireproofing material provides the safe shutdown of key areas in a structure or plant, or provides the times needed for firefighters to get the fire under control. The function of static type fire proofing, like Mandoval CP2 is to prevent premature collapse of a struc-ture and eliminate extensive property damage. Structural steel fire proofing iis an indirect contribution to life safety
HUME CONCRETE INDONESIA 2
HUMEX SET SOIL STABILIZATION
In the 1930s soil cement method was developed in the United States of Amer-ica for improving base course of road. This method was also widely used in Japan in 1950s. However it resulted in success mainly because of reflection crack on the pavement where shrinkage occurred after construction work.
Recently it has been difficult to find replacement materials in good quality, which cause the diversification of the objectives of improvement. In case of using conventional stabilizing materials such as ordinary portland cement and lime for improving fine grained soil, organic soil and so on, the improved soil sometimes cannot reach the target strength.
Aiming at solving the above mentioned problem, cement based stabilizing agent named Clean Set has been developed in Japan.
PT. Hume Concrete Indonesia under techni-cal assistance by Taiheiyo Cement Com-pany Limited, Japan developed these special cement in order to overcome soil stabilization problem in Indonesia which have variety type of soil.
Mix design are base on each typical area of soil type and through several soil test at our laboratory in order to obtain the relationship between mixing rate and strength, which is used as data to deter-mined mixing rate at construction site.
In fire protection work which particularly give high assurance quality and tech-niques of applications, We provide a certified skill team work to implement the works.
However PT. Hume Concrete Indonesia developing and explore technology and construction techniques progress to en-gage great environment in constructions.
Due to customers requirement of high quality result in construction work , PT. Hume Concrete Indonesia equipped its division with application work to pursue high technical standard and contribute a great social infrastructure.
Our Non Pollution Piling technologies and techniques further to applied high piling work standard in foundation work and make the work more substantial, more flexible and comfortable for sur-roundings environment.
Others
These special product is to achieving to simplify construction work more efficient and safety working environment without reduce quality and strengtheners.
Precast Constructions Product
Other concrete product produce accord-ing customer requirement, and shall be discussed with our engineering officer as well as production, delivery and QC officer to obtain optimal product qual-ity, efficiently and effectively both in design mostly in finish good itself.
MOUNT SALAK COOLING TOWER SLAB
JETTY PROJECT PILING WORKS
TPPI PROJECT COLOUMN TUBAN, EAST
PRECAST BEAM
3 HUME CONCRETE INDONESIA
Company Structure And Organization
4 HUME CONCRETE INDONESIA
OFFICE Address : Cikarang Industrial Estate Jl. Jababeka V Block G, Cikarang-Bekasi, West Java-INDONESIA Phone Number : + 62-21 8934024 Fax Number : + 62-21 8934222 Website/Email : www.humeconcrete.com / [email protected] Date of Establishment : 2nd August, 1991 PRINCIPAL Principal Name : Nippon Hume Corporation Principal Address : 33-11, 5-Chome Shinbashi, Tokyo-JAPAN Phone Number : +81-3-3433-4118 Fax Number : +81-3-3436-3276 Website : www.nipponhume.co.jp ORGANIZATION President Director : Yasuo BANNO General Manager : Sunao SHIOMI Finance Manager : Dadong SAPTARI Adminisration Manager : Kavita D. HERMAN Marketing Manager : Mirda D. MADAKURI Engineering Manager : Akijas ASIANTO Factory Manager : Maradel P. SIJABAT QA/QC Manager : Akijas ASIANTO SHE Manager : Kusnendar ARIBOWO
Factory Profile
5 HUME CONCRETE INDONESIA
FACTORY Address : Cikarang Industrial Estate Jl. Jababeka V Block G, Cikarang-Bekasi, West Java-INDONESIA Phone Number : + 62-21 8934024 Fax Number : + 62-21 8934222 Website/Email : www.humeconcrete.com / [email protected] CERTIFICATION OF QUALITY MANAGEMENT SYSTEM Standard : ISO 9001:2008 No. Certificate : JKT 0402597 Validity : January 2013 Certification Body : Lloyds Register Quality FACTORY LAYOUT DETAIL Electricity : - PLN = 415 kVa - Genset = 530 kVa Water : Jababeka Water Treatment Total Land Area : 40,000 m2
Spun Pile Factory : 3,500 m2
Anchor Factory Area : 550 m2
Stock Yard Area : 10,000 m2
Utilities Area : 2,000 m2
Measurement & Testing Instrument
6 HUME CONCRETE INDONESIA
NO NAME of EQUIPMENT SPECIFICATION / BRAND QTY (unit) 1. Vernier Caliper Accuracy : 1.0 mm 3 units 2. Steel Roll Meter Accuracy : 1.0 mm 2 units 3. Dial Gauge Accuracy : 0.1 mm 3 units 4. Pile Bending Test Range : 10 tonf 1 unit Range : 25 tonf 1 unit Range : 50 tonf 1 unit Range : 100 tonf 1 unit 5. Tensile Test Range : 3 tonf 1 unit Range : 6 tonf 1 unit Range : 15 tonf 1 unit Range : 30 tonf 1 unit 6. Compressive Strength Test Range : 25 tonf 1 unit Range : 50 tonf 1 unit Range : 100 tonf 1 unit Range : 250 tonf 1 unit 7. Batching Plant Accuracy Gravel : 1.00 kg 1 unit Sand : 1.00 kg 1 unit Cement : 1.00 kg 1 unit Water : 0.20 kg 1 unit Admixture : 0.02 kg 1 unit 8. Balance Electronic Balance : 0.1 gr 1 unit Mechanical Balance : 0.2 kg 1 unit 9. Thermocouple Accuracy : 1.0 C 1 unit
Machinery
7 HUME CONCRETE INDONESIA
NO NAME of EQUIPMENT SPECIFICATION / BRAND QTY (unit) 1. Lathe Machine 25 MD 18.5 kW 1 unit 2. Drilling Machine 1 & 2 KUD-650 2X2.2 kW 1 unit 3. Drilling Machine 3 KUD-550 2X1.5 kW 1 unit 4. Punching Machine ACD-2D 5.5 kW 1 unit 5. Tapping KUD-550 FP 1.5 kW 1 unit 6. Rooling BL-1200/H 3-8 1.5 kW 1 unit 7. Grooving BL-800/H 3-8 1.5 kW 1 unit 8. Automatic Welding Machine W-IM-039 0.1 kW 1 unit 9. Press 150 ton AH 7.5 - P 5.5 kW 1 unit 10. Press NCP 75 NCP-75 1 unit 11. Press GSC 40 ton GSC-40 5.5 kW 1 unit 12. Spinning VF-402 5.5 kW 1 unit 13. Spot Welding SU-FR 20 20.0 KVA 1 unit 14. Cutting Machine AW-IF-L 8.0 kW 1 unit 15. Heading Machine MSU-32 R 16/50 T 1 unit 16. Cage Forming P 60015B 1 unit 17. Batching Plant M4-250 18.5 kW 1 unit 18. Tension Machine Serial 15524 5.5 kW 1 unit 19. Spinning Machine EDB-MPC 5.5 kW 1 unit 20. Boiler K5-20 5.5 kW 1 unit 21. Water Treatment CR-2-2N 0.1 kW 1 unit 22. Main Water Pump WKK 7.5 kW 1 unit 23. Bending Test Machine No. 3053 250 T Cap 100T 1 unit 24. Compressive Test Machine No. 18086 30 T Cap 250T 1 unit 25. Tensile Test Machine Cap 30 T 1 unit 26. Mesin ARC Welding B 250 11.8 kW 1 unit 27. Mesin Cicular Shear MFG 9112 2.2 kW 1 unit 28. Diesel Hammer KC-45, M-43, KC-23, MH-35A, MH-35B, MH-35C MH-23A, MH-23B 8 unit 29. Welding Machine Lincoln, Denyo-1,2,3,4,5 6 unit 30. Egn Auger D-80, D-60 2 unit 31. Screw Dia. 350, 450mm 2 unit
(MM) Q'ty(m)
JGCCORPORATION EXORI SUPPLY dia350 29,315 JUL'92
BALONGAN dia400 24,896
dia500 2,980
dia600 144
PT.PPTAISEICONSTRUCTION POMALAA SUPPLY dia350 1,266 OCT'92
INDONESIA NIFEFACTORY dia400 2,856
HAZAMACORPORATION SEMARANG SUPPLY dia450 15,480 NOV'92
POWERPLANT dia600 21,553(G.T.P.P) dia450
dia600
KONOIKECO.,LTD BEKASIFACTORY SUPPLY dia350 449 NOV'92
TEXTILEFACTORY SUPPLY 350 6,929 MAY'93
CIKARANG
PT.ENCONAINDUSTRIES.INC CILINCING SUPPLY 400 1,657 MAY'93
JAKARTA
INDONAKANOGUMI FACTORY SUPPLY 350 3,606 MAY'93
(EJIP) DRIVING
PT.PPTAISEICONSTRUCTION TANJUNGPRIOKCOALCYCLING SUPPLY 350 1,700 JUN'93
INDONESIA POWERPLANT 500 8,500
PT.KADIINTERNATIONAL FACTORY SUPPLY 400 684 JUN'93
JAKARTA 450 3,000
PT.CHIYODAINTERNATIONAL KARAWANGINDAH SUPPLY 350 2,629 AUG'93
INDONESIA INDUSTRIALESTATE DRIVING"MCW"PROJECT
PT.MEINDOELANGINDAH RISJADBRASALI SUPPLY 350 7,200 AUG'93
STIRINDO
KUMAGAIKADIIJ.O HUMEXBONNA SUPPLY 400 612 SEP'93
FACTORY 350 639
KUMAGAIKADIIJ/O TANCHOFACTORY SUPPLY 350 228 NOV'93
400 684450 3,000
PT.SUMICONUTAMA MORISHITATEXTILE SUPLLY& 300 425 DEC'93
FACTORY DRIVING
PT.TAIYOSINARRAYATEKNIK EPOXYRESINPLANT SUPPLY& 300 143 DEC'93
DRIVING 350 2,114
PT.JAYAOBAYASHI BRIDGESTONE SUPPLY 350 1,875 DEC'93
FACTORY
PT.WARGAPONDASINDO WAREHOUSE SUPPLY& 300 4,398 DEC'93
PERKASA DRIVING 350
JGCCORPORATION EXORIBALONGAN SUPPLY 350 44,400 DEC'93
Additional
PT.SUMICONUTAMA BEKASICONTAINER SUPPLY& 300 3,360 DEC'93
DRIVING 350
PT.JAYAOBAYASHI SANYOFACTORY SUPPLY 350 6,570 JAN'94
JGCCORPORATION POLYPROPHYLENE SUPPLY 350 25,385 JAN'94
450
PT.SAMSUNGENGINEERING&CONSTRUCTIONCO.,LTD
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.TRIOWAPBUMI PROPHYLENE SUPPLY 450 5,670 APR'94
SPHERETANK
JGCCORPORATION ASAHIMASSUBENTRA SUPPLY& 300 JUL'94
CHEMICAL DRIVING 400 504
PT.SAYTAMITRASURYA ETYLBENZENE SUPPLY 300 1,750 JUL'94
PERKASA PLANT 400 2,480
500 1,580
PT.ODILEHOSINDO TOYOTAWATER SUPPLY& 350 125 JUL'94
TREATMENT DRIVING
PT.SAMSUNGENG. PETPROJECT SUPPLY& 300 2,234 AUG'94
DRIVING 400 3,502
HUTAMATAKENAKA SEIKOEPSON SUPPLY& 300 6,630 AUG'94
EJIPFACTORY DRIVING 350
PT.ARTHAGUNASARANA SEMANGGITOWER SUPPLY& 450 7,500 AUG'94
PRATAMA 24FL.OFFICEBUILD. DRIVING
PT.NUSARAYACIPTA MATSUSHITA SUPPLY 400 2,718 SEP'94
PT.GUNUNGGARUDA P.T.APROJECT SUPPLY 350 2,027 SEP'94
JGCCORPORATION SUPPLY& 300 41,357
DRIVING 350,400
PT.WARGAPONDASINDO DUNIAEXPRESS SUPPLY& 300 2,592 OCT'94
PROJECT DRIVING 350 1,2163,808
PTFRANKIPILEINDONESIA SUNTERPARADISE SUPPLY 300 10,140 OCT'94
CHIYODACORPORATION SERAYAISLANDPROJECT SUPPLY 400 123,199
ATSINGAPORE
PT.MURIAGUNGABADI PENI SUPPLY& 350 1,730 OCT'94
DRIVING
PT.GUNUNGRAJAPAKSI STEELFACTORY SUPPLY 350 1,488 NOV'94
PT.PRABAINDOPERSADA MULIAGLASSFACTORY SUPPLY 400 1,822 NOV'94
PT.MARGASARANA CIKAMPEKBRIDGE DRIVING 1,920 NOV'94
KONOIKECONSTRUCTION EJIPFACTORY SUPPLY& 300 998 DEC'94
DRIVING 350
PERMATADWILESTARI GUDANGARANG SUPPLY 600 6,240 DEC'94
T.PRIOK
DJABESMEN DJABESMEN SUPPLY& 300 6,700 DEC'94
FACTORY DRIVING 350
PT.CAHAYAANGGUNENG. INDACI/ASAHI SUPPLY& 300 937 DEC'94
DRIVING
KONSTRUKSIMUARATAWAR MUARATAWARCCPP SUPPLY 350 11,994 JAN'95
500 141
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
600 6,629
KONSORSIUMHUTAMAYALA HARBOURROAD SUPPLY 450 80,000 JAN'95
PT.PEMBANGUNANPERUMAHAN PLTGU SUPPLY 600 16,000 FEB'95CABANGVSEMARANG TAMBAKLOROK 450 18,500
PT.BALLASTINDONESIA MIGASCENTRE SUPPLY 600 27,949 MAR'95
50FL.OFFICEBUILD
CONCRETINDOREJEKIPT. SEMENNUSANTARA SUPPLY 500 4,650 APR'95
SUMICONUTAMAPT. KATSUSHIRO SUPPLY& 300 2,700 JUN'95
DRIVING
KONOIKECONSTRUCTIONCO. KYOWAFACTORY SUPPLY 300 3,917 JUN'95
HAZAMABINAINDONESIA EJIP SUPPLY& 300 3,519 JUN'95
DRIVING
SUMICONUTAMA FUKUSUKE SUPPLY& 300 1,440 JUL'95
DRIVING
PT.METAEPSI HALIMUN SUPPLY& 350 1,000 JUL'95
DRIVING
DIMENSIJAYAOBAYASHIJ.O. PONDOKINDAH SUPPLY& 500 4,620 JUL'95
16FL.OFFICEBUILD DRIVING
PT.SIERADGRAIN SIERADFEEDMILL SUPPLY 300 7,000 AUG'95
LAMPUNG
PT.REVODPERKANA TANKFONDATION SUPPLY& 600 1,516 OCT'95
DRIVING
KIANIKERTAS PROJECTATKALIMANTAN SUPPLY 450 4,132 DEC'95
SUMICONUTAMA SANYO SUPPLY& 300 1,262 DEC'95
DRIVING
JGCELNUSA BALIKPAPAN SUPPLY 350 23,800 JAN'96
REFINERYPROJECT
SUMICONUTAMA TOSHIBAFACTORY SUPPLY& 300 20,000 JAN'96
DRIVING
IKPTCHIYODA LNGTRAING SUPPLY 300 71,992 JAN'96
BONTANGLNG 400
PT.MURINDAIRONSTEEL MITRAKARAWANG SUPPLY& 350 6,341 JAN'96
DRIVING 400 200
DAELIMUTAMAENGINEERING PTAPOLYPRIMA SUPPLY 400 30,000 JAN'96
PT.RIAKENCANA GD.GYMNASIUM SUPPLY 400 3,852 JAN'96
MURIAGUNGABADI DAIHWAFACTORY SUPPLY& 300 3,366 JAN'96
DRIVING
PT.IRAWANPRIMA HUFIJABABEKA SUPPLY& 300 2,760 JAN'96
DRIVING
SATYAMITRASURYAPERKASA RPUMERAK SUPPLY& 400 837 JAN'96
DRIVING
KONSORSIUMHUTAMAYALA HARBOURROAD SUPPLY 450 85,000 FEB'96
(ADDITIONALORDER)
BERDIKARIPONDASIPERKASA SEMENNUSANTARA SUPPLY 500 40,000 FEB'96
PROJECT
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
SUMICONUTAMA MITSUBOSHI SUPPLY& 300 2,662 FEB'96
DRIVING
HUTAMATAKENAKA EPSONPROJECT SUPPLY& 300 6,166 APR'96
DRIVING 350 642
KONOIKECONSTRUCTION KITAGAWA,EJIP SUPPLY 300 1,739 APR'96
DRIVING
PT.SUMICONUTAMA HYMOLDINDONESIA SUPPLY 300 2,183 APR'96
DRIVING 350 684
400 940
PT.MADYATRIOUTAMA SEMPLAKBRIDGE SUPPLY 500 788 MAY'96
DRIVING
TEKENWIKAPRABA TANAHABANGSTATION SUPPLY 350 5,318 MAY'96
PT.MURIAGUNGABADI FUJIUNIVANCE SUPPLY 300 1,495 MAY'96
DRIVING
PT.MURIAGUNGABADI FUJISANGYO SUPPLY 300 1,329 MAY'96
DRIVING
PT.BINAKOPPIN STO.SUKARESMI SUPPLY 400 2,025 MAY'96
DRIVING
PT.SUMICONUTAMA TOPLATECHNO SUPPLY 300 792 JUN'96
DRIVING 350 360
PT.SUMICONUTAMA ASNOCIPTA SUPPLY 300 2,205 JUN'96
DRIVING
PT.METAEPSIENGINEERING GISPLNDURENTIGA SUPPLY 350 1,518 JUN'96
DRIVING
JAYAOBAYASHI SUMIRUBBER SUPPLY 300 16,815 JUN'96
CIKAMPEK 350 5,390
400 3,476
THIESSCONTRACTOR ProjectatWayangWindu Driving JUL'96
BandungWestJava
NINDYAKARYA RAWWATERPIPELINE SUPPLY 350 2,950 JUL'96
PEJOMPONGAN DRIVING
PT.MURINDAIRONSTEEL ILPFACTORYPROJECTat SUPPLY& 400 15,440 AUG'96
Lampung DRIVING
SUMICONUTAMA MITSUBISHI SUPPLY& 500 1,000 AUG'96
DRIVING
PT.BINANGUNARTABANDAYO POWERHOUSEKOJA SUPPLY& 400 3,930 AUG'96
DRIVING
PT.SIMAXINDO GARDURANCAKASUMBA SUPPLY& 350 8,620 AUG'96
DRIVING
HUTAMAAJIBARAGA PENJARINGANJUNCTION SUPPLY 500 50,000 AUG'96
PT.METRIXELCIPTA PORTEXPTG.PRIOK SUPPLY& 400 1,708 AUG'96
DRIVING
DIMENSIENGINEERING DAVIDWAREHOUSE SUPPLY& 300 25,593 AUG'96
CIBITUNG DRIVING 400
TAKENAKACORPORATION ASAHIGLASS SUPPLY& 300 12,041 SEP'96
DRIVING 400
500
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
HAZAMAHABINDOJ.O KODECOPROJECT SUPPLY 300 69,153 OCT'96
400
600
FREEPORT AMAMAPAREPOWER SUPPLY 450 120,000 OCT'96
PLANT
ENERGYEQUITYCORPORATION SINGAIPROJECT DRIVING OCT'96
PRABUMULIH
NIIGATAENGINEERING PSFPROJECT LOADING NOV'96
BOJONEGARA TEST
KOBAME CIJANTUNGMALL SUPPLY 450 14,579 NOV'96
PT.INTANPERWIRAMEGAH TANJUNGDUREN SUPPLY 600 9,246 DEC'96
CONDOMINIUM DRIVING
PT.MULIAINTILAND MULIAHOTEL SUPPLY 600 9,804 DEC'96
SENAYAN,JAKARTA
HAZAMAMARUBENICONSORTIUM REHABILITATIONCENTER SUPPLY 300600 8,425 DEC'96
CIBINONG DRIVING
KUMAGAIKADII WATERTREATMENT SUPPLY& 400 7,900 DEC'96
DRIVING
KUMAGAIKADII WATERTREATMENT SUPPLY& 400 7,900 DEC'96
DRIVING
PENTASPUJ.O ASAMERAPROJECT SUPPLY& 600 15,500 DEC'96
DRIVING
PT.ELNUSA PLANT#16REVAMP SUPPLY 350 2,080 DEC'96
PROJECT
PT.BARCLAYMOWLEMINDONESIA IKCBRIDGEProject SUPPLY 600 2,092 DEC'96
PT.PALUMASSEJATI BAYURCADAS SUPPLY 450 876 DEC'96
TANGERANG
JGCCORPORATION PENIMERAKWORK SUPPLY 300 141,508 JAN'97
EXPANTION 500
600
PT.NARWASTUMURNIPERMAI STOTARUMAJAYA SUPPLY 400 1,232 JAN'97
BEKASI DRIVING
HAZAMACORPORATION AIRLANGGAUNIVERSITY SUPPLY 500 825 JAN'97
INTERNATIONAL SURABAYA DRIVING 600 525
MITSUIENGINEERING TANJUNGJATI"B" LOAD JAN'97
COALFIREDPOWER TEST
STATION
PT.BAKTIBESTOTEKINDONESIA PLTGBONTANG SUPPLY 350 624 JAN'97
HUTAMATAKENAKACORP. EPSONIII SUPPLY 300 5,314 JAN'97
DRIVING
HUTAMATAKENAKA EPSONIII SUPPLY 300 4,500 JAN'97
EJIP DRIVING
KAJIMAOVERSEASWASKAJ.O SANOHFACTORYPROJECT SUPPLY, 300 1,440 FEB'97
DRIVING,
PT.KADIINTERNATIONAL SUNSTARENGINEERING SUPPLY 350 1,000 FEB'97
INDONESIA DRIVING
TOBISHIMACORPORATION CHUBBLIPINDONESIA SUPPLY 300 574 FEB'97
DRIVING 350 661
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.SOEGIHINTERJAYA REFINEDWAX SUPPLY 400 3,724 FEB'97
BALIKPAPAN
PT.BUMIPUTERAMITRASARANA GROUNDRESERVOIR SUPPLY 600 1,568 MAR'97
DRIVING
PT.ADHIKARYA PETIKEMASKOJA SUPPLY 400 1,000 MAR'97
DRIVING
TINGTAIKARYAJO BERDIKARIFLOURMILL SUPPLY 450 21,500 MAR'97
PLANT
MITSUIENGINEERING TANJUNGJATI"B" SUPPLY 350A 10,886 MAR'97
COALFIREDPOWER DRIVING 350B 1,874
600A 31,909
600B 63,763
PT.KAJIMAINDONESIA SANOHINDONESIAFACTORY SUPPLY 300 3,807 MAR'97
DRIVING
PT.PEMBANGUNANPERUMAHAN PASARKENARI SUPPLY 450 6,443 MAR'97
DRIVING
PT.JAYAMARLEYINDONESIA COOLINGTOWER CONCRETE CONCRETE APR'97
CT400,CT500,CT600 PRODUCT PANEL
PT.SUMICONUTAMA BEKASICONTAINER SUPPLY 350 6,960 APR'97
TERMINALII DRIVING
COATING
HUTAMATAKENAKA BRIDGESTONEFACTORY SUPPLY 300 15,288 APR'97
DRIVING 350
400
450
KADIINTERNATIONAL KAWASHIMAFACTORY SUPPLY 300 1,036 APR'97
DRIVING
KISANSASJO TIMORFACTORY SUPPLY 400 6,524 APR'97
PT.CAHAYAANGGUN SHOWAFACTORY SUPPLY 300 1,674 APR'97
DRIVING 400 180
PT.SUMICONUTAMA ASIAACRYLYCNDUSTRY SUPPLY 300 20,347 APR'97
ANYER DRIVING 350
400
PT.IRAWANPRIMAUTAMA 0 SUPPLY 300 1,000 MAY'97
EXTENTION DRIVING
PT.SUMICONUTAMA TOPLATECNO& SUPPLY 300 1,284 MAY'97
TOPLAABADI DRIVING
PT.TOBISHIMACORPORATION TUNGYAMITSUISOKO SUPPLY 300 2,264 MAY'97
WAREHOUSEPROJECT DRIVING
PT.SIMAXINDOPRIMADAYA GSIPADALARANG SUPPLY 350 3,360 MAY'97
DRIVING
PT.WIJAYAKARYA CIBUBURFLYOVER SUPPLY 600 870 MAY'97
PT.IRAWANPRIMAUTAMA UNIVANCEIND.FACTORY SUPPLY 300 972 MAY'97
DRIVING
PT.SUMICONUTAMA TOPLAPHASEIIIPROJECT SUPPLY 300 996 MAY'97
DRIVING
PT.WARGAPONDASINDOPERKASA NIKAWATEXFACTORY SUPPLY 300 770 MAY'97
DRIVING
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.CAHAYAANGGUN TSUTSUNAKAPLASTIKIND. SUPPLY 300 146 JUN'97
DRIVING
PT.CAHAYAANGGUN TAIYOANGGUN SUPPLY 300 729 JUN'97
DRIVING
KUMAGAIKADII YKKFACTORYEXPANSION SUPPLY 350 2,904 JUN'97
ATCIBITUNG DRIVING
PT.WARGAPONDASINDOPERKASA A.I.MPROJECT SUPPLY 300 197 JUN'97
ATMITRAKARAWANG DRIVING
PT.SUMICONUTAMA SMR2PROJECT SUPPLY 400 4,252
ATMERAK DRIVING 450 1,120 JUN'97
500 12,360
PT.SUMICONUTAMA YOHZUKOGYOFACTORY SUPPLY 300 390 JUN'97
ATJABABEKA DRIVING
JGCCORPORATION MERAKWORKEXPANSION SUPPLY 300 425 JUL'97
PROJECT 500 441
600 1,410
PT.SUMICONUTAMA INABATAPROJECT SUPPLY 300 2,450 AUG'97
ATEJIPCIKARANG DRIVING
PT.TIMORPUTERANASIONAL TIMORINDUSTRI
KOMPONENFACTORY SUPPLY 350 9,240 AUG'97
ATCIKAMPEK
PT.DAELIMUTAMA AMURANGPOWERPLANT SUPPLY 400 42,000 AUG'97
CONSTRUCTION Amurang,NorthCelebes DRIVING
PENTASPUJ.O. CAPCPROJECT SUPPLY 300 2,470
ATMERAK 350 1,370 SEP'97
400 1,888
KOAWASKAJ.O NGKFACTORYPHASEII SUPPLY 300 1,476 DEC'97
DRIVING
PT.TAIYOSINARRAYA MURAMOTOFACTORY SUPPLY 300 6,556 JAN'98
DRIVING
PT.PERKASAANDALAS SIBOLGAPOWERPLANT SUPPLY 400 19,136 MAR'98
PT.PUTRASUMBERKIMINDO PUSUTPLYWOODFACTORY SUPPLY 350 6,520 APR'98
DRIVING 400 160
PT.PANTJAMAKMUR BUCKLINGCPOPLANT SUPPLY 500 1,088 AUG'98
PALEMBANG
PT.HUTAMATAKENAKA EPSONFACTORYPHASEV DRIVING MINI SEPT'98
EJIPCIKARANG PILE
PT.DWIMARUNDAMAKMUR FACTORYEXTENSION SUPPLY 300 1,000 SEP'98
MARUNDA DRIVING
PT.TAIYOSINAR STEELFACTORY SUPPLY 300 1,853 NOV'98
KARAWANGBARAT DRIVING 350 3,888
PT.JAYAOBAYASHI SUMMIRUBBERFACTORY SUPPLY 300 508 DEC'98
CIKAMPEK DRIVING
HUTAMATAKENAKA BRIDGESTONEFACTORY SUPPLY 300 378 JAN'99
CIKAMPEK DRIVING
PT.JATIMMUSTIKASTEEL ECCOFACTORY SUPPLY 500 10,531 FEB'99
SIDOARJO
PT.SUMICONUTAMA LAUTANOTSUKA SUPPLY 300 5,659 FEB'99
CHEMICALPLANTMERAK DRIVING
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.TENOINDONESIA FACTORYPLANT SUPPLY 400 18,244 MAR'99
SURABAYAEASTJAVA SURABAYA
KUMAGAIKADII JAYAINDAHCASTING SUPPLY 300 650 MAR'99
CIKARANGEJIP
HUTAMATAKENAKA YAMAHAFACTORY SUPPLY 300 104 MAR'99
PULOGADUNG DRIVING 400 768
450 290
PT.DEVRINDOWIDYA FACTORY SUPPLY 350 2,700 MAR'99
TEXMACOGROUP SUBANG
PT.SUMICONUTAMA TOPLAPHASEIV SUPPLY 300 1,020 MAR'99
CIBITUNG DRIVING
MITSUBISHIHEAVYINDUSTRY PHUMYPOWERPLANT SUPPLY PHC500 37,200 MAR'99
VIETNAM
HUTAMATAKENAKA BRIDGESTONEFACTORY SUPPLY 300 1,514 MAR'99
KARAWANG DRIVING 400 122
450 2,197
PT.WIDJAYAPURA TANKPROJECT SUPPLY 400 2,420 APR'99
T.GEREMMERAK
PT.KUMAGAIKADII TOKAIKAGUPROJECT SUPPLY 300 900
EJIPCIKARANG & MINIPILE MAY'99
DRIVING
PT.MURIAGUNGABADI MURAMOTO SUPPLY 300 544 JUN'99
PT.KWARTADAYADIRGANUSA CGS10CALTEX SUPPLY 400 31,920 JUN'99
DURISOUTHSUMATERA
KRAKATAUENGINEERINGCORP. PIM2PROJECT SUPPLY 300 4,198
350 10,956 AUG'99
PT.WIDYAPONDASIGRIYA FACTORYPROJECT SUPPLY 350 286 OCT'99
ATCILEUNGSI
PT.REKAYASAINDUSTRI POPKACONVEYER SUPPLY 400 1,550 NOV'99
PROJECT
PT.CAHAYARATUBERLIAN TANKPROJECT SUPPLY 400 2,784 NOV'99
ATCIREBON
PT.REKAYASAINDUSTRI(Persero) GRISIKGASPRETREATMENT SUPPLY 300 1,100 NOV'99
PT.SUMICONUTAMA HYMOLDEXPANSION SUPPLY 300 580 DEC'99
EJIP DRIVING
PT.JAYAOBAYASHI SUMIRUBBER SUPPLY 300 612 DEC'99
KARAWANG DRIVING
PT.TAKENAKAINDONESIA BRIDGESTONEV SUPPLY 300,350 27,119 DEC'99
DRIVING 400,450
SHINWAENGINEERING&CONSTRUCTION KPIPROJECT SUPPLY 350,400 41,722 DEC'99
BONTANG BONTANG
KUMAGAIGUMI TANCHONEWFACTORY SUPPLY 300 3,454 FEB'00
DRIVING 20x20
PT.JAYAOBAYASHI BRIDGESTONE SUPPLY 300 1,216 FEB'00
KAJIMAOVERSEASASIA SANKENFACTORY SUPPLY 350 1,309 MAR'00
DRIVING
PT.ARTAMORAMANDIRI NGLPROJECT SUPPLY 300 5,676 MAR'00
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.SUMICONUTAMA SEIWAINDONESIA SUPPLY 300 552 MAR"00
DRIVING
INTIKARYAPERSADATEHNIK CGS10DURI,DUMAI SUPPLY 400 3,375 APR'00
PT.JAYAOBAYASHI TIFICOPROJECT SUPPLY 300 2,942 APR'00
DRIVING
PT.JAYAOBAYASHI KANSAIPROJECT SUPPLY 400 2,866 MAY'00
DRIVING
PT.ANEKAPANCANGUTAMA ISOGAIPROJECT SUPPLY 300 3,525 MAY'00
400 216
PT.KAJIMAINDONESIA SAKAIPROJECT SUPPLY 350 767 MAY'00
PT.JAYAOBAYASHI M.S.I.L.PROJECT SUPPLY 500 216 MAY'00
DRIVING
PT.JAYAOBAYASHI SUMMIRUBBER SUPPLY 400 1,904 MAY'00
DRIVING
PT.KAJIMAOVERSEAS FDKPROJECT SUPPLY 350 3,927 MAY'00
DRIVING
PT.TAKENAKAINDONESIA V.G.IPROJECT SUPPLY 300 7,620 MAY'00
DRIVING
PT.SATYAMITRASURYAPERKASA PBMFACTORYKUDUS SUPPLY 350 1,624 MAY'00
450 1,848
KUMAGAIGUMICO.,LTD SANYOSCOM SUPPLY 300 2,820 JUN'00
DRIVING
PT.SUMICONUTAMA D.M.C.PROJECT SUPPLY 300 1,071 JUL'00
DRIVING
PT.SUMICONUTAMA TOSHIBACTVFACTORY SUPPLY 300 1,078 JUL'00
DRIVING
PT.INDONAKANO INABATAPROJECT SUPPLY 300 1,581 JUL'00
DRIVING
PT.KAJIMAINDONESIA UMEDAPHASE2 SUPPLY 350 913 AUG'00
PT.PUTRAJAYA SHINHEUNGFACTORY SUPLY 300 1,556 SEP'00
PT.SACNUSANTARA TARJUNBUCKLINGSTATION SUPPLY 500 1,308 SEP'00
400 96
KAWASAKISTEELCORP. KPIBONTANG SUPPLY 350 558 SEP'00
PT.YASAINDUSTRINUSANTARA KPITIEINPROJECT SUPPLY 350 450 OCT'00
BONTANG 400 290
PT.INDRABASPURNAMAMAKMUR PONDATIONTANK SUPPLY 450 2,259 JAN'01
KOTABARUKALIMANTAN
PT.IRAWANPRIMA HUFIFACTORY SUPPLY 300 468 JAN'01
CIKARANG
PT.KAJIMAINDONESIA TSUSUNAKAPLASTICFACT. SUPPLY 350 6,151 JAN'01
CIBITUNG DRIVING
PTPENTAOCEAN ASAHIMAS,ANYER SUPPLY 300 1,772 JAN'01
DRIVING 350 1,326
PT.FRANKIPILEINDONESIA KAMPUSLPKIABANDUNG SUPPLY 450 266 JAN'01
WESTJAVA
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PTMANDIRIKRIDAYASAMA SBITRAININGCENTRE SUPPLY 300 726 JAN'01
PTPRAMBANANDWIPAKA RUKOINKOPAL SUPPY 400 22,640 JAN'01
DRIVING
WIKAYPPJ.O. JEMBATANPASIRBRIDGE SUPPLY 400 385 FEB'01
PENTAOCEANINDONESIA GENTOINDONESIAFACTORY SUPPLY 300 1,044 FEB'01
KARAWANG DRIVING
PTADHIKARYA(Persero) JakartaInternationalContainer SUPPLY 400 288 FEB'01
TerminalProject
KALIRAYASARI KALIMANTANPROJECT SUPPLY 400 1,104 FEB'01
PT.REKAYASAINDUSTRI UBS4PROJECT SUPPLY 350 540 MAR'01
400 840
450 8,250
PT.TAKENAKAINDONESIA YKKFASCOPROJECT SUPPLY 400 828 MAR'01
CIBITUNG DRIVING
PT.INDOPORA TOSHIBAPROJECT SUPPLY 300 5,912 MAR'01
EJIPCIKARANG
TOACORPORATION HITACHIPROJECT SUPPLY 400 420 MAR'01
DRIVING 300 2,529
CVLEILEMJAYA PROJECTatMANADO SUPPLY 400 778 MAR'01
SouthCelebes
PT.REKAYASAINDUSTRI GELAMGASCOMPRESSION SUPPLY 300 675 MAR'01
GULFRESOURCES(GRISSIK)PROJECT DRIVING
PTTAKENAKAINDONESIA YKKZIPPERPROJECT SUPPLY 350 114 MAR'01
CIBITUNG DRIVING
PTTUNASDUNIAGEMILANG SAMSUNGFACTORY SUPPLY 400 3,933 MAR'01
CIKARANG
PTANDALASSURYAAGUNG MAMPANGHOTEL SUPPLY 400 5,320 APR'01
JAKARTA
PT.PEMBANGUNANPERUMAHAN ICBCITARUMPROJECT SUPPLY 400 100 APR'01
WESTJAVA
PTUESENTOSA BANJARMASINMALL SUPPLY 400 19,624 APR'01
PTHUTAMAKARYA PELINTUNGJETTY SUPPLY 600 3,780 MAY'01
RIAUSOUTSUMATERA
PTDUTAGRAHA UNILEVERFACTORY SUPPLY 350 3,250 MAY'01
PTELKAINDONESIAJAYA PROJECTBALONGAN SUPPLY 400 1,898 MAY'01
WESTJAVA
PTMUARATEKNIK PALEMBANGBRIDGE SUPPLY 400 1,656 MAY'01
SOUTHSUMATERA
JAYAOBAYASHI PISTONRINGPROJECT SUPPLY 300 20,081 MAY'01
KARAWANGWESTJAVA DRIVING
CVBUDIUTAMASENTOSA PROJECTatBANDUNG SUPPLY 300 276 MAY'01
CANTONCHINESERESTAURANT CANTONRESTAURANT SUPPLY 400 1,824 JUN'01
CIKARANGWestJava DRIVING
JAYAOBAYASHI KRAMAYUDHAMITSUBISHI SUPPLY 300 2,522 JUN'01
DRIVING
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.ALEXINDO CIKUPAPROJECT SUPPLY 350 1,620 JUN'01
PT.IADECCO TTLCPROJECT SUPPLY 300 90 JUN'01
CIBITUNGWestJava DRIVING
CV.LEILEMJAYA PROJECTatMANADO SUPPLY 400 402 JUL'01
SOUTHCELEBES
PTGRAHAMEGARIARAYA CILANDAKTOWNSQUARE SUPPLY 350 5,508 JUL'01
JAKARTA
WIKAYPPJ.O. BINTAROVIADUCTTOLLROAD SUPPLY 600 1,772 JUL'01
JAKARTA DRIVING
PTCATURPILEPERKASA HOSPITALPROJECT SUPPLY 350 1,668 JUL'01
JAKARTA
PTFRANKIPILEINDONESIA CITRAGRANMALL SUPPLY 350 2,090 JUL'01
CIBUBURWestJava
JAYAOBAYASHI FCCPROJECT SUPPLY 300 8,100 JUL'01
KARAWANGWestJava DRIVING
JAYAOBAYASHI KARYASUMIDENProject SUPPLY 300 1,276 JUL'01
KARAWANGWestJava DRIVING
TAKENAKAINDONESIA YKKZIPPER SUPPLY 350 1,035 JUL'01
CIBITUNGWestJava DRIVING 400 1,234
450 156
500 306
PTPEMBANGUNANPERUMAHAN CIMANUKBRIDGE SUPPLY 350 504 JUL'01
WESTJAVA
PTTAIYOSINARRAYATEKNIK YAMAHAPROJECT SUPPLY 350 1,965 AUG'01
DRIVING
TAKENAKAINDONESIA TOTOKUPROJECT SUPPLY 300 416 AUG'01
KARAWANGWestJava DRIVING 350 93
400 331
PTINTISENTOSAALAMBAHTERA PROJECTatLAMPUNG SUPPLY 350 216 AUG'01
SOUTHSUMATERA
KAJIMAINDONESIA NGKPROJECT SUPPLY 300 524 AUG'01
CIKARANGWestJava DRIVING
JAYAOBAYASHI KONDOBOPROJECT SUPPLY 350 3,828 AUG'01
SUBANGWestJava DRIVING 300 5,169
PT.CATURPILEPERKASA KANTORWALIKOTA SUPPLY 450 2,448 AUG'01
JAKARTAUTARA
PTSUMICONUTAMA TOPLAPROJECT SUPPLY 300 144 AUG'01
CIBITUNGWestJava DRIVING
PT.WILKOJAYA LAMPUNGPROJECT SUPPLY 400 776 AUG'01
SouthSumatera
PT.LEANADRILL CIPARAGEBRIDGE SUPPLY 350 336 AUG'01
WestJava
PT.YALAPERSADAANGKASA NAVYJETTYatBITUNG SUPPLY 600 1,752 AUG'01
SOUThCELEBES
PT.HUTAMAKARYA GOVERNMENTOFFICE SUPPLY 300 86 AUG'01
TanggerangWestJava
FRANKIPILEINDONESIA CILEGONPROJECT SUPPLY 400 800 AUG'01
WestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.BARITOPERMAI PANGKALBALAMPROJECT SUPPLY 400 2,921 AUG'01
BANGKASouthSumatera
PT.DAMBHAPRIMAUTAMA SUKAPURABRIDGE SUPPLY 500 204 AUG'01
PT.MURIAGUNGABADI YANYINPROJECT SUPPLY 300 632 AUG'01
CIKARANGWestJava
JAYAOBAYASHI KAYABAPROJECT SUPPLY 350 800 AUG'01
KARAWANGWestJava DRIVING
PT.RIYAGAPUTRALESTARI MAJENANGSS550KV SUPPLY 300 882 SEP'01
CentralJava
LEADERQUALITEX FACTORYPLANT DRIVING 400 4,637 OCT'01
JAKARTA
PT.MATRASPERKASAADHIPRATAMA GRAINFEEDINGCONVEYER SUPPLY 300 3,114 OCT'01
CILEGONWestJava DRIVING 400 1,296
PTJAYAKONSTRUKSI MANGGADUABRIDGE SUPPLY 600 1,323 OCT'01
JAKARTA
JAYAOBAYASHI HILAXPROJECT SUPPLY 300 780 OCT'01
DRIVING
KUMAGAIGUMI LIMATAKAHAPROJECT SUPPLY 300 635 OCT'01
DRIVING
SUMICONUTAMA ASNOCIPTA SUPPLY 350 2,914 OCT'01
DRIVING
TAKENAKAINDONESIA BRIDGESTONEPROJECT SUPPLY 300 1,207 OCT'01
KARAWANGWestJava DRIVING
TAKENAKAINDONESIA BANDOPROJECT SUPPLY 300 1,980 OCT'01
KARAWANGWestJava DRIVING
BUKAKATEKNIKUTAMA KRAKATAUPROJECT SUPPLY 400 1,374 DEC'01
DRIVING
KAJIMAINDONESIA TOYODENSO SUPPLY 400 2,400 DEC'01
DRIVING
PT.SANYUSEMARANG FactoryProjectinSemarang SUPPLY 350 611 JAN'02
PT.TEKNIKOINDONESIA CIWANDANPORT SUPPLY 300 715 JAN'02
WESTJAVA
PT.SUMICONUTAMA SM2PROJECT SUPPLY 500 435 JAN'02
MERAK ROTARY
PT.TUNASDUNIAGEMILANG HANKOOKCASTINGFACTORY SUPPLY 300 888 JAN'02
HYUNDAYCIKARANG
PT.REKAYASAINDUSTRI GASBOOSTERSTATION SUPPLY 350 3,706 FEB'02
JAMBIRIAU
PT.SUMICONUTAMA YOHZUFACTORYEXT. SUPPLY 300 336 FEB'02
CIKARANGWESTJAVA DRIVING
PT.CAHAYARATUBERLIAN CPOTANK SUPPLY 400 3,600 FEB'02
CIREBON
LEADERQUALITEX LEADERQUALITEXFACTORY SUPPLY 450 128 FEB'02
PULOGADUNGJAKARTA DRIVING
PT.TAKENAKAINDONESIA HONDAFACTORY SUPPLY 300 18,685 FEB'02
KARAWANGWESTJAVA DRIVING 350 5,150
400 5,530
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.JAYAOBAYASHI SUMIRUBBER SUPPLY MINIPILE FEB'02
CIKAMPEKWESTJAVA DRIVING
PT.BRANTASABIPRAYA PLTUTARAHANLOT1 SUPPLY 300 1,400 FEB'02
LAMPUNGSOUTHSUMATERA
PT.KAJIMAINDONESIA JSTIIIPROJECT SUPPLY 350 1,195 FEB'02
CIBITUNGWSETJAVA DRIVING
PT.JAYAOBAYASHI FUJITAPROJECT SUPPLY 300 1,898 MAR'02
KARAWANGWESTJAVA DRIVING
PT.JAYAOBAYASHI TIFICOPROJECT SUPPLY 300 1,768 MAR'02
TANGGERANGWSETJAVA DRIVING
PT.JAYAOBAYASHI NAIGAIFACTORY SUPPLY 300 978 MAR'02
KARAWANGWESTJAVA DRIVING
PT.JAYAOBAYASHI MUGAIFACTORY SUPPLY 300 1,488 MAR'02
KARAWANGWESTJAVA DRIVING
SHIMIZUDEXTAMJ.O. MAUKRATINGSCHOOL SUPPLY 350 29,418 MAR'02
TANGGERANGWSETJAVA DRIVING
PENTAOCEANCONSTRUCTIONCO.,LTD ASAHIMASCHEMICAL SUPPLY 350 338 APR'02
CILEGONWESTJAVA DRIVING
ISTAKAHUTAMAJ.O. CIREBONBYPASS SUPPLY 500 3,300 APR'02
CIREBONWESTJAVA DRIVING
MURIAGUNGABADI ANDAHANESAPROJECT SUPPLY 450 1,971 APR'02
LAMPUNGSOUTHSUMATERA DRIVING
PT.IADECCO PETNESIARESINDO SUPPLY 300 368 MAY'02
TANGGERANGWESTJAVA DRIVING
PT.JAYAOBAYASHI MUSASHIFACTORY SUPPLY 300 2,511 MAY'02
CIKARANGWESTJAVA DRIVING
PT.TAIYOSINARRAYATEKNIK YAMAHAINDONESIAMOTOR SUPPLY 300 1,140 MAY'02
PULOGADUNGJAKARTA DRIVING
PT.JAYAOBAYASHI AICHIKIKIFACTORY SUPPLY 300 14,485 MAY'02
KARAWANGWESTJAVA DRIVING
PT.JAYAOBAYASHI KARYASUMIDENFACTORY SUPPLY 300 1,540 MAY'02
TANGGERANGWESTJAVA DRIVING
PT.LEMOAGUNGANEKAPONDASI VICFACTORY SUPPLY 350 324 MAY'02
KARAWANGWESTJAVA
PT.KAJIMAINDONESIA JVCFACTORY SUPPLY 350 792 JUN'02
KARAWANGWESTJAVA DRIVING
TOBISHIMACORPORATION INSTITUTTEKNOLOGISURABAYA SUPPLY 350 1,612 JUN'02
SURABAYAEASTJAVA DRIVING 400 244
450 505
500 108
600 248
PT.RINKAINUSANTARA BITUNGPORT SUPPLY 450 1,092 JUL'02
BITUNGSULAWESI
PT.POLYTAMAPROPINDO BATCHREACTOR SUPPLY 450 2,608 JUL'02
BALONGANWESTJAVA DRIVING 350 726
SAMARINDACENTRALPLAZA DOCKINGJETTY SUPPLY 500 900 JUL'02
SAMARINDAKalimantan
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
POLYTAMAPROPINDO BATCHREACTOR&COOLING SUPPLY 450 3,300 JUL'02
TOWERPROJECT DRIVING 350 726
BALONGANINDRAMAYU
SHIMIZUDEXTAMJ.O. HONDAPRECISIONFACTORY SUPPLY 300 27,440 AUG'02
CIKAMPEKWESTJAVA DRIVING
TAKENAKAINDONESIA VGIProject SUPPLY 300 1,950 AUG'02
CIKARANG DRIVING
WIKABETON MEDITERANIAGARDENAPPART. SUPPLY 450 31,739 AUG'02
T.DurenJakartaBarat
PT.OLOKNANENG ProjectlocatedinPalembang SUPPLY 400 684 SEP'02
POLYPRIMAKARYAREKSA ANYERPLANTExpansion SUPPLY 400 1,440 SEP'02
DRIVING
TAKENAKAINDONESIA ISOGAIFACTORY SUPPLY 300 855 SEP'02
DRIVING
JAYAOBAYASHI FCCFACTORYExtension SUPPLY 300 5,883 SEP'02
DRIVING
PT.TAKENAKAINDONESIA HINDAFACTORYPROJECT SUPPLY 300 2,425 SEP'02
Karawang DRIVING 350 450
400 715
PT.OLOKNANENG PROJECTatLAMPUNG SUPPLY 600 432 SEP'02
PT.YALAPERSDADAANGKASA PROJECTJETTYBITUNG SUPPLY 600 88 SEP'02
SouthSulawesi
PT.PPCAB.III RUMAHPOMPA SUPPLY 400 486 OCT'02
KALITANJUNGAN 500 3,978
TOBISHIMACONTS.LTD. TECHNICALINSTITUTEofSURABAYA SUPPLY Column 500Pcs OCT'02
PT.ADHIKARYA PROYEKSYPHONLIGUNG SUPPLY 400 300 OCT'02
CAB.VJAWABARAT&BANTEN JAWABARAT
PT.MASMUSTIKAANUGRAHSEJAHTERA MANADOSQUARE SUPPLY 450 720 OCT'02
PT.JAYAOBAYASHI EMBLEMPROJECT SUPPLY 300 6,239 NOV'02
MM2100Cibitung DRIVING
PT.TAKENAKAINDONESIA MALIGIPROJECT SUPPLY 300 754 NOV'02
KIIC,Karawang DRIVING
KAJIMAINDONESIA JSTPHASEV SUPPLY 350 2,865 NOV'02
MM2100Cibitung DRIVING
DUTAGRAHA ELEMENTARYSCHOOL SUPPLY 300 1,498 NOV'02
PuriArtha
PT.TAKENAKAINDONESIA HIMNEWPLANTPROJECT SUPPLY 300 138 NOV'02
BukitIndahCity,Karawang DRIVING
PT.ADHIKARYA(Persero) SYPHONLIGUNGBRIDGEPROJECT SUPPLY 400 150 NOV.02
CAB.VJawaBarat&Banten Ligung,WestJava
PT.PACIFICPRESTRESSEDIND. SUPPLY 600 1,050 NOV'02
PT.TAKENAKAINDONESIA TOYOBESQFACTORY SUPPLY 300 1,052 DEC'02
MM2100Cibitung
TAISEIPPTAISEIJ.O. MAP1SMELTINGPLANT SUPPLY 350 3,615 DEC'02
BukitIndahCity,Karawang DRIVING
JAYAOBAYASHI BRIDGESTONEPROJECT SUPPLY 350 1,420 DEC'02
Bekasi DRIVING
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.SUMICONUTAMA KTBFACTORY SUPPLY 500 1,476 DEC'02
Pulomas,JakartaTimur DRIVING
PT.RINKAINUSANTARA BITUNGPORT SUPPLY 300 1,016 JAN'03
SouthSulawesi
PT.JAYAOBAYASHI ITSTANGGERANG SUPPLY 300 1,752 FEB'03
DRIVING 350 480
WASKITAKARYA(PERSERO) CIJALUBRIDGE SUPPLY 300 490 FEB'03
WestJava
TOBISHIMACORPORATION ITSSURABAYA SUPPLY Louver 1660pcs FEB'03
EastJava Coulumn 74pcs
DEXTAMCONTRACTORS KAOFACTORY SUPPLY 300 848 FEB'03
Cikarang,WestJava DRIVING
PT.TAKENAKAINDONESIA HINOFACTORY DRIVING 1000m FEB'03
BukitIndahCity,Cikampek
PT.MULTIKARYADEVELINDO PIM2FERTILIZERPLANT SUPPLY 400 4,500 MAR'03
Lhoksemauwe,NorthAceh
PT.TAKENAKAINDONESIA KANEBOFACTORY SUPPLY 300 3,672 APR'03
BukitIndahCity,Cikampek DRIVING
PT.JAYAOBAYASHI KYOWAFACTORY SUPPLY 300 2,511 APR'03
MM2100,Cibitung DRIVING
DEXTAMCONTRACTORS KAOFACTORY SUPPLY 300 615 APR'03
DRIVING
TAKENAKAINDONESIA HONDAPROSPECTMOTORFACTORY SUPPLY 400,350 1,885 APR'03
Bekasi DRIVING
PT.BALFOURBEATTYSAKTI MUARATAWARGTTP6 SUPPLY 350 19,200 MAY'03
Bekasi 500 11,400
600 9,720
PT.SUMICONUTAMA GRESIKCOOPERSMELTER SUPPLY 450 2,251 MAY'03
Surabaya,EastJava DRIVING
CHIYODAINTERNATIONALINDONESIA BETARACOMPLEXDEVELOPMENT SUPPLY 300 50,920 JUN'03
Jambi,SouthSumatera DRIVING 400 19,036
PT.TEKNIKOINDONESIA CIWANDANPORT SUPPLY U_DICTH 75PCs JUN'03
Banten,WestJava
PT.KAJIMAINDONESIA UNICHARMFACTORY SUPPLY 300 2,142 JUN'03
KIIC,Karawang DRIVING 350 1,207
PT.KAJIMAINDONESIA SAKAIFACTORY SUPPLY 350 833 JUN'03
EJIP,Cikarang DRIVING
PT.REKAYASAINDUSTRI KUJANG1BPLANTPROJECT SUPPLY 350,450 25,363 JUL'03
Cikampek 500
PT.BAYUJAYALESTARI PALEMBANGSQUAREBUILDING SUPPLY 400 3,366 JUL'03
Palembang,SouthSumatera
PT.JAYAOBAYASHI POCARISWEATFACTORY SUPPLY 300 2,130 JUL'03
Sukabumi,WestJava DRIVING
PT.GATRAWISESAKENCANA BALIKPAPANBRIDGEPROJECT SUPPLY 400 720 AUG'03
Kalimantan
PT.TAKENAKAINDONESIA HONDAFACTORY SUPPLY 300 2,934 AUG'03
MitraKarawang DRIVING 350 17,910
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.WIJAYAKITASARANA PALEMBANGBRIDGEPROJECT SUPPLY 400 1,444 AUG'03
South,Sumatera
PT.MEINDOELANGINDAH BCD3PETROCHINAPROJECT SUPPLY 300 32,000 AUG'03
Jambi,SouthSumatera DRIVING 350 15,000
PT.CITACONTRAC GITE500/150KV SUPPLY 350 1,500 AUG'03
Tasikmalaya,WestJava
CV.BINAWIRAKARYA CILACAPPROJECT SUPPLY 400 480 SEP'03
Cilacap,CentralJava
PT.KARASANTANPERTAMA KARAFACTORY SUPPLY 300 656 SEP'03
PT.ADHIKARYA BRIDGEPROJECT SUPPLY 350 694 SEP'03
CAB.VJAWABARAT&BANTEN S.Kumpul,WestJava
PT.WIJAYAKARYA 150MWGFCCPOWERPLANTCNOOCPROJECT SUPPLY 450 8,930 SEP'03
Div.ISipilUmum Palembang,SouthSumatera
PT.SARANAINTIINDOTAMA LAMPUNGPROJECT SUPPLY 350 460 SEP'03
Lampung,SouthSumatera
PT.TAKENAKAINDONESIA FUMIRAFACTORY SUPPLY 300 791 SEP'03
MM2100,Cibitung DRIVING
PT.TAKENAKAINDONESIA HONDAMGAFACTORY SUPPLY 300 4,500 OCT'03
Cikampek DRIVING
SUMICONINDONESIA IHARAFACTORY SUPPLY 300 1,300 OCT'03
EJIPCikarang DRIVING
KADEKAMANDIRIUTAMA RumahPompaSunter SUPPLY 400 1,000 NOV'03
EastJakarta DRIVING
JAYAOBAYASHI SUMIRUBBERFACTORY SUPPLY 300 480 DEC'03
Cikampek DRIVING
SHIMIZUBCKJ.O. AISHINFACTORY SUPPLY 300 27,250 DEC'03
Cikarang DRIVING
TAKENAKAINDONESIA WHITEFACTORY SUPPLY 300 1,500 DEC'03
Cikarang DRIVING
TAKENAKAINDONESIA RENTALFACTORY SUPPLY 300 600 DEC'03
Cikampek DRIVING
PT.INTIKARYAPERSADATEHNIK BCDPROJECT SUPPLY 300 1,000 DEC'03
Jambi DRIVING
PT.SUMICONUTAMA TSTECHProject SUPPLY 300 3,255 JAN'04
EJIPCikarang,WestJava DRIVING
PT.JAYAOBAYASHI KEIHINFACTORY SUPPLY 300 4,213 JAN'04
MM2100Cibitung,WestJava DRIVING
PT.JAYAOBAYASHI MARUHACHIFACTORY SUPPLY 300 2,393 FEB'04
EJIPCikarang,WestJava DRIVING
PT.TAKENAKAINDONESIA STANLEYFACTORY SUPPLY 300 650 FEB'04
Cikupa,TanggerangWestJava DRIVING
PT.BARATHAINDONESIA FERRONICKELPLANT SUPPLY 300 4,500 FEB'04
Pomalaa,SouthCelebes
MITSUIENGINEERING Tg.JATIBPOWERPLANT SUPPLY 600 950 FEB'04
Jepara,CentralJava DRIVING
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
INTIKARYAPERSADATEHNIK FLAREGAS&HYDROGENRECOVERYSYSTEM SUPPLY 400 2,500 MAR'04
PERTAMINAUPVPROJECT
BalikpapanEastKalimantan
TEKNIKOINDONESIA CIWANDANPORT SUPPLY 400 250 MAR'04
Tanggerang,WestJava
JAYAOBAYASHI MITSUBISHIELEVATORFACTORY SUPPLY 300 300 MAR'04
Krawang,WestJava DRIVING
CHICAGOBRIDGE&IRON NGLSPHERETANKPROJECT SUPPLY 350 10,500 APR'04
BCDJambi,SouthSumatera DRIVING
PT.SUMICONUTAMA IHARAFACTORY SUPPLY 300 800 APR'04
EJIPCikarang,WestJava DRIVING
JAYAOBAYASHI FUJITECHNICAFACTORY SUPPLY 400 2,826 APR'04
Karawang,WestJava DRIVING
KAJIMAINDONESIA NGKFACTORY SUPPLY 300 6,700 APR'04
EJIPCikarang,WestJava DRIVING
JAYAOBAYASHI LAUTANOTSUKAPLANT SUPPLY 300 1,618 APR'04
Anyer,WestJava DRIVING
JAYAOBAYASHI TIFICOFACTORY SUPPLY 300 120 APR'04
Tanggerang,WestJava DRIVING
TAKENAKAINDONESIA DELTASILICONProject SUPPLY 300 570 APR'04
EJIPCikarang,WestJava DRIVING
TAKENAKAINDONESIA MITSUBISHICHEMICALPLANT SUPPLY 300 1,300 MAY'04
Merak,WestJava DRIVING
PT.SUMICONUTAMA DIECAST SUPPLY 300 551 MAY'04
EJIPCikarang,WestJava DRIVING
RINKAINUSANTARA SAMUDRAINDONESIAPORT SUPPLY 600 18,500 MAY'04
T.Priok,Jakarta DRIVING
KAJIMAINDONESIA OMRONProject SUPPLY 350 960 MAY'04
EJIPCikarang,WestJava DRIVING
TAKENAKAINDONESIA TOYOBESQProject SUPPLY 300 1,116 MAY'04
Karawang,WestJava DRIVING
PT.GEMAPUTRABINANGKIT CIPATUJUHBRIDGE SUPPLY 500 2,054 MAY'04
Tasikmalaya,WestJava
PT.SUMICONUTAMA ATSUMIINDONESIA SUPPLY 300 2,680 MAY'04
JababekaCikarang,WestJava DRIVING
KAJIMAINDONESIA SHINETSUFACTORY SUPPLY 350 2,198 JUN'04
KIIC,Karawang DRIVING
JAYAOBAYASHI FCCFACTORY SUPPLY 300 3,152 JUN'04
KIIC,Karawang DRIVING
SHIMIZUSBCKJ.O NIPPONSEIKI SUPPLY 300 3,593 JUN'04
Cikande,Tanggerang DRIVING
PT.HUMECONSTRUCTIONINDONESIA ANNEXSENAYAN DRIVING LS JUL'04
PTPETROSEATbk. SANGATTACOALHANDLINGSYSTEM SUPPLY 600 3,731 JUL'04
ENGINEERINGCONSTRUCTION&MINING KPCPROJECTEASTKALIMANTAN
TAKENAKAINDONESIA KIICNo.3FACTORY SUPPLY 300 4,955 JUL'04
Karawang
PT.JAYAOBAYASHI KANSAIPAINTFACTORY SUPPLY 400 421 AUG'04
CibitungWestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.TAKENAKAINDONESIA ASAHIDENSOFACTORY SUPPLY 300 1,697 AUG'04
MM2100Cibitung,WestJava
SHIMIZUCORPORATION KAOFACTORY SUPPLY 300 168 AUG'04
CikarangWestJava
PT.WIJAYAKITASARANA BRIDGEPROJECT SUPPLY 400 869 AUG'04
Palembang,SouthSumatera
PT.TOMINIMANDIRI GORONTALOPORT SUPPLY 400 577 AUG'04
GorontaloCelebes
PT.SUMICONUTAMA MITRADAYACIPTAFACTORY SUPPLY 300 3,039 SEP'04
CibitungWestJava
PT.PACIFICPRESTRESSINDONESIA SUPPLY 500 640 SEP'04
Karawang
PT.KAJIMAINDONESIA JAGADKARIMBANUSAFACTORY SUPPLY 300 600 SEP'04
CikarangWestJava
PT.JAYAOBAYASHI MUSASHIFACTORY SUPPLY 300 2,504 SEP'04
CikarangWestJava
PT.TAKENAKAINDONESIA KOYAMAFACTORY SUPPLY 300 1,338 SEP'04
KIICKarawang,WestJava
PT.SUMICONUTAMA POSMISTEELFACTORY SUPPLY 300 3,280 SEP'04
CibitungWestJava
PT.JAYAOBAYASHI MARUHACHIFACTORY SUPPLY 300 1,699 OCT'04
CikarangWestJava
PT.KAHANPRIMANUSA FUELBLENDINGPLANT SUPPLY 600 384 OCT'04
WestJakarta
PT.PANCADUTAPRAKARSA FUELUNLOADINGJETTY SUPPLY 600 243 OCT'04
WestJakarta
PT.PANTAIMUTIARA HOUSINGPROJECT SUPPLY 350 1,253 OCT'04
EASTJAKARTA
PT.JAYAOBAYASHI MUGAIFACTORY SUPPLY 300 1,086 OCT'04
KarawangWestJava
PT.TAKENAKAINDONESIA MAP1FACTORY SUPPLY 300 1,540 OCT'04
CikampekWestJava
CV.CEMERLANGABADINUSA BRIDGEPROJECT SUPPLY 400 224 OCT'04
Palembang,SouthSumatera
PT.KAJIMAINDONESIA NGKFACTORY SUPPLY 300 223 OCT'04
CikarangWestJava
PT.JAYAOBAYASHI MARUHACHIFACTORY SUPPLY 300 1,140 NOV'04
EJIPCikarang,WestJava
PT.PP(Pesero)Cab.Bali DENPASARSEWERAGEDEV.PROJECT SUPPLY 300 1,102 NOV'04
DenpasarBali
PT.TEKNIKOINDONESIA CPOTANKBULKINGSTATION SUPPLY 600 12,156 NOV'04
DumaiRiau,SouthSumatera
PT.MUGITRIMANINTERCONTINENTAL BRIDGEPROJECT SUPPLY 350 1,800 NOV'04
Jambi,SouthSumatera
PT.JAYAOBAYASHI RENTALFACTORY SUPPLY 300 2,898 NOV'04
EJIPCikarang,WestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.SUMICONUTAMA NIKAWATEXTILEINDUSTRY SUPPLY 350 4,715 DEC'04
KawasanIndustriMitra,Karawang
PT.MULTIARTHAPRATAMA BUKITGOLFMEDITERANIARESIDENCE SUPPLY 300 102,180 DEC'04
PantaiIndahKapuk,WestJakarta
PT.PP(Persero)CAB.MEDAN PERAWANGRIVERBRIDGE SUPPLY 600 3,020 DEC'04
SiakRiver,Riau,SouthSumatera 350 12,170
PT.KALTIMPRIMACOAL KPCSANGATTA SUPPLY 600 3,810 DEC'04
Sangatta,EastKalimantan
PT.ENCONAINTIINDUSTRI KOMATSUFACTORY SUPPLY 350 28,960 DEC'04
Cakung,EastJakarta
PT.TAKENAKAINDONESIA TRIXFACTORY SUPPLY 300 2,153 JAN'05
Karawang,WestJava
PT.SACNUSANTARA COMBINEDCYCLEPOWERPLANT SUPPLY 600 945 JAN'05
Cilegon,Banten
PT.JAYAOBAYASHI ITSFACTORY SUPPLY 300 712 FEB'05
TanggerangWestJava
PT.KAJIMAINDONESIA YAMAHAFACTORY SUPPLY 350 1,836 FEB'05
EastJakarta
PT.TAKENAKAINDONESIA WHITEDANONEFACTORY SUPPLY 300 468 FEB'05
HyundaiCikarang,WestJava
PT.JAYAOBAYASHI FUJITAFACTORY SUPPLY 300 992 FEB'05
KarawangWestJava
PT.SUMICONUTAMAINDONESIA MITRADAYACIPTAFACTORY SUPPLY 300 212 FEB'05
Cibitung,WestJava
PT.NICPATIKARUNIADINAMIKAWORKS ST.ANTONIUSSCHOOL SUPPLY 450 3,120 MAR'05
PantaiIndahKapuk,WestJakarta
PT.JAYAOBAYASHI TIFICOFACTORY SUPPLY 450 223 MAR'05
Tanggerang
PT.KALTIMPRIMACOAL SANGATTAPLANTL98629 SUPLY 600 4,500 APR'05
EastKalimantan
PT.TAKENAKAINDONESIA IDEMITSUFACTORY SUPPLY 350 759 APR'05
Karawang,WestJava
PT.JAYAOBAYASHI MITSUBISHICHEMICALENG.PLANT SUPPLY 600 336 APR'05
Merak,Banten
PT.TAKENAKAINDONESIA TOYOTAFACTORY SUPPLY 350 216 APR'05
Karawang,WestJava
SHIMIZUSBCKJ.O. KAOFACTORY SUPPLY 300 574 MAY'05
JABABEKA,Cikarang
PT.KAJIMAINDONESIA YAMAHAFLAGSHIEPFACTORY SUPPLY 300 1,661 JUN'05
Bandung,WestJava
PT.SWIJETTYNUSANTARA PT.SWIJETTYWorkshop SUPPLY 600 83 JUN'05
Tarahan,Lampung
PT.JAYAOBAYASHI KANSAIPAINTFACTORY SUPPLY 400 4,461 JUN'05
MM2100Cibitung,WestJava
PT.PARBANUSANTARA SERPONGPLANTPROJECT SUPPLY 350 432 JUN'05
Tanggerang,WestJava
PT.TAKENAKAINDONESIA HONDAPPMFACTORY SUPPLY 300 1,646 JUN'05
Karawang,WestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.PANCAMANUNGGALANUGERAH TUNGYACOLLINTERMINAL SUPPLY 300 1,896 JUL'05
Surabaya,EastJava
PT.TAKENAKAINDONESIA NHCHFACTORY SUPPLY 300 4,446 JUL'05
Cibitung,WestJava
PT.JAYAOBAYASHI AICHIKIKIFACTORY SUPPLY 300 6,107 AUG'05
Karawang,WestJava
PT.JAYAOBAYASHI FCCFACTORY SUPPLY 300 326 SEP'05
Karawang,WestJava
PT.KAJIMAINDONESIA MUSASHIAUTOPARTFACTORY SUPPLY 300 12,376 SEP'05
SuryaCipta,Karawang
PT.TAKENAKAINDONESIA TGSSIFACTORY SUPPLY 300 3,302 SEP'05
Cibinong,WestJava
PT.KALTIMPRIMACOAL SANGATTAPROJECTN08416 SUPPLY 600 1,200 OCT'05
EastKalimantan
PT.JAYAOBAYASHI ASTRADAIHATSUMOTORPAINTINGPLANT SUPPLY 300 12,797 OCT'05
Sunter,EastJakarta
PT.JAYAOBAYASHI ASTRADAIHATSUMOTORNEWENGINEPLANT SUPPLY 350 9,359 OCT'05
Karawang,WestJava
PT.JAYAOBAYASHI ASTRADAIHATSUMOTORCASTINGPLANT SUPPLY 400 4,320 OCT'05
Karawang,WestJava
PT.KARASANTANPERTAMA RIVERBRIDGEPROJECT SUPPLY 300 996 NOV'05
SouthSumatera
PT.JAYAOBAYASHI ITSPHASE2 SUPPLY 300/350/600 3,856 NOV'05
Tanggerang
PT.TAKENAKAINDONESIA KANEBOFACTORY SUUPLY PRECAST 5 NOV'05
CikampekWestJava
PT.JAYAOBAYASHI EASTERNTEX SUPPLY 350/600 1,536 NOV'05
PandaanSurabaya,EastJava
PT.SUMICONUTAMA UNITEDSTEELFACTORY SUPPLY 300 2,525 DEC'05
KarawangWestJava
PT.KALTIMPRIMACOAL SANGATTAPROJECTNO:N12340 SUPPLY 600 1,236 DEC'05
EastKalimantan
PT.PANCAMANUNGGALANUGERAH CHINAGLAZEFACTORY SUPPLY 300 5,068 DEC'05
KarawangWestJava
PT.JAYAOBAYASHI KEIHINFACTORY SUPPLY 300 2,576 DEC'05
MM2100Cibitung,WestJava
PT.JAYAOBAYASHI KARYASUMIDENFACTORY SUPPLY 300 441 JAN'06
TangerangWestJava
PT.KAJIMAINDONESIA MANDOMFACTORY SUPPLY 350 7,583 MAR'06
CibitungWestJava
PT.JAYAOBAYASHI FCCFACTORY SUPPLY 300 1,347 MAR'06
KarawangWestJava
PT.TAKENAKAINDONESIA AISANFACTORY SUPPLY 300 2,288 MAR'06
EJIPCikarang,WestJava
PT.JAYAOBAYASHI YAMAHAPIANOFACTORYSUPPLY 350 5,642 MAR'06
P.GadungEastJakarta
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.TAKENAKAINDONESIA SANKEIINDONESIAFACTORY SUPPLY 300 1,271 MAY'06
KIICKarawang,WestJava
PT.JAYAOBAYASHI POCARISWEATFACTORYSUPPLY 300 3,924 MAY'06
LIDO,SukabumiWestJava
PT.MULTIBRATAANUGERAHUTAMA PDPFACTORY SUPPLY 300 1,983 MAY'06
CakungEastJakarta
CV.DWIKARYA ITSFACTORYSUPPLY 350 338 MAY'06
TangerangBanten
PT.SUMITOMOMITSUICONSTRUCTIONUTAMA POSMIFACTORY SUPPLY 300 424 JUN'06
INDONESIA CibitungWestJava
PT.GEOTECKONSTRUKSIUTAMA ISUZUFACTORY SUPPLY 400 1,497 JUN'06
PondokUnguEastJakarta
PT.SUMITOMOMITSUICONSTRUCTIONUTAMA NAMICOHFACTORY SUPPLY 300 1,890 AUG'06
INDONESIA EJIPCikarang,WestJava
PT.SURYAPRIMAUTAMA GEDUNG11PUMA SUPPLY 500 1,801 AUG'06
SerangBanten
PT.FRANKIPILEINDONESIA PGNPROJECT SUPPLY 300 42 SEP'06
Balebab,BekasiEastJakarta
CV.KARUNIAINDAH PESALAKANBRIDGESUPPLY 400 171 SEP'06
KebumenWestJava
PT.PALUSEWUPERKASA SouthSumateraWestJavaP1CP2STAGE1 SUPPLY 300 593 SEP'06
MerakBanten
PT.TAKENAKAINDONESIA KYORAKUFACTORY SUPPLY 350 861 SEP'06
KarawangWestJava
PT.TAKENAKAINDONESIA JSTFACTORY SUPPLY 300 2,119 SEP'06
CibitungWestjava
PT.PALUSEWUPERKASA SouthSumateraWestJavaP1CP2STAGE1 SUPPLY 300 881 OCT'06
MerakBanten
PT.JAYAOBAYASHI MITSUBISHICHEMICALPLANT SUPPLY 350 2,887 OCT'06
MerakBanten
PT.TAKENAKAINDONESIA JSTFACTORY SUPPLY300/350/400&
4502,119 OCT'06
MM2100Cibitung,WestJava
PT.TAKENAKAINDONESIA BRIDGESTONEFACTORYSUPPLY 300 1,076 OCT'06
PondokUnguBekasi
PT.GEOTECKONSTRUKSIUTAMA SINETSUFACTORY SUPPLY 350 490 OCT'06
KIICKarawang,WestJava
PT.PEMBANGUNANPERUMAHAN(PERSERO) INDONESIAUNIVERSITYOFEDUCATION SUPPLY 450 8,000 OCT'06
Bandung,WestJava
PT.ADHIMIXPRECASTINDONESIA PUBLICKAPARTMENTPROJECTSUPPLY 400 1,849 NOV'06
CilacapCentralJava
PT.PRAKARSADIRDAANEKA FISHMARKETPROJECT SUPPLY 450&350 1,926 NOV'06
Sampit,CentralKalimantan
PT.REKAYASAINDUSTRI(PERSERO) BIOETHANOLFORGASOHOLPROJECT SUPPLY 300 1,924 NOV'06
Kotabumi,LampungSouthSumatera
PT.JAYASENTRIKONINDONESIA ProjectinPadang SUPPLY 400 2,523 NOV'06
WestSumatera
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.GEOTECKONSTRUKSIUTAMA KUMATEXFACTORY SUPPLY 300 1,034 DEC'06
KIICKarawang,WestJava
PT.DUAASIAPADUSEJATI PT.PELITACENGKARENGPAPERPLANT SUPPLY 300 1,110 DEC'06
WestJakarta
PT.JAKASATYARAMA MARINACOASTPROJECT SUPPLY 300&350 1,542 DEC'06
Ancol,NorthJakarta
SKENGINEERING&CONSTRUCTIONCo.,Ltd DUMAILPJTSUPPLY 400,500,600 48,291 DEC'06
Pekanbaru,Sumatera
PT.TAKENAKAINDONESIA HONDAPPMEXTENSIONPLANTPROJECT SUPPLY 300&350 30,263 DEC'06
BukitIndahCityCikampek
PT.KAJIMAINDONESIA ASNOHORIEFACTORY SUPPLY 300 3,102 DEC'06
EJIP,Cikarang
PT.BARATAINDONESIA PAKARETDKIPROJECT SUPPLY 300&350 347 DEC'06
CentralJakarta
PT.PARATECHGAWI SOUTHSUMATERAWESTJAVAGASPIPELINE SUPPLY 300 2,542 JAN'07
BekasiEastJakarta
PT.PURNADHARMAPERSADA PAMENTASANBRIDGESUPPLY 400 583 JAN'07
BandungWestJava
PT.JAKASATYARAMA MARINACOASTPROJECT SUPPLY 300&350 2,297 JAN'07
Ancol,NorthJakarta
PETROSEALAINGO'ROURKEJo. BONTANGCOALTERMINALUPGRADE SUPPLY 400 2,799 FEB'07
Bontang,EastKalimantan
PT.TAKENAKAINDONESIA ENKEIFACTORY SUPPLY 300 585 FEB'07
EJIPCikarang,WestJava
CV.KARUNIAINDAH SIDAREJABRIDGESUPPLY 400 523 FEB'07
Cilacap,CentralJava
PT.TAKENAKAINDONESIA HITACHICONSTRUCTIONMACHINERIES SUPPLY 300 14,305 FEB'07
CibitungWestJava
SKENGINEERING&CONSTRUCTIONCo.,Ltd LBOPROJECT SUPPLY 400 18,090 FEB'07
Dumai,Riau,Sumatera
PT.IRAWANPRIMAUTAMA KOMATSUFACTORYSUPPLY 300 6,356 MAR'07
EjipCikarang
PT.PEMBANGUNANPERUMAHAN(PERSERO) BUAHBATUAPARTMENT SUPPLY&DRIVING 400 3,769 MAR'07
Bandung,WestJava
PT.PEMBANGUNANPERUMAHAN(PERSERO) CITARUMBRIDGE SUPPLY 400 2,010 MAR'07
WestJava
PT.GEOTECKONSTRUKSIUTAMA KBNTAINANFACTORY SUPPLY 300 9,576 MAR'07
Cakung,EastJakarta
WAKACHIKUCONSTRUCTION DILIPORT SUPPLY 600 4,804 MAR'07
Dili,EastTimor
PT.JAYAOBAYASHI MIYUKIINDONESIAFACTORY SUPPLY 300 2,305 MAR'07
Karawang,WestJava
CV.ASRICIPTA PLTDSIANTAN&PLTDSEIRAYA SUPPLY 450 884 MAR'07
Banjarmasin,CentralKalimantan
Mr.ARIFINHANDRA/PT.PERKASAANDALAS PRIVATEHOUSING SUPPLY 300 2,331 MAR'07
PantaiMutiaraWestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.REKAYASAINDUSTRI(PERSERO) BIOETHANOLFORGASOHOLPROJECTSUPPLY&DRIVING 300 5,932 MAR'07
LampungSouthSumatera
PT.JAYAOBAYASHI ASTRADAIHATSUFACTORY SUPPLY 300 10,169 APR'07
Cakung,EastJakarta
PT.DUTAGRAHAINDAH NATUNAGERBANGUTARAKU SUPPLY 300&400 84,746 APR'07
NatunaIsland,RiauIsland
PT.PENTAOCEAN TARAHANPORTWAREHOUSE SUPPLY 300 9,322 APR'07
Tarahan,LampungSouthSumatera
PT.REKAYASAINDUSTRI(PERSERO) BIOETHANOLPLANTFORGASOHOLPACKAGE2 SUPPLY&DRIVING 300 5,703 APR'07
Tarahan,LampungSouthSumatera
CV.ASRICIPTA PLTDTRISAKTISUPPLY 450 492 MAY'07
Banjarmasin,CentralKalimantan
PT.JAYAOBAYASHI POCARISWEATFACTORYSUPPLY 350 1,821 MAY'07
SukabumiWestJava
PT.KAJIMAINDONESIA UNICHARMFACTORY SUPPLY 350 212 MAY'07
Karawang,WestJava
PT.JAYAOBAYASHI ADMSTAMPINGPLANT SUPPLY 300 6,542 MAY'07
SunterEastJakarta
SUMITOMOMITSUI ASAHIMASSUBENTRACHEMICALBOILER SUPPLY 300 2,966 MAY'07
Anyer,Banten
PT.TAKENAKAINDONESIA PLNMARUBENIPROJECT SUPPLY 350&450 3,974 MAY'07
Jl.Pramuka,NorthJakarta
PT.JAYASENTRIKONINDONESIA BUILDINGPROJECTSUPPLY 400 9,839 MAY'07
Padang,WestSumatera
IBNUUMARFOUNDATION IBNUUMARMOSQUE SUPPLY&DRIVING 350 3,709 JUL'07Serpong,Banten
PT.TAKENAKAINDONESIA BRIDGESTONEFACTORYSUPPLY 300 22,034 JUL'07
KarawangWestJava
PT.IRAWANPRIMAUTAMA WALLSFACTORYSUPPLY 450 207 JUL'07
CikarangWestJava
PT.TAKENAKAINDONESIA KOYAMAFACTORYSUPPLY 300 627 AUG'07
KarawangWestJava
PT.FRANKIPILEINDONESIA BINTANGPOLINDOPERKASAPROJECT SUPPLY 300 915 AUG'07
Ciwandan,Banten
PT.GEOCONPERSADAJAYA ANCOLPROJECT SUPPLY 300 220 AUG'07
Ancol,NorthJakarta
CV.KARUNIAINDAH SIDAREJABRIDGESUPPLY 400 322 AUG'07
Cilacap,CentralJava
PT.TAKENAKAINDONESIA TOYOBESQSUPPLY 300 5,627 AUG'07
Karawang,WestJava
CHINANATIONALELECTRICEQUIPMENT INDRAMAYU3x300MWCOALSTEAMFIREDPP SUPPLY 600B 12,069 SEP'07
CORPORATION WestJava
PT.PEMBANGUNANPERUMAHAN(PERSERO) MASJIDAGUNGMURIRAWASSUPPLY 300 5,085 SEP'07
CABII MuaraBeliti,SouthSumatera
PT.SEJAHTERAPRIMAPERSADA PRIVATEHOUSING SUPPLY 300 1,500 SEP'07
PantaiIndahKapuk
PT.JAYAOBAYASHI MARUHACHIFACTORY SUPPLY 300 3,890 SEP'07
Karawang,WestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.TENOINDONESIA TL.BAWANG2x25MWCOALFIRED SUPPLY 600B 25,735 OCT'07
POWERPLANT
SSANGYONGHUTAMAJA USAIDFORACEHPROJECT SUPPLY 600 613 JAN'08
BANDAACEH
PT.TAKENAKAINDONESIA NSIFACTORY SUPPLY 300 966 JAN'08
CilegonBanten
PT.JAYAOBAYASHI YAMAHAFACTORY SUPPLY 300 11,949 JAN'08
PT.JAYAOBAYASHI PISTONRINGFACTORY SUPPLY 300 11,585 JAN'08
Karawang,WestJava
PT.KADIINTERNASIONAL HATORIFACTORYSUPPLY 300 10,356 FEB'08
Rancaekek,WestJava
SSANGYONGENGINEERING&CONSTRUCTION T.PRIOKTANKTERMINALSUPPLY 500 96,070 FEB'08
NorthJakarta
PT.TAKENAKAINDONESIA IDEMITSUFACTORY SUPPLY 350 219 MAR'08
KarawangWestJava
PT.TAKENAKACIVIL TANJUNGENIMLESTARIPLANT SUPPLY PHC600 1,961 MAR'08
Prabumulih,SouthSumatera
PT.PEMBANGUNANPERUMAHAN(PERSERO) RASUNARIVERDEVELOPMENT SUPPLY 350 10,384 MAR'08
SouthJakarta
WAKACHIKUCONSTRUCTION DILIPORTSUPPLY 600C 3,650 MAR'08
TIMORLESTE
PT.HERMACON RIVERBRIDGESUPPLY 300 203 APR'08
Subang,WestJava
PT.TAKENAKAINDONESIA HAMATETSUFACTORY SUPPLY 300 1,695 APR'08
KIIC,Karawang
PT.PANCAMANUNGGAL CHENFAFACTORYSUPPLY 400 930 APR'08
Cirebon,WestJava
PT.PEMBANGUNANPERUMAHAN(PERSERO) JALANTOLSEDYATMOPAKETII SUPPLY 500B 27,575 APR'08
WestJakarta
PT.TAKENAKAINDONESIA BRIDGESTONEFACTORYSUPPLY 450 99 APR'08
SuryaCiptaIndustrialEstate,Karawang
PT.TAKENAKAINDONESIA HAMATETSUFACTORY SUPPLY 300 1,593 APR'08
KIIC,Karawang
KATYATOKYUJO MAPINDONESIAEXTENSIONFACTORY SUPPLY&DRIVING 300 3,644 APR'08
INDOTAISEIINDUSTRIALESTATE
CV.LAVRIONUTAMA BRIDGEPROJECT SUPPLY 300 220 JUN'08
Cianjur,WestJava
PT.TAKENAKAINDONESIA BRIDGESTONEFACTORY SUPPLY 300 1,992 JUN'08
SuryaCiptaIndustrialEstate,Karawang
PT.TAKENAKAINDONESIA ENKEIFACTORYSUPPLY 300 2,500 JUN'08
Cikarang,WestJava
PT.DOOSANHEAVYINDUSTRI CIREBONPOWERPLANT SUPPLY 600 17,157 JUN'08
Cirebon,WestJava
PT.HASANABUANAGRAHA PROJECTAtBINTARO SUPPLY 300 305 AUG'08
JAKARTA
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.KAJIMAINDONESIA UNICHARMFACTORY SUPPLY 350 3,185 AUG'08
KIICKarawang
PT.PEMBINAANPRINSIPPERSPEKTIF CARESTARPLANTSUPPLY 300 534 AUG'08
CilegonBanten
MKDEVELINDO PLNBALARAJA SUPPLY 400 5,025 AUG'08
BalarajaTangerang
PT.MITRAKONSTRUKSIKALBAR ProjectAtWestKalimantan SUPPLY 500 1,914 AUG'08
SHIMIZUCORPORATION MARITIMEDUCATION&TRAININGCENTRE SUPPLY 500 3,206 AUG'08
Tangerang
PT.IKHTIARBARAYAUTAMA JEMBATANTELUKGONGPROJECT SUPPLY 450 393 AUG'08
WestJakarta
PT.TAKENAKAINDONESIA HINOFACTORY SUPPLY 300 3,576 SEP'08
Karawang
PT.TAKENAKAINDONESIA MEIWAKOGYOFACTORY SUPPLY 300 695 SEP'08
Karawang
PT.PPPERSERODVOII PUSPITEKSERPONGPROJECTSUPPLY&DRIVING 300 1,314 SEP'08
Tangerang
PT.MURINDAIRONSTEEl MITSUBHAFACTORY SUPPLY 300 14,737 OCT'08
Tangerang
PT.TATATIRTAUTAMA POLYPEDPROJECTSUPPLY&DRIVING 400 296 OCT'08
AnyerBanten
PT.WIRAAGUNG GED.PERPUSTAKAANSUPPLY&DRIVING 300 1,466 OCT'08
Indramayu
KATYATOKYUJOINTOPERATION KAYABAFACTORY SUPPLY&DRIVING 350 7,497 OCT'08
EJIPCikarang
PT.PP(PERSERO)DVOII SPORTREHABILITATIONCENTYREPROJECT SUPPLY 400 1,090 NOV'08
Tangerang
PT.BALFOURBEATTYSAKTI MUARATAWARCCPP SUPPLY 350,500,600 1,219 NOV'08
EastJakarta
PT.SMCCUTAMA PROJECTATGRESIK SUPPLY 450 897 NOV'08
EastJava
PT.RAGAPERKASAEKAGUNA CONOCOPROJECTSUPPLY 300 3,127 DEC'08
Prabumulih,SouthSumatera
PT.CATURBANGUNMANDIRI BUAHBATUAPARTMENTSUPPLY 400 3,442 DEC'08
Bandung
PT.TIMASSUPLINDO NPKSUPERPELANGIPKTPROJECT SUPPLY 350 10,358 DEC'08
PKT,BontangEastKalimantan
PT.MENARAKARSAMANDIRI BUAHBATUAPARTMENTSUPPLY 400 1,598 JAN'09
Bandung
SMCCHUTAMAJOINTOPERATION T.PRIOKACCESROADSUPPLY 500&600 265,781 JAN'09
EastJakarta
PT.TIMASSUPLINDO NPKSUPERPELANGIPKTPROJECT SUPPLY 350 11,258 MAR'09
PKT,BontangEastKalimantan
PT.ADHIKARYA KANCITOLROAD SUPPLY 600 765 APR'09
CirebonWestJava
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.KAJIMAINDONESIA UNICHARMFACTORYSUPPLY 300&350 20,119 APR'09
Karawang
PT.MITRAPONDASIUTAMA PLTUSUPPLY 500&600 93 APR'09
BangkaBelitung
PT.TIMASSUPLINDO NPKSUPERPELANGIPKTPROJECT SUPPLY 350 1,013 MAY'09
PKT,BontangEastKalimantan
PT.DOOSANHEAVYINDUSTRI CIREBONCOALFIREDPOWERPLANT SUPPLY 600 1,716 JUN'09
Cirebon,WestJava
PT.TAKENAKACIVIL PT.TEL SUPPLY 300 4,780 JUN'09
TanjungEnimSouthSumatera
PT.FRANKIPILEINDONESIA ASTRASENECACIKARANG SUPPLY 350 563 JUN'09
WestJava
CV.LAVRIONUTAMAJEMBATANTAMBAKJATIPATOKBESI&JEMBATAN
BALEBANDUNGSUPPLY 300 633 JUL'09
SubangJawaBarat
PT.TAKENAKAINDONESIA IDEMITSUPROJECT SUPPLY 300&350 7,686 JUL'09
KIICKarawang,WestJava
PT.JAYAOBAYASHI SGIPROJECT SUPPLY 300 1,966 AUGUST'09
MM2100Cibitung,WestJava
CV.DEWIMANDIRI JEMBATANJAGABAYASUPPLY 300 110 AUGUST'09
SindangIndramayu,WestJava
PT.CAHAYAGUNUNGMAS MESSPUPEMDABENGKULU SUPPLY 400 1,005 SEP'09
CV.MANDIRI TANGERANG SUPPLY 300 847 OCT'09
REKAYASAINDUSTRIENGINEERING PLTUSUMBAR2X120MW,PADANG SUPPLY 400,600 110,553 NOV'09
PT.MURINDAIRONSTEEL MITSHUBAEXTENSION SUPPLY 300 4,968 DEC'09CIKANDE
PT.JAKASATYARAMA THAILANDEMBASSY SUPPLY 300,400 2,472 DEC'09
PT.JAKASATYARAMA KOHWAPRECISIONINDONESIA SUPPLY 400 720 DEC'09
TAKENAKAINDONESIA BRIDGESTONEINDONESIA SUPPLY 300 8,110 FEB'10
PT.SMCCUTAMAINDONESIA EXEDYNEWOFFICE&FACTORY SUPPLY 300 4,565 MAR'10
SHIMIZUSBCKJO MISCL.10AYAKULT SUPPLY 300 2,216 MAR'10MANUFACTURINGINDONESIA
PT.SMCCUTAMAINDONESIA ATSUMI SUPPLY 300 980 APR'10
PT.TERAPANNILAIOSILASIINDONESIA SANTOSABADINEWFACTORY&OFFICE SUPPLY 300,350 4,280 APR'10KARAWANG
PT.TAKENAKAINDONESIA AISANNASMOCO SUPPLY 300,400 3,642 APR'10
PT.JAYAOBAYASHI PT.YAMAHAMOTORPARTS SUPPLY 300 3,852 MAY'10MANUFACTURINGINDONESIA
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.DAYARADARUTAMA NOAHTUSHIPYARD SUPPLY 300,350 354 MAY'10
PT.SMCCUTAMAINDONESIA FUKUSUKE SUPPLY 300 7,276 MAY'10
PT.SMCCUTAMAINDONESIA ATSUMI SUPPLY 300 140 MAY'10
PT.JAYAOBAYASHI MAIWAKOGYO SUPPLY 300 531 JUN'10
PT.JAYAOBAYASHI KOHWAPRECISIONINDONESIA SUPPLY 400 961 JUN'10
PT.TAKENAKAINDONESIA KOITO SUPPLY 300,350 30,476 JUL'10
PT.TAKENAKAINDONESIA FREYABADI SUPPLY 300,350,400 2,488 JUL'10
PT.DAYABANGUNPERMAI DERMAGAMUARAGEMBONG SUPPLY 400 48 AUG'10
PT.SULUHARDHIENGINEERING EPCGASMETERINGSTATION SUPPLY 300 576 AUG'10MUSIBANYUASIN
CV.STARENGINEERING KRAKATAUDAYALISTRIK SUPPLY 400 81 AUG'10
PT.TAKENAKAINDONESIA EPSONEJIP SUPPLY 300 2,700 AUG'10
PT.PEMBANGUNANPERUMAHAN UNPADJATINANGOR SUPPLY 300 6,603 AUG'10
PT.JAYAOBAYASAHI KEIHIN SUPPLY 300 6,086 SEP'10
PT.JAYAOBAYASAHI FUJISEAT SUPPLY 300 1,964 SEP'10
JFECIVILENGINEERING&CONSTRUCTION TAGANITOHPAL SUPPLY 500PHC 11,582 OCT'10CORPORATION TAGANITO,CLAVER,SURGAODELNORTE
PHILIPPINESPT.TAKENAKAINDONESIA BRIGDESTONEINDONESIA SUPPLY 300 2,409 OCT'10
PT.JAYAOBAYASHI STANLEYELECTRIC SUPPLY 300,350 32,197 OCT'10
CV.ASMAKARYA SUTET500KV SUPPLY 300 390 OCT'10
PT.ALCOSGRAHAJAYA PT.BRIDGESTONETIREINDONESIA SUPPLY 300 980 NOV'10
PT.JAYAOBAYASHI PT.NISSANMOTORINDONESIA SUPPLY 300 1,131 NOV'10
PT.SUNWAYYASAPMIPILE PT.NISSANMOTORINDONESIA SUPPLY 300 10 NOV'10
PT.CAHAYAASITAEKATAMA SUPPLY 300 224 NOV'10
PT.KAJIMAINDONESIA SUMITOMOSHI SUPPLY 300,350 15,518 NOV'10
(MM) Q'ty(m)
TABLEEXPERIENCE
PT.HUMECONCRETEINDONESIAAMEMBEROFNIPPONHUMEGROUP,JAPAN
ITEMCLIENT PROJECT SCOPEOFWORK Period
PT.KAJIMAINDONESIA DAIKIALUMINIUMFACTORY SUPPLY 300 4,174 NOV'10
PT.JAYAOBAYASHI PT.KOYAMA,KIIC SUPPLY 300 1,561 DEC'10
PT.JAYAOBAYASHI FUJITA,KIIC SUPPLY 300 1,230 DEC'10
PT.TAKENAKAINDONESIA BRIDGESTONE SUPPLY 450,300 615 DEC'10SURYACIPTA,KERAWANG
PT.ADIGUNASHIPBUILDING&ENGINEERING EPCCONDENSATEHANDLINGFACILITY SUPPLY 350 132 DEC'10