7
COMPANY PROFILE

COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

COMPANYPROFILE

Page 2: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

EPC (Engineering, Procurement, Construction)Mitsubishi Heavy Industries Engineering (MHIENG) organizes

optimal, highly experienced teams led by project managers

who comprehensively understand and manage the entirety

and details of every phase, from planning to completion and

maintenance, of EPC projects. QCD (Quality, Cost, Delivery)

and project risks are strictly managed to implement optimum

operation so that customer demands are met. We strive to

further strengthen our performance, such as timely monitoring

and early response to project risks, by using project management

capabilities developed through our extensive experience gained

through numerous EPC projects, highly experienced human

resources who organize the projects, and our excellent systems

and strong networks.

Quality management is continuously implemented through our

independent quality control system and through objective

inspections, ensuring the reliability of MHIENG’s projects.

To promote environmental conservation, which is indispensable

to the sustained growth of society and humankind, HSE (Health,

Safety, Environment) management is positioned as one of the

most critical aspects of our business and is conducted in

accordance with global demands and standards.

O&M (Operation & Maintenance)We provide a wide range of after-sales services, such as LTSA

(Long-Term Service Agreements), O&M services, and revamps (to

improve availability, increase capacity, improve efficiency, etc.),

to help ensure that the plants and transportation systems we

deliver continue running safely and efficiently without any

problems. Furthermore, we are actively incorporating new

areas which will provide even greater added-value to

customers; specifically, we are utilizing cutting-edge IoT and

remote monitoring technology-driven data analysis to enable

us to perform predictive diagnostics and maintenance cycle

optimization.

Business InvestmentWe invest in highly profitable businesses, such as chemical

product manufacturing. We have a wealth of expertise in EPC

and O&M through our core business, and work to further

strengthen this by feeding back the insights we glean from

being involved in projects from the initial stage, which is critical

for business profitability as it improves operational rate

reliability, and by pursuing greater involvement in O&M as

investors.

Mitsubishi Heavy Industries Engineering offers reliable technologies gained

from engineering synergies realized within the Mitsubishi Heavy Industries (MHI) Group.

We contribute to the development of society by supplying numerous EPC (Engineering,

Procurement, Construction) projects covering large-scale infrastructure,

such as chemical plants, environmental plants, and transportation systems,

in many countries and regions around the world.

Our engineering capabilities, accumulated from the MHI Group’s wide range

of global infrastructure projects and products, and our project management abilities,

garnered from an abundant record of successful project achievements, are skillfully integrated

by highly experienced personnel working in an outstanding system and supported by a powerful network.

Applying our extensive capabilities, we readily meet diversified customer expectations

by undertaking all phases from project planning to basic design, detailed design,

procurement, manufacturing, construction, commissioning, after-sales services,

and O&M (Operation & Maintenance). In this way, we continue to contribute

to the creation of comfortable lifestyles and an enriched society.

Mitsubishi Heavy Industries Engineering seeks to bring about a reliable future through engineering.

ENGINEERING A RELIABLE FUTURE

MissionTo create comfortable lives and enrich society through

pursuing the best engineering solutions.

VisionTo achieve sustained business growth by proactively

seeking new opportunities to develop, improve, and launch

customer and social value.

Values• Sincerity

Dedicated to our customers and mutually beneficial relationships

with partner communities.

• Pragmatic Solutions

Continually approaching new challenges in the most effective way.

• Purpose Driven

Determined in our commitment to building a stable society while

achieving our goals.

• Incremental Innovation

Always evolving with emerging technology; our pursuit of value

for customers moves us forward.

Engineering Business Cycle

Procurement•

ManufacturingOperation Support

Funding Delivery

Design

Planning

Maintenance

Training

Evaluation•

Optimization

Commissioning

Construction

Needs Analysis

O&MEPC

+Manufacturing

Business Fields

3MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.2 MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.

Page 3: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

MHIENG has been manufacturing conventional railway vehicles, including 244 steam locomotives and 100 electric locomotives, since

1910, when we received orders for passenger carriages from the Railway Board and streetcars from Tosa Electric Railway.

Starting in the 1970s, we began the development of diverse transportation systems, notably new transit systems such as the

rubber-tired Automated Guideway Transit (AGT) system. We have received orders for and delivered more than 500 AGT vehicles

domestically and overseas.

Transportation

AGT

Tokyo Yurikamome Saitama New Urban Transit “New Shuttle” Nippori-Toneri Liner

Hiroshima New Rapid Transit Astram Line Macau LRT Singapore Sengkang-Punggol LRT

Tampa International Airport APM Orlando International Airport APM

Railway Systems (High-Speed Railways / Overseas Metro Systems)

Monorail Maintenance Vehicle

Taiwan High-Speed Rail

Suspended Monorail

Dubai Metro

Shinkansen Maintenance Vehicle

Air Brake Systems

Brake Control Unit Pneumatic Brake Caliper Air Compressor (Oil-Free Scroll Type)

Business Information

4 5MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD. MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.

Page 4: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

Business Information

In the chemical plant business, MHIENG has received high praise as a plant construction expert from our customers for delivering

many different plants globally since delivering our first plant in 1958, including fertilizer plants, methanol plants, and petrochemical

plants using natural gas as a raw material.

Our advanced technology and project management skills cultivated by our extensive experience enable us to provide customers with

highly safe and reliable plants that meet diverse needs for industrial infrastructure.

Chemical Plants

Fertilizer

Plants

Petrochemical

Plants

Methanol Plants

Ammonia and Methanol Co-Production Plant (Russia) Ammonia / Urea Plant (Malaysia) Ammonia / Urea Plant (Oman)

Styron Solution Synthetic Rubber Plant (S-SBR) (Singapore) Acrylic Acid Plant (Russia)

Methanol Plant (Brunei) Methanol Plant (Venezuela) Methanol Plant (Saudi Arabia)

Polyethylene Plant (Mexico)

6 7MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD. MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.

Page 5: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

Even after a project is complete, MHIENG provides a variety of

after-sales services to ensure trouble-free, safe, and efficient

operation of the plant facilities and transportation systems

we delivers. In addition to conventional O&M (Operation &

Maintenance) services, various revamps (to improve availability,

increase capacity, improve efficiency, etc.), and LTSA (Long-Term

Service Agreements), we actively incorporate new areas of

enhanced value for customers by using cutting-edge IoT and

remote monitoring technology for data analysis-driven

predictive diagnostics and maintenance cycle optimization.

Facility Revamps

Provide a variety of revamps to improve availability, increase

capacity, and improve efficiency, etc., of the plants we deliver.

Consulting Services

Draw upon our wealth of technological expertise to design

solutions for customers’ various operational challenges.

O&M Services

Work with affiliated companies both in Japan and overseas to

provide a broad range of 0&M services for completed systems,

spanning from daily maintenance to overhauls.

System Upgrades

Perform various renovations of the systems we deliver, such as

system capacity expansion, implementing system rehabilitation

or improving passengers’ riding comfort.

Remote Status Monitoring Service

Utilize IoT to provide remote status monitoring services.

After-Sales Services for Chemical Plants and CO2 Capture Plants

After-Sales Services for Transportation Systems

Business Information

MHIENG, together with Kansai Electric Power Co., have already

established and commercialized its own post combustion CO2

capture technology, called the KM-CDR Process™.

The KM-CDR Process™ , with its own developed unique amine

solvent (KS-1™), has been adopted by 13 commercial plants all

over the world (as of Feb. 2019). Several of its outstanding features

are as follows:

1. Can be applied to various types of flue gas sources

2. Advanced energy saving process - significant operation

cost saving

3. Highly efficient proprietary solvent (KS-1™), with the

lowest energy consumption and the least degradation

CO2 Capture Plants After-Sales Services

Chemical Applications /General Applications CO2 Capture & Storage Enhanced Oil Recovery (EOR)

Concept of “CPAS CLOUD” Solution

Chemical

Plant

Assistance

Service

CLOUD CPAS Cloud Features

• Monitoring of operational data for major equipment

• Problem prevention by using predictive sensors

• Development of facility improvement proposals

based on long-term analysis

Compressor Pump GTG Blower / Fan SSP / MCC

CPAS CLOUD

Plant Owner

MITSUBISHIHEAVYINDUSTRIESGROUP

CO2 Capture Unit for General Applications (Japan) Coal-Fired Flue Gas CO2 Capture Demonstration Plant (U.S.)

CO2 Capture Plant for EOR (U.S.)

GPS, PositionCar Temp.

Vibration of BogieTire Pressure & Temp.

Axle, Bearing Health Air-Spring PressurePropulsion Motor Health

TCMSVibration of Carbody

CLOUD

FTP Server Database WEB ServerVisualization

Door Engine Health

Gateway

Cellular Satellite

This system captures CO2 from flue gas in power generation and other facilities. Captured CO2 will be injected into the oil reservoir of

the oil fields to increase the recovery rate of crude oil.

Enhanced Oil Recovery (EOR)

8 9MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD. MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.

Page 6: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

2 4

3

671

5

1 2 4

5 6 7

3

1. Training

Enables foreign urban transportation organizations to

understand the Japanese urban transportation system and

technologies through this facility.

Enables the provision of training for O&M (Operation &

Maintenance) trainees before being deployed overseas, and

the acquirement of training know-how.

2. Product Development and Safety Analysis

Contributes to minimization of on-site testing and enhances

introduction of new systems and technologies to the market by

demonstration tests and safety analysis at the facility.

3. Accommodating International Standards

Promotes Japanese technology in the global market through

data analysis and evaluation of test results based on international

specifications and standards.

Utilization and Expectations

Company Name Mitsubishi Heavy Industries Engineering, Ltd. (MHIENG)

Establishment January 1, 2018

Head Office 3-1, Minatomirai 3-chome, Nishi-ku, Yokohama,

Kanagawa 220-8401, Japan

President and CEO Kenji Terasawa

Business Scope Engineering, manufacturing, procurement,

construction, marketing, and after-sales services of

chemical plants, transportation systems and products,

environmental products, etc., including ancillary

businesses

Capital 20,000 million yen (As of January 1, 2018)

Shareholder Mitsubishi Heavy Industries, Ltd. (100%)(Equity Stake)

Website https://mhieng.mhi.com/

Corporate Overview

Business Information

MIHARA Test Center

A strong driving tool and facility in promoting product

development, demonstration, and training, and for strengthening

Japan's global competitiveness in the urban transportation

system business.

Multipurpose Integrated Highly

Advanced Railway Applications

Group Companies

Domestic

Mitsubishi Heavy Industries Environmental &

Chemical Engineering, Ltd. (MHIEC)

Business Scope

Design, production, installation, and engineering of various types of environmen-

tal equipment, chemical plants, etc., as well as repair and renovation, part sales,

inspections, engineering dispatch, consulting, guidance on installation and

operation, and maintenance management

www.mhiec.co.jp/en/

Mitsubishi Heavy Industries Transportation Engineering & Construction Co., Ltd. (MHI-TC)

Business Scope

Design, construction,commissioning, and after-sales service of transportation systems / Development, design, manufacture, and after-sales service of

transportation equipment, general industrial machinery, and environmental chemical equipment, and electronic control systems / Design, construction, test

operation, modification and after-sales service of various plants screws, maintenance / Development, design, manufacture, and technical support of new products

and test facilities / Contracted design, supervision and construction of civil engineering structures / Planning, design, supervision and construction of plant

buildings, buildings and commercial facilities contract

MHI Executive Experts, Ltd. (MHIEX)

Business Scope

A labor dispatching service that dispatches engineers necessary for EPC

implementation of various large-scale plants (power generation plants,

environmental plants, chemical plants, etc.), transportation systems, and other

facilities both within and outside Japan, as well as the provisioning of manage-

ment and consulting services

Mitsubishi Heavy Industries America, Inc. (MHIA)*

Business Scope

Market surveys, PR, material procurement, construction, sales, installation,

after-sales services, and related operations for products of the MHI Group

www.mhi.com/company/regions/americas

Mitsubishi Heavy Industries Asia Pacific Pte. Ltd. (MHI-AP)*

Business Scope

A global overseas operation base for chemical plants and environmental

equipment, ITS, water treatment facilities, large-scale refrigeration equipment,

and other operations. Serves as a base for Group business development in the

Asia-Pacific region and corporate shared services.

www.mhi.com/company/regions/apac

MHI Engineering and Industrial Projects

India Private Limited (MEIP)

Business Scope

EPCm (mini-EPC), after-sales services, and O&M related to environmental and

chemical plants and transportation systems within India, and undertaking of the

MHI Group’s design and procurement operations

www.mhieip.com/

Crystal Mover Services, Inc. (CMS)

Business Scope

O&M activities for AGT systems (APM system: Automated People Mover) supplied

to U.S. airports by the MHI Group

www.crystal-mover.com/

Overseas *Mitsubishi Heavy Industries Regional Headquarters

Railway Test Track(Dual-Gauge / 3.2km Loop Track)

Railway Test Track(Dual-Gauge / 3.2km Loop Track)

Main Track Pit Platform North

Platform North

Operations Control Center (OCC)

OCC

AGT Test Track

Automated Guideway Transit(AGT) Test Track

High-Speed AGT Test Track Railway Loop Test Track

Operation Control Room

Main Track Pit

Lead Track Pit Platform South Super AGT(High-speed AGT)

AGT MIHARA Liner

Platform South

Gradient Track (50‰)[Ballast and Slab Track]

Gradient Track (50‰)[Ballast and Slab Track]

Lead Track Pit

Small Radius Test Track

10 11MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD. MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.

Page 7: COMPANY PROFILE · 2018. 1. 1. · or improving passengers’ riding comfort. Remote Status Monitoring Service Utilize IoT to provide remote status monitoring services. After-Sales

Head Office Yokohama

3-1, Minatomirai 3-chome, Nishi-ku, Yokohama,

Kanagawa 220-8401, Japan

Kobe Site

1-1, Wadasaki-cho 1-chome, Hyogo-ku, Kobe,

Hyogo 652-8585, Japan

Mihara Sites

[Wadaoki]

1-1, Wadaoki-cho, Mihara, Hiroshima 723-0042,

Japan

[Kohama, Itosaki]

1-1, Itosakiminami 1-chome, Mihara, Hiroshima

729-0393, Japan

MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.

Issued April 2020

https://mhieng.mhi.com/