COMPANY CONFIDENTIAL© 2009 Fluor Corporation. All Rights Reserved. 1
FLUOR AS EPC LEADER IN POWER SECTOR
“Zmieniamy Polski Przemysł”, 3rd February 2009, Warsaw
February 2009
2
AGENDA
Safety Always First
Fluor Corporation
Fluor Power
Fluor in Poland
Fluor’s Power Experience
Why Fluor?
February 2009
3
SAFETY ALWAYS FIRST
TCIR rate of 0.40 with 318 million man-hours worked!In 2008 Fluor noted recordable TCIR = 0.33
February 2009
4
One of the largest publicly owned Engineering, Procurement, Construction and Maintenance companies
2007 revenue: $16.7 billion3Q2008 revenue: $16.3 billion
2007 new awards: $22.6 billion3Q2008 new awards: $20.9 billion
2007 backlog: $30.2 billion3Q2008 backlog: $36.5 billion
Over 1,000 projects annually, serving morethan 600 Clients in 85 different countries
More than 47,000 employees worldwideincluding 630 in Poland
Offices in more than 25 countries
Nearly 100 years of experience
FLUOR CORPORATION
Fluor Corporate HeadquartersDallas, Texas
February 2009
5
FLUOR CORPORATIONServing Diversified Industries
Energy & Chemicals
Global Services
Government Industrial & Infrastructure
Chemicals
Downstream
Upstream
LNG
IGCC
POWER
Solid Fueled& Biomass
Gas/IGCC(including Wind Farms, Solar Plants)
Betterments(CO2, SO2, NOx)
Nuclear
Government Projects in USA and rest of the world
Environmental & Nuclear
UK Nuclear Decommissioning Authority
Mining
Metals
Telecommunication
Transport
Water
Life Sciences
Manufacturing
Microelectronics
Healthcare
Operations & Maintenance
Procurement
Project Execution Services
Sr. VPs Project Management
Construction Equipment & Tools
February 2009
FLUOR POWERGlobal Presence – Power Offices Only
Greenville, SCSolid Fueled/Plant Betterment/Nuclear/Renewables
Aliso Viejo, CAGas Fueled/IGCC/Renewables
Charlotte, NCGas/Solid Fueled/Plant Betterment
Camberley, UKGas/Solid Fueled/Nuclear/Plant Betterment
Shanghai, ChinaPlant Betterment/IGCC / Solid Fueled
Johannesburg, South AfricaGas/Solid Fueled/Nuclear
New Delhi, IndiaGlobal Execution Center Gas/Coal
Dallas, TXCorporateHeadquaters
Houston, TXGas/Solid Fueled
Madrid / Asturias, SpainGas Fueled/Rnewables Gliwice, Poland
EPC & Workshare
Haarlem, The NetherlandsGas and IGCC
Manila, Philippines Global Execution CenterGas
Brno, Czech RepublicEPC & Workshare
February 2009
7
The biggest project office in Poland, more than 630 employees
Industry experience since 1945
Executing local, regional & international projects
Executing EPC & workshare projects
Using the same tools and Management & Quality & HSE Systems as other Fluor’s Offices
More than 400 3D PDS stations
ISO9001 since 1998
FLUOR IN POLANDGliwice Office
February 2009
8
EPC industry leader in Gas Fueled Power Plants – 100,000 MW
300 Gas Turbines installed in 160 Power Stations worldwide
Power range from 49 MW to 1,789 MW
All fuel types: Natural gas, low Btu gas, fuel oil, others
Technology: Simple Cycle, Combined Cycle, Combined Heat & Power, IGCC
Working with all major Turbine Suppliers: GE, Siemens, Alstom, Mitsubishi, Toshiba, ABB, Sulzer and others
Working with HRSG Suppliers including: Nooter Erikson, Aalborg, Deltak, Vogt, NEM
FLUOR’S POWER EXPERIENCEGas Fueled Capabilities
February 2009
9
FLUOR’S POWER EXPERIENCEGas Fueled – Only Projects Since 2002
February 2009
FLUOR’S POWER EXPERIENCEGas Fueled - Project Highlights
Completed date: 2006
Location: Las Vegas, Nevada, U.S.
Description: Gas Turbine Combined Cycle Power Plant – 1,200 MW
AQCS: Fuel Conditioning SCR
Fluor Scope: Engineering, Procurement, Construction, Commissioning
Gas Turbines: General ElectricHRSGs: General Electric
The largest air cooled condenser in North America
Project: Chuck Lenzie Generating Station
February 2009
11
30 years experience in industry gasification technology
Gasification know-how on both Power Plants and Process Plants
All fuel types: Coal, lignite, biomass, petroleum coke, others
IGCC technology neutral:ConocoPhilips E-Gas, ECUST, GE, Lurgi, Mitsubishi, Shell, Siemens SFG, Uhde PRENFLO
Expertise in supporting technologies:Sulfur recovery, CO2 recovery & compression
Fluor has done more than 150 gasification studies and analysis, designed & built more than 20 gasification projects including:– Sasol II & Sasol III in South Africa - the largest coal gasification
plant in the world processing 100,000 ton coal per day– Great Plains Synfuels Plant, North Dakota, U.S. – the largest coal
gasification plant in North America with CO2 capture, designed by Fluor
FLUOR’S POWER EXPERIENCEIGCC Capabilities
February 2009
12
FLUOR’S POWER EXPERIENCEIGCC – Key Projects Highlight
February 2009
FLUOR’S POWER EXPERIENCEIGCC - Project Highlights
Completed date: 1997
Location: Pernis, The Netherlands
Description: Gasification of 1,656 tons/day of residual oil to syngas & Combine Cycle Gas Power Plant
AQCS: Sulfur removal
Fluor Scope: Engineering, Procurement, Construction Managment
Technology: Shell
Part of syngas used to produce 285 tons/day of hydrogen
Rest of syngas used for combined cycle power generation
Gas Turbines: General Electric
Project: Three-Train Gasification Unit
February 2009
14
In the last 10 years designed & built more coal fired plants thanany other EPC company in Power business
Power from 65 MW to 1,760 MW Technology:
Subcrititcal, Supercritical, Ultra Supercritical, Circulating Fluidized Bed
All major fuel types: Coal, pulverized coal, lignite, biomass, others
Working with all major Steam Turbine Suppliers: GE, Siemens, Alstom, Mitsubishi, Toshiba, ABB, Sulzer and others
Efficiently reducing the schedule and capital costs utilizing available reference plant designs: 2x65MW, 181MW, 250MW, 400MW, 2x615MW, 2x750MW, 2x800MW
FLUOR’S POWER EXPERIENCECoal Fueled Capabilities
February 2009
15
FLUOR’S POWER EXPERIENCECoal Fueled – Reference Short List
February 2009
FLUOR’S POWER EXPERIENCECoal Fueled – Projects Highlight
Ongoing, target completion date: June 2010
Location: Robertson County, Texas
Description: Supercritical Pulverized Coal Fired Power Plant – 1,634 MW
AQCS: Baghouse, Wet FGD, SCR, Mercury Control using Activated Carbon Injection
Fluor Scope: Engineering, Procurement, Construction, Commissioning
80% cleaner than average in U.S.
2500 craft at peak
Steam Turbines: GE Boilers: Alstom, Babcock & Wilcox
Project: TXU Oak Grove Project
February 2009
17
To comply with environmental legislation
To increase efficiency of existing units
Flue Gas Desulphurization – 43 units; 19,665 MWRemoval of SO2
Selective Catalytic Reduction – 28 units; 16,081 MWRemoval of NOx
Electrostatic Precipitator/Fabric Filters – 42 units; 25,882 MWRemoval of dust
Mercury Control System – 12 units; 7,241 MW
Renewables: Wind Farms, Solar, Biomass
FLUOR’S POWER EXPERIENCEBetterments & Renewables Capabilities
February 2009
18
FLUOR’S POWER EXPERIENCEBetterments – Only Projects Since 2002
February 2009
FLUOR’S POWER EXPERIENCEBetterments – Projects Highlight
Completed date: October 2008
Location: United Kingdom
Description: To achieve compliance with the LCP, IPPC
AQCS: 6 SCRs on 6x500MW coal fired units
Fluor Scope: Feasibility Study
The only technology neutral offer made Fluor successful to win the next stage FEED
Project: SSE SCRs at Fieddler’s Ferry and Ferrybridge
3D PDS models on Feasibility Study stage
February 2009
FLUOR’S POWER EXPERIENCERenewables – Projects Highlight
Ongoing
Location: Cost of Suffolk, UK
Description: 500 MW Wind Farm
140 wind turbines 3.6MW each
Associated infrastructure including met masts and offshore transformers
Wind Turbines by Siemens
Fluor Scope: Engineering, Procurement, Construction, Commissioning
Once constructed it will be the world’s largest offshore wind farm project
147 square kilometres
Project: Greater Gabbard Offshore Wind Farm
February 2009
21
FLUOR’S POWER EXPERIENCEBetterments - CCS Capabilities
Fluor owns CO2 Capture Technology - Econamine FG PlusSM
37 CO2 Capture Units built based on this technology
More than 20 years of proven operating experience
Econamine FG PlusSM works well in difficult environments like boiler stack and gas turbine flue gas streams
Fluor has experience with following captured CO2 treatment: utilization within chemical plant, compressing and liquefying, transporting, Enhanced Oil Recovery, purifying for food industry
Fluor has designed and constructed almost 2000 km of CO2 transport pipelines including infrastructure – pump stations, meter stations, injection points
Fluor is executing feasibility study for CO2 storage to the reservoir under the see bed for Confidential Client in the U.S.
February 2009
22
FLUOR’S POWER EXPERIENCECO2 Capture & Transport – Projects Highlight
Wyoming to Dakota CO2 Pipeline Project, U.S.Scope EPC, Ongoing but Phase 1 completed 1000 km CO2 pipelines 16-inch & 20-inch with 9 pump and 13 meter stations. Phase 1 completed: 170 km CO2 pipelines, 1 pump and 3 meter stations.
CO2 Removal from Flue Gas Bellingham, Massachusetts, U.S.Scope EPC, Status: Completed in 1992 CHP Plant with CO2 capture capacity of 350 ton/day. Captured CO2 is compressed, purified and liquefied to be sold to the food industry
E.ON Energie AG CCS Pilot Plant, Wilhelmshaven, GermanyScope EPC, Status: OngoingCO2 capture capacity of 70 ton/day on existing 474 MW Coal Power Plant. CO2 will be compressed and liquefied for transport.
Gassnova CO2 Capture at Karsto, NorwayScope FEED, Status: OngoingCO2 capture capacity of 3,000 ton/day on existing 420 MW Gas Power Plant. Once built it will be the largest CO2 capture facility in the world on gas plant.
February 2009
23
Fluor’s nuclear diverse experience begun in 1940s
Designed 3 Nuclear Power Plants
Constructed 10 Nuclear Power Plants, and supported construction of 10 others
From 1977 focused on modifications and maintenance (90million hours)
In 1990s expanded services for decommissioning and environmental cleanup
Fluor has performed about $1 billion annually in nuclear facility decommissioning over the past 10 years
Since 2007, again all licences in place and full EPC capabilitiesfocusing on new builds and modifications
Experience with PWR and BWR reactor technologies
2,750 personnel with nuclear experience
FLUOR’S POWER EXPERIENCENuclear Energy Capability
February 2009
24
South Texas Project, Bay City, Texas, U.S.– Engineering, Procurement, Consturction and Commissioning– 2 new Advanced Boiling Water Reactors (ABWRs)– Total capacity of 2,700MW– Toshiba will provide reactors– 6,000 craft planned on site– First 2 new units built in U.S. for more than 2 decades
Oconee Nuclear Station, Lake Keowee, South Carolina, U.S.– Engineering, Procurement, Construction and Commissioning– Major capital modifications– Installing tornado barriers, replacement of 1,5 MW pump (nuclear
safety item) with all associated piping, new reinforced concrete building to house emergency switchgear and about 80 km of wiring
– Construction started in June 2008– Currently 55 craft on site; 300 planned in peak
FLUOR’S POWER EXPERIENCENuclear Energy – Current Projects Highlight
February 2009
25
Executing of all type of Power Plants worldwide
Financial stability
Sourcing material globally
Strategic Relationship Agreements (SRAs)
Linking global engineering resources
Meeting compressed schedule
Having excellent safety records, unmatched by competition
European Power Market is changing – EPC Contractors have larger role on projects
Number #1 in Fortune Magazine’s “EPC Category”of America’s largest corporations
WHY FLUOR?
February 2009
FLUOR AS EPC LEADER IN POWER SECTOR
Thank You
Dariusz Kiełtyka
E-mail: [email protected]