COMPANY PROFILE

S H A L A K A I N F R A - T E C H ( I ) P V T L T D

siplonserver1/coprofile

Page 2: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Date :

To,

Subject :- Company Profile

Dear Sir,It gives us great privilege to introduce ourselves as a group of young, qualified, devoted, experienced, andefficient Engineers/Professionals in the field of Turn-Key Projects. During the last 20 years since inception,we have successfully executed projects in Government; Semi Govt.; Industrial, Commercial ;as well asResidential sectors.

We have to our credit some prestigious projects like "Sakhar Sankul", Commissionerate of Sugar, Govt. ofMaharashtra (State of the art Administrative Building Complex); Life Insurance Corpn. of India, ("Yogakshema" , Western Zone office, Nariman Point, Mumbai); Airports Authority of India ( Domesticand International Airports at Ahmedabad, Pune, Aurangabad, Nagpur, Bhubaneswar, Goa ) National Councilof Science Museums, Pimpri, Pune; MIDC ( 5 star Industrial Estate); GED, MSEDCL, MSETCL,POWERGRID; MHADA (Housing project); PCMC, IDA, CPWD, EPIL, CGHB, NBCC, CIDCO,MADC, TIDC, BESCOM, BSNL, Central Raiway, Uttar Pradesh Samaj Kalyan Nirman Nigam Ltd. &MSRDC (Infrastructure development of power supply network); Spinning Mills, Hotel Industries, UltraModern Shopping Malls, Polymer Sitting Arrangement DPE, Club Houses, Telecom projects (OFC work,OSP wiring work, PMP cluster wiring), replacement of meter & allied works etc. We have now ventured intoSolar Power Generation Projects. The detailed profile of our company is enclosed herewith for your readyreference. We believe in quality work because it is the Quality that is remembered forever. Safety and Reliability is thekey of Electrical System and is very important for any project. Many latest technological advance systems arebeing introduced in this field to improve the efficiency and reliability of Electrical systems. Our youngenergetic engineers implement these advanced systems.

If you require any clarifications or further information, please contact us at your convenience. Thanking you and assuring you of our best services at all times, we remain.

Yours sincerely,

Uday LidbideProject Head

siplonserver1/coprofile

Page 3: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)
Page 4: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)
Page 5: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

siplonserver1/coprofile

Page 6: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

1 :

2 Registered Office & H.O. :

3 Branch Offices Nagpur :

Goa : Vasant Arcade, 1st floor, office no.02,Comba- Margao, Goa- 403 601Tel. No. 0832-2700174

Sangli : Flat No. 51 & 55, 2nd Floor, Shiv- Pavilion Building,Near Ram Mandir, Sangli-Miraj Road, Sangli-416 416Tele No. 84118 83972

Ahemedabad

Tel No. 079 – 40051222, 40031612.

Raipur :

Tel- 0771-4265567

Wardha : Dr. Punjabrao Housing SocietyPlot No.38 Aarvi Road, Wardha

Telangana :

4 :

5 Managing Director :Director

Status of Organization

E-mail : [email protected]

Mr. Ravindra Lunawat

Plot No.285, Abhyankar Nagar,

Mrs. Swati Lunawat

C-185, Near Saroj Nursingh Home,

Telefax : 0712 - 224 0575 / +919422501602

Bio data

Tel : 020- 2565 7000 / 01 / 02; Fax: 020- 2565 7004Mob: +9194220 30431

Nagpur - 440010

Name of the Organization Shalaka Infra-Tech (I) Pvt Ltd.

Private Limited

"Shalaka House", Plot No. 22, Gajanan Housing Society, Ganeshkhind Road, Shivaji Nagar, Pune-411016

A-1, Block No. A, Safal Profitaire, Opp. Ramada Hotel,Corporate Road, Prahladnagar, Ahmedabad - 380 015.

G4, MahaLaxmi Nilayam, Road No 5, Sri Balaji Nagar,Medchal, RangaReddy, Telangana - 501401.

NMDC Colony, Near Rajendra Nagar,Raipur - 49200

siplonserver1/coprofile

Page 7: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

6Govt. Please refer enclosed list for details.

7 :

8 :

9 :

10 Work experience :

11 :

12 :

13 :

State Bank of IndiaC.C.- Rs.6 Cr. L.C. 10 Cr.

14 Bank Solvency :

15 :

As per enclosed Organization Chart

As per enclosed list.

Organization

Registrations and Licences

As per enclosed list.

Bank of Maharashtra

Corporate Finance Branch, F.C. Road, Pune-411005Bankers

Industrial finance Branch, Wakdewadi, Pune-411 003

Registered Electrical & Civil Contractor with various State

Rs. 100 Crore

As per enclosed list.

Human Resource

As per enclosed list.Work in hand

Credit Facility from BankC.C.- Rs.18.5 Cr, B.G.- Rs. 75 Cr, L.C. 20 Cr

Plant and Machinery

State Bank of India

Bank of Maharashtra

Collector Solvency Rs. 53.39 Lacs.

siplonserver1/coprofile

Page 8: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Organisation Chart

EXE.DIRECTOR

IN CHARGE -PROJECT

FINANCEADMINISTRATION

ADMIN OFFICER

FRONT OFFICE

ACCOUNTS OFFICER

INTERNAL AUDITOR

ESTIMATION & PLANNING

PROJECT ENGINEER MATERIALS & QUALITY CONTROL

SITE SUPERVISOR

OTHER SITE STAFF

PURCHASE OFFICER

Q.C.ENGINEERESTIMATION ENGINEER

SITE CO-ORDINATOR

MANAGING DIRECTOR

siplonserver1/coprofile

Page 9: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Registration of firmPrivate Limited, incorporated under theCompanies Act, 1956 (No.1 of 1956) by theRegistrar of Companies, Maharashtra, Pune

: Regn . No. CIN U 45203 PN 2006 PTC 021915

Registration for Civil Works

PWD-Electrical (Govt. of Maharashtra) in Class A (No limit) A-67

Govt. of Maharashtra Electrical Contractors License No. 11429

Govt. of Goa GLB- 791

Govt. of Chhattisgarh Electrical Contractor's License No. 8/802

MES Enlistment in Class- "SS" (Civil & Electrical & Solar Projects) SS-171

DRDO Electrical & DG Sets- Category ED-IV

Class IV

A. Licenses / Registrations

Licenses and Registrations

Registration for Electrical Works /

allied works

PWD (Govt. of Maharashtra)

siplonserver1/coprofile

Page 10: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Telangana State 36AAJCS6397Q1Z7

Maharashtra State 27AAJCS6397Q1Z6

Goa State 30AAJCS6397Q1ZJ

Delhi State 07AAJCS6397Q1Z8

Orissa State 21AAJCS6397Q1ZI

Karnataka State 29AAJCS6397Q1Z2

Gujrat State 24AAJCS6397Q1ZC

Raipur State 22AAJCS6397Q1ZG

Madhya Pradesh State 23AAJCS6397Q1ZE

Haryana State 06AAJCS6397Q1ZA

P. A. N. AAJCS6397Q

Professional Tax No. PT/E/2/2/6/28/18/2952 and PT/R/2/2/6/28/12010

Provident Fund Regn. No. MH/PUNE/123681

E.S.I.C.Regn. No. 33000354920001000

T.A.N.No. PNES16584B

Import Export Code No. 3107008346

Other Registrations

GST No.

B. Taxes & other registrations:

siplonserver1/coprofile

Page 11: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr. No. Name Qualification Experience Designation

1 Mr. Ravindra Lunawat B.E., B.Com., D.B.M. 30 Years Managing Director

2 Mrs. Swati Lunawat B.com 26 Years Director

3 Mr. Suyash Lunawat B.E., M.Sc (U.K.) 2 Years Executive Director

4 Mr. Kishor Chhajjed B.com 20 Years Project Sales Head

5 Mr. Uday Lidbide D.M.E. 35 Years Project Head (Electrical)

6 Mr. Zainoddin Sayyed D.C.E. 23 Years Project Head (Civil)

Details of Directors & Key Personnel

siplonserver1/coprofile

Page 12: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr.No. Name Designation Age Qualification Experience1 Vinay Ganu Project Incharge 50 yrs B.E. (Elect) 28 yrs2 Brijesh Sanklecha Project Co-ordinator 44 yrs B.Com 22 yrs3 Gajanan Karvekar Site In charge 44 yrs D.E.E. 20 yrs

4 Dhanashri Jain Sr. Project Engineer 35 yrs B.E. (Elect), PGDBM 12 yrs

5 Prajakta Satav Sr. Project Engineer 33 yrs B.E. (Elect) 10 yrs6 Madhuri Pradhan Electrical Engineer 30 yrs B.E. (Elect) 7 yrs7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect) 5 yrs10 Vinod Tukde Site Engineer 35 yrs B.E.(EEE) 9 yrs11 Shripal Bothra Site Engineer 30 yrs B.E. (Elect) 8 yrs 12 Akash Raut Site Engineer 26 yrs B.E. (Civil) 2 yrs13 Samadhan Bhagat Site Engineer 34 yrs D.C.E. 15 yrs14 Rajesh Shastarkar Civil Engineer 40 yrs D.C.E. 11 yrs15 Pandurang Patil Billing Engineer 34 yrs 12th 12 yrs16 Satish Madiwal Store-Incharge 31 yrs B.A. 7 yrs17 Sameer Thakare Site Supervisor 25 yrs D.C.E. 7 yrs 18 Sachin Vaidya Site Supervisor 38 yrs ITI (Elect.) 9 yrs19 Sataywan Jadhav Site-Supervisior 30 yrs B.A . 6 yrs20 Ishwar Jondhale Site Supervisor 42 yrs B.Com 10 yrs21 Arvind Sawant Site Engineer 31 yrs M.Tech 8 yrs22 Prashant Dhapute Site Supervisor 32 yrs 12 th 12 yrs23 Rajesh Shinde Store-Keepar 52 yrs B.A. 5 yrs24 Parshuram Nalwade Store-Keepar 29 yrs 10 th 10 yrs25 Roshan Khanna Site Supervisor 33 yrs B.E. 10 yrs26 Mahendra Patole Site Supervisor 31 yrs B.Tech 6 yrs27 Chetan Sawalkar Site Supervisor 30 yrs B.E. 3 yrs28 Yuvraj Joshi Store-Keepar 36 yrs 10th 10 yrs29 Purushottam Pate Store-Keepar 59 yrs 10th 15 yrs

List of Technical Personnel

siplonserver1/coprofile

Page 13: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr.No. Name Designation Age Qualification Experience1 Sandip Soni CFO 40 yrs M.Com 18 yrs2 Ramchandra Jadhav Sr. Accountant 45 yrs B.Com 17 yrs3 Reena Dive Admin Officer 27 yrs M.A. 8 yrs4 Sunil Raut Accountant 29 yrs B.Com 6 yrs5 Deepali Gaikwad Accountant 30 yrs C.A. 6 yrs6 Shrikant Bhawsar Accountant 52 yrs B.Com 29 yrs7 Sandip Hulawale Accountant 36 yrs M. com 10 yrs8 Shantaram Shinde Office Asst. 42 yrs 10th 18 yrs9 Balasaheb Gaikwad Office Asst. 45 yrs MA 18 yrs

OTHER STAFF1 Wireman / Electrician : 75 Nos.2 Sub Contractors

List of Administrative Personnel

: 18 Contractor with their own machinery & manpower

siplonserver1/coprofile

Page 14: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr. No. Qty

1 1 No.2 Hi Pot machine for testing HT Cable up to 33 KV 1 No.3 HT & lt Cable fault detector machine with Mobile Van 1 No.4 Welding Transformer (250 Amp, 3ph) 2 Nos5 Gas cutter 1 No.6 Chain pulley Block ( 5,3,2.5 Tonnes) 3 Nos7 Electric Drill Machine (1000W, 500 W, 250 W ) 5 Nos8 Elecric Concrete Cutter ( Up to 63mm ) 3 Nos.9 Blower ( 500 W, 300 W) 2 Nos

10 Electric Hammer Tool 2 Nos11 Hand Grinder 2 Nos12 Crimping Tool (Up to 300, 95, 25 10 sq.mm.) 4 Nos13 Electric Pump 2 Nos14 Water Tanker 2 Nos15 Excavator cum loader 1 No.16 Pneumatic Compressors 2 Nos17 Pneumatic Hand drills 8 Nos18 Tile Cutting Machine 2 Nos19 2 Nos20 Rope (25, 19, 16 mm ) 150 Mtr21 Scaffolding 4 Sets22 Aluminium, Wooden Ladders 7 Sets23 Testing Equipments24 a) Digital Tong Tester 8 Nos25 b) Analog Tong Tester 5 Nos26 c) D.C.Voltage Source 2 Nos27 d) Multimeter 15 Nos28 e) Auto Transformer 1 No29 1 No

Note : Relay testing kit and secondary injection kit and any other equipments/machinery can be made available as and when required.

Description

Tool Box

Plant & Machinery ( Electrical)

15 KVA Mobile DG Set with Canopy

Truck mounted Crane- 12.4 MT, Hook Height- 10.2 Mtr

siplonserver1/coprofile

Page 15: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr. No. Name of Equipment No. of

Units Kind and Make Capacity Age and Condition

1 JCB - Tracked Excavator 1 no. JCB- JS120 0.5 Year in good condition

2 Tipper 4 Nos. Tata 1210 SF 12 T 4 yrs. In working condition

3 Concrete Mixer 6 Nos Miller, Cosmos 0.2 Cum 0.3 cum 2 yrs. In working condition

4 Centering Material 1500 Sqm. Cosmos - 1 Year in good condition5 Weigh Batcher 23 Nos Universal New

6 Needle Vibrator 25 mm to 50 mm dia 8 Nos Cosmos,

Universal3 HP 5 HP 1 yr. In working condition

7 Surface vibrator 2 Nos Universal 1 yr. In working condition8 Water Pumps (Electrical) 15 Nos Vigneshwar 1- 3 H.P. 2 yrs. In working condition

9 Water Pumpe (Diesel) 6 Nos Kirloskar 5 H. P. 18 Months in working condition

10 Lift & Hoist 3 Nos Universal 0.5 M.T 2 yrs. In working condition11 Earth Compactor 2 Nos Cosmos 5 H. P. 2 yrs. In working condition

12 H' Frame for Scraffolding 125 Nos Cosmos 1 yr. In working condition

13 Sand Screening Machine 4 Nos Universal 2 yrs. In working condition

14 Concrete cube moulds 72 Nos Local Made 15X15X15 1 yr. In working condition

15 Compression testing Machine 3 Nos L & Mayo 3 yrs. In working condition

16 Floor Polishing Machine 6 Nos Local Made 2 yrs. In working condition17 Theodolite 2 Nos L & Mayo 1 Sec. 1 yr. In working condition18 Auto Level 6 Nos L & Mayo 5 yrs. In working condition19 Excavator 1 No. Escort JCB 0.9 Cum 3 yrs. In working condition20 Water Tanker 1 No. Tractor 6000 Ltr. 2 yrs. In working condition

21 Centering Plates 4000 Nos. Local Made 24000 S.Ft. In Good condition

22 D.G.set 1 No. Kirloskar 250 KVA 6 months23 D.G.set 1 No. Kirloskar 50 KVA 2 Years24 Hot Mix Plant 45D 1 No. 4 yrs. In working condition25 Tipper 12 Nos. 2 yrs. In working condition26 Pokland 1 No. New27 Dummper 10 Nos. 1 yr. In working condition28 Blasting Tractor 1 No. 1 yr. In working condition29 Regular Tractor 4 Nos. 2 yrs. In working condition

30 Crusher 1 No. 18 Months in working condition

31 Road Roller 2 Nos. 2 yrs. In working condition32 Statistic Roller 1 No. 2 yrs. In working condition

Plant & Machinery (Civil)

siplonserver1/coprofile

Page 16: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

A }

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

1 Commissioner of Sugar (Maharashtra State Pune)

S/I/T/C of Internal & External Elct. Work of Admin. Bldg.

Sakhar Sankul Shivajinagar Pune

Architect Shashi Prabhu & Asso.

Mumbai Consultant- M/s Gajanan Entrp.

Pune

229.74 380.81 Mar 00 Dec 00

2 LIC (Life Insurance Corporation of India), Mumbai

Electrical installation work of Central office of LIC

Yogkshema' J.B.Marg Nariman point Mumbai

Architect M/s Nitin Parulekar Architects

Pvt. Ltd. Mumbai

118.00 110.00 June 02 Dec. 04

3 NIPHT (National Institute of Post Harvest Technology) under Mah. State Agricultural Mktg. Board

Internal & External Electrification work of Horticulture Training Centre of NIPHT

Sr. No. 398-400 Next to CRPF Campus,

Talegaon Dabhade Tal. Maval Dist. Pune

M/s Satyajeet Rane & Associates Pune

68.66 29.10 Aug. 02 Feb. 03

4 SDCC ( Satara District Central Co-operative Bank) Satara

Electrical installation work of Central Building of SDCC Bank at Satara

SDCC Bank Shivaji Circle Powai Naka

Satara

Bhosale-Kadam Associates

52.69 36.00 Sept 03 June 05

B} Power Supply- Electricity Board/ Corporation / Industrial / Commercial Project ( 2005 On words1 Kakade Construction

Company (Promoters & Builders)

S/I/T/C/ of Internal & External Electrification work icluding Indoor Sub-station, D.G.Sets, HT & LT Panels& other equipments.

Kakade Magnum Mall ( SGS Mall) Moledina

Road, Pune

M/s S.N.Joshi Consultants Pvt. Ltd

LBS Road, Pune

486.00 528.48 June 05 March 06

2 U.N. Mehta Institute of Cardiology and Research Centre, Ahmedabad

Supply, Testing commissioning & installation of Electrification of U.N. Mehta Institute of Cardiology & Research Centre

Director, U.N. Mehta Institute of Cardiology and Research Centre,

Ahmedabad

Ahmedabad 275.00 321.01 Jul.09 Sep.10

3 U.N. Mehta Institute of Cardiology and Research Centre, Ahmedabad

SITC of 2x500 KVA silent D.G. set with auto synchronizing panel & uploading existing 2x250 KVA DG set with its panel to work in parallel with 2x500 KVA DG Set

Director, U.N. Mehta Institute of Cardiology and Research Centre,

Ahmedabad

Ahmedabad 81.00 81.00 Aug.09 Oct.10

4 Maharashtra Labour Welfare Board Elphinstone Rd, Mumbai (M.L.W.B.)

S/I/T/C/ of H.T. and L.T. Electrical work, D.G.Set. and internal electrification work

Lalit Kala Bhavan, Sahakarnagar No. 1,

Parvati Pune

M/s Space Designer Syndicate Pune

40.68 49.91 July 06 Sept.06

5 Military Engineering Services Secundarabad

HT VCB, HT Cabling Panels and internal Elect. Work

HEMRL Sutarwadi, Pune

Military Engineering Services

Secundarabad

99.82 103.00 Nov.05 Feb. 07

6 Accelerated Power Development Reform Programme Through MSEB funded by Govt. of India and Rural Electrification corp. Ltd. New Delhi

11 KV UG Lines with 300 sq.mm. XLPE Cable and allied works

Nagpur Urban Zone, Nagur Maharashtra

Chief Engineer MSEDCL (MSEB)

Nagpur Maharashtra

4495.00 4495.00 Mar 05 Oct. 07

7 National Highway Authority of India, New Delhi (NHAI)

Shifting, erecting & Laying of Electrical poles/lines (O/H, U/G) of 33KV 11 KV and distribution Transformer in the State of Rajasthan

NH-76 between Km 338 to 411 in the state

of Rajasthan

Mr.B.L.Meena Project Director NHAI-PIU Kota

Rajasthan

230.07 263.89 Sept 05 Nov 07

8 MIDC (Maharashtra Industrial Development Corpn.) Nagpur

Streching of 33 KC feeder from Hingna -1 Sub station of MSEB to 33 KV Sub Station at IT Park, Parsodi, Nagpur

IT Park at Parsodi Nagpur

Mr. P.G.Deogiri Executive Engineer

(E&M) MIDC, Nagpur

188.83 180.57 July 06 Aug 07

9 MIDC (Maharashtra Industrial Development Corpn.) Nagpur

Providing, Erecting & commissioning 33KV/ 5 MVA Sub station

IT Park at Parsodi Nagpur

Mr. P.G.Deogiri Executive Engineer

(E&M) MIDC, Nagpur

243.45 242.00 July 06 Aug 07

List of Projects Completed ( Electrical)

Major Projects between 1995 to 2005

siplonserver1/coprofile

Page 17: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

10 MSEDCL, Sidhudurg circle MIDC area Kudal

Revamping of 33/11 KV Malvan Sub Station & other allied works in Sindhudurg Dist.Sindhudurg Maharashtra

Suptd. Engineer, Kudal, Dist. Sindhudurg

79.05 79.05 Jan.08 Aug. 08

11 Atlanta Ltd. JNNURM Project of Municipal Corpn.

Shifting existing street lighting and MSEDCL utilities and fixing new ones

Baner Road, Pune M/s Consulting Engineering Services

401.95 393.00 May 08 Oct 08

12 Sandeep Associates JNNURM Project of Municipal Corpn

Shifting of Electrical Utilities & Street Lights of Baner Road

Baner Road, Pune M/s Consulting Engineering Services

87.43 87.43 May 08 Oct 08

13 Sandeep Associates JNNURM Project of Municipal Corpn

Shifting of Electrical Utilities Sancheti Hospital to Govt. Poultry Farm &

from Govt. Poultry Farm to Harries Bridge Pune-Mumbai Highway

M/s Consulting Engineering Services

150.91 150.91 May 08 Oct 08

14 MIDC (Maharashtra Industrial Development Corpn. ) Pune

Providing power supply arrangement in D & C Block….. 5 MVA , 33/11 KV Sub Station, 100 KVA Dist. Transformer Center (25 Nos) etc.

Five Star Indl. Area Shendra (Dist. Aurangabad)

Executive Engineers (E& M)

251.43 243 May 08 Dec. 08

15 MSEDCL(Maharashtra State Electricity Distribution Co.Ltd.) Sangli Circle, Sangli

Construction of 33 KV Substation, 33 KV & 11 KV Lines & Augmentation of 33/11 KV substation, Dist. Sangli

Sangli District, Maharashtra.

Suptd. Engineer, Sangli Circle, Sangli

421.55 417.3345 March 08 Sept 09

16 Central Public Works Department New Delhi CPWD

Construction of Jawaharlal Nehru Bhawan at Janpath, New Delhi.(SH: Supplying, installation, testing, commissioning of Sub Station and Bus Trunking etc.

Janpath, New Delhi Executive Engineer , JNB Project, CPWD,

New Delhi.

367.69 367.69 Sept. 08 May,11

17 Bharat Sanchar Nigam Ltd., Mumbai (BSNL)

Supply of 2 x 3000 KVA Transformers, HT Panel ,Bus trunking, MV Panels at Fountain -II T.E. Bldg Fort Mumbai-1& ITC of 2 x 3000 KVA Transformers, HT Panel, Bus trunking, MV Panels and other associated works at Fountain -II,T.E. Bldg

Fountain, Mumbai Executive Engineer (E), BSNL Elect.

Divn. No.1, Mumbai.

189.89 189.89 Feb.09 August.09

18 Government of Goa, Electricity Department, Division No. : IV , Margao, Goa- 19(08)

Coversion of 11 KV overhead lines to underground network in Loutolim Constituency in Salcete Taluka, for Electricity Department, Govt. of Goa

Loutolim Constituency in Salcete Taluka,

Goa.

Executive Engineer, Div. IV, Electricity

Department, Margao, Goa.

3967.00 3668.82 Feb.09 June,11

19 MSEDCL, Vidut Bhavan Katol Road, Nagpur

“Turnkey Contract for the Works of Backlog scheme work. at Chandrapur Circle.under Nagpur Zone.”

Chandrapur Maharashtra

Suptd. Engineer, O&M Circle, Chandrapur/

901.67 851.15 Nov.08 Dec.10

20 Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)

Turnkey Contract for commissioning of 33/11 KV Sub-stations at Dhawadwadi Tal. Jath along with allied Works

Dhavadwadi Tal. Jath Sangli Circle

Suptg Engineer, (SC)-MSEDCL

Sangli

390.98 428.46 Jul-10 Dec-11

21 MSEDCL, Sangli, T-45 Turnkey Contract for Power Transformer, HT lines& allied works for commissioning of 33/11 KV Sub- Station at Bhikwadi (Kh.) Ta: KadegaonDist . Sangli

Sangli, Maharashtra Superintending Engineer, MSEDCL

276.32 253.5 Mar-11 Jan-13

22 Indore Development Authority

External electrification with HT and LT underground cabling in scheme No.140,

Indore M.P. Suptd. Engineer, I.D.A. Indore.

3064.00 3064.00 Sep-08 Mar-12

23 National Council of Science Museums

Internal & External Electrical Installation Works for Regional Science Centre, Chinchwad, Pune

Chinchwad, Pune Kothari & Associates 21.98 24.98 Jul-10 Sep-12

siplonserver1/coprofile

Page 18: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

24 Maharashtra State Electricity Transmission Company Limited- State Load Dispatch Centre, Kalwa

Supply, Installation, Testing & Commissioning of the Internal Electrification of New Building at State Load Dispatch Center, Airoli, Navi Mumbai.

Kalwa M/s Shethgiri Associates, Mumbai

121.53 142.67 Nov-11 Apr-13

25 CPWD, Mumbai Construction of Office Building for Canara Bank at Plot No. C 14, BKC, Mumbai. SH: SITC of 2 No.s 750 KVA DG Sets

IDBI PED CPWD, Mumbai

CPWD 160.62 149.11 Apr-11 June -13

26 Chhattisgarh Housing Board

Exeternal Electrification work i/c Underground Cable System for Residential Colony at Sector-27 Naya Raipur.

Raipur Executive Engineer, Chhattisgarh

Housing Board, Raipur

2193.80 2139.72 Apr-12 Mar-14

27 Chhattisgarh Housing Board

External Electrification work i/c Underground Cable System for Twin City, Talpuri, Amdi Ruabandha, Durg-BhilaiDistrict-Durg (C.G.)

Bhilai, Durg Executive Engineer, Chhattisgarh

Housing Board, Bhilai

1649.70 1651.55 July -12 Mar-16

28 Maharashtra Airport Development Company Ltd.

Execution of 33 KV Supply System to MRO Unit from PSS IV in SEZ Area of Mihan Project at Nagpur

Nagpur Chief Engineer, MADC Ltd., Nagpur

215.24 194.1 July-12 Sep-14

29 Maharashtra State Electricity Distribution Company Limited

Tender No: T-5: Internal Electrification, Telephone and LAN cabling work for new Administrative Building at Chaturshrungi, Pune

Pune Superintending Engineer (C)

MSEDCL, Pune

115.4 114.72 Oct-12 Oct-14

30 Bharat Sanchar Nigam Limited

SITC of 1 X 800 KVA E/A sets for Internal Data Centre (IDC) at TE Bldg, Vidya Dhar Nagar, Jaipur

Jaipur Executive Engineer, BSNL, Electrical Division, Jaipur

50.29 50.29 Oct-11 Dec-14

31 Bharat Sanchar Nigam Limited

SITC of 2 X 800 KVA D.G. set for Internet Data Centre (IDC) at Bapunagar, T.E. Bldg, Ahmedabad (Supply portion)

Ahmedabad Executive Engineer (E), BSNL, Electrical

Division- III, Ahmedabad

97.2 97.2 Sep-11 Dec-14

32 Bharat Sanchar Nigam Limited

SITC of 2 X 800 KVA D.G. set for Internet Data Centre (IDC) at Bapunagar, T.E. Bldg, Ahmedabad (ITC & Misc. portion)

Ahmedabad Executive Engineer (E), BSNL, Electrical

Division- III, Ahmedabad

10.0275 10.02 Sep-11 Nov-14

33 MSEDCL, Nagpur Rural Circle, Nagpur

HT Power Supply in r/o Executive Engineer, Water Works, Nagpur Municipal Corporation, Kamptee on 33 KV Express feeder from 220 KV Kanhan Sub-station under Nagpur Rural Circle.

Nagpur The Superintending Engineer, MSEDCL,

NRC, Nagpur

403.61 403.61 Aug-13 Sep-14

34 Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in Joint Venture with M/s. GTL Ltd.

Turnkey Contract for Tender No. 27 of Infrastructure Plan, Phase -II in Vita Division under Sangli Circle, Kolhapur Zone, of MSEDCL

Sangli, Vita Chief Engineer, MSEDCL, Infra

Projects, MSEDCL, Prakashgad, Mumbai

4581.00 4032.16 Jul-09 Apr-15

35 Directorate of Primary Education

Supply of Polymer Sitting Arrengement (PSA Desk) in the state of Maharashtra

All over Maharashtra Director of Primary Education

16499 16499 Feb-15 Jan-16

siplonserver1/coprofile

Page 19: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

36 Engineering Projects (I) Ltd.

Tender No. NRO/CON/ 588/571 : External Electrical works for Metrology Block at National Physical Laboratory, Pusa Campus, New Delhi.

New Delhi, General Manager, MMD, Engineering Projects (India) Ltd.,

New Delhi

1007.33 1011.8 Oct-11 Dec-14

37 Engineering Projects (I) Ltd.

Tender no. NRO/CON/ 588/574: External Electrical works for Clean Room at NPL, New Delhi.

New Delhi, General Manager, MMD, Engineering Projects (India) Ltd.,

New Delhi

564.76 539.10 Nov-11 Dec-14

38 CIDCO, Navi Mumbai Providing street lighting on various roads in sector 34,35 & peripheral 45 mtr wide road (Jal Marg) from sector-16 to 45 at Kharghar. (2nd call)

Kharghar, Navi Mumbai

Executive Engineer (Elect-I), CIDCO

464.06 466.92 Jan-14 Sep-14

39 Central Railway Provision of 2x500KVA, 11KV /415 volt substation, 2X30 KVA UPS and 320KVA DG set alongwith other associated equipments in the basement of New IRICEN institute building at Koregaon park, Pune

Pune Divisional Electrical Engineer (C )

113.11 108.20 Aug-12 Sep-14

40 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)- T-01

Work of Shifting & Conversion of 22 KV HT OH Line by U/G Cable of Malvali & Lis Feeder At 220 KV Chinchwad Sub-Station (Turnkey Contract)

Chinchwad, Pune The Chief Engineer, MSETCL

67.01 67.01 Aug-10 July-12

41 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)-T-04

Supply, Erection & Commissioning of 1 x 100 MVA, 220/132 KV ICT including shifting of 132 KV Bay at 220 KV Baramati Sub-station, Dist, Pune

Baramati, Pune The Chief Engineer, MSETCL

168.33 168.33 May-10 Jul-13

42 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)-T-05

Supply, Erection & Commissioning of 1 x 25 MVA, 220/33 KV Transformer with 4 x 33 KV Outlets at 220 KV Baramati Sub-station, Dist, Pune

Baramati, Pune The Chief Engineer, MSETCL

196.15 196.15 May-10 Apr-12

43 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)- T-25

Supply, Erection & Commissioning of 1X25 MVA, 132-100/22 KV Transformer with 4 X22 KV Bays At 100 KV Pawana Nagar S/ Stn., Dist : Pune.

Pawana Nagar, Dist.Pune

The Chief Engineer, MSETCL

299.79 299.79 Aug-10 May-13

44 Maharashtra State Electricity Transmission Company Limited (MSETCL)- T-42

Supply, Erection, Commissioning of 220 KV & 132 KV TBC & BC Bays at 220 KV Jeur Substation, Dist. Solapur

Solapur The Chief Engineer, MSETCL

187.43 176.59 Sep-10 Apr-17

45 Maharashtra State Electricity Transmission Company Ltd.- T-06

Work of additional 25 MVA, 132/22 KV transformer including 1 X 22 kv incomer feeder & allied civil works at 132 kv Varasgaon S/stn

Varasgaon The Chief Engineer, MSETCL

322.99 322.99 Mar-12 June-16

46 Government of Goa, Electricity Department, Division No. : IV (O&M) Margao, Goa- 23(08)

Supply, erection, testing & commissioning of 33 KV VCB's Bay equipment including structural material for upgrading existing infrastructure & improving of flexibility at various substation

Aquem Margao, Goa Executive Engineer, Div. IV, Electricity

Department, Margao, Goa.

278.03 139.42 Aug.09 Apr-17

siplonserver1/coprofile

Page 20: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

47 Government of Goa, Electricity Department, Division No. : IV (O&M) Margao, Goa- 22(09)

s from (i) Ponda s/s to Fatorda s/s via Raia s/s (ii) Xeldem s/s to Cuncolim s/s & (iii) Xeldem s/s to Aquem s/s, for Govt. of Goa, Electricity Department, Division, IV, Margao, Goa.

Margao, Goa Executive Engineer, Div. IV, Electricity

Department, Margao, Goa.

1996.47 1486.15 Aug-10 Apr-17

48 BESCOM- R-APDRP/BGR/56 (BESCOM)

Execution of Restructured Accelerated Power Development and Reforms Programme (R-APDRP) Part-B”of Anekal, Dobbaballapura & Hoskote towns of Banglore Rural District in BESCOM

Banglore Chief General Manager, BESCOM,

K.R.Circle, Bangalore

3319.21 2959.55 Mar-11 Feb-15

49 Bangalore Electricity Supply Co. Ltd. (BESCOM)

Execution of “Restructured Accelerated Power Development and Reforms Programme (R-APDRP) Part-B” of Chintamani, Chikkaballapura, Gowribidanur & Sidlanghatta Towns of Chikkaballapura District in BESCOM

Bangalore & Chikkabalpur Districts.

Chief General Manager, BESCOM,

K.R.Circle, Bangalore

3102.45 2627.07 Mar-11 Feb-15

50 Goa Electricity Department

Tender No. 04(13-14): Supply, Erection, Testing & Commissioning of 100 KVA DTC containing RMU & LV Switchboard along with laying of 11 KV underground cable & erection of LT overhead line for electrification of Nadquem village in Canacona under Schedule Tribe Development Scheme (Plan)

Goa Executive Engineer-XVI, Margao, Goa

97.75 44.62 Nov-13 Jan-17

51 Maharashtra State Electricity Distribution Company Limited (R-APDRP Part B scheme)

Tender No : CE/APDRP/RAPDRP PART-B/T-11: Turnkey Contract for R-APDRP Part B scheme works for Pune Zone

Pune Chief Engineer (APDRP),

MSEDCL, Mumbai

1402.37 1418.88 Mar-12 Apr-17

52 MSEDCL, Mumbai Tender No. CE (Infra) /Infra-Part II/Phase-A/Mumbai/EE-

IV/13-14/T-21: Kolhapur Zone: Vita & Sangli ('R)

Division

Sangli Chief Engineer (Infrastructure Plan)

MSEDCL, MUMBAI

10992.35 10055 Oct-13 Jul-17

53 MSEDCL, Nagpur Tender No. CE (NZ) /Infra Part II/Nagpur S/Dn.-I(Fetri S/S)/15-

16/T-36

Nagpur Chief Engineer (Infrastructure Plan), MSEDCL, Mumbai

698.78 698.78 Apr-16 Aug-17

54 Chhattisgarh Housing Board

Tender for “External Electrification work through under ground cabling system

for GAD Quarters Phase- I at Sector -17, Naya Raipur

(C.G.)”

Naya Raipur Executive Engineer, Chhattisgarh

Housing Board, Naya Raipur

993.43 933.09 Jul-14 Nov-16

55 NBCC External Electrification Works in “NBCC Heights”,

Residential Group Housing

New Delhi DGM, NBCC, New Delhi

912.1 1073.17 June-13 Mar-17

56 MSEDCL Tender No. CE(Infra) /Infra Part II/Phase-B-

3/EE-III/Mumbai/15-16- Mouda Town, Nagpur

Nagpur Chief Engineer (Infrastructure Plan), MSEDCL, Mumbai

1766.91 1835.02 Dec-15 Nov-17

57 Tapi Irrigation Development Corporation

“Construction of 132/33 KV Sub-station @ Iserkhed, 132

KV Double Circuit Transmission Line, 33KV

distribution line and allied civil works”

Jalgaon Superintending Engineer, Jalgoan

Irrigation Dept

6317.58 5906.65 Jan.10 Jan-15

siplonserver1/coprofile

Page 21: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

58 Vidarbha Hydro Electric & Lift IrrigationDivision, Nagpur

Design, Supply, Erection, Testing and commissioning of 33/6.6kv switchyard equipment

for Borghat lift Irrigation Scheme Ta. Mul Distt:

Chandrapur

Borghat-Chandrapur Vidarbha Hydro Electric & Lift

irrigationDivision, Nagpur

190.4 189.58 Feb-14 Feb-18

59 Water Resource Department, Birwadi Lift Irrigation Scheme

Design, manufacture, Supply, transport, erection, testing,

commissioning of 22/3.3 KV Switchyard equipment, power transformer, power and control

cables etc. in respect of Birwadi Lift Irrigation Scheme

Tal. Shahapur Dist. Thane

Shahapur, Thane Water Resource Department, Birwadi

Lift Irrigation Scheme

178.92 84.9 June-14 Jan-18

60 MSEDCL, Mumbai Tender No. CE (Infra) /Infra-Part II/Phase-C (Town

Scheme)/Mumbai/EE-IV/13-14/T-44: Pune Zone: Nagar

Road Division

Nagar Road, Pune Chief Engineer (Infrastructure Plan)

MSEDCL, MUMBAI

3451.06 2851.12 Jul-14 Jan-18

62 Indian Institute of Science Education & Research, Bhopal

Construction of IISER Bhopal (Package-I : Academic Block- 1 & 2, Lecture Hall Complex,

Hostel-1, Dining Hall & Development work) SH: External Development

(Electrical) SW: SITC of L.T. Panels & installing of

Substation work

Bhopal Superintending Engineer, IWD, IISER Bhopal

662.02 378.94 Sep-12 May-16

63 CPWD Providing HT Supply to the NIASM Campus at Malegaon, Baramati, Pune including Sub-station equipment’s, DG sets, Feeder pillars & cabling and construction of sub-station

building”.

Baramati, Pune The Executive Engineer (E), CPWD, Pune.

380.73 343.24 Dec-15 Jun-17

64 MSEDCL, Mumbai Tender No: CE (NZ) /Infra Part II/Nagpur Dn.-II/15-16/T-05-

Nagpur Rural Circle

Nagpur The Chief Engineer (Nagpur Zone),

MSEDCL, Nagpur

1723.81 1733.95 Dec-15 Aug-19

65 MSEDCL, Mumbai Supply of Material, testing, transport, construction, erection, testing & commissioning of material, completion of Civil works for New Danoli Sub statins of capacity 2X5 MVA, 33 KV/11 KV lines in Jaysingpur Divisions under Kolhapur Zone

Sangli The Chief Engineer, Kolhapur Zone,

Kolhapur

482.41 489.00 Dec-17 June-19

Jan-1961 Goa Electricity Department, Tender No. (01)10

Laying of underground 33 KV double circuit cables by

Horizontal Directional Drilling method from Sancole s/stn to

Majorda s/station & from Verna s/station to Kadamba

s/station using departmentally supplied 3C, 400 Sq.mm

XLPE cable, including Jointing & Termination kits & SITC of

33 KV incoming / outgoing equipment & bay arrangements

along with control & switchgears

Vasco, Goa Executive Engineer, GED

1109.00 796.05 May-11

siplonserver1/coprofile

Page 22: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

S. No. Name of Employer Name of Work Location of Project Architect/ Consultant

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of Start of Work

Date of Completion

of Work

66 MSEDCL, Mumbai Tender No.CE (NZ) /Infra Part II/Nagpur S/Dn.-I(Surabardi S/S)/15-16/T-37

Nagpur Chief Engineer (Infrastructure Plan), MSEDCL, Mumbai

884.548 829.09 Apr-16 Apr-18

67 MSEDCL, Mumbai Urban Electrification Works of Sangli Circle in Maharashtra State under Integrated Power

Development Scheme (IPDS).

Sangli The Chief Engineer, Kolhapur Zone,

Kolhapur

2185.48 1251.64 Feb-17 Dec-19

68 Madhuban Inn Pvt. Ltd. Electrical work of Amar Madhuban Tech Park

Pune Genius Systems 10.00 10.00 Apr-19 Aug-19

C} Airports

1 Airports Authority of India, New Delhi AAI

Expansion and modification of existing Terminal building at Pune Airport

Pune Airport, Pune Asst. G.M Engg (K. Dilip Singh)

189.00 196.00 Apr.06 May 07

2 Airports Authority of India Delhi AAI

SITC of new substation equipments and allied works at Nagpur airport

Dr.Babasaheb Ambedkar Airport,

Nagpur

Sr, Manager Engg ( Elect)

519.94 519.03 Apr. 07 Oct. 08

3 Airports Authority of India, Aurangabad (AAI)

SITC of substation equipment and allied works at Aurangabad Airport

Aurangabad Airport Deputy General Manager Engg (E) AAI, Aurangabad

674.71 658.00 Apr.08 Apr. 09

4 Airports Authorities of India, Ahmedabad AAI

“Construction of new integrated terminal building at Ahmedabad Airport. SH: SITC of substation equipment & DG Set.

Sardar Vallabhai Patel International Airport

Ahmedabad

Senior Manager Engg (E) AAI,

Ahmedabad

1492.00 1803.52 Aug.08 Jul.10

5 Airports Authority of India

Augmentation of Essential Power Supply by providing higher capacity DG sets

Pune Senior Manager, (Engg- E ), AAI,

Pune Airport, Pune

201.06 201.06 Aug-13 Jul-14

6 Airports Authority of India, Goa Airport, Goa

Construction of New Integrated Terminal Building at Goa Airport, SH: Supply & laying of 33 KV 300 Sq.mm secondary incomer for NITB

Goa Asst. Gen. Manager (Engg-E)

15.1 15.2 Sep-12 Dec-14

7 Airports Authority of India

Supply, Installation, Testing & Commissioning (SITC) of substation Equipments & DG sets at Biju Patnaik Airport, Bhubaneswar

Bhubaneswar Airports Authority of India

549.13 532.57 May-11 Feb-17

siplonserver1/coprofile

Page 23: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr. No

Name of the Employer Name of the work Location of

Project

Architect/ Consultant/

Contact Person

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of start of work

Date of completion of

work

1 Maharashtra Jeevan R R Loham and five village Satara, Maharashtra Executive Engineer, 391.15 410.08 Mar-99 Oct-01Pradhikaran Works water supply scheme Tal: Maharashtra Jeevan

Division Satara Kharadala, Dist Satara Pradhikaran Works For Maharashtra Jeevan Division Satara

Pradhikaran Works DivisionSatara

2 Maharashtre State Construction of Buildings Talegaon Dabhade, General Manager 228 343.00 Aug-02 Oct 03Agriculture and on S. No. 398 at Talegaon Pune Maharashtre State

Marketing Board Dabhade For NIPHT'S HTC Agriculture andPune For Maharashtra State Marketing Board

Agriculture & Marketing PuneBoard

3 Maharashtra Renovation and Extension Dist. Jalna Executive Engineer, 167.59 176.21 Jan. 2002 Feb 05Health Systems of Dist. Hospital at Jalna M.H.S.D.P.Development Dist. Jalna Engineering Division

Project4 Agriculture Construction of new cotton Khamgoan Project Architect, 216.722 216.722 Jan 01 Mar-05

Product Market Market Yard under TMC at APMC KhamgaonCommittee APMC Khamgoan

5 Maharashtra Redevelopment of Lalit Kala Sahakarnagar, Pune Civil Engineer, 964.63 964.46 Feb-04 Jan-06Labour Welfare Bhavan including MLWBBoard, Mumbai Multipurpose Hall swimming

pool, Stedia Gallary sitedevelopment, compound wall& allied facilities at S. No. 78

C.T.S.No. 2612 Parvati Sahakarnagar, Pune 411 009

6 Central Railway Construction of Director's Koregaon Park, Dy.Chief Engineer 253.57 229.12 Mar-05 Sep-07Construction Bungalow, Sports complex Pune (Construction)Division Pune swimming pool and allied Central Railway,

works at Koregaon Park PunePune

7 Panchashil Construction of Panchshil Moshi, Pune M/s Creations 659 400.00 Oct-98 Oct-00Recreation Club recreation club buildings

Pvt. Ltd. swimming pool,electrificationetc. PHASE - I

8 Pravara Rural Construction of full Olympic Gogalgoan Road Chief Civil Engineer 183.6 183.97 Jan-01 Oct-10

Education Society size swimming pool for LoniGogalgoan Road Pravara Rural Education

Loni Society, PravaranagarFor Pravara Rural Education Society PROSSP Gogalgaon

Road, Loni9 Fixity Packaging Construction of Factory Hinjewadi, Pune Managing Director, 518 497 Jan-04 Jan-05

Pvt. Ltd. Building Unit - 2 Fixity Packaging Pvt Ltd.

10 MSPH&WCL Maharashtra State Police Housing &

welfare Corpn. Ltd. Mumbai

Construction of balance work of 442 quarters for SRPF Gr.I at

Wanawadi,Pune

Wanawadi, Pune General Manager, Maharashtra State Police Housing &

welfare Corpn. Ltd. Mumbai

2275 2406.92 Dec-07 Dec-09

List of Projects Completed ( Civil & Interior Works )

siplonserver1/coprofile

Page 24: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr. No

Name of the Employer Name of the work Location of

Project

Architect/ Consultant/

Contact Person

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of start of work

Date of completion of

work

List of Projects Completed ( Civil & Interior Works )

11 MSPH&WCL Maharashtra State Police Housing &

welfare Corpn. Ltd. Mumbai

Construction of 6 Additional classroom, One mess Building

for 300 trainees Total 1758 Sq. . Bult up area & Parade ground 4800 sq. mtr. at P.T.S.Marol,

Andheri (East) Mumbai

Andheri (East) Mumbai

General Manager, Maharashtra State Police Housing &

welfare Corpn. Ltd. Mumbai

314.8 372.65 Jan-08 Oct-08

12 MSPH&WCL Maharashtra State Police Housing &

welfare Corpn. Ltd. Mumbai

Construction of 197 Residential Staff Quarters for SRPF Gr X at

Soregaon,Dist. Solapur.

Solapur M/s S.G. Sule Architect & town

planner, Pune

2072.79 2252.22 May-09 May-12

13 National Council of Science Museums

Construction of proposed regional science center building

and allied works at Pimpri Chinchwad Municipal Corporation at Pune.

Pimpri - Chinchwad

M/s Kothari & Associates, Kolkata

449.44 442.06 Sep-09 Nov-11

14 Maharashtra State Load Despatch

Centre (MSLDC) At & Post AiroiliNavi Mumbai

MSETCL

Construction of Control Room building for SLDC Kalwa at

Airoli, Navi Mumbai.

Airoli, Navi Mumbai

M/s Shethgiri Associates, Mumbai

999.05 999.05 Aug.09 Apr-13

15 Maharashtra State Load Despatch

Centre (MSLDC) At & Post AiroiliNavi Mumbai

MSETCL

Tender No. MSLDC/CELD /INT/T-1111/004: Interior, furnishing, plumbing and sanitary, water supply and

drainage, Lifts and site beautification works for new

Building at State Load Dispatch Center, Airoli, Navi Mumbai.

Airoli, Navi Mumbai

M/s Shethgiri Associates, Mumbai

472.66 542.09 Apr-12 May-13

16 Maharashtra Tribal Public School

Society, Nashik

Construction of English Medium Residential School Building

boys hostel, Girls hostel, Principal quarter, teachers

quarter, peon/ cook quarter, compound wall, site

development & electrification in Gat no. 1030 at Mundhegaon,

Tal. Igatpuri Dist. Nashik

Nashik Maharashtra Tribal Public School

Society

2000.75 2220.97 Jan-11 Mar-14

17 Swami Ramanand Tirth Marathwada

University, Nanded

Construction of the administrative building of

University Sub- Centre at Latur.

Latur M/s Dilip G. Kale, Pune

906.00 896.84 Mar-09 Feb-15

18 Power Grid Corpn. India Ltd.

Const. of multistoried (high rise) building at township of 400/220

KV substation at Talegoan at Pune

Talegaon, Pune M/s Shethgiri Associates, Mumbai

1051 929.32 Mar-10 Nov-16

19 Maharashtra State Agricultural

Marketing Board

Landscape & allied work at Head office Building of

Maharashtra State Agricultural Marketing Board, Pune

Pune Maharashtra State Agricultural

Marketing Board

165 153.23 Feb-14 Nov-16

20 Directorate of Primary Education

Supply of Polymer Sitting Arrengement in the state of

Maharashtra

All over Maharashtra

Director of Primary Education

8870 8870.00 Feb-16 Dec-16

siplonserver1/coprofile

Page 25: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr. No

Name of the Employer Name of the work Location of

Project

Architect/ Consultant/

Contact Person

Contract Price (Lacs)

Final Completed

cost of Project (Lacs)

Date of start of work

Date of completion of

work

List of Projects Completed ( Civil & Interior Works )

21 Goa State Infrastructure Development

Corporation Limited (GSIDC)

Construction of Government College of Commerce and

Economics at Margao, Goa - Interior Furniture Works –

PhaseI

Margao, Goa Goa State Infrastructure Development

Corporation Limited (GSIDC)

167.08 144.43 Feb-15 Apr-18

22 CIDCO, CBD Belapur

Design and Execution of Interior work for the offices at 1st floor North wing, Part of 6th floor

South wing at CIDCO Bhavan and part at 3rd floor of Raigad Bhavan, CBD Belapur, Navi

Mumbai

Navi Mumbai The Executive Engineer (NM),

CIDCO

383.4 277.21 Feb-15 Mar-18

23 Airports Authority of India

Construction of operational office building for Airports

Authority of India, Bureau of Civil Aviation Security (BCAS)

and Director General of Civil Aviation (DGCA) at Mumbai

Airport. SH: Balance Works (Civil &

Electrical)

Mumbai Airports Authority of India

669.82 565.13 Feb-15 Dec-17

24 National Centre For Cell Science

Interior Works at NCCS, Pune Pune Shirish Beri & Associates

266.6 220.25 May-15 Mar-18

25 The Sports Authority of Goa

Construction of Pavilion on the west side with Changing Rooms, Office Dias, Gymnasium along

with necessary development works at Assagao, Bardez-Goa

Bardez, Goa The Sports Authority of Goa

341.75 364.22 Feb-15 Mar-19

siplonserver1/coprofile

Page 26: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client Nature of Work Location of site Architect/ Consultant

Value of Contract

(Lacs)

Value of Work

completed (Lacs)

Value of Bal. work.

(Lacs)

Date of start of work

Target date of

Completion

Present progress

(%)

MSEDCL, Mumbai

Turnkey Contract for Infrastructure Plan Part-II

Project for Tender T-59 for Works in

Amravati Zone, Akola / Amravati Circle/

Achalpur Division.

Amravati The Superintending Engineer,

Amravati

287.216 194.34 92.88 Oct-16 Jun-20 68%

MSEDCL, Mumbai

Turnkey Contract for Infrastructure Plan Part-II

Project for Tender T-63 for Works in

Amravati Zone, Akola / Amravati Circle/

Achalpur Division.

Amravati The Superintending Engineer,

Amravati

168.012 121.12 46.89 Oct-16 Jun-20 72%

MSEDCL, Mumbai

Turnkey Contract for Infrastructure Plan Part-II

Project for Tender T-65 for Works in

Amravati Zone, Akola / Amravati Circle/

Achalpur Division.

Amravati The Superintending Engineer,

Amravati

126.18 71.34 54.84 Oct-16 Jun-20 57%

MSEDCL, Mumbai

Rural Electrification Works of Chandrapur

District in Maharashtra State under Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)”

Chandrapur The Chief Engineer

(Infra) MSEDCL, Mumbai

3984.2 2583.4 1400.77 Nov-16 Jul-20 65%

MSEDCL, Mumbai

Urban Electrification works of Wardha Circle

in Maharashtra state under Integrated Power Development (IPDS)

Scheme

Wardha The Chief Engineer (IPDS),

MSEDCL, Mumbai

2424.4 2439.6 0 Feb-17 May-20 Final bill in progress

Naya raipur Development

Authority

Power supply arrangement and

operation & maintenance of two years for

Prime Minister Housing Scheme for various

sectors at Naya Raipur

Naya Raipur Chief Executive Officer, NRDA

2144.97 797.21 1347.76 Feb-18 Jul-20 37%

Rural Electrification Corporation , Noida (UP)

Electrification works IN GANDERBAL CIRCLE ON FULL TURNKEY

BASIS UNDER RAPDRP PART-B.

GANDERBAL( Jammu and

Kashmir)

Rural Electrication

Corpn

1308.88 392.38 916.5 Jun-18 Aug-20 30%

Rural Electrification Corporation , Noida (UP)

Electrification works IN SOPORE CIRCLE ON

FULL TURNKEY BASIS UNDER

RAPDRP PART-B.

SOPORE( Jammu and

Kashmir)

Rural Electrication

Corpn

1932.99 560.7 1372.29 Jun-18 Aug-20 29%

Project Wing, Jammu

RuralElectrification works of KISHTWAR District in Jammu Province under

(DDUGJY)/PMDP (RURAL)/ RGGVYII

KISHTWAR District in

Jammu

Project Wing, Jammu

6953.57 1973.85 4979.72 Jun-18 Aug-20 28%

List of Projects in Hand ( Electrical)

siplonserver1/coprofile

Page 27: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client Nature of Work Location of site Architect/ Consultant

Value of Contract

(Lacs)

Value of Work

completed (Lacs)

Value of Bal. work.

(Lacs)

Date of start of work

Target date of

Completion

Present progress

(%)

List of Projects in Hand ( Electrical)

Project Wing, Jammu

RuralElectrification works of

DODA District in Jammu Province under

(DDUGJY)/PMDP (RURAL)/ RGGVYII

DODA District in Jammu

Project Wing, Jammu

8409.13 2351.72 6057.41 Jun-18 Aug-20 28%

Project Wing, Kashmir

Rural Electrification works of District

Bandipora and District Ganderbal in the state of

Jammu and Kashmir under

(DDUGJY) and (PMDP-Rural)

Bandipora and Ganderbal,

Jammu

Project Wing,

Kashmir

9967.00 2651.45 7315.55 Jun-18 Aug-20 27%

Project Wing, Kashmir

Rural Electrification works of Kupwara & Baramulla District in

Kashmir Province under Deen Dayal Upadhaya

Gramin Jyoti Yojna (DDUGJY)/ PMDP

Rural.

Kupwara & Baramulla

Project Wing,

Kashmir

14097.75 4040.76 10056.99 Jun-18 Aug-20 29%

Imagine Panaji Smart City

Development Limited

Smart Conversion ofOverhead to Underground

Electrical Network – Panaji & Ribander

Panaji & Ribander

Managing Director &

CEO, IPSCDL

7375.20 4189.47 3185.73 Nov-18 May-20 57%

Ajmer Vidyut Vitran Nigam

Limited

Providing Rural House hold electrification work, which inter-alia includes construction of 11 KV & LT Lines, installation of distribution transformers

and providing service connections to rural

house hol of Udaipur District (LOT 8), under SAUBHAGYA Scheme

package AVVNL/SAUBHAGYA/

UDR/TN-78/LOT-8

Udaipur, Rajasthan

The Superintending Engineer (DDUGJY),

AVVNL, Ajmer

1392.24 252.44 1139.8 Jan-19 Aug-20 18%

Pritam Constructions

Pvt. Ltd.

132 KV DC line shifting work for MSETCL

Pune Pritam Construction

s Pvt. Ltd.

238.75 0 238.75 Dec-19 May-20 Work in progress

Madhuban Inn Pvt. Ltd.

Electrical work of Amar Madhuban Tech Park

Pune Madhuban Inn Pvt. Ltd.

302.14 0 302.14 Dec-19 May-20 Work in progress

Airports Authority of

India

Construction of combined operational offices forDGCA, BCAS, AAIB, AERA and AAI at Safdarjung Airport, New Delhi.SH- SITCof Substation equipments etc.

Delhi Airports Authority of

India

1592.36 0 1592.36 May-20 Dec-20 Work order received

Ajmer Vidyut Vitran Nigam

Limited

AVVNL/KUSUM-C/GRID-SPV/TN-84/(Lot-10)- Solarization of grid connected agriculture consumers (Dungarpur-I)

Ajmer The Superintending Engineer (DDUGJY),

AVVNL, Ajmer

1152.89 0 1152.89 Aug-20 May-21 We are L1. LOA awaited

siplonserver1/coprofile

Page 28: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client

Nature of Work

Location of site

Architect/ Consultant

Value of Contract

(Lacs)

Value of Work

completed

(Lacs)

Value of Work Bal.

(Lacs)

Date of start of work

Stipulated date

of Complet

ion

Present progresss

(%)

Uttar Pradesh Samaj Kalyan

Nirman Nigam Limited

Construction of Museum at M.G.AH.V.

Wardha.

Wardha Uttar Pradesh Samaj Kalyan

Nirman Nigam Limited

971.04 618.32 352.72 June-13 Jul-20 64%

Uttar Pradesh Samaj Kalyan

Nirman Nigam Limited

Construction of Residence at M.G.A.H.V.

Wardha

Wardha Uttar Pradesh Samaj Kalyan

Nirman Nigam Limited

998.46 596.80 401.66 June-13 Jul-20 60%

Goa Housing Board

Construction of new market

complex marriage hall,

conference halland joggers park

at Porvorim Bardez -Goa

Goa Goa Housing Board

2178.22 1612.8 565.42 Mar-14 June-20 74%

Goa State Infrastructure Development Corporation

Limited (GSIDC)

Construction of Sanskruti

Bhavans for the Department of Tribal Welfare in Canacona

Taluka at Adarshgram, Ammonae-Poinguinim,

Gaondongrem, Kulgati, Edda & Gullem villages

Goa Goa State Infrastructure Development Corporation

Limited (GSIDC)

1135.51 697.46 438.05 Nov-14 June-20 61%

List of Projects in Hand ( Civil & Interior)

siplonserver1/coprofile

Page 29: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client

Nature of Work

Location of site

Architect/ Consultant

Value of Contract

(Lacs)

Value of Work

completed

(Lacs)

Value of Work Bal.

(Lacs)

Date of start of work

Stipulated date

of Complet

ion

Present progresss

(%)

List of Projects in Hand ( Civil & Interior)

Agricultural Produce Market

Committee

Proposed Construction of Flower Trading

Centre at Marketyard,

Gultekdi, Pune- 411 037

Pune Agricultural Produce Market

Committee

5054.08 3739.07 1315.01 May-15 Oct-20 74%

Nehru Science Centre

Construction of Science and Innovation

Activity Centre at Satara

Satara Nehru Science Centre, Mumbai

110.04 95.4 14.64 Sep-17 May-20 87%

siplonserver1/coprofile

Page 30: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client

Location of Project Name of the work

Architect/ Consultant/

Contact Person

Contract Price (Lacs)

Final Completed cost of Project (Lacs)

Date of start of work

Date of completi

on of work

Bharat Dynamics Limited

Bhanur, Telangana

Design, engineering, procurement & supply, construction & erection, testing, commissioing, associated transmission

system & comprehensive operation & maintenance for 5 yrs of 5 MW (AC) Solar PV Power Plant at BDL,

Bhanur (Telangana)

SECI 3303.79 3097.26 Nov-16 Nov-17

Siddhant College Of Engineering

Pimpri, Pune

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 221 KW Solar PV rooftop power

plant at Pune

Self 120 120 May-18 Oct-18

Pravin Industries

Mumbai, Maharashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 310 KW Solar PV rooftop power

plant at Pune

Self 110 110 Nov-18 Jan-19

Jaihind Pune, Mahrashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 20 KW Solar PV rooftop power

plant at Pune

Self 18 18 May-19 May-19

Chikaskar Pune, Mahrashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 11 KW Solar PV rooftop power

plant at Pune

Self 9 9 May-19 May-19

List of Projects Completed (Solar)

Page 31: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client

Location of Project Name of the work

Architect/ Consultant/

Contact Person

Contract Price (Lacs)

Final Completed cost of Project (Lacs)

Date of start of work

Date of completi

on of work

Kumar Buildtech

Pune, Mahrashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 22 KW Solar PV rooftop power

plant at Pune

Self 15 15 May-19 May-19

Silver Star Fashion

Pimpri, Maharashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 41 KW Solar PV rooftop power

plant at Pune

Self 29 29 Jun-19 Jun-19

Rajas Jain Pune, Mahrashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 21 KW Solar PV rooftop power

plant at Pune

Self 15 15 Mar-19 Apr-19

Shalaka House

Pune, Mahrashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 20 KW Solar PV rooftop power

plant at Pune

Self 15 15 Jun-19 Jun-19

Kushi Society

Pune, Mahrashtra

Design, engineering, procurement & supply, construction & erection,

testing, commissioing of 18 KW Solar PV rooftop power

plant at Pune

Self 11.9 11.9 Jun-19 Jun-19

Page 32: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Name of Client

Location of Site Name of the work

Architect/ Consultant

Value of Contract

(Lacs)

Date of start of work

Target date of

Completion & COD

Present progress

(%)

Southern Power

Distribution Company of Telangana Limited

(TSSPDCL)

Alair SS, District Yadadri,

Telangana State

Setting up of Grid connected solar PV project in Telangana

on "Build Own Operate" basis for the capacity of 15 MW AC / 18 MW DC for a

period of 25 yrs on PPA Basis

Southern Power

Distribution Company of Telangana Limited

(TSSPDCL)

12000.00 Mar-18 Nov-18 100% complete

d & commissi

oned

List of Solar Projects completed as a developer

Page 33: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr.No.Name Client & Proejct Value of

Contract (Lacs)

Date of start of work

Stipulated date of

Completion

Remark

1 Navi Mumbai Municipal Corporation: Design, supply, erection, installation & commissioning of 20 MW grid Project connected solar PV power plant & 1.5 MW of Hydro-power plant at MORBE dam on turnkey basis including: O&M for 25 yrs”

16300 May-2020 May-2021 Tech specs & Statutory approvals

under process

Sr.No. Name of Client CapacityProject

Value (Rs. In Lacs)

Location of site

Stipulated period of

completion

1 Java Labs 640 KW 350 Chakan, Pune 3 months2 Appolo Hospitals 400 KW 250 Hyderabad 3 months3 Bricks & Milestones Office 100 KW 125 Bangalore 1 month4 Greenshire Residential Project 100 KW 100 Bangalore 1 month5 Jaihind Collections, Nashik 50 KW 35 Nashik 1 month6 Sun Shine -Bhavisha Homes 150 KW 150 Bangalore 2 months7 Kandivali Apartments 250 KW 200 Mumbai 2 months8 Aditya House 5 KW 5 Pune 1 month9 Navjeet Houe 15 KW 15 Pune 1 month10 Shah House 10 KW 10 Pune 1 month11 Dutt House 2 KW 2 Bangalore 1 month12 Bhikshu Marbles 40 KW 25 Pune 1 month13 Bhavisha Homes P - 1 75 KW 50 Bangalore 1 month14 Bhavisha Homes P - 2 100 KW 80 Bangalore 1 month15 New Dawn 200 KW 125 Bangalore 2 months16 Sanskriti School 100 KW 45 Pune 1 month

Projects in Pipeline- Solar

ROOF TOP SOLAR SYSTEM

GROUND MOUNTED SOLAR SYSTEM

Page 34: COMPANY PROFILE7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs 8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs 9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect)

Sr.No. Name of Client Name of Work Location of site Tender Value (Rs. In Lacs)

1North Cachar Hills Autonomous Council (NCHAC)

Development, Design, Engineering, Supply & Procurement, Construction & Erection, Testing, Commissioning & Comprehensive Operation & Maintenance for 2 years of (50+20) MWp Solar PV Power Plant at Dima Hassao, Assam

Dima Hassao (Assam) 77000.00

2Karbi Anglong Autonomous Council (KAAC), Guwahati

Construction of Karbi Bhavan at Sector-13, Dwarka, New Delhi New Delhi 3000.00

Tenders in pipeline