State Route 2 Freeway Terminus Improvement Project
Community Open HouseNovember 30, 2010November 30, 2010
Mayberry Elementary School 6:00 p.m. – 8:00 p.m.
November 2010
Features of the Locally Preferred Alternative
• Relocate SB off-ramp to east with right-turn only access to NB Glendale Blvd
• Conversion of existing southbound off-ramp to open space
Constr ct ion of a barrier/so nd all bet een the fl o er and open space• Construct ion of a barrier/soundwall between the flyover and open space
• Traffic metering and calming devices
• Restriped lanes and New directional signage– on SR-2 and I-5 above the interchange
– new signage on SB SR-2
• Improved sidewalks at– Allesandro St.
– Waterloo St.
– Glendale Blvd between intersections
ff l l d l l d • New traffic cameras at Waterloo-Fargo/Glendale Blvd intersection
November 2010
Coordination with Other Agencies
• CALTRANS– Memorandum of Understanding for Design Phaseg g
– Project Funding
f f d k• City of LA Department of Recreation and Parks– Development of the Open Space
• City of LA BOE Department of Public Works– Tommy Lasorda Field of Dreams Prop K Improvementsy p p
Current Phase and Next StepsNovember 2010
Oct 2010 Prepared Mitigated Negative Declaration (MND) and Finding of No Significant Impact (FONSI)
Nov 2010 Issued Notice of Availability (NOA) [Mail and Media]y ( ) [ ]CEQA Notice of Determination (NOD) Filed
Dec 2010 Publish FONSI in the Federal Register
0 0 d A lWinter 2010 Recommend LPA to CaltransProcure PS&E / Outreach Contracts
Winter 2010 Begin PS&E (Preliminary Design/Final Engineering)
Spring 2011 Develop Focus Group for Input on Project Implementation
Fall 2011 Complete Design / Develop Construction Documents
Winter 2011 Procure Construction
2012 – 2013* Project Construction * Projected time frames are contingent upon securing necessary funding ojected t e a es a e co t ge t upo secu g ecessa y u d g
HYBRID ALTERNATIVE
HYBRID ALTERNATIVE
Ope
n Sp
ace
HYBRID ALTERNATIVE
Open Space
HYBRID ALTERNATIVE-TERMINUS IMPROVEMENTS
200
201
202
203
204
205
206207
208
209
210
211
212
213
214
215216
217218
219220
221222
22322
4225
226
227
228
229
230
231
232
233
234
235
236
23723
823
924
024
124
224
324
424
524
624
724
824
925
025
125
225
325
425
5 255
End Wall
End Wall
End WallBeginWall
Begin WallEnd Wall
Begin Wall
End Wall
End Wall
Begin Wall
New Open Space
I 5
STAT
E HWY 2
I 5
STAT
E HWY 2
GLEN
DALE
BLVD
GLEN
DALE
BLVD
G LE N
D ALE
BLV
D
RIVERSIDE DRSIL
VER L
AKE B
LVD
RIPPLE ST
NEWELL ST
SILVER RIDGE AVE
FLETCHER DR
SILVE
R LA
KE B
LVD
ALLESANDRO ST
VEST
AL AV
ELE
MOYN
E ST
ECHO
PARK
AVE
HIDA
LGO
AVE
LAKE
VIEW
AVE
SILVE
R RI
DGE A
VE
EARL ST
DUANE ST
BAXTER ST
TEVIO
T ST
CERRO GORDO ST
ARMSTRONG AVE
LAKE
SHOR
E AVE
ALVAR
ADO
ST
INDIA ST
MCCOLLUM ST
APEX AVE
CLIFFORD ST
SILVE
R LA
KE C
T
IVANHOE DR
EDGE
WAT
ER TE
R
BRANDEN ST
LOMA VISTA PL
BRIER AVE
EWING ST
PRINC
ETON
AVE
ROSEBUD AVE
COVE AVE
ROCK
FORD
RD
FARGO ST
PRESTON AVE
RIVE
RSID
E TER
BANCROFT AVE
WHITMORE AVE
OAK GLEN PL
MARSH ST
WATERLOO ST
RIVE
RSID
E PL
AVON ST
MCCR
EADY
AVE
CORR
ALITA
S DR
VALE
NTINE
ST
PARTR
IDGE AVE
LANDA ST
WALCOTT WAY
TESLA AVE MELLON AVE
EDENDALE PL
AYR ST
AARON ST
MOORE ST
ALTIVO WAY
ELECTRIC ST
ADELBERT AVE
FELL
OWSHIP PARK WAY
IVAN HILL TER
RA VINE RD
LAKE VIEW TER
EL M
ORAN ST
DEANE ST
LINDSAY LN
FANNING ST
DONALDSON ST
PERU
ST
ALL E Y
CHAMPLAIN TER
LOBD
ELL P
L
GILROY S
T
CURRAN ST
FAIR OAK VIEW TER
SUNFLOWER AVE
SILVERWOOD TER
SILVER LAKE AVE
COVE WAY
BENTON WAY
MODJESKA ST
SILVER
LAKE
TER
NEUT
RA PL
KNOX ST
LAKEWOOD AVE
ROSELIN PL
GLENEDEN ST
COOLIDGE AVE
AUDREY PL
AVALON ST
SILVER RIDGE WAY
EARL CT
PERU
ST
EWING ST
LAKE
SHORE AVE
MELLON AVE
COVE AVE
COOLIDGE A
VE
LAKE VIEW AVE
L ANDA ST
ALTIVO WAY
EARL ST
ALVA
RADO
ST
APEX
AVE
VALE
NTINE
ST
ALTIVO WAY
INDIA ST
DONALDSON ST
BAXTER ST
DUANE ST
EWING ST
COVE AVE
FARGO ST
AARON ST
BRANDEN ST
LOMA VISTA PL
FARGO ST
EWING ST
EWING ST
LAND
A ST
BAXTER ST
0 250 500125Feet
±
HYBRID ALTERNATIVE