Community Internet
A collaborative effort to provide high performance broadband internet service to a close community: Cikini3
Issues with the currently available ISPs at Cikini 3 At Cikini 3, the only available choices are
Telkom Speedy and Bignet Shared with so many users, link performance is
inconsistent.
The concept of community internet Acquiring a relatively high cost broadband
internet service from an ISP Distributing it among the community members
through a low cost community wireless network: Wireless Distribution System (WDS)
Sharing the initial investment cost (one time) and its operational cost (monthly) to all members
The broadband internet service The link is a 1 Mbps uplink and 2 Mbps
downlink. The link will be shared only by us, the
community member. The initial cost for installation and
commissioning is one time. The monthly cost is fix and will be shared by all
participants equally. The minimum contract with ISP is 1 (one) Year,
but can be paid in monthly basis at the beginning of the month.
Wireless Distribution System (WDS)
Distributing Wireless Access Points (APs) across the area
Maximum distance is 2 x 75 meters from one AP to another, the closer the better
All APs are positioned in LOS (Line of Sight)
Access Point #1
Access Point #2Access Point #3
Access Point #n
Requirements
Internet drop point: Several network devices: routers, modems etc Continuous electrical supply
Access Points / WDS node at member’s premises: 1x Linksys WRT-54GL: It must be installed outdoor in shade, protected
from rain and sun, line-of-sight with other WDS nodes (Access Points)
Installation material, e.g.: wall mounting bracket, conduit, cable, screws etc
You’re free to install additional unit to share the service with your family members
Critical Factor
Internet drop point Continuous electrical supply
WDS Due to its limited coverage, participation of
each community member is critical. A blank spot will hinder the next member to join the network
Continuous electrical supply and accessibility to the power outlet for emergency reset
Timely payment
The benefits
The internet link is connected to the 1st tier / International Internet Exchange instead of the 2nd tier / Indonesian Internet Exchange, hence better performance.
2 Mbps is quite significant big bandwidth, good performance and available 24 x 7
Unlimited access with no quota and on a fix cost basis The more participant the lower is the cost sharing The WDS can also be utilized for other purposes, such
as: CCTV, IP telephony etc We are not limiting the number of computers at your
home and / or usage. This is free for all of your family members, everyone is welcome
The downside
At Cikini 3, the whole infrastructure will be managed by amateur, no dedicated staff will be assigned to maintain the quality of service
Cost
Estimation of initial cost (one time)
Cost for the internet drop point Initial investment to purchase the required
devices: Router Modems Cables Etc
Cost is Rp 5 Mio, divided by 15 ~ Rp 335.000,-
Cost for the WDS Nodes
WDS Node
Qty Unit Price
Total
Radio + AntennaLinksys WRT-54GL
1 67 67
Mounting Bracket 1 5 5
Installation labor fee 1 10 10
Other consumable materials (cable, nuts and bolts etc)
1 4 4
Total cost per WDS Node USD 86
Initial cost sharing - Summary Total cost per house, based on 15 members:
Internet: Rp 335.000,- WDS (USD 86): Rp 903.000,- Total: Rp 1.238.000,-
This amount is paid in to the provider up-front, one time and calculated based on 15 participants
Cost
Estimation of Monthly Cost
Other cost sharing item
Contribution to member who provides space and electricity for the internet drop point: Electricity: approx. 108 kwh per month ~ Rp
250.000,- Maintenance cost to anticipate any hardware
failure (not on your in-house devices).
Monthly operation cost sharing - Summary Internet Access: Rp 4.400.000,- Contribution to place provider: Rp 250.000,- Maintenance cost to anticipate any hardware failure
(not on your in-house devices) Rp 100.000,-
Total: Rp 4.750.000,- Divided by 15: Rp
317.000,-
To Do
Action Item
1. Agree on the concept and its pricing and determine the timeframe for the implementation.
2. Proof of concept: Dipa will perform some research to ensure that WDS is applicable in Cikini 3, need cooperation from participants.
Rectify the design if necessary Followed by project scheduling.
3. Define process for the monthly payment.4. Define rule for participants and new joiner.5. Initiate installation.
THANK YOU