Common Solutions Group
Jan 2005
Chao Lam
Product Manager, OSAF
WAC Meeting summary
• Chandler is on track with last reported schedule• 0.5 release is scheduled for March 2005. Goal: OSAF
day-to-day calendar use.• CalDAV is gaining strong momentum. CalConnect
interoperability meeting next week is a key milestone• With 0.5 release, brave early developers can start
experimenting and contributing– PyCon (late March) major event to get word out
• WAC technical meeting scheduled for April 2005 to gather next level of higher ed requirements
• UW & UCB volunteered to be “seed” sites for early Chandler usage
News
• 0.4 released end Oct 2004• 0.5 scheduled for Mar 2005• Initiated plans for separate server project• OSAF becomes founding member CalConnect
Consortium Nov• CalConnect interoperability event next week (Jan 10th)• CalDAV IETF Draft 4• OSAF presentation at Educause 2004• OSAF to present at PyCon end Mar 2005
Server product plans
• Initiating a new open source project for next generation WebDAV server– First step towards accelerating Westwood requirements
• Teaming up with Isamet (formerly Cyrusoft)• Current plan is to base server on the Apache Jakarta
Slide project• Server product and architecture will be basis for
– Kibble hosting service– CalDAV server– Westwood central server
• Key next step is to hire server developer
0.5 plan• Goal: First attempt at day-to-day OSAF calendaring use
– Manual import/export of data. No auto-recover. Expect crashes
– Will benchmark performance but not yet ready to set perf. goals
• Calendar features– Calendar summary and detail views
– Reminders and All day events
– Mini-calendar browser and daily summary on sidebar
• Collections sharing (rev 2)– End-to-end sharing workflow
• Incremental infrastructure (e.g. email attachments, access controls)• Reliability, performance and UI improvements• More details at ZeroPointFivePlanning
Client Product Roadmap
Release Target Date Goal
0.4 Oct 2004 Experimentally usable
0.5 Q1 2005 Calendar alpha-usable @ OSAF
Kibble Q4 2005 Early-adopter usable
Kibble+ Q1 2006 Fix necessary Kibble mistakes
Westwood ??? Campus deployable
Kibble: Basic “Old World” PIM App features
• Comprehensive calendar functionality for small workgroups
• Basic features for:– Email– Task– Notes
• Reasonable “1.0” level:– Performance– Reliability– UI Polish
Kibble: “New World” features
• Stamping• Item Collections and Rules• Dashboard View and Item Triage• Cross “silo” searching• Collections Sharing & Event invitations• Open platform for developer extensibility
– WebDAV objects should be interoperable with non-Chandler clients (e.g. iCalendar objects)
Areas to gather next level of Higher Ed requirements
• Seeding Kibble in Higher Ed - What are the minimum requirements needed to start seeding Kibble in one or two workgroups?
• Calendaring and CalDAV - making sure we meet Higher Ed requirements in the right sequence
• Westwood Kiosk mode - discussing alternatives and understanding the next level of detail
Backup slides
Kibble Feature Prioritization Principles
• Usable, collaborative calendar app comes first• “Dogfood” Principle: Shortest path for OSAF to
use Chandler as a Calendar & Email application• Introduce core “new world” PIM features• Invest in extensibility, infrastructure and
architecture intelligently• Provide developer platform to leverage
community (“Developer Dogfood”)• Continuous improvements in performance,
reliability and polish
Top 5 Risks for Kibble
• Repository Performance• Quantity of Widgets Work• HTTP (sharing) Performance• Developer Platform• Ensuring the Right Scope of Product