COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs

Mohammed Yaqoob Technical & Quality Manager

Nexia InternationalAudit Forum - Paris 2011

Page 2: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

MAIN MESSAGES:

•COMPLIANCE CULTURE•GET IT RIGHT FIRST TIME

Page 3: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

QCRs

• Scheduling - need greater priority from regions, firms, need to agree and adhere to dates, not allow slippage of QCRs to next FY

• Advance information - to be provided well in time to enable effective/efficient planning (sections E & F of the QCR work pack and audit client details (largest 10 audits (by audit fee income) for each audit partner together with industry/activity, listed/PI/regulated/other specialist/private/NFP, approx. turnover, audit fee income, total hours spent)

• Advance planning required by reviewee firm – internal transfers, accommodation, availability of audit personnel, manuals, files

• Website content - awareness of QCR process etc• Interpreter(s) – needed where audit papers are not in English• Costs – full details in Audit Committee operating procedures and guidance for

reviewees

Page 4: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

QCRs – cont’d• 2010/11 – delays in scheduling, replying to QCR findings, supplying further

information/documentation

• 2011/12 QCRs – spreadsheet to be emailed to regional chairmen after the Paris conference

• Responding to emails

• Elapsed times

• T&QM and local reviewers

• Limited scope reviews (LSR) & full scope reviews (FSR)

• Advanced QCRs – full cost to be borne by firms

Page 5: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

Annual Audit Questionnaire Confirmation (AAQC) survey• Poor response rate (approx. 50%) – no trend across

regions, firm sizes etc

• Recurring simple mistakes

• Very few correct first time

• Difficulty in applying a risk based approach without almost a 100% response rate

• Consideration of FSR/ADV QCRs where no responses forthcoming

Page 6: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

NIMo• No data yet on how well populated

• Wholly reliant on firms

• Only addresses non-audit services provided to audit clients

• Other independence threats (e.g. financial interests) have to be covered manually but need to target relevant firms and to avoid sending emails to ALL firms

Page 7: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

IFAC Manuals• Nexia does not provide audit/quality control manuals

• Guidance is to use locally sourced material

• If not, then use IFAC Audit Guide (Oct 2010) and the IFAC Quality Control Guide (Aug 2011)

• In any case MUST ensure tailored to firm’s circumstances

Page 8: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

IFRS support

• Covered by Christian Fuchs

Page 9: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

Caseware

• Marcel Keizer will be present during the conference

• Members should take the opportunity to discuss & resolve any issues

Page 10: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

Audit CommitteeOperating procedures

• Board of Directors to consider and approve revised/updated procedures

Page 11: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

Common Issues arising from 2010 and 2011 QCRs

Results based on 52 QCRs (13 in FY2011 and 39 in FY2010)

• Files lacked adequate recording and/or evidence of audit procedures leading to doubts as to whether adequate audit work had been conducted or not (33/52=63%).

• Audit manual and quality control manual needed improving/updating (e.g. by ref. To IFAC manuals) (25/52=48%).

• Concerns arising re compliance with IFRSs (15/52=29%).• Concerns over complaince with ISQC1 (15/52=29%).• The auditor should retain control over obtaining third party confirmations

(circularisations, bank letters etc) (12/52=23%).

Page 12: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

Common Issues (cont’d)

• Audit working papers not properly signed and dated (9/52=17%).

• No clear system for checking formats/disclosures in financial statements (e.g. by use of disclosure checklists) (9/52=17%).

• Lack of adequate documentation of partner involvement (in planning, conduct of work and completion)

• Incomplete audit file and lack of proper/complete referencing and file completion policy (8/52=15%).

• Incorrectly dated letters of management representations (should NEVER be dated after the date of the audit report) (8/52=15%)

Page 13: COMMON ISSUES & IMPORTANT MESSAGES ARISING FROM QCRs Mohammed Yaqoob Technical & Quality Manager Nexia International Audit Forum - Paris 2011

Website

• Firm’s should regularly review the Nexia website for new/updated material and other resources

• Contents of Audit Forum to be published in due course.