Committed to environmental quality

Energy Efficiency and Renewable Energy at ACUA

Atlantic County, NJ

Page 2: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

The Atlantic County Utilities Authority

o The Atlantic County Utilities Authority is a public agency that provides environmental and waste management services to the people of Atlantic County and southern New Jersey

o The ACUA operates both Wastewater and Solid Waste Management Systems.

Page 3: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

About the

o $66.9 million in annual revenue o 250 employeeso Full service regional wastewater treatment facility, trash

& recycling collection, landfill, composting, recycling center, CNG Filing Station and transfer station.

The Atlantic County Utilities Authority is responsible for enhancing the quality of life through the protection of waters and lands from pollution by providing responsible waste management services. The Authority is an environmental leader and will continue to use new technologies, innovations and employee ideas to provide the highest quality and most cost effective environmental services.

The ACUA Mission Statement. . .

. . .makes the Authority a natural facilitator for renewable energy projects

Page 4: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

ACUA Goes Green With:

o 7.5 megawatt wind farm o 500 kilowatt solar generation facility o 5.4 megawatt landfill gas to electric facility

o Biodiesel- B5 blend powers the ACUA diesel fleet

o Hybrid and Electric Vehicles

o Geothermal heating and cooling

o Energy conservation

o Energy curtailment

o Compressed Natural Gas vehicles

o Membership in the Greenhouse Gas offset markets

Chicago Climate Exchange and Climate Action Reserve

Page 5: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

Jersey – Atlantic Wind Farm

Atlantic City, NJ

M.A. Mortenson Company

Page 6: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Jersey – Atlantic Wind Farm How it Works:

A weather station located on top of each of the wind turbines turns the nacelle, the small building at the top of the tower, facing into the wind.

The turbine’s three blades pitch to maximize the speed at which the turbine spins. A shaft, attached to the hub of the blades, turns a gear box that is attached to a generator that processes the electricity.

The electricity is then transported to the ground by

wires, which are then attached to the electrical grid at the plant.

Committed to environmental quality

Page 7: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Jersey – Atlantic Wind Farm Energy Generation:

Once the wind is blowing more than 12 miles per hour, each wind turbine can produce 1.5

megawatts of electricity.

At reduced wind speeds, electricity production decreases.

When wind speed exceeds 45 miles per hour the turbines shut down to protect the machinery

inside.

Committed to environmental quality

Page 8: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Jersey – Atlantic Wind Farm Project Specifics:

Wind farm owners: Jersey-Atlantic Wind, LLC, a partner with original developer Community Energy, Inc.

Project includes five, 380 foot tall turbines.

Each turbine is capable of producing 1.5 megawatts for a total of 7.5 megawatts.

Committed to environmental quality

Page 9: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

Jersey – Atlantic Wind Farm Project Specifics:

o Enough to power 2,500 homes

o When operating at design wind conditions, the energy is used to operate the ACUA wastewater treatment plant, with any excess energy provided to the main power grid.

Page 10: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Jersey – Atlantic Wind Farm Project Specifics:

Project cost was $12.5 million. Community Energy received a $1.7 million grant from the New Jersey Board of Public Utilities, and a $1.92 million customer supply grant through Atlantic City Electric.

The wind farm has saved the ACUA over $2.4 million dollars in its first five years of operation.

Committed to environmental quality

Page 11: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Wind Farm: Power Purchase Agreement (PPA)

20 year agreement between ACUA and Jersey-Atlantic Wind, LLC.

ACUA receives a $15,000 yearly payment from Jersey-Atlantic Wind, LLC as a lease for the land in the project.

ACUA has guaranteed to purchase 9,500,000 kWh a year.

The cost charged is 7.95 cents a kWh over the life of the agreement. The grid rate paid in 2010 was 12 cents for utility grid power.

Committed to environmental quality

Page 12: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Solar at ACUA How it Works

Solar cells convert sunlight directly into electricity. Cells are made of semiconductor-type materials similar to that used in computer chips.

When these materials absorb sunlight the solar energy knocks electrons loose from the atoms producing electricity.

This process of converting light (photons) to electricity (voltage) is called the photovoltaic (PV) effect.

Committed to environmental quality

Page 13: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Solar at ACUA How it Works (continued)

Individual solar cells are combined into modules or panels that are mounted into larger arrays.

In the ACUA application, DC power produced by the solar arrays is fed to the inverters.

The inverters convert the DC power to AC power that is then fed into the building’s electrical system.

The performance of a solar cell is measured in terms of its efficiency at converting sunlight into electricity.

A typical solar cell has an efficiency of 15 percent, meaning about one-sixth of the sunlight striking the cell

generates electricity.

Committed to environmental quality

Page 14: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

ACUA’s Solar Portfolio

o 2,700 solar panels installed at Wastewater Treatment Facility in five arrays - two roof top, two ground mounts and one canopy array

o 500 kW system owned and maintained by ACUAo Operational in 2006o $3.25 million projecto $1.9 million CORE rebate from NJBPUo Electricity from the solar arrays also create SRECs (Solar Renewable Energy

Credits)o So far the ACUA’s solar arrays have generated over 3 million kWh of electricity

and saved the ACUA over $1.8 million

Page 15: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

Renewable Energy Use at ACUA

Page 16: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

Renewable Energy Savings and Revenue at ACUA

Page 17: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

Electric Charging Stations and Electric Vehicles at the ACUA

The ACUA has installed a total of three Electric Vehicle Charging Stations at the Atlantic City Wastewater Treatment Facility and the Solid Waste Facility, which are all powered by clean energy.

The Wastewater Treatment Plant is powered by wind and solar energy, while the Solid Waste Facility is powered by a Landfill Gas to Energy Project.

The ACUA hopes this project will jumpstart the use of electric cars and the development of charging stations.

Page 18: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Electric Vehicles

Committed to environmental quality

oThe ACUA unveiled three electric charging stations in July of 2009 on both its Solid Waste and Wastewater Treatment sites

oThe stations are capable of charging at 110 volts or 220 volts

oThe ACUA owns a low-speed GEM electric car and a 2000 Ford Ranger EV

oThe Ranger gets 61 miles on a single charge and takes between 6 and 8 hours to charge

oEstimated cost of $0.04 per mile

oElectricity produced for the vehicles comes from renewable sources

Page 19: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Greening the Office Place:Energy & Water Conservation

• Waterless urinals, faucet sensors and low-flow aerators

• Replaced CRT monitors with energy efficient LCDs

• Computer monitors utilize energy saving “sleep” mode

• Reduced servers by 1/3

• Energy Star certified appliances and office equipment and high efficiency lighting

• Energy Audit done by Concord through the NJCEP, Local Government Energy Audit Program (LGEA)

Committed to environmental quality

Page 20: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Portfolio Manager at ACUA

In preparation for the LGEA, ACUAbenchmarked the Wastewater Treatment

Facility in Atlantic City using Portfolio Manager

Helps Compare Wastewater FacilitiesHelps to show where energy efficiency

improvements can be made within the plant.

Committed to environmental quality

Page 21: Committed to environmental quality Energy Efficiency and Renewable Energy at ACUA Atlantic County, NJ

Committed to environmental quality

Tom LaulettaVice President of Wastewater

Atlantic County Utilities Authority

Contact information: