ACG CxA WORKSHOP WEBINAR

Commissioning Webinar Commissioning Webinar Thursday, December 1, 2011Thursday, December 1, 2011

2:30 2:30 –– 5:00 p.m., EST5:00 p.m., EST

Instructor: Jim Magee, CxA, LEED-APImmediate Past President, ACG

President, Facility Commissioning Group

ACG CxA WORKSHOP WEBINAR

AIA Continuing Education CourseThe AABC Commissioning Group (ACG) is a Registered

Provider with The American Institute of Architects Continuing Education System (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material or construction or any method or manner of handling, using, distributing, or dealing with any material or product.

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

ACG CxA WORKSHOP WEBINAR

Course Description

This 2 ½ hour Commissioning Webinar will cover the commissioning process as described in the ACG Commissioning Guideline, as well as valuable practical insight on skills, strategies, and communication and documentation protocols essential to applying the process on “real- world” projects.

ACG CxA WORKSHOP WEBINAR

Learning Objectives d

At the end of this program, participants will be able to:

Explain the purpose, methodology, and benefits of the commissioning process as it relates to construction projects.

Identify and distinguish between the five phases of commissioning – (1) Pre-Design, (2) Design, (3) Construction, (4) Acceptance, and (5) Post-Acceptance – and the activities carried out in each of them.

Describe the documentation and deliverables that are essential to the delivery of quality commissioning services.

Identify the roles and responsibilities of all commissioning team members within the commissioning process, with particular emphasis on the role of the commissioning provider.

ACG CxA WORKSHOP WEBINAR

OverviewOverview

CxCx Advocacy, Economics, BenefitsAdvocacy, Economics, Benefits

Associations, Certifications, GuidelinesAssociations, Certifications, Guidelines

Commissioning TeamCommissioning Team

Commissioning (Commissioning (CxCx) Process) Process

CxCx Team Roles and ResponsibilitiesTeam Roles and Responsibilities

Commissioning Website ResourcesCommissioning Website Resources

DiscussionDiscussion

ACG CxA WORKSHOP WEBINAR

CommissioningCommissioning Advocacy, Advocacy, Economics, & BenefitsEconomics, & Benefits

ACG CxA WORKSHOP WEBINAR

Why Commission?Why Commission?

Better Buildings

Building owners are finding that the energy, water, and productivity savings achieved by commissioned buildings can offset the cost of the commissioning process. Studies indicate 8 to 20 percent savings in building operating costs over those in a non-commissioned building.

(Building Commissioning Guide, Version 2.2, GSA/DOE, dated July 30, 1998)

ACG CxA WORKSHOP WEBINAR

Why Commission?Why Commission?

Better PeopleBetter People

Aside from achieving documented cost savings and cost avoidance, commissioning enhances customer satisfaction by promoting proper training of the owner’s Operations & Maintenance staff, which increases the longevity and efficient operation of building systems.

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

What is Commissioning?What is Commissioning?

A process of documentation, adjustment, testing, verification, and training, performed specifically to ensure that the finished facility operates in accordance with the owner’s documented project requirements and the construction documents.

It begins in pre-design and continues through design, construction, and the life of the facility.

(BCA draft document, 2004.)

ACG CxA WORKSHOP WEBINAR

What is Commissioning?What is Commissioning?

Design Intent Document

Details functional requirements and Owner’s expectations of how a building will be used and operated - OWNER’S PROJECT REQUIREMENTS

Basis for building commissioning

Basis of Design

The concepts, calculations, decisions, and product selections used to meet the OWNER’S PROJECT REQUIREMENTS

ACG CxA WORKSHOP WEBINAR

What Commissioning is NOT?What Commissioning is NOT?

Completing Standard Forms

Contractors’ QA/QC Program

Verification of the Contractors’ QA/QC Program

Construction Inspection

Construction Management Substitute

ACG CxA WORKSHOP WEBINAR

DesignIntent

Commissioningvalidates the design!

That the design works and meets the “design intent”

Commissioning

“retro” ; “re”; or

“ongoing”Cx

Design Construction O & M

“Inspections” validate

constructionThat the construction is installed correctly per the “design”

Changing Needs

What is Commissioning?(validates the “design”!)

This is not commissioning!

ACG CxA WORKSHOP WEBINAR

Objections To CommissioningObjections To Commissioning

““HavenHaven’’t I already paid for a quality building t I already paid for a quality building in my design and construction fees?in my design and construction fees?””

Designer’s (A/E) services typically do not include field verification that their design works as intended.

Construction Manager’s services typically do not include functional verification that the installed systems meet design intent.

ACG CxA WORKSHOP WEBINAR

Objections To CommissioningObjections To Commissioning

“Isn’t the Commissioning Authority just a ‘bigger hammer’ for the owner to use to

pound the designer and contractor?”

No. The CxA must be a team builder by using the commissioning process to the benefit of all.

No. The CxA should respect the traditional construction disciplines. The CxA has a distinct responsibility to owner for system quality and performance.

ACG CxA WORKSHOP WEBINAR

Objections To CommissioningObjections To Commissioning

“Isn’t commissioning just another layer of inspection?”

The CxA is not a layer, but a catalyst for communication that makes quality solutions possible.

The CxA is not inspector (fault finder, accuser).

The commissioning process provides verification that Owner’s Project Requirements implemented in design and construction.

ACG CxA WORKSHOP WEBINAR

Commissioning (Commissioning (CxCx))(New Construction)

0.5 to 1.5 Percent of Total Construction Cost

RetrocommissioningRetrocommissioning ((RetroCxRetroCx))(Existing Construction)

3.0 to 5.0 Percent of Total Operating Cost

Source: Building Commissioning Guide, Version 2.2, DOE/GSA, July 30, 1998

Wha

t Doe

s Com

mis

sion

ing

Cos

t?

ACG CxA WORKSHOP WEBINAR

Commissioning CostsCommissioning Costs

Commissioning New ConstructionCommissioning New Construction

Approximately 2%-3% of Mechanical System Construction Cost – (BCA Case Studies)

Approximately 1%-2% of Electrical System Construction Cost – (BCA Case Studies)

Approximately 2%-5% of Comprehensive HVAC Construction Cost – (ACG Commissioning Guideline)

ACG CxA WORKSHOP WEBINAR

The Economics of CommissioningThe Economics of Commissioning

* Based on research findings from University of Wisconsin,ASERTTI Training Module, 1998

If planned correctly and implemented early enough in the design process, commissioning can be included with little or no cost impact*.

Without Commissioning

With CommissioningDesign Phase Costs

Construction Phase Costs First Year Warranty Period Costs

Design Phase Costs

Construction Phase Costs First Year Warranty Period Costs

Wha

t Doe

s Com

mis

sion

ing

Cos

t?

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

ACG CxA WORKSHOP WEBINAR

BenefitsBenefits

Better bid documents

More accurate budgets

More “control” of project

Projects delivered on time

Fewer change orders

Fewer warranty issues

Satisfied Client

ACG CxA WORKSHOP WEBINAR

Associations, Certifications, & Guidelines Associations, Certifications, & Guidelines

ACG CxA WORKSHOP WEBINAR

AssociationsAssociations

AABC Commissioning Group (ACG)

ASHRAE

Building Commissioning Association (BCxA)

Institute of Electrical & Electronic Engineers (IEEE)

International Society For Pharmaceutical Engineering (ISPE)

National Environmental Balancing Bureau (NEBB)

Sheet Metal and Air Conditioning Contractors' National Association / Testing Adjusting and Balancing Bureau (SMACNA / TABB)

University of Wisconsin

Association of Energy Engineers (AEE)

ACG CxA WORKSHOP WEBINAR

CertificationsCertifications

AABC Commissioning Group (ACG)

ASHRAE (Process Management Certification)

Building Commissioning Association (BCxA)

Institute of Electrical & Electronic Engineers (IEEE)

International Society For Pharmaceutical Engineering (ISPE)

National Environmental Balancing Bureau (NEBB)

Sheet Metal and Air Conditioning Contractors' National Association / Testing Adjusting and Balancing Bureau (SMACNA / TABB)

University of Wisconsin

Association of Energy Engineers (AEE)

ACG CxA WORKSHOP WEBINAR

The Need for GuidelinesThe Need for Guidelines

Uniform delivery of services

Cx adoption as standard practice

Owner procurement / selection of providers

Continuing education

Benchmarking of Cx Benefits

Training competent Cx service providers

Client education and cooperation

Efficient Cx interface with designers, contractors, vendors, etc

ACG CxA WORKSHOP WEBINAR

GuidelinesGuidelines

ACG Commissioning Guideline – 2005

ASHRAE Guideline 1 –1996: The HVAC Commissioning Process

ASHRAE Guideline 1.1 – 2007: HVAC&R Technical Requirements for the Commissioning Process

ASHRAE Guideline 0-2005: The Commissioning Process

NECA90-2004: Recommended Practices for Commissioning Building Electrical Systems

ISPE Pharmaceutical Engineering Guide Volume 5: Commissioning and Qualification

ACG CxA WORKSHOP WEBINAR

ACG Commissioning Guideline1. Independent 3rd party direct for owner Cx services

2. Cx process intended for provider application

3. Useful for owners, designers and constructors, but intended for training Cx providers

4. Defines 5-Phase process:

a) Pre-Design

b) Design

c) Construction

d) Acceptance

e) Post-Acceptance

ACG CxA WORKSHOP WEBINAR

ASHRAE Guideline 11. Cx responsibilities statement in request for A/E design

services.

2. Owner’s Program development and commitment.

3. Assign O&M personnel to the commissioning process.

4. Review and approve the Design Intent Document.

5. Review and approve the construction documents.

6. Provide competent documenting of training sessions (video, etc.)

7. Record construction progress (photo, video, narratives, etc.)

8. Review and comment on CxA verification report.

9. Review and accept the commissioning report

ACG CxA WORKSHOP WEBINAR

Guideline 0:1.1. CxCx responsibilities statement in request for A/E design responsibilities statement in request for A/E design

services.services.2.2. Develop and commit to OwnerDevelop and commit to Owner’’s Project Requirements.s Project Requirements.3.3. Assign O&M personnel to the commissioning process.Assign O&M personnel to the commissioning process.4.4. Review and approve changes made in the OwnerReview and approve changes made in the Owner’’s Project s Project

Requirements.Requirements.5.5. Review and approve the Construction Documents.Review and approve the Construction Documents.6.6. Provide competent documenting of training sessions (video, Provide competent documenting of training sessions (video,

etc.)etc.)7.7. Review and comment on the Review and comment on the CxCx Process Progress Reports.Process Progress Reports.8.8. Review and comment on the Review and comment on the CxCx AuthorityAuthority’’s verification s verification

reports.reports.

ACG CxA WORKSHOP WEBINAR

What is the key difference between Guideline 1 and Guideline 0?

Design Intent Document

Vs.

Owner’s Project Requirements

ACG CxA WORKSHOP WEBINAR

ASHRAE Guideline 1.11. Aligns Guideline 1.1 with Guideline 0 terminology

2. Greater emphasis on Owners Project Requirements (OPR)

3. Eliminate DID terminology

4. Suggests challenging design for achieving OPR

5. Promotes sampling over 100% verification and testing

6. Includes more technical process details (specific tasks)

7. Enhanced appendix of sample forms and procedures

8. Advocates extensive training for owner personnel

9. Promotes team building to accomplish commissioning

ACG CxA WORKSHOP WEBINAR

Owner’s Project Requirements

Program requirements

Community context

Codes and regulations

Site and climate

Facility context and function

Facility technology

Sustainability

Cost

Schedule

Client’s needs and capabilities

ACG CxA WORKSHOP WEBINAR

Commissioning DefinitionsCommissioning Definitions

Commissioning Authority (CxA):Commissioning Authority (CxA):

A person (or firm) representing the facility owner

Leader of the Commissioning Team

Authority of Cx Process – not design or means and methods

CxA not in chain of command – preserves objectivity

ACG CxA WORKSHOP WEBINAR

Commissioning DefinitionsCommissioning Definitions

Commissioning Provider (CP):Commissioning Provider (CP):

Independent Third-Party Commissioning Firm

A/E Firm

General Contractor

Construction Manager

Owner's Personnel

ACG CxA WORKSHOP WEBINAR

Commissioning DefinitionsCommissioning Definitions

EXISTING BUILDING COMMISSIONINGEXISTING BUILDING COMMISSIONING

RetroRetro--Commissioning (Commissioning (RetroCxRetroCx):):

Commissioning an existing building that has never been commissioned

ReRe--Commissioning (Commissioning (ReCxReCx):):

Commissioning a building that has been previously commissioned

Continuous Commissioning (Continuous Commissioning (CCxCCx):):

Owner continues to collect and compare baseline data on selected building systems to ensure that the building functions optimally throughout its operating life

ACG CxA WORKSHOP WEBINAR

Commissioning DefinitionsCommissioning Definitions

Total Building Commissioning (Total Building Commissioning (TBCxTBCx))

Emphasizes that Commissioning is NOT only for the Mechanical and HVAC system, or any single system

Commissioning TeamCommissioning Team

Experts who, through coordinated actions, are responsible for carrying out the Commissioning Process

Commissioning PlanCommissioning Plan

A strategy overseen by the Commissioning Authority and prepared by the Commissioning Team

ACG CxA WORKSHOP WEBINAR

Systems Typically CommissionedSystems Typically Commissioned

Mechanical SystemsMechanical Systems

Heating, Ventilation and Air Conditioning (HVAC)

Building Automation Systems (BAS)

Fire ProtectionElectrical SystemsElectrical Systems

Switchgear and Transformers

Grounding/Bonding, Circuitry

Generators and UPS Systems

Lighting and Lighting ControlsSpecialty SystemsSpecialty Systems

Security Systems and Fire Alarm

Voice/Data Systems

ACG CxA WORKSHOP WEBINAR

Future Commissioned SystemsFuture Commissioned Systems

The National Institute for Building Sciences (NIBS) is currently developing commissioning requirements for the following systems:

Exterior Envelope

Roofing Systems

Structural Systems

Interior Systems

Elevator Systems

Plumbing Systems

Lighting Systems

Electrical Systems

Fire Protection Systems

Telecommunication Systems

ACG CxA WORKSHOP WEBINAR

LEED EA Prerequisite 1LEED EA Prerequisite 1

Experienced, independent, CxA to owner

Review OPR and DID

Incorporate Cx requirements into CD’s

Create/execute Cx Plan

Verify installation and performance of Systems to be Commissioned

Complete and submit a Cx Report

ACG CxA WORKSHOP WEBINAR

EA Credit 3 Enhanced CommissioningEA Credit 3 Enhanced Commissioning

Independent 3rd Party CxA

Review OPR, BOD and Design by mid-CD’s

Independent submittal review

Systems Manual

O&M and Occupant Training Verification

10th Month Review of Building Operation

ACG CxA WORKSHOP WEBINAR

Commissioning TeamCommissioning Team

ACG CxA WORKSHOP WEBINAR

Team EffortTeam Effort

Commissioning succeeds whenCommissioning succeeds when……

Team members understand and carry out their responsibilities

Team members cooperate and coordinate with each other and third-party agencies

Communication and accountability essential for effective teamwork – and they are the responsibility of the commissioning agent.

ACG CxA WORKSHOP WEBINAR

Commissioning Team MembersCommissioning Team Members

Owner / OperatorOwner / Operator

ArchitectArchitect

Design ConsultantsDesign Consultants

Commissioning AgentCommissioning Agent

Construction Manager (or General Contractor)Construction Manager (or General Contractor)

Mechanical ContractorMechanical Contractor

Electrical ContractorElectrical Contractor

Temperature Controls ContractorTemperature Controls Contractor

Test and Balance ContractorTest and Balance Contractor

ACG CxA WORKSHOP WEBINAR

Commissioning Team MembersCommissioning Team Members

Potential Team Members:Potential Team Members:

Equipment Vendors

Specialty Trades

Specialty Consultants

Program Manager

Service Contract Providers

BAS Specialists

IT Support Groups

ACG CxA WORKSHOP WEBINAR

Commissioning (Commissioning (CxCx) Process) Process

ACG CxA WORKSHOP WEBINAR

Elements of CommissioningElements of Commissioning

Design Intent Documents (DID or OPR)Design Intent Documents (DID or OPR)

Design ReviewsDesign Reviews

Submittal ReviewsSubmittal Reviews

Site Observations and Site MeetingsSite Observations and Site Meetings

Resolution Tracking Forms (Resolution Tracking Forms (RTFRTF’’ss))

System Verification Checklists (System Verification Checklists (SVCSVC’’ss))

Organized Systems StartOrganized Systems Start--UpsUps

Functional Performance Tests (Functional Performance Tests (FPT'sFPT's))

Operation and Maintenance (O&M) trainingOperation and Maintenance (O&M) training

O&M DocumentationO&M Documentation

Commissioning ReportCommissioning Report

Warranty Review of Building OperationWarranty Review of Building Operation

ACG CxA WORKSHOP WEBINAR

Approaches to CommissioningApproaches to Commissioning

Comprehensive Commissioning

Construction Phase Commissioning

ACG CxA WORKSHOP WEBINAR

Phases of CommissioningPhases of Commissioning

PrePre--Design PhaseDesign Phase

Design PhaseDesign Phase

Construction PhaseConstruction Phase

Acceptance PhaseAcceptance Phase

PostPost--Acceptance PhaseAcceptance Phase

ACG CxA WORKSHOP WEBINAR

PrePre--Design PhaseDesign Phase

Establish commissioning Establish commissioning

Select a Commissioning Agency (CxA)Select a Commissioning Agency (CxA)

Develop commissioning scopeDevelop commissioning scope

CxA review of DID or OPRCxA review of DID or OPR

ACG CxA WORKSHOP WEBINAR

PrePre--Design PhaseDesign Phase

Establish commissioning:Establish commissioning:

Allocate funds in budget

Comprehensive or Construction

Independent 3rd Party , Design Team, or Construction Team

HVAC, Electrical, Etc.

ACG CxA WORKSHOP WEBINAR

PrePre--Design PhaseDesign Phase

Select a Commissioning Agency (CxA):Select a Commissioning Agency (CxA):

Request for Qualifications

Request for Proposal

ACG CxA WORKSHOP WEBINAR

PrePre--Design PhaseDesign Phase

Develop commissioning scope:

Match scope to budgetMatch scope to budget

Needs basedNeeds based

Past experiencePast experience

EndEnd--user needsuser needs

Maintenance prioritiesMaintenance priorities

ACG CxA WORKSHOP WEBINAR

PrePre--Design PhaseDesign Phase

CxA review of DID or OPR:CxA review of DID or OPR:

Defined usage

Defined goals

Short term needs

Long term needs

ACG CxA WORKSHOP WEBINAR

Design PhaseDesign Phase

Review design for commissioning, testing and O&M access and provisions

Prepare commissioning specification

Write the commissioning plan

Establish commissioning in the project schedule

ACG CxA WORKSHOP WEBINAR

Design PhaseDesign Phase

Review design for commissioning, testing and O&M access and provisions:

Adequate testing access

Adequate access for valves, dampers, control

Quantity and location of service valves

Coil pull access

Ladders and catwalks

Conformity to Owner’s Design Standards

ACG CxA WORKSHOP WEBINAR

Design PhaseDesign Phase

Prepare commissioning specification / plan:Prepare commissioning specification / plan:

Develop commissioning plan

Commissioning team

Systems to be commissioned

Define approximate extent of testing

Contractor roles and responsibilities

ACG CxA WORKSHOP WEBINAR

Design PhaseDesign Phase

Establish commissioning in the project schedule:Establish commissioning in the project schedule:

General and Supplemental ConditionsGeneral and Supplemental Conditions

Define commissioning activities in scheduleDefine commissioning activities in schedule

Note blocks of time for Note blocks of time for FPTFPT’’ss in schedule in schedule –– especially for phased projectsespecially for phased projects

Define frequency of Define frequency of CxCx meetingsmeetings

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

Review submittals

Update commissioning plan

Coordination including site observation, Cx Meetings, Resolution Tracking Forms (RTF’s), and System Verification Checklists (SVC’s)

Equipment and systems start-ups

TAB HVAC systems

Verify Building Automation System (BAS) installation and start-up

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

Review submittals:Review submittals:

Checklist based on specification and OwnerChecklist based on specification and Owner’’s s Design StandardsDesign Standards

Check options Check options –– especially accessespecially access

Check size for spatial applicationCheck size for spatial application

Check valve sizing and applicationCheck valve sizing and application

Check for integration of componentsCheck for integration of components

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

Update commissioning plan:Update commissioning plan:

Include revised schedule

SVC’s based on current information

Draft FPT’s for review

Discuss O&M Documentation

Provide construction observation procedures

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

Coordination:Coordination:

Site observationSite observation

CxCx MeetingsMeetings

Resolution Tracking Forms (Resolution Tracking Forms (RTFRTF’’ss))

System Verification Checklists (System Verification Checklists (SVCSVC’’ss))

Functional Performance Tests (Functional Performance Tests (FPTFPT’’ss))

O&M Training ProvisionsO&M Training Provisions

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

Equipment and systems startEquipment and systems start--ups:ups:

Contractor start-up

Factory start-up

Documentation chain of submission

Temporary conditions

Maintenance responsibility

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

TAB HVAC systems:TAB HVAC systems:

Systems properly started

Systems under full control

Appropriate hardware and software interface

Coordination with other trades, especially TCC

Access to space

ACG CxA WORKSHOP WEBINAR

Construction PhaseConstruction Phase

Verify Building Automation System (BAS):Verify Building Automation System (BAS):

Installation complete per design

Installation complete per submittal / drawings

Start-up performed and documented

Project specific programming

Point-to-point checklists

Safeties tested and documented

ACG CxA WORKSHOP WEBINAR

Acceptance PhaseAcceptance Phase

Review TAB Report

Functional Performance Tests (FPT’s)

O&M Training and Documentation

Commissioning Report

ACG CxA WORKSHOP WEBINAR

Acceptance PhaseAcceptance Phase

Review TAB Report:Review TAB Report:

Pages are numbered with index

All equipment is accounted for in report

No “extra” equipment shown in report

Performance is per design (± XX %)

Problems sufficiently documented in footnotes

ACG CxA WORKSHOP WEBINAR

Acceptance PhaseAcceptance Phase

Functional Performance Tests (Functional Performance Tests (FPTFPT’’ss):):

Systems tested as noted in the Cx Plan

“Failure” modes for valves and dampers are not software driven

System is properly networked

Workstation graphics show appropriate response

Occupied / Unoccupied / Optimal Start

ACG CxA WORKSHOP WEBINAR

Acceptance PhaseAcceptance Phase

O&M Training and Documentation:O&M Training and Documentation:

Manuals contain useable maintenance documentsManuals contain useable maintenance documents

Proper indexing and tabsProper indexing and tabs

Training agenda tailored for ownerTraining agenda tailored for owner’’s needss needs

Documentation provided prior to trainingDocumentation provided prior to training

Additional documentation provided at trainingAdditional documentation provided at training

Training for systems and componentsTraining for systems and components

ACG CxA WORKSHOP WEBINAR

Acceptance PhaseAcceptance Phase

Commissioning Report:Commissioning Report:

Proper indexing and tabsProper indexing and tabs

Documentation for all phasesDocumentation for all phases

Executive SummaryExecutive Summary

Provide supporting documentation (Sequence of Provide supporting documentation (Sequence of Operation, Control Drawings, Etc.)Operation, Control Drawings, Etc.)

ACG CxA WORKSHOP WEBINAR

Post Acceptance PhasePost Acceptance Phase

Correct unresolved deficiencies and conduct required re-tests

Carry out specified off-season testing

Perform specified post-occupancy monitoring

Review usage changes

Update commissioning documentation

ACG CxA WORKSHOP WEBINAR

Post Acceptance PhasePost Acceptance Phase

Correct unresolved deficiencies:Correct unresolved deficiencies:

Unresolved RTF issuesUnresolved RTF issues

Uncompleted CM/Owner punch listsUncompleted CM/Owner punch lists

Conduct required reConduct required re--teststests

Outstanding or additional trainingOutstanding or additional training

ACG CxA WORKSHOP WEBINAR

Post Acceptance PhasePost Acceptance Phase

Carry out specified offCarry out specified off--season testing:season testing:

FPT’s per the Commissioning Plan

Choose near-design day

Build on completed FPT’s

Utilize BAS trending

ACG CxA WORKSHOP WEBINAR

Post Acceptance PhasePost Acceptance Phase

PostPost--occupancy monitoring:occupancy monitoring:

Scheduled site visits

Remote (web) monitoring

Warranty items

Owner conference

User conference

ACG CxA WORKSHOP WEBINAR

Post Acceptance PhasePost Acceptance Phase

Review usage changes:Review usage changes:

Computers / office machines

Furniture placement

Occupancy change

Closet to office

Energy saving methodology

ACG CxA WORKSHOP WEBINAR

Post Acceptance PhasePost Acceptance Phase

Update commissioning documentation:Update commissioning documentation:

Resolved issuesResolved issues

OffOff--Season testsSeason tests

Usage ChangesUsage Changes

Provide additional volume for Provide additional volume for CxCx ReportReport

ACG CxA WORKSHOP WEBINAR

Commissioning Team Commissioning Team

Roles and ResponsibilitiesRoles and Responsibilities

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Owner / OperatorOwner / Operator

Assign Assign CxCx Team Member and attend meetingsTeam Member and attend meetings

Retain a commissioning agentRetain a commissioning agent

Communicate project requirements to the design Communicate project requirements to the design teamteam

Coordinate facilities and staff participationCoordinate facilities and staff participation

Conduct regular site observationConduct regular site observation

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

ArchitectArchitect

Assign Cx Team Member and attend meetings

Coordinate work of design consultants

Consider spatial requirements

Consider room naming convention

Conduct regular site observation

Coordinate design and changes with owner and end-users

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Design ConsultantsDesign Consultants

Assign Cx Team Members and attend meetings

Provide Basis of Design and Design Intent

Respond to RFI’s and CO’s

Conduct regular site observation

Coordinate design and changes with owner and end-users

Review O&M manuals, as-built drawings and other specified documentation

Provide HVAC training on the design intent

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Commissioning AgentCommissioning Agent

Assign Cx Team Leader and attend meetings

Review Design

Provide Commissioning Plan and Specification

Conduct regular site observation visits

Provide System Verification Checklists

Monitor system start-ups

Conduct Functional Performance Tests

Review O&M documentation and training

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Construction ManagerConstruction Manager

Assign Cx Team Member and attend meetings

Project Scheduling

Manage overall completion of work

Manage project documentation

Coordination of contractors

Maintaining specified building conditions

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Mechanical ContractorMechanical Contractor

Assign Cx Team Member and attend meetings

Manage subcontractors and vendors

Document Progress (SVC’s)

Coordinate equipment start-up

Operate systems as required for Functional Performance Tests

Plan and deliver O&M staff training

Provide O&M manuals, as-built drawings and other specified documentation

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Electrical ContractorElectrical Contractor

Assign Assign CxCx Team Member and attend meetingsTeam Member and attend meetings

Coordinate electrical installation with mechanical Coordinate electrical installation with mechanical workwork

Attend meetingsAttend meetings

Document Progress (Document Progress (SVCSVC’’ss))

Operate systems as required for Functional Operate systems as required for Functional Performance TestsPerformance Tests

Plan and deliver O&M staff trainingPlan and deliver O&M staff training

Provide O&M manuals, asProvide O&M manuals, as--built drawings and built drawings and other specified documentationother specified documentation

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Temperature Controls ContractorTemperature Controls Contractor

Assign Cx Team member and attend meetings

Design and complete controls installation as required by DID/OPR

Document Progress (SVC’s)

Coordinate with TAB agency

Operate systems as required for Functional Performance Tests

Plan and deliver O&M staff training

Provide O&M manuals, as-built drawings and other specified documentation

ACG CxA WORKSHOP WEBINAR

Commissioning Team RolesCommissioning Team Roles

Test and Balance ContractorTest and Balance Contractor

Assign Assign CxCx team member and attend meetingsteam member and attend meetings

Review design for adequate testing provisionsReview design for adequate testing provisions

Submit TAB data sheets for approvalSubmit TAB data sheets for approval

Coordinate work with master scheduleCoordinate work with master schedule

Review site conditions prior to field workReview site conditions prior to field work

Submit complete and accurate TAB ReportSubmit complete and accurate TAB Report

Participate in verification of TAB ReportParticipate in verification of TAB Report

ACG CxA WORKSHOP WEBINAR

Commissioning Commissioning Website ResourcesWebsite Resources

ACG CxA WORKSHOP WEBINAR

ResourcesResources

www.commissioning.org for AABC Commissioning Group

www.ashrae.org for American Society of Heating, Refrigerating, and Air-Conditioning Engineers

www.bcxa.org for Building Commissioning Association

www.buildingamerica.gov for U. S. Dept. of Energy Building America Program

www.facomgrp.com for Facility Commissioning Group

ACG CxA WORKSHOP WEBINAR

ResourcesResources

www.ieee.org for Institute of Electrical & Electronic Engineers

www.ispe.org for International Society For Pharmaceutical Engineering

www.nebb.org for National Environmental Balancing Bureau

www.peci.org for Portland Energy Conservation, Inc.

www.smacna.org for Sheet Metal and Air Conditioning Contractors' National Balancing Bureau

www.usgbc.org for United States Green Building Council

ACG CxA WORKSHOP WEBINAR

Q&A

This concludes The American Institute of Architects Continuing Education Systems Course.

ACG National Headquarters 1518 K Street, NW, Suite 503 Washington, DC 20005 (ph) 202-737-7775 www.Commissioning.org [email protected]

ACG CxA WORKSHOP WEBINAR

Copyright Materials

This presentation is protected by U.S. and International Copyright laws. Reproduction,

distribution, display and use of the presentation without permission of ACG

is prohibited.

© AABC Commissioning Group 2011