Commercial Points for 93rd OCC meeting
Change in Bank a/c
• New Account for Deviation Settlement opened in Axis Bank
• Name of the A/C : Power System Operation Corporation Ltd -SRPC Deviation Pool Fund Account.
• Name of Bank : AXIS Bank• Name of Brach: Majestic Branch, Bangalore • Account Number: • IFSC code• RTGS code:
•Tamil Nadu TN opened LC for Rs.8.49Cr only in lieu of Rs.32.84Cr
•LKPPL Rs.2.44 Lakhs Due to delay of wk40(31.12.12-06.01.13) UI payment
OPENING OF LC DUE TO DELAYED UI PAYMENT
Number of Instances of delay in Weekly SEM data receipt at SRLDC during February 2014
ANDRA PRADESH KARNATAKA KERALAGuttur 1 Manjeswaram 1
KTPS(Kothagudam) 1 Nelamangala 1 POWERGRIDGajwel 1 Alipura 1 Gajuwaka 1
Tandur 1 Kadra 2 Pugulur 1
TAMILNADU Kodasally 2 Sriperumbudur 1
Gumminipondy 1 PONDY Salem 1
Arni 1 Yanam Vijayawada 1
Udumalpet 1 GOA Kalivanthapattu 1
Xeldam 1
Time Drift Statement Not Received from the following stations during February 14
ANDRA PRADESH
KARNATAKA TN
Gajwel Ambewadi Konaje Arni
Ragulapadu Alipura Sedam Acharapakkam
Prathapnagar Guttur Yerandahally Theni
KTPP
(Bhoopalapally)
Hoody Kadra NCTPS
Chitoor Kadakola Kodasally SP Koil
Ditchipally Hoody Btps Thiruvalam
Kurnool SV Chathram
Mehaboobnagar GOA S R Pusur
Vemagiri Xeldam Ponda TTPS
Sulurpet
Time Drift Statement Not Received from the following stations during February 14
ISGS POWERGRID IPPS
SR- 1 SR -2
Simhadri Cudappa Pondichery Mepl
Vallur Gooty Arasur Sepl
Bhavni Hyderabad Hosur
Maps Munirabad Pugulur
Ramagundam Nellore Tirunalveli
Nellore PS Kalivanthapattu
765kV Raichur Munirabad
Vijayawada
• Validation Committee meeting scheduled on 07.03.2014.
• DICs may participate from NLDC or SRLDC through Vedio Conferencing.
PoC Data for Q1 of 2014-15 (April 14-June14)
PoC Data for Q1 of 2014-15 (April 14-June14)
All the DICs has to furnish
(1) the technical details of new transmission elements, generating units which are expected to commence commercial operation from April 14-June14(2) Yearly Transmission charges (3) node wise MW/MVAR and (4) forecast generation and demand data
Henceforth all DICs are requested furnish the full data required for computations at least by two quarters in advance without waiting for reminders from NLDC.
Status of Data for Q1 2014-15
DIC Network Node-wise MW/MVAr Injection /Drawls
Load-Generation
data
AP √ - -
KPTCL - - √
TN √ √ √
KSEB - - -
Pondy - - -
Forecasting & Scheduling of Wind and Solar
• As per CERC order dt 07-01-14 in Petition No. 356/SM/2013:
• the commercial mechanism shall remain suspended till further orders.
• the forecasting and scheduling of wind generation shall continue as per the provisions of the Grid Code and RRF procedure approved vide our order dated 9.7.2013
• All SLDCs are requested to comply.
RRF Schedule data details
• AP sent the RRF Schedule data for following periods :
• 18-11-13 to 02-02-14
• 03-02-14 to 09-02-14
• 10-02-14 to 16-02-14
• 17-02-14 to 23-02-14