Commercial Issues
• Yet to open LC for UI payment delays :
• TN default in UI& Reactive chargesTamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive Energy charges during 2011-12.
Disbursement from pool affected
Due to shortage Wk 10 &11 UI disbursement not done
UTILITYLC AMOUNT
(Rs.Crs)Default for year
AP 10.2 2009-10
Puducherry 1.0 2009-10
TN 32.84 Current year
• DELAY IN WEEKLY SEM DATA RECEIPT DURING JULY 2011
Andhrapradesh Karnataka Tamilnadu
StationsNo.of
occassionsStations
No.of occassion
sStations
No.of occassions
Kothagudam 3 Kadakola 2 S.P.COIL 1
Bellary 1
Hoody 1
Raichur 1
• Time drift report receipt status:
ANDHRAPRADESH: No station is sending
KARNATAKA: Only Nelamangala started sending
TAMILNADUOnly Gumdipundi and Hosur sending regularly.
PONDICHERRYResumed sending
ISGS STATIONS:NTPC: RSTPS not regularNLC : NLC II and Expansion I not regular.KGS : Not regularMAPS : Not sending
Mock Exercise for the implementation of the RRF
• CERC directed to start mock exercise for the implementation of RRF w.e.f. 01.07.2011.
• SLRDC wrote to Beneficiaries on 05-07-11 requesting to make arrangements
Letter dt.05.07.11
Letter dt.01.08.11
Actions to be taken by statesStates to furnish: • a list of the wind farms and solar farms eligible for
RRF provision.• details of Contracts along with contracted price to
the concerned RPC and RLDC through the respective SLDC
• Forecasting data for wind and solar generation to the concerned SLDC/RLDC and RPC
• 15-minute block-wise data of schedule and actual generation from wind farm generation/ Solar Generation plants as recorded in the Special Energy Meters on a weekly basis
Solar Schedules vetting
• Solar generators may be advised to give availability of the generator, weather forecasting, solar insolation, season and normal solar generation curve etc. so as to enable SRLDC to vet the Generation schedules
Identify Nodal Officer• Furnish Details of Nodal developer who
shall be responsible for coordinating for the collective capacity on behalf of the group of developers on issues like SCADA, metering, scheduling, UI charges, RRF, forecasting data with the concerned SLDC/RLDC.