11
ASCENT DATA CENTER 30 MW Data Center Enterprise Grade Facility LEED Gold COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT Ascent Data Center is located in the greater Atlanta, Georgia area and features an enterprise-grade, highly secure data center available now to be deployed to customer-specific data center requirements. Purpose-Built Data Center Highly Secure Concurrently Maintainable Expansion Potential 38 Acres (2) 17,000 SF Suites ©2018 Ascent, LLC. All Rights Reserved.

COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

  • Upload
    others

  • View
    9

  • Download
    3

Embed Size (px)

Citation preview

Page 1: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

1 | www.ascentcorp.com

ASCENTDATA CENTER

30 MW Data Center Enterprise Grade FacilityLEED Gold

COLOCATION SUITESAVAILABLE NOW!

A T L A N T A , G A

ABOUT ASCENTAscent Data Center is located in the greater Atlanta, Georgia area and features an enterprise-grade, highly secure data center available now to be deployed to customer-specific data center requirements.

Purpose-Built Data Center

Highly Secure

Concurrently Maintainable

Expansion Potential

38 Acres

(2) 17,000 SF Suites

©2018 Ascent, LLC. All Rights Reserved.

Page 2: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

2 | www.ascentcorp.com

AT L A N TA M A R K E T

ATLANTAThe Southeast Regional Hub75% of Fortune 1000 CompaniesLow, Competitive Energy CostStrong & Growing Economy

ASCENT DATA CENTER

2 | www.ascentcorp.com

Page 3: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

3 | www.ascentcorp.com

DATA CENTER SPECS

PROPERTY OVERVIEW38 Acres in High Tech corridor(2) 17,000 SF suites available, each suite has

• 4,050 kW of power• Approx. 600 48RU racks in place, server ready

185,000 SF Single Story BuildingPlus Additional Building PotentialPhase 2 Expansion - Additional 12 MWPhase 3 Expansion - Additional 10 MW1st Class Office Setup

BUILDING CONSTRUCTIONLEED GoldHardened to Withstand Winds of 180 mphPrecast Concrete Double TWhite TPO Membrane over 2ply Roof30’ Slab to Slab Clear Heights

PHYSICAL SECURITYPerimeter Security FenceCCTV, Microwave, Motion Detectors (200+)Bollards, Security Booths at Entrances, Man TrapsAccess Control & Dual Factor Authentication

FIBERMultiple Manholes with Diverse Entry PointsTwo Diverse MMRsLevel 3, AT&T, Verizon, Comcast Diverse POPs with Significant Dark Fiber

CURRENT DATA CONDITIONSBi-Directional 138 kV Feeders25 kV Redundant Direct Underground Utility Feeders to Site, 20 MVA Transformers with Automatic TransferDesigned to Tier III StandardsConcurrently Maintainable36” Raised Floor on Depressed Slab (No Ramps)Floor Capacity of 2500 lbs/tile (625 lbs/SF)2N UPS Power Distribution to RacksWet Cell Battery, 20min Runtime90Hrs+ Generator Runtime at Full Load(5) 3,125 kVA Indoor Diesel GeneratorsFuel 60,000 Gal. Underground(34) 300 kVA PDUs at 208VN+1 Mechanical Infrastructure(4) 800T Water Cooled Chillers, CT & EconomizerHeat Exchangers (N+1)Make Up Water from 2 Diverse City Water Feeds,Backup 125gpm Well on Premise & 160,000 Gal.Make Up Water Storage (36 Hrs)300,000 Gal. Thermal Water Storage Tank (45mins Capacity)Emergency Chiller ConnectionRoof Rain Water Collection for IrrigationEquipment Segregration (Support Fault Tolerance)Multi-Zone VESDA Fire DetectionGaseous Suppression & Pre-action Sprinkler Protection

P R O J E C T O V E R V I E W

©2018. Ascent, LLC | 3

Page 4: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

4 | www.ascentcorp.com ©2017. Ascent, LLC | 5

Phase 2 60,000 SFExpansion of Building12 MW

Suite 2002,700 to 4,050 kWData Center

Available Now

Suite 1002,700 to 4,050 kW Data Center

Available Now

Future Phase 3

100,000 SF Building - 10 MW

138 kV Transmission Line

25 kV Redundant Direct Underground Utility

Feeders to Site, 20 MVA Transformers

with Automatic Transfer

4 | www.ascentcorp.com ©2018. Ascent, LLC | 5

Page 5: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

6 | www.ascentcorp.com ©2017. Ascent, LLC | 76 | www.ascentcorp.com

ASCENT DATA CENTER Site Features

Enterprise Grade FacilityHigh quality construction and purpose-built data center

Impressive Security10 layers of security and access control to step on data center floor

Extremely Low RiskSignificant MEP infrastructure safeguards for business continuity

Low Profile LocationFacility sits away from road with limited to no visibility of its presence

©2018. Ascent, LLC | 7

Page 6: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

8 | www.ascentcorp.com ©2017. Ascent, LLC | 98 | www.ascentcorp.com ©2018. Ascent, LLC | 9

ASCENT DATA CENTER Interior

Page 7: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

10 | www.ascentcorp.com ©2017. Ascent, LLC | 1110 | www.ascentcorp.com ©2018. Ascent, LLC | 11

ASCENT DATA CENTER Exterior

Page 8: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

12 | www.ascentcorp.com ©2017. Ascent, LLC | 13

Security Booths &

Access Gates At Entrances

Access Controlled Man

Trap & Metal Detection Entrance

Protected Central

Security Office Manned 24x7

Limited Street Visibility

12 | www.ascentcorp.com

ASCENT DATA CENTER Security Features

10 layers of security from street to cabinet, building designed to withstand up to 180 mph winds including hard-walled equipment yard Hard Wall

Protecting Equipment

Yard

©2018. Ascent, LLC | 13

Fencing Around the

Premise

Retractable Bollards, Access

Controlled

Dual Factor Authentication to Data Center

Floor

Page 9: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

14 | www.ascentcorp.com

Windstream

Zayo

Level 3

AT&T

Verizon

Sunesys

Fiberlight

CenturyLink

Comcast

ATL1 FIBER MAP

FIBER PROVIDERS

CenturyLink Level 3 Zayo Windstream AT&T Verizon Fiberlight Sunesys Comcast

MULTIPLE MANHOLES WITH DIVERSE FIBER POINTS, SIGNIFICANT DARK FIBER

PLUS MANY MORE!

ASCENT DATA CENTER

L E G E N D

Zayo

Windstream

CenturyLink

Level 3

AT&T

Verizon

Fiberlight

Crown Castle

Comcast

On-NetLevel 3, AT&T, Verizon, Fiberlight

Comcast, Zayo, CenturyLink

Page 10: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

15 | www.ascentcorp.com

IT & CRITICAL SITE STAFFING

Ascent has provided critical facilities staffing solutions around the clock for more than a decade with critical facility technicians and managers facilitating preventative, corrective and emergency maintenance of data center infrastructure. As an added layer of support, Ascent provides IT Smart Hands services including hardware and infrastucture deployment & decommissioning, break/fix, asset migrations and management services.

24X7 MONITORING

Ascent’s Operations Center (AOC) is staffed 24x7x365 for real-time critical-systems monitoring, dispatch/escalation and maintenance management services. Based in Ascent’s headquarters in St. Louis, MO, the AOC responds to calls, emails, alarms and tickets for maintenance activities, service requests, problem tracking, and problem resolution.

O P E R AT I O N O P T I O N S

Page 11: COLOCATION SUITES ASCENT AVAILABLE NOW! DATA …...DATA CENTER 30 MW Data Center . Enterprise Grade Facility LEED Gold . COLOCATION SUITES AVAILABLE NOW! ATLANTA, GA ABOUT ASCENT

C O N TA C T U S

©2018. Ascent, LLC | www.ascentcorp.com | 2350 Ball Drive, St. Louis, MO 63146

©2018 Jones Lang LaSalle IP, Inc. All rights reserved. All information contained herein is

from sources deemed reliable; however, no representation or warranty is made to the

accuracy thereof. 633703_06.18

Ascent Corporate

2350 Ball Drive

St. Louis, MO 63146

Local (314) 989-1011

Toll Free 1 (877) 427-2368

For more information contact:

Wendy McArthur

+1 404 995 7429

[email protected]

Leigh Martin

+1 404 995 2122

[email protected]