Colin JT Mackenzie BSc BSc(Eng) CEng MICE FIHTProject Consultant to the Highland Timber Transport Group
06/12/2010 2
What is the Matter?
13/02/08
06/12/2010 4
HTTG data collection 2007 and 2010
Cost: £20k + £10k + analysis
660 exit points
230 FCS 430 Private
Good match with FCS Production Forecast
06/12/2010 5
06/12/2010 6
06/12/2010 7
HTTG data: making it available
06/12/2010 8
HTTG data: next steps
Continue analysis to identify key timber routes
Develop urgent solution(s) for the Flow Country
Update ARM’s
Identify other “high value” pinch points
Feed in to any planting strategy review
06/12/2010 9
13/02/08
06/12/2010 11
Rathad na Mara
06/12/2010 12
Fersit: InverlairBridge
06/12/2010 13