Upload
others
View
20
Download
0
Embed Size (px)
Citation preview
COLGATE ELEMENTARY SCHOOL
April 17, 2018
Colgate Elementary School
PRELIMINARY DESIGN PRESENTATIONThe Board of Education of Baltimore County
Ms. Verletta White, Interim Superintendent
COLGATE ELEMENTARY SCHOOL
April 17, 2018
VICINITY MAP 2
COLGATE ELEMENTARY SCHOOL
April 17, 2018
• General Information
• Existing Conditions
• Project Goals
• Project Location
• Site Conditions
• Building Organization
• Renderings
• Project Schedule Overview
• Questions
AGENDA 3
COLGATE ELEMENTARY SCHOOL
April 17, 2018
• Colgate Elementary School - Replacement
• Enrollment Information• Existing SRC 319
• Current Enrollment 432
• Proposed SRC 530
• Building Square Footage• Existing Building 49,860 gsf
• New Building 88,123 gsf
• Regional Programs• None
• Special Education
• School Construction History• Original Building Construction 1924
• Additions 1929, 1951 and 1966
GENERAL INFORMATION 4
COLGATE ELEMENTARY SCHOOL
April 17, 2018
EXISTING CONDITIONS 5
Aerial Photo of Colgate Elementary School in 1926
COLGATE ELEMENTARY SCHOOL
April 17, 2018
EXISTING CONDITIONS 6
Aerial Photo of Colgate Elementary School in 2017
COLGATE ELEMENTARY SCHOOL
April 17, 2018
EXISTING CONDITIONS 7
COLGATE ELEMENTARY SCHOOL
April 17, 2018
EXISTING CONDITIONS 8
COLGATE ELEMENTARY SCHOOL
April 17, 2018
Support 21st Century Learning Techniques
• Flexible spaces for collaboration
• Spaces for hands on learning
• Integrated technology throughout
• Green roof to be used as outdoor learning area
• Photovoltaic panels as an educational exhibit
Implement Sustainable Design Strategies
• Building location respects the adjacent homes and maintains a buffer from major roadways
• Project includes recreational facilities that are shared with surrounding community
• Project conserves energy through the use of a highly efficient boiler system
• Recycled and regional materials are specified for use throughout the new building
• Low water-use plumbing fixtures are specified for use
• Achieve LEED Silver™ rating (Leadership in Energy and Environmental Design) from the United
States Green Building Council (USGBC)
PROJECT GOALS 9
COLGATE ELEMENTARY SCHOOL
April 17, 2018
Promote Safety Objectives
• Building lighting and landscaping are designed to maximize visibility
• Separated pedestrian, car, and bus traffic
Promote Security Objectives
• Card reader and security camera system
• Lockout vestibule entry into the building
• Building lighting and landscaping are designed to enhance security
• Community areas secured from educational areas
Unique Design Features
• Compact footprint provides daylight and views
• Clustered classroom locations are flexible
• Extended Learning Areas
• Collaborative Learning Areas
PROJECT GOALS 10
COLGATE ELEMENTARY SCHOOL
April 17, 2018
• Addition of Extended Learning Areas
• Increased Collaborative Learning Areas
• Standardization of typical classroom sizes and features
• Use of exterior materials that harmonize with surrounding community
• Addition of grade level storage rooms for each grade
• Addition of Digital Learning Lab and Maker Space
EVOLUTION OF THE WEST TOWSON ES PROTOTYPE 11
COLGATE ELEMENTARY SCHOOL
April 17, 2018
PROJECT LOCATION 12
Colgate ES
Regional Location Map
Colgate at Rosedale Center
I-95
I-695
COLGATE ELEMENTARY SCHOOL
April 17, 2018
PROJECT LOCATION 13
Berkshire ES
Colgate ES
Neighborhood Location Map
Holabird MS Norwood ES
Dundalk / Sollers Point HSPatapsco HS
Dundalk MS
Dundalk ES
1 MILE RADIUS
2 MILE RADIUS
Grange ES
Sandy Plains ES
General John Stricker MS
Logan ES
Bal
tim
ore
Cit
y
Bal
tim
ore
Co
un
ty
Charlesmont ES
Battle Monument School
COLGATE ELEMENTARY SCHOOL
April 17, 2018
Existing Architectural Site Plan
SITE CONDITIONS 14
COLGATE ELEMENTARY SCHOOL
April 17, 2018
SITE CONDITIONS 15
Proposed Architectural Site Plan
CAR PATH
BUS PATH
STUDENT PATHS
6
20
14
15
9
5
9
7
ON-SITE PARKING SPACES 63CURB-SIDE STREET PARKING SPACES 22TOTAL PARKING SPACES 85
MULTI-PURPOSE HARD SURFACE
COURT
GRADE 1-5PLAY AREA
Pre-K / KPLAY AREA
60’ BALL FIELD
COLGATE ELEMENTARY SCHOOL
April 17, 2018
BUILDING ORGANIZATION(Circulation)
16
Ground Level Plan
COLGATE ELEMENTARY SCHOOL
April 17, 2018
BUILDING ORGANIZATION(Circulation)
17
Entry Level Plan
COLGATE ELEMENTARY SCHOOL
April 17, 2018
BUILDING ORGANIZATION(Circulation)
18
Upper Level Plan
COLGATE ELEMENTARY SCHOOL
April 17, 2018
BUILDING ORGANIZATION 19
Ground Level Plan
RECREATION & PARKS RESTROOMS and STORAGE
EXTENDED LEARNING AREA
COLLABORATIVE LEARNING AREA
GRADE LEVEL STORAGE
3RD GRADE CLASSROOMS
4TH GRADE CLASSROOMS
ESOL & SPECIAL EDUCATION CLASSROOMS
5TH GRADE CLASSROOMS
3 4
5
COLGATE ELEMENTARY SCHOOL
April 17, 2018
BUILDING ORGANIZATION 20
Entry Level Plan
RECREATION & PARKSCOMMUNITY ROOM
ADMIN &HEALTH
GYM &CAFETERIA
MUSICWING
EXTENDED LEARNING AREA
COLLABORATIVE LEARNING AREA
GRADE LEVEL STORAGE
KINDERGARTENCLASSROOMS
ESOL & SPECIAL EDUCATION CLASSROOMS
PRE-KCLASSROOMS
1ST GRADECLASSROOMS
1
COLGATE ELEMENTARY SCHOOL
April 17, 2018
BUILDING ORGANIZATION 21
Upper Level Plan
LEARNING COMMONS
DIGITAL LEARNING LAB & MAKERSPACEART
STUDIO
EXTENDED LEARNING AREA
COLLABORATIVE LEARNING AREA
GRADE LEVEL STORAGE
2ND GRADE CLASSROOMSand ENRICHMENT READING
2
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 22
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 23
Interior Renderings - Lobby
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 24
Interior Renderings – Cafeteria / Platform
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 25
Interior Renderings – Typical Classroom
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 26
Interior Renderings – Upper Level Lobby
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 27
Interior Renderings – Learning Commons
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 28
Interior Renderings – Ground Level Collaboration Area
COLGATE ELEMENTARY SCHOOL
April 17, 2018
RENDERINGS 29
Interior Animation
COLGATE ELEMENTARY SCHOOL
April 17, 2018
PROJECT SCHEDULE OVERVIEW 30
Phase/Activity Date
Design Kick-Off June 2017
Site / Demo Package
Advertisement for Bid March 2018
Board Approval May 2018
Notice to Proceed June 2018
New Building Package
Advertisement for Bid December 2018
Board Approval February 2019
Notice to Proceed March 2019
Substantial Completion August 2020
COLGATE ELEMENTARY SCHOOL
April 17, 2018
Thank You
Questions and Answers