15
Cold&Hot Corridor Installation Manual

Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l [email protected] l P. +90 216 484 2222 Formation of the Rack The cabinets should

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

Cold&Hot CorridorInstallation Manual

Page 2: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 22222 l Cold Aisle Containment Installation Manual_eng

No Item Name Quantity1 Automatic Door Upper Profi le Kit 22 Sliding Door Vertical Support Profi le ( Left ) 23 Sliding Door Vertical Support Profi le (Right) 24 Sliding Door Assembly(Left) 25 Sliding Door Assembly(Right) 26 Door Upper Left Cover 27 Door Upper Right Cover 28 Top Cover Panels n9 Top Cover Panels Support n

1

9 9

8

2

3

4

5

6

7

Page 3: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 2222 Cold Aisle Containment Installation Manual_eng l 3

The doors of the rack should be removed from the cabinet that will form the corridor solution. For aluminum cabinets, after the door is opened to 90 degree, the pin on the hinge should be removed and the door should be pulled out. For steel cabinets, the pin should be pulled down(so it stays loose) so that the door can be removed.

Note: Please don’t lose the hinge kit, it will be needed for further assembly

Removing the Doors

Page 4: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 22224 l Cold Aisle Containment Installation Manual_eng

Formation of the Rack

The cabinets should be placed as seen on the photo.(Making 2 rows with 120cm of distance in between) In order to fi x the racks to the ground ,remove the bottom sheet of the rack and then use fi xing kits that can be found in the plinth.

120 cm

120 cm

120 cm

118 cm

118 cm

123 cm

118 cm

120 cm

Page 5: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 2222 Cold Aisle Containment Installation Manual_eng l 5

Assembly of the Fixing Kit

Place the cabinets side by side, Once done, remove the front and rear doors. Cabinet baying kits should be screwed by using M6x8 screw set .Assembly should be done on 4 points that are found on the upper and lower side of the front and rear profi les

Note :On some cases when the side panels are removed ,fi x the rack separator bracket on the left corner of each rack

Please remove the front and rear doors of cabinet and frontcooler.

Page 6: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 22226 l Cold Aisle Containment Installation Manual_eng

Aluminum Rack Cabinet Aluminum Rack CabinetM12x40 needs to be screwed by M10 allen wrench

For Aluminum cabinets; Top cover support should be fi xed on each cabinets with M12x40 screw set on 2 points. For Steel cabinets ; top cover support should be fi xed on each cabinets with smart screw set.

Top Cover Support Assembly

Page 7: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 2222 Cold Aisle Containment Installation Manual_eng l 7

Installation bracket should be fi xed on the fi rst cabinets of each row on 4 points (see image 1) using M12x40 screw set

image 1

Cold corridor Door Installation bracket:

Page 8: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 22228 l Cold Aisle Containment Installation Manual_eng

image 2

image 3

image 4

The installation of the frames shall be done on the points that is shown on the image 2on the profi les of the fi rst and last racks of the corridor.

The frame profi les shall be assembled in a way that the lower ,lengthy parts should be left out as seen in image 3.

The frame profi les should be assembled on the racks on 5 points with the help of smart screws as seen on image 4.

Warning : When assembling please avoid harming the electric cables that are found on the profi les of the automatic doors

The Installation of the Door Frames

Page 9: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 2222 Cold Aisle Containment Installation Manual_eng l 9

Before installing the sliding door kit, please remove 4 pcs of M4x12 screws from the mechanism. (Image 8)

Please remove the cover as shown in image 9. Please install the sliding door mechanism on the door installation bracket and door frame profi les that you fi xed before.

Image 8

Image 10

Sliding Door Mechanism Kit

On the automatic door systems, the cables that come thru the door assembly profi les should pass thru the holes located under the mechanism.

Image 9The sliding door mechanism should be installed as seen in the image 11.

The sliding door mechanism should be attached to the racks with the help of smart screws as seenon the image 12

Warning : Be carrefull not to damage cables

Image 11

Image 12

Page 10: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 222210 l Cold Aisle Containment Installation Manual_eng

Assembling The DoorsPlease remove the lower reel assembly kit from the door .

Lower Reel Assembly Kit

After the assembly , lower reel assembly kit and the screws should be kept for further use

Place the doors fi rst on the lower rail of the doors

Place the Sliding door system rollers on the rail

In order to fi x the door to the belt please remove the M6*12 screws that comes with the door

Once you unite the doors (no space should be left in between the doors),place the door assembly bracketon the screw holes that are located on the sliding door mechanism.Fix the bracket with the help of the M6*12 screws.

Page 11: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 2222 Cold Aisle Containment Installation Manual_eng l 11

In order to adjust the height of the doors you can ease the M6 cage nuts as seen in the pics.

Plese place previously removed lower reel assembly kit back to its original place.

On the automatic door systems ,the cables that come thru both profi les. Should be connected in a way; that the red striped ones connect to the lower socket whereas the black striped ones shall be connected to the middle socket.

Connecting the Cables

Page 12: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 222212 l Cold Aisle Containment Installation Manual_eng

Warning : While working with electrics please make sure there is no electricity on in the system.

Parameter Adjustments (Trim pod) There are 4 parameter adjustment trim pods on the card. You can easily adjust the parameters with these trim pods. The changes done while the doors are on use ,will remain effective after the doors are closed or open

P1 High speed Closing (Speed increases clockwise)P2 High speed opening (speed increases clockwise)P3 Opening/Closing low speed(speed increases clockwise)P4 Standby adjustment(0-32 sec.)(standby time increases clockwise

Installing the Electrical Cables

Position

Position

Anticipator Connection Detail

CloseOpen

Speed

Speed Opening Profile

Closing Profile

Electricity Connection Scheme Direction

BlackGreenYellowRed

Encoder

Warning :The false connection of the encoder might cause permanent damages

Earth

Neutral

Phase

Switch

WarningCannot function withSDC4000 TransformerAlways use 29VDC SMPS

Page 13: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 2222 Cold Aisle Containment Installation Manual_eng l 13

Once all the adjustments are done ,put the electricity on.Push the on/off button under the sliding door mechanism.The fi rst time system is on ,the doors will open /close slowly in order to anticipate the distance.Once the system anticipates all the parameters, the buttons on the Door Frame Profi les will be activated.

Note: After the system starts to work, the doors sensors will be on.If the censors gives warning continuously, please check whether there is leak on the electricity.

Please fi x the top cover of the Sliding door mechanism with the M4*10 screws .

For the door top cover right and left parts (the triangle shapes),fi x them as seen in the picture.

Please use the smart screws for that.

Testing the doors

Page 14: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

www.canovate.com l [email protected] l P. +90 216 484 222214 l Cold Aisle Containment Installation Manual_eng

The top cover panels should be placed one on each rack.

Image 1- While placing the top cover panels, use the fi rst and the last cover panels for both sides , and the rest for the middle.

The Alighment of the Top Cover Panels

Image 1

Page 15: Cold Aisle Containment Installation Manual eng · 4 l Cold Aisle Containment Installation Manual_eng l info@canovate.com l P. +90 216 484 2222 Formation of the Rack The cabinets should

© Copyright 2013 Canvoate Group, The information contained herein is subject to change without notice. The only warranties for Canvoate products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. Canovate shall not be liable for technical or editorial errors or omissions contained herein.

www.canovate.com l [email protected] l P. +90 216 484 2222

Document Name: Cold Aisle Containment Installation Manual_eng Publication Date : 05/09/14

www.linkedin.com/company/canovate-group

www.facebook.com/canovategroup

canovatesales

Get connected :www.canovate.com/getconnected