18
25 years A symphony of ideas www.spml.co.in Subhash Projects and Marketing Limited Corporate Office 8/2, Ulsoor Road, Bangalore-560 042. Ph: +91-80-41859500. Fax: +91-80- 25595515. Registered Office F-27/2, Okhla Industrial Area, Phase-II, New Delhi - 110020. Ph: +91-11-26387091. Fax: +91-11-26386003. Head Office 22, Camac Street, Block A, 3rd Floor, Kolkata - 700 017. Ph: +91-33-40091200/1/2/3/4. Fax: +91-33-40091303. DISCLAIMER: Some of the contents of this brochure are conceptual in nature and by no means comprise a legal offering. The promoters reserve the right to add, delete or modify any features or specifications. All brand names, trademarks and logos belong to their respective owners and are hereby acknowledged. Readers are advised to make their own professional judgement about getting into a business agreement and not based on the information given herein.

coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

25 yearsA symphony of ideas

www.spml.co.in

Subhash Projects and Marketing Limited

Corporate Office

8/2, Ulsoor Road, Bangalore-560 042. Ph: +91-80-41859500. Fax: +91-80- 25595515.

Registered Office

F-27/2, Okhla Industrial Area, Phase-II, New Delhi - 110020.

Ph: +91-11-26387091. Fax: +91-11-26386003.

Head Office

22, Camac Street, Block A, 3rd Floor, Kolkata - 700 017.

Ph: +91-33-40091200/1/2/3/4. Fax: +91-33-40091303.

DISC

LAIM

ER: S

ome o

f the

cont

ents

of th

is br

ochu

re ar

e con

cept

ual in

natu

re an

d by n

o mea

ns co

mpr

ise a

legal

offe

ring.

The

prom

oter

s res

erve

the r

ight

to ad

d, de

lete o

r mod

ify an

y fea

ture

s or s

pecif

icatio

ns. A

ll bra

nd na

mes

, tra

dem

arks

an

d log

os b

elong

to th

eir re

spec

tive

owne

rs a

nd a

re h

ereb

y ac

know

ledge

d. R

eade

rs a

re a

dvise

d to

mak

e th

eir o

wn

prof

essio

nal j

udge

men

t abo

ut g

ettin

g in

to a

bus

ines

s agr

eem

ent a

nd n

ot b

ased

on

the

info

rmat

ion

give

n he

rein

.

Page 2: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

We’re inspired by our guiding light who had dreamt to create

masterpieces in the world of infrastructure building for the nation.

His mission is to constantly evolve, continuously grow and explore

new horizons. As a result, create new benchmarks and scale new

heights in our business.

It’s his grand vision that helps us push our limits in this musical

extravaganza of infrastructure development for the nation.

THE INSPIRATION FOR THE MAGNUM OPUS

Shri. Punam Chand SethiChairman Emeritus

Page 3: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

May we introduce you to the group – The SPML Group today celebrates the Silver Jubilee in nation building. It has completed 25 years of infrastructure development in public and private sector.

Playing to the gallery from their offices in Delhi, Kolkata, Bangalore, Chennai, Hyderabad, Mumbai, Bhopal, Patna and Jaipur, SPML is in the process of building infrastructure worth Rs. 150 billion and has completed around 400 projects.

About the Grand Ensemble

A cohesion of disparate talent, which is close to 1500 professionals form the soul of the orchestra. Highly skilled engineers, project managers, IT experts and financial wiz kids with a total man years experience of 17,500 years ensure quality standards and timelines are met in every single project.

The members of the Orchestra

1981 - 2006

Page 4: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

The essence of this symphony we created is the essence of life – Water. It’s most precious. And the dearest resource to mankind. At SPML, the experts work in tandem with nature to bring water from rivers and streams to taps in your home.

Sounds like sweet music to your ears, doesn’t it? We’ll soon be completing the process of laying over 2500 km of pipeline across cities and towns of India. Further we lift water from rivers and tanks to irrigate thousand of hectares of land creating revolution in agriculture. By providing turnkey solution, right from conceptualisation to commissioning and beyond.

Conductor: Subhash Projects and Marketing Limited

www.spml.co.in

Partial list of Projects

1. Water Supply Project for Sawaimadhopur and Pali town, Rajasthan.

2. Water Intake and Water Supply project for Bakreshwar Thermal Power project, West Bengal.

3. Saurashtra Pipeline Project, Gujarat.

4. Lift Irrigation Project, Thembu, Maharashtra.

5. Davangere & Chamrajnagar Town Water Supply project, Karnataka.

6. Rameshwara Lift Irrigation Project, Karnataka.

7. Sripadsagar Make up Water Supply Project, Andhra Pradesh.

8. Ash Water Re-circulation system project for Barh Super Thermal Power Project, Bihar.

9. JBIC funded Water Supply Project at Meenad and Pattuvum, Kerala.

10. Greater Lunglei Water Supply Project, Mizoram.

11. Jhansi Water Supply Scheme, Uttar Pradesh.

Water

Page 5: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 2

Conductor: Subhash Projects and Marketing Limited

www.spml.co.in

Power Transmission and Distribution

Partial list of Projects

1. Rural Electrification Projects for Rohtas, Kaimur, Araria, Gaya, Purnea and West Midnapur, Bihar.

2. Re-conductoring project, Gulbarga, Karnataka.

3. Rural Electrification project for Bangalore Rural, Kolar & Tumkur, Karnataka.

4. Transmission & Distribution project, Maharashtra.

5. Transmission & Distribution project, Haryana.

6. Rural Electrification project for Firozabad and Manipuri, Uttar Pradesh.

7. Rural Electrification project for East Midnapur, West Bengal.

8. Rural Load Management project for HESCOM, Karnataka.

9. 220KV, 110KV & 66KV transmission line and sub-station works for KPTCL, Karnataka.

10. Underground cabling work at Patna, Bihar and Bangalore, Karnataka.

The soul stirring music that has come out of this symphony is in the process of lighting up more than one lakh habitats across the country, through many sub-stations and thousands of kilometers of transmission lines.

Thus, this symphony of ‘Power’ has actually empowered millions of people in India.

Page 6: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 3

Conductor: Subhash Projects and Marketing Limited

www.spml.co.in

Environment

Partial list of Projects

1. Okhla Sewage Treatment Plant, Delhi.

2. Combined Effluent Treatment Plant at Okhla Industrial Area, Delhi.

3. Effluent Treatment Plant at Bawana & Naraina, Delhi.

4. Yelhanka Tertiary Treatment Plant, Karnataka.

5. Mysore Sewage Treatment Plant, Karnataka.

A musical piece de resistance worked out to protect the environment from the vagaries of industrialisation and urbanisation. At SPML, we have found ways to treat sewage / effluents in such a manner that it becomes suitable for reuse in the industry.

Page 7: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 4

Conductor: Subhash Projects and Marketing Limited

www.spml.co.in

Infrastructure

Partial list of Projects

1. Construction of Noida – Greater Noida Express Highway, Uttar Pradesh.

2. Construction of Infrastructure works for relocation of Industries at Bawana, Delhi.

3. Construction of Dalkhola Bypass, West Bengal.

4. Offsite Area Civil works package for Barh Super Thermal Power project (3x660MW), Bihar.

5. Main Plant Civil works package for Korba Super Thermal Power Project, Chattisgargh.

6. Development of state highways in Jamui, Saharsa, Supaul and Madhepura districts, Bihar.

When it comes to Infrastructure Development, striking the right chord in the construction of roads, bridges, flyovers, highways, industrial infrastructure works, power houses and tunnels is a necessity. And SPML has been creating masterpieces across the country.

Page 8: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 5

Conductor: SPML Energy Limited

www.spmlenergy.com

Partial list of Projects

1. 20MW Kabini Hydro Electric project in Karnataka on a Build, Own, Operate scheme.

2. 5 small Hydro Electric projects in Himachal Pradesh of aggregate capacity 22.5MW on Build, Own & Operate scheme.

3. 3 small Hydro Electric projects in Uttarakhand of aggregate capacity 42MW on Build, Own & Operate scheme.

4. 9 small Hydro Electric projects in Bihar of aggregate capacity 69MW on Build, Own & Operate scheme.

5. 45MW capacity Wind Power projects in Tamil Nadu and Karnataka.

Eco-friendly Power Generation is a tune that our country can sing with pride. Since this mellifluous symphony was possible due to SPML’s 25-year partnership with nature.

Which is why, setting up complex hydel projects even in the remotest parts of the country just didn’t seem difficult. SPML has pioneered Wind Energy Development in India by turning the turbines on the wind farms of Tamil Nadu and Karnataka and producing boundless electricity in these regions.

Eco-friendly power generation

Page 9: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 6

Conductor: SPML Energy Limited

www.spmlenergy.com

Consider this a melodious harmony to save the energy situation in India. With oil resources fast depleting across the world and energy security fears of India, SPML has already started developing bio-fuel by taking up Jetropha plantation in across 850 acres in Tamil Nadu. Bio-diesel is an efficient clean, non toxic, biodegradable, 100% natural energy alternative, to petrol.

Alternate energy

Project Detail

1. Development of plantation for generation of bio-fuel in Tamil Nadu.

Page 10: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 7

Conductor: Delhi Waste Management Private Limited

www.dwmpl.com

Unorganised solid waste management is an environmental menace. And this sonata was created to protect the environment. This kicked off with Municipal Corporation of Delhi (MCD), that engaged Delhi Waste Management Private Limited (DWMPL), a special purpose vehicle floated by the SPML to carry out the activities of collection, segregation and transportation of solid waste. Everyday, a fleet of trucks, monitored through IT tools, fans out from strategically located depots at South, Central and City Zones of Delhi to collect waste from more than 5,00,000 households in 3 out of 12 zones in Delhi, 24x7.

Then, the sonata was played out in other places across the country.

Solid waste management

Project Detail

1. Collection, segregation and transportation of Municipal Solid Wastes from 3 out of 12 zones of Delhi for 9 years.

2. Collection, segregation and transportation of Solid Wastes at Indira Gandhi Airport, Delhi.

3. Primary collection , storage, segregation, transportation , landfill site development, leachate ETP compost plant for Agra , Mainpuri, Jhansi and Faizabad towns of UP including O&M for 3 years.

Page 11: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 8

Conductor: Pondicherry Port Limited

www.pondicherryport.com

This is a structural composition par excellence that’s being developed in Puducherry. A Multi-terminal deep sea port in the eastern coast, the Pondicherry Port will be able to handle 2.2 million TEUs of container traffic.

The various parts of this composition are orchestrated in a cohesive fashion. There’s an International Cruise Terminal with transit accommodation, Business Lounges for international tourists and International Yacht Marina - targeted towards the growing number of Yacht/Boat owners in the region.

Port

Project Detail

1. A joint venture project with Om Metals Infraprojects Limited, with an estimated project cost of Rs. 23,000 million.

Page 12: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 9

Conductor: Pondicherry Special Economic Zone Company Limited

www.fashioncity.in

A classical symphony that will soon gain applause from the audience is Fashion City. The world’s first integrated Industrial Township primarily for IT and the Fashion Industry. It’s a multi-product SEZ – dedicated importantly to IT, fashion, fashion related industries, fashion technology and fashion education.

What this composition will also contain is India Furniture Mart – the first ever meeting point between Indian Institutional / Wholesale Buyers & Furniture Makers of the world along with infrastructure that will contain monorail, transport interchange hub, residential blocks, entertainment, hospitality and schools among others.

Fashion city

Project Detail

1. A multi-product SEZ spread approximately over 1000 acres in Sedarapet and Karasur revenue villages, Puducherry. A joint venture with Om Metals

Infraprojects Limited and PIPDIC, with an estimated project cost of Rs. 37,500 million.

Page 13: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 10

Conductor: SPML Realty Limited

www.spmlrealty.com

This excellent composition will soon be a tourist’s favourite tune in Tamil Nadu and Karnataka. SPML is building cable cars with state-of-the-art technology at Ooty, Kodaikanal, Kanyakumari and Yercaud.

Apart from this, water front resorts coming up in Karnataka will provide a new experience for the growing number of tourists coming here.

Leisure

Partial list of Projects:

1. Establishment of Cable Car at Ooty, Kodaikanal and Kanyakumari on Annuity basis with 30 years of Operation & Maintenance services.

2. Establishment of Cable Car at Yercaud on Build-Own-Operate basis for 30 years.

3. Development of waterfront tourism facilities in Karnataka.

4. Development of Eco-city and resort complex at Coonoor, Tamil Nadu.

Page 14: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 11

Conductor: SPML Realty Limited

www.spmlrealty.com

It’s a tune that’s specifically composed to address a booming business sector in the country. Real Estate is in an all-time high in India and SPML is developing commercial and residential properties with an investment of Rs.10,000 million. In association with various reputed builders and developers.

Real Estate

Projects

1. Development of Township at Whitefield, Bangalore with 135 luxury villas.

2. Mixed use development at Kukatpally, Hyderabad as a Co-developer: The project plans for a mall of about 1.03 million sq.ft. in 4 levels, residential apartment tower/s of 1.70 million sq.ft. in 19 levels comprising of about 3060 nos. of studios / 1 BHK / 2 BHK and a multi-level car park of 6 levels.

3. Development of commercial & residential property at Gurgaon and Amritsar.

4. Building homes for citizens who had to relocate due to reclamation project in Bandra, and development of residential/commercial complex for Maharashtra Housing and Area Development Authority (MHADA), Mumbai in 30,000 sq.mt. of land as a Co-developer.

Page 15: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 12

Conductor: SPML Technologies Limited

www.spmltechnologies.com

This innovative musical piece is a composition of the future – technology. And what SPML has developed, be it ATP or Hydrocomp makes your life more relaxed and enjoyable. Jut what soulful music normally does to you.

E - Payments – Any Time Payment Systems

Gives consumers convenience 24x7 – You can pay water, electricity, telecom, travel, banking, insurance, school & college fees, multiplex tickets, brand & service feedback with a smart card. All this with Multi-language Voice Assist and convenience of accessing it anytime, anywhere. Smart card based comprehensive information of students’ dynamic profile in educational institutions. And a smart card solution for passengers in buses and metro rail.

IT Solution for Integrated management of water distribution

Hydro-Comp, Cyprus, an international information technology and consulting group of companies specialising in Integrated Management Systems and related consulting services for the water distribution industry, has joined with SPML to provide solutions in the areas of engineering consulting services, management system and water cycle treatment from storage & distribution of drinking water to collection, waste water treatment and operation & maintenance.

Technology

Project Detail

1. ATP machines are in operation across the country.

Page 16: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 13

Conductor: SPML Group

Call this a concert in the name of social responsibility. SPML believes that a company’s responsibility goes beyond its business interests. As a commitment to strong social causes, SPML has founded Kesari Chand and Punam Chand Sethi Charitable Trust.

Social responsibility

Projects

1. Charitable Eye hospital in Shravanabelagola.

2. Sponsored Eye Camps.

3. Charitable Ayurvedic Hospital in Sonagiri, Madhya Pradesh.

4. Mobile Hospital in Kanakagiri, Karnataka.

5. Free education to poor girls around the project site area.

6. Sponsored and organized several social & religious functions across the country.

7. Contribution to various temples in the country.

Page 17: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Sym

phon

y 14

No composition would be possible without the involvement of the entire entourage. In SPML’s case, it has been a wonderful union of bankers, auditors and consultants who have partnered in our progress.

Partnership

Conductors:

Bankers: Canara Bank, Andhra Bank, Bank of Baroda, State Bank of Travancore, State Bank of Hyderabad, State Bank of Mysore, State

Bank of Bikaner & Jaipur, Punjab National Bank, Oriental Bank of Commerce, Syndicate Bank, Union Bank of India, IDBI Bank Ltd.

Partners: Insituform Technologies Inc., USA, Hydro-Comp Enterprises, Cyprus, OTV, France, Om Metals Infraprojects Limited, Ranhill

Utilities, Berhad, Malaysia, Accel Transmatic Limited.

Consultants: Halcrow Consulting India Ltd., TCE Consulting Ltd., Jurong Consultants Pvt. Ltd., Indo Canadian Services Ltd., SMEC India

Pvt. Ltd., Dr. Hutarew & Partner (India) Pvt. Ltd., Ernst & Young, Wipro Infotech Ltd., Adrenalin, Algorithm.

Page 18: coffee table book1Jaipur, SPML is in the process of building infrastructure worth Rs.150 billion and has completed around 400 projects. About the Grand Ensemble A cohesion of disparate

Promoters

Mr. Anil Sethi Mr. Subhash Sethi Mr. Sushil Sethi Mr. Deepak Sethi Mr. Rishabh Sethi

Customer Orientation

Wealth Creation

Employee Empowerment

Systems & Processes

Teamwork & Cooperation

Proactiveness & Innovation

Core values

Build world class

infrastructure

with passion and

innovation

to make human life

comfortable

Vision