Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
CODE INFORMATION
APPLICABLE CODES, LAWS AND REGULATIONS
2015 INTERNATIONAL RESIDENTIAL CODE (IRC)2015 INTERNATIONAL BUILDING CODE (IBC)2015 INTERNATIONAL FIRE CODE (IFC)2014 NATIONAL ELECTRICAL CODE (NEC)
SHEET
SATELLITE IMAGE
JOB NOTES
CO
VER
SH
EET
PVA-0
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
PROJECT LOCATION
NTS
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
GRID-TIED PHOTOVOLTAIC SYSTEM
SOLAR INDIVIDUAL PERMIT PACKAGE
JEFF OLANDER / THERESA OLANDER
4160 STAGE STOP WAY LOT 6204022187889
WICKENBURG, ARIZONA 85390
8.63 kW
AHJ: TOWN OF WICKENBURGUTILITY: ARIZONA PUBLIC SERVICE CO
AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW
PV SOLAR ARCHITECTURAL DRAWINGS
SHEET INDEX
PV SOLAR ELECTRICAL DRAWINGS
PVE-1 ELECTRICAL THREE-LINE DIAGRAM &
PVE-2 ELECTRICAL CALCULATIONPVE-3 ELECTRICAL DATA & SPECIFICATIONS
SPECIFICATIONS
PVE-4PVE-5 BRANCH DIAGRAM
PV SOLAR STRUCTURAL DRAWINGS
PVS-1 MOUNTING DETAILS
PVA-0 COVER SHEET
PVA-1 ARRAY LAYOUT
PLACARD / EQUINOX GROUNDING DETAILS
87'-7
"
67'-7"
ROOF ONE: 21 MODULES
5.5:12ROOF TWO: 4 MODULES
3:12
TO E
LECT
RIC
UTIL
ITY
GRID
ACD
PVM
N-LC
(E) GARAGE
ROOF ACCESSPOINT
(E) FENCE/GATE
(E) FENCE/GATE
SHEET
ARRAY
LAYO
UT
PVA-1
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
ROOF TYPE
CONTRACT MODULE
MICROINVERTER
STORY
SYSTEM
ROOF PITCH
& QUANTITY
TYPE & QUANTITY
HOME TYPE
ORIENTATION
TOTALARRAY AREA
ROOF ATTACHMENTQUANTITY
SQ.FT.
FLAT TILE
5.5:12 & 3:12
1 - STORY
222°
SPR-X21-345-E-AC (240) (25)
IQ7XS-96-ACM-US (240)(25)
52
447
1/16" = 1'-0"
L E G E N D
JUNCTION BOX
EXISTING SERVICE POINTAND UTILITY METERING
PROPERTY LINE
3' WIDE ACCESS PATH
CONDUIT
ACD PV UTILITY DISCONNECT
N-LC NEW LOAD CENTER
PV METERPVM
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
ROOF VENT
1.5' WIDE ACCESS PATH
NOTE: UTILITY HAS 24-HR UNRESTRICTEDACCESS TO ALL PHOTOVOLTAIC SYSTEMCOMPONENTS LOCATED AT SERVICEENTRANCE.
NOTE: REFERENCE SECTION 301.15 OF THEAPS ESRM FOR ELECTRIC METERSEPARATION BETWEEN WATER AND GAS.
NOTE: WORKSPACE IN FRONT OF ACELECTICAL SYSTEM COMPONENTS SHALLBE IN ACCORDANCE WITH APS AND NECREQUIREMENS. FOR APSREQUIREMENTS, REFERENCE SECTION300 OF THE APS ESRM AND SECTION 8.2OF THE APS INTERCONNECTIONREQUIREMENTS.
NOTE: NO FENCES OR GATES RESTRICTING ACCESS TO UTILITY METER AND APS EQUIPMENT.
NOTE:1. FIELD ADJUSTMENTS OF FEWER
THAN 6” MAY BE ALLOWED BASED ON SITECONDITIONS AND MEASUREMENTS.
N
FIGURE 3: MOUNTING CLAMPPOSITIONING DETAILSTABLE 2: PENETRATION GUIDE FOR INSTALL
STACKED STAGGERED FULLY STAGGERED
STACKED/STAGGEREDFULLY STAGGERED
*CHECK TABLE 1 FOR MAX.. PENETRATION SPACING AND PENETRATION PATTERN FOR EACH ARRAY.
TWO OR MORE ROWS OF MODULES
ONE ROW OF MODULES
96 CELL MODULE
·RAILS SHALL BE POSITIONED IN THE NON-CROSSHATCHED REGIONS
FIGURE 2: INVISIMOUNT WITH PEGASUS SOLAR ROOF ATTACHMENT DETAILS @ TRUSS / RAFTERS
PV MODULE PV MODULE
FIG 1.1: ROOF 1 STRUCTURAL FRAMING DETAIL
FIG 1.2: ROOF 2 STRUCTURAL FRAMING DETAIL
TABLE 1 – ARRAYS INFORMATION
ROOF
PITCH
ROOFING
TYPE
ATTACHMENT
TYPE
NO. OF
STORIES
FRAMING
TYPE (in.)
MAX.
RAFTER
SPAN (ft.)
PENETRATION
PATTERN (in.)
MAX. ATTACHMENT
SPACING (in.)
MAX. RAIL
OVERHANG (in.)
ROOF 1 24° Flat Tile Pegasus Tile 1 2x4 Truss @ 24" OC 8' Staggered 48" 16"
ROOF 2 14° Flat Tile Pegasus Tile 1 2x4 Truss @ 24" OC 6' Staggered 48" 16"
ROOF 3 -- -- -- -- -- -- -- -- --
ROOF 4 -- -- -- -- -- -- -- -- --
ROOF 5 -- -- -- -- -- -- -- -- --
ROOF 6 -- -- -- -- -- -- -- -- --
CHECK TABLE 2 FOR PENETRATION PATTERN GUIDE
SHEET
STR
UCTU
RAL
INFO
RM
ATI
ON
AN
D M
OU
NTI
NG
DET
AIL
S
PVS-1
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
NTS
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
9
C
YES
THWN-2
EGC: THWN-2
3
1
C
WITH VISIBLE KNIFE BLADES
SQUARE D LOCATED OUTSIDE
GND
C#8
#10EMT 3/4"
DU222RB OR EQUIVALENTUTILITY-LOCKABLE SAFETY SWITCH 60A, 240VAC
EGC: BARE Cu #6
BRANCH CIRCUITFROM PV ARRAY TO
JUNCTION BOX
SUNPOWER PROVIDED AC MODULES EXTENSIONCABLE, LISTED AS AN ASSEMBLY #12 2
A --
1EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THENEC AND ALL APPLICABLE REQUIREMENTS OF THE SERVINGELECTRIC UTILITY COMPANY AND OF THE LOCAL AUTHORITYHAVING JURISDICTION.
2BI-DIRECTIONAL UTILITY METER TO BE INSTALLED BY UTILITYCOMPANY.
3LABEL "PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH".SWITCH COVER TO BE LOCKED AT ALL TIMES. SWITCH TO BEVISUAL OPEN AND ACCESSIBLE PER UTILITY REQUIREMENTS ANDCONFORM TO NEC 705.22
4LABEL "PHOTOVOLTAIC ARRAY DC DISCONNECT SWITCH: PERNEC 690.14(C)(2). LABEL WITH OPERATING CURRENT,OPERATING VOLTAGE MAXIMUM SYSTEM VOLTAGE, AND SHORTCIRCUIT CURRENT PER NEC 690.53 SWITCH TO BE LOCKED PERNEC 690.70(D)
5LABEL" PHOTOVOLTAIC POWER SYSTEM DEDICATED KWHMETER".METER ENCLOSURE AND SOCKET PROVIDED ANDINSTALLED BY CUSTOMER PER APS ESRM.METER PROVIDED BYCUSTOMER.
6PROVIDE WARNING SIGN PER NED 690.17 READING"WARNING-ELECTRIC SHOCK HAZARD-DO NOT TOUCHTERMINALS-TERMINALS ON BOTH LINE AND LOAD SIDES MAY BEENERGIZED IN THE OFF POSITION.
7METALLIC CONDUIT SHALL BE USED WITHIN BUILDING PER NEC690.31(E)
8LABEL "DEDICATED PHOTOVOLTAIC SYSTEM COMBINER PANEL"AND " LOADS NOT TO BE ADDED TO THIS PANEL.
9GEC TO BE INSTALLED AS REQUIRED BY MANUFACTURERINSTRUCTIONS AND NED 690.47.
10GROUNDING BUSHINGS AT EVERY ENTRY AND EXIT POINT TOENCLOSURES WITH RMC
11A PLACARD OR DIRECTORY IS INSTALLED AT THE SERVICEENTRANCE WITH EXPLICIT DIRECTIONS TO THE LOCATION OFTHE PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH ASREQUIRED BY APS.
12A PERMANENT PLACARD OR DIRECTORY IS INSTALLED PER NEC705.10
13SUPPLY SIDE CONNECTION IS INSTALLED PER NEC 230 APS,ESRM AND APS INTERCONNECTION REQUIREMENTS, LABELPHOTOVOLTAIC SYSTEM SERVICE DISCONNECT SWITCH, SWITCHCOVER TO BE LOCKED AT ALL TIMES.
14SUPPLY SIDE CONNECTIONS IS INSTALLED IN ACCORDANCEWITH MANUFACTURERS INSTRUCTIONS. DOCUMENTATION ISINCLUDED WITH THE APS INTERCONNECTION APPLICATION.ENSURE UL LISTED CONNECTORS.
15LABEL WARNING - A GENERATION SOURCE IS CONNECTED TOTHE SUPPLY (UTILITY) SIDE OF THE SERVICE OF THE SERVICEDISCONNECTING MEANS. FOLLOW PROPER LOCKOUT/ TAGOUTPROCEDURES TO ENSURE THE PHOTOVOLTAIC SYSTEM UTILITYDISCONNECT SWITCH IS OPENED PRIOR TO PERFORMING WORKON THIS DEVICE.
16EQUIPMENT SHALL BE LISTED, TESTEDAND MARKED TOWITHSTAND THE AVAILABLE SHORT CIRCUITCURRENT
AC MODULES NOTES:1. DC CIRCUIT IS ISOLATED AND INSULATED FROM GROUND AND MEETS THE REQUIREMENT OF NEC 690.35.2. SUNPOWER PROVIDED CABLES COMES WITH TWO (2) #12 AWG WIRE AND THIS IS BY DESIGN. NEUTRAL AND
ADDITIONAL GROUND WIRE IS NOT REQUIRED FOR PROVIDED TRUNK AND EXTENSION CABLES.3. SUNPOWER AC MODULES HAVE BEEN TESTED AND CERTIFIED TO UL 2703 FOR INTEGRATED GROUNDING AND
HENCE A SEPARATE GROUND WIRE IS NOT REQUIRED WITHIN THE ARRAY.4. USE ROW-TO-ROW GROUNDING CLIP PROVIDED TO GROUND ROWS OF MODULE. BOND SUB-ARRAYS BY
RUNNING #6 AWG BARE CU WIRE AND GROUND LUGS AT A SINGLE POINT ON EACH SUB-ARRAY AND THEN TOTHE JUNCTION BOX. REFER TO PVE-4 FOR ADDITIONAL DETAILS.
NOTE:BELOW ARE OPTIONAL OFFERINGS AND SHALLONLY BE INSTALLED IF THE HOMEOWNER SIGNSA SPECIFIC CONTRACT WITH SUNPOWER:· SUNPOWER MONITORING SYSTEM
ELECTRICAL NOTES:1. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC.2. ALL CONDUIT BEND RADII TO CONFORM TO THE NEC MINIMUM BEND RADII REQUIREMENTS.3. MINIMUM CLEARANCE SHALL BE MAINTAINED PER NEC FOR ALL NEW EQUIPMENT TO BE INSTALLED.4. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET NEC AND LOCAL UTILITY REQUIREMENTS.5. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED.6. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING NEC
REQUIREMENTS.7. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY 3RD PARTY.8. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%.9. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT.10. EQUIVALENT SPECIFICATION ON CABLES AND ELECTRICAL EQUIPMENT SPECIFIED ARE ACCEPTABLE.11. AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT
REQUIRED.
CHECK BOX FOR WHETHER SYSTEM IS GROUNDED ORUNGROUNDED:
GROUNDED (INCLUDE GEC)UNGROUNDED
FOR UNGROUNDED SYSTEMS:· DC OCPD DISCONNECT BOTH CONDUCTORS OF EACH
SOURCE CIRCUIT.· UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER
210.5(C). WHITE FINISHED CONDUCTORS ARE NOTPERMITTED.
TAG
1
2
3
4
5
6
7
8
9
DC / DC CONVERTERS
SOURCE CIRCUIT JUNCTION BOX
SEPARATE DC DISCONNECT
INTERNAL INVERTER DC DISCONNECT
STRING INVERTER
SOLAR LOAD CENTER
PV PRODUCTION METER
SEPARATE AC DISCONNECT
DESCRIPTION
NO
NO
YES
1
SOLAR AC MODULE / BRANCH ACM
NO
NO 1
A
DC
AC
DC
AC
DC
AC
1SUNPOWER MODULES
AC MODULEEXTENSION CABLE
AC MODULEEXTENSION CABLE
AC MODULEEXTENSION CABLE
8 AC MODULESBRANCH CIRCUIT #3
8 AC MODULESBRANCH CIRCUIT #2
9 AC MODULESBRANCH CIRCUIT #1
SPR-X21-345-E-AC (240)
GROUNDING ELECTRODEGROUND ROD
H
INCOMING SOURCE FEED
, 120/240V, 1PH, 3W
TOP FED
MCB
*MSP MAX PV BREAKER (A) = x 120% -
=
LOCATION:
MANUF: (E) UTILITYBIDIRECTIONAL
METER #:
(E) MAIN SERVICE PANEL
TO HOUSELOADS
L1L2N
GN
D
PV BREAKER: TO BEINSTALLED ON THE OPPOSITE SIDE
OF THE MAIN OCPD OF THE BUSS
225A 200A70A
225A
200A, 2P
LEFT SIDE OF HOME
SQUARE D
GA5774
50A, 2P
B
THWN-2
EGC: THWN-2
6
1
JUNCTION BOX,NEMA-3R,
3
B 3/4"EMT#10
#10
CONDUCTOR / CONDUIT SCHEDULE
DESCRIPTION &CONDUCTOR TYPE
CONDUCTOR SIZE(AWG) CONDUIT/CABLE TYPETAG CONDUIT SIZENUMBER OF
CONDUCTORS
L1L2N
GN
D
7
YES
MIN., 120/240 V,LOCATION:
MLO
20A, 2P
20A, 2P
20A, 2P
NEAR MSP100 A(N) SOLAR LOAD CENTER
MICROINVERTER MODEL:IQ7XS-96-ACM-US (240)
YES
M
8*MILBANK 100A, 1Ø, 3W,
U5929-XL-INS, 4-JAW, FORM 2S
SUNPOWERMONITORING
PVS6
ETHERNETCONNECTION TO
DSL/CABLE MODEM
CAT5e
(3) #14 THWN(1) #14 THWN EGC
15A, 2P
PV UTILITY DISCONNECT SWITCH
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
FIGURE A: THREE LINE DIAGRAM -
ELEC
TRIC
AL
THREE
-LIN
E D
IAG
RAM
& S
PECIF
ICATI
ON
S
06-03-2020
EVALDEZ
06-03-2020
8.63 kW
SHEET
PVE-1
NTS
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
ELECTRICAL CALCULATIONS
BRANCH 2 BRANCH 3BRANCH 1
NUMBER OF MODULES
VOLTAGE
RATED AC OUTPUT CURRENT: IOUT =
MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25
CONDUCTOR DE-RATING
MAXIMUM AMBIENT TEMPERATURE
TEMPERATURE ADDER
TEMPERATURE USED FOR AMPACITY DE-RATING
TEMPERATURE DE-RATING COEFFICIENT
FILL DE-RATING COEFFICIENT
IWIREMIN = IMAX / TEMP_COEFF / FILL_COEFFWIRE SIZE AMPACITY
CONDUCTOR SIZE
CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP
OVERCURRENT PROTECTION
MINIMUM OCPD = IOUT x 1.25
CALCULATED VOLTAGE DROP
ONE WAY CIRCUIT LENGTH
SUBPANEL TO GRID-TIE WIRING
VOLTAGE
SUM OF BRANCHES: IOUT_TOTAL =
MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25
CONDUCTOR DE-RATING
MAXIMUM AMBIENT TEMPERATURE
TEMPERATURE USED FOR AMPACITY DE-RATING
TEMPERATURE DE-RATING COEFFICIENT
FILL DE-RATING COEFFICIENT
IWIREMIN = IMAX / TEMP_COEFF / FILL_COEFF
WIRE SIZE AMPACITY
CONDUCTOR SIZE
CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP
OVERCURRENT PROTECTION
MINIMUM OCPD = IOUT x 1.25
VOLTAGE DROP
ONE WAY CIRCUIT LENGTH
ROOF JCT BOX TO SUBPANEL WIRING #10
8
240 V
10.48 A
13.10 A
46°C
22°C
68°C
0.58
0.8028.23 A
40 A
#10
#10
1.68%
20A, 2P
13.10 A
#10
9
240 V
11.79 A
14.74 A
46°C
22°C
68°C
0.58
0.80
31.76 A40 A
#10
#10
1.93%
20A, 2P
14.74 A
#10
8
240 V
10.48 A
13.10 A
46°C
22°C
68°C
0.58
0.8028.23 A
40 A
#10
#10
1.79%
20A, 2P
13.10 A
85 FT.85 FT. 85 FT.
40.94 A
50A, 2P
1.04%
#8
#8
55A
49.92 A
1
0.82
46°C
46°C
#8
10 FT.
40.94 A
32.75 A
240 V
SHEET
ELEC
TRIC
AL
CALC
ULA
TIO
N
PVE-2
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
NTS
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PHOTOVOLTAIC SYSTEMAC DISCONNECT
RATED AC OUTPUT CURRENT:
NOMINAL OPERATING AC VOLTAGE:
SIGNAGE LOCATIONS:
· INDOOR / OUTDOOR AC DISCONNECT
AMPS
VOLTS
·
RAPID SHUTDOWN SWITCH FORSOLAR PV SYSTEM
SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWN
TURN RAPID SHUTDOWNSWITCH TO THE "OFF"
POSITION TO SHUT DOWNAND REDUCE SHOCK
HAZARD IN THE ARRAY
SOLAR ELECTRICPV PANELS
SIGNAGE LOCATIONS:
· SHALL BE LOCATED ON OR NO MORE THAN 1 M (3 FT)FROM THE SERVICE DISCONNECTING MEANS TO WHICHTHE PV SYSTEMS ARE CONNECTED.
32.75 A
240 V
1. MATERIAL USED FOR THE SIGNAGE SHALL BE REFLECTIVE,WEATHER RESISTANT AND SUITABLE FOR THEENVIRONMENT.
2. ALL SIGNAGE SHALL HAVE ALL CAPITAL LETTERS WITHMINIMUM 38" LETTER HEIGHT.
3. MAIN SERVICE DISCONNECT MARKING SHALL BE PLACEDADJACENT TO MAIN SERVICE DISCONNECT IN A LOCATIONCLEARLY VISIBLE FROM THE LOCATION WHERE THE LEVER ISOPERATED.
4. MARKING IS REQUIRED ON ALL INTERIOR AND EXTERIOR DCCONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES,AND JUNCTION BOXES TO ALERT THE FIRE SERVICE TOAVOID CUTTING THEM. MARKINGS SHALL BE PLACED EVERY10', AT TURNS AND ABOVE AND/OR BELOW PENETRATIONS,AND AT ALL DC COMBINER AND JUNCTION BOXES.
5. DO NOT USE SCREWS FOR SIGNAGE ATTACHMENT. USEONLY APPROVED ADHESIVE.
SIGNAGE NOTES
ELECTRICAL DATA & SPECIFICATIONS
PHOTOVOLTAIC SYSTEM EQUIPPEDWITH RAPID SHUTDOWN
AMPS
VOLTS
PHOTOVOLTAIC POINT OFINTERCONNECTION
WARNING: DUAL POWER SOURCE.SECOND SOURCE IS PHOTOVOLTAIC
SYSTEM
SIGNAGE LOCATIONS:
· MAIN SERVICE PANEL· INDOOR / OUTDOOR SUBPANEL
MAXIMUM RATED AC OUTPUT CURRENT:
MAXIMUM OPERATING AC VOLTAGE:
SIGNAGE LOCATIONS:
· MAIN SERVICE PANEL
PV SOLAR BREAKERDO NOT RELOCATE THISOVERCURRENT DEVICE
SIGNAGE LOCATIONS:
· MAIN SERVICE PANEL· NEW INDOOR / OUTDOOR LOAD CENTER· INDOOR / OUTDOOR SUBPANEL
32.75 A
240 V
SHEET
ELEC
TRIC
AL
DATA
& S
PECIF
ICATI
ON
S
PVE-3
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
NTS
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
ACD
PVM
N-LC
FIGURE 1: SUNPOWER EQUINOX GROUNDING DETAILS
FILE: RP-113183-IP-PLSOLAR-PVE-4.dwg, USER: erwvaldez, DATE/TIME: Jun 05, 2020 - 9:48am
SHEET
PVE-4
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
NTS
POWER TO THIS BUILDING IS ALSOSUPPLIED FROM THE FOLLOWINGSOURCES WITH DISCONNECT(S)
LOCATED AS SHOWN:
CAUTION:
ACDISCONNECT
PHOTOVOLTAICARRAY ON ROOF
SERVICE POINT &UTILITY METERING
SOLAR LOADCENTER
PV METER
FIGURE 2: PLACARD IDENTIFYING LOCATION OF DISCONNECTS AND POWER SOURCES
PLACARD SIGNAGE / SUNPOWER EQUINOX GROUNDING DETAILS
PLACARD
/ S
UN
POW
ER E
QU
INO
XG
RO
UN
DIN
G D
ETAIL
S
4160 STAGE STOP WAY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
ROOF ONE: 21 MODULES
5.5:12ROOF TWO: 4 MODULES
3:12
ACD
PVM
N-LC
SHEET
BRAN
CH
DIA
GRAM
PVE-5
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
06-03-2020
EVALDEZ
06-03-2020
3/32" = 1'-0"
INSTALLER NAME:
_____________________BRANCH VOLTAGES:
1.2.3.4.5.6.
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
R E V I S I O N S
SO
LAR I
ND
IVID
UAL
PERM
IT P
ACKAG
E
GRID
-TIE
D P
HO
TOVO
LTAIC
SYS
TEM
REV DESCRIPTION DATE DB CB
PROJECT
OPPORTUNITY
JEFF
OLA
ND
ER /
TH
ERES
A O
LAN
DER
4160
STA
GE
STO
P W
AY
LOT
620
WIC
KEN
BU
RG
, ARIZ
ON
A 8
5390
RP-113183
8.63
kW
SPRI - PHOENIX
7.88
kW
MAX.
OU
TPU
T PO
WER
RATI
NG
TYLER BOSHARD
C A
L
I C
E N
S E
#
8 9
0 8
9 5
LEGEND & SYMBOLS:
TERMINATOR
GROUND LUG ASSEMBLY
FEMALE CONNECTOR
R2R GROUNDING CLIP
SEALING CAP
MALE CONNECTOR
JUNCTION BOX
RAW TRUNK CABLE
2.0 m. TRUNK CABLE
1.3 m. TRUNK CABLE
2.3 m. TRUNK CABLE
ONE CONNECTORPER MODULE
EXISTING RAFTER
ROOF ATTACHMENT
RAIL
1 2ROOF
SYSTEMORIENTATION
ROOF PITCH
MODULE QTY.
3:12
222
4
5.5:12
222
21
N
PV MODULE SPECIFICATION SHEET AC MODULE COMPLIANCE LETTER SHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: MODULE INSTALLATION MANUAL PAGE 1 FIGURE 2: MODULE INSTALLATION MANUAL PAGE 2SHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: MODULE INSTALLATION MANUAL PAGE 3 FIGURE 2: MODULE INSTALLATION MANUAL PAGE 4SHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: MODULE INSTALLATION MANUAL PAGE 5 FIGURE 2: MODULE INSTALLATION MANUAL PAGE 6SHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: MODULE INSTALLATION MANUAL PAGE 7SHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: INVISIMOUNT DATA SHEET FIGURE 2: CERTIFICATE OF COMPLIANCESHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
UL CERTIFICATION - MOUNTING SYSTEMS,DEVICES, CLAMPING DEVICES & GROUND LUGS FOR PV UL CERTIFICATION - MOUNTING SYSTEMS,DEVICES, CLAMPING DEVICES & GROUND LUGS FOR PVSHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
UL CERTIFICATION - MOUNTING SYSTEMS,DEVICES, CLAMPING DEVICES & GROUND LUGS FOR PVSHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: PEGASUS SOLAR MOUNTING DATA SHEET FIGURE 2: PEGASUS SOLAR MOUNTING DATA SHEET
FILE: Pegasus Solar_SPEC SHEETS.dwg, USER: reude, DATE/TIME: Mar 20, 2017 - 7:43pm
SHEET
REV DESCRIPTION DATE DB CB
R E V I S I O N S
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
SCALE
DRAWN BY
PROJECT
DATE DRAWN
OPPORTUNITY
CHECKED BY
DATE CHECKED
NTS
C A
L
I C
E N
S E
#
8 9
0 8
9 5
FIGURE 1: PEGASUS SOLAR CERTIFICATION LETTER FIGURE 2: PEGASUS SOLAR CERTIFICATION LETTER
FILE: SPD_PS_SPEC SHEETS.dwg, USER: reude, DATE/TIME: Mar 20, 2017 - 7:30pm
SHEET
REV DESCRIPTION DATE DB CB
R E V I S I O N S
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
SCALE
DRAWN BY
PROJECT
DATE DRAWN
OPPORTUNITY
CHECKED BY
DATE CHECKED
C A
L
I C
E N
S E
#
8 9
0 8
9 5
NTS
FIGURE 1: PEGASUS SOLAR CERTIFICATION LETTER FIGURE 2: PEGASUS SOLAR TEST VERIFICATION OF CONFORMITY
FILE: Pegasus Solar_SPEC SHEETS.dwg, USER: reude, DATE/TIME: Mar 20, 2017 - 7:44pm
SHEET
REV DESCRIPTION DATE DB CB
R E V I S I O N S
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
SCALE
DRAWN BY
PROJECT
DATE DRAWN
OPPORTUNITY
CHECKED BY
DATE CHECKED
C A
L
I C
E N
S E
#
8 9
0 8
9 5
NTS
FIGURE 1: PVS6 SPECIFICATION SHEET FIGURE 1: PVS6 SPECIFICATION SHEETSHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FIGURE 1: SUNPOWER EQUINOX GROUND PATH & COMPLIANCE FIGURE 2: CURRENT TRANSFORMER SPECIFICATION SHEETSHEET
DRAWN BY
DATE DRAWN
DATE CHECKED
SCALE
CHECKED BY
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
R E V I S I O N SREV DESCRIPTION DATE DB CB
C A
L
I C
E N
S E
#
8 9
0 8
9 5
PROJECT
OPPORTUNITY
FILE: SQUARE D SPEC SHEETS.dwg, USER: jbernales, DATE/TIME: Jul 05, 2018 - 11:32am
SHEET
REV DESCRIPTION DATE DB CB
R E V I S I O N S
1 4
1 4
H
A R
B O
U R
W
A Y
S O
U T
H
R I
C H
M O
N D
,
C A
9 4
8 0
4
( 5
1 0
) 5
4 0
- 0
5 5
0
C O
R P
O R
A T
I O
N ,
S Y
S T
E M
S
THIS
DO
CU
MEN
T CO
NTA
INS P
RO
PRIE
TARY
INFO
RM
ATI
ON
. REP
RO
DU
CTI
ON
,D
ISCLO
SU
RE,
OR U
SE
WIT
HO
UT
SPE
CIF
IC W
RIT
TEN
AU
THO
RIZ
ATI
ON
OF
SU
NPO
WER
CO
RPO
RATI
ON
IS S
TRIC
TLY
FORBID
DEN
.
SCALE
DRAWN BY
PROJECT
DATE DRAWN
OPPORTUNITY
CHECKED BY
DATE CHECKED
C A
L
I C
E N
S E
#
8 9
0 8
9 5
NTS