4
MTA Engineering Sp. z o. o., ul. Poniatowskiego 14, 35-026 Rzeszów www.mta-online.net Reference letters

COAL PROCESSING PLANT “BOGDANKA SA” - mta · PDF fileDesign of supporting steel structure of the steam generator ... Executive design of a boiler house for the energy block

Embed Size (px)

Citation preview

Page 1: COAL PROCESSING PLANT “BOGDANKA SA” - mta · PDF fileDesign of supporting steel structure of the steam generator ... Executive design of a boiler house for the energy block

MTA Engineering Sp. z o. o., ul. Poniatowskiego 14, 35-026 Rzeszów www.mta-online.net

Reference letters

COAL PROCESSING PLANT “BOGDANKA SA”

Page 2: COAL PROCESSING PLANT “BOGDANKA SA” - mta · PDF fileDesign of supporting steel structure of the steam generator ... Executive design of a boiler house for the energy block

Workshop documentation of steel structure as a part of the project: development of coal dressing plant “Bogdanka S.A.” in Poland. The scope of works included the documentation for 34 objects (dump station, conveyor bridges, tanks, washing machine). The tonnage of designed objects amounts to 8400 tons.

Design of supporting steel structure of the steam generator SteamGen™4 and design of MCC building casing in a refinery in Zarqa in Jordan. The scope of work included planning, structural calculation, modeling and project documentation of the steel structure and foundation.

COAL PROCESSING PLANT “BOGDANKA SA”

REFINERY IN JORDAN

www.mta-online.net

Page 3: COAL PROCESSING PLANT “BOGDANKA SA” - mta · PDF fileDesign of supporting steel structure of the steam generator ... Executive design of a boiler house for the energy block

Executive design of a boiler house for the energy block incinerating lignite with the power output of 660 MW in the Power Plant Ledvice in the Czech Republic. The tonnage of designed structure amounts to 12 400 tons.

Executive design of steel structure in the hard-coal fired power plant with the output capacity of 550 MW in Lünen in Germany. The tonnage of designed structure amounts to 5 600 tons.

POWER PLANT LEDVICE

POWER PLANT LÜNEN

www.mta-online.net

Page 4: COAL PROCESSING PLANT “BOGDANKA SA” - mta · PDF fileDesign of supporting steel structure of the steam generator ... Executive design of a boiler house for the energy block

Executive design of a boiler house for the energy block 858 MW in BOT Power Plant Bełchatów in Poland. The scope of work included technical documentation for steel structure of suspended and standing parts of the boiler house, furnace installation elements, hot and cold air ducts and outlet flue gas ducts. The tonnage of designed structure amounts to 15 000 tons.

Part of basic engineering including structural analysis and complete detail engineering for pipe racks in a pulp mill in Uruguay. Tonnage of 14 objects amounts to 3170 tons.

POWER PLANT BEŁCHATÓW

PULP MILL IN MONTES DEL PLATA

www.mta-online.net