Enquiry for Coal Mill Up gradation Work : Dis mentling and Erection The following are the works involved. 1. Hot gas duct modification. 2. Erection of new dryer Dia 2.0 x 2.0m length and shifting feed chute position. 3. Erection of new conveyor belt 650w x 9.0m length. 4. Dismentling and erection of mill outlet duct 5. Dismentling and erection of static separator with dynamic separator. (Seperator size 2.0m dia x 2.0m approx) 6. Dismentling and erection of duct from separator to bag filter. New duct Dia 660mm 7. Dismentling & erection of existing 180 bags bag filter with 270 bags bag filter, height approx 20m 8. Dismentling and erection of duct from bag filter to ventfan, new duct size 680mm. 9. Dismentling and erection of Dust collector fan. 10. Desmentling and erection of ducting from fan outlet to chimney Kindly quote your lowest price for the above. Expected time to complete the above work is 10 to 12 days.

Coal mill upgradation project.doc

Embed Size (px)

Citation preview

Page 1: Coal mill upgradation project.doc

Enquiry for Coal Mill Up gradation

Work : Dis mentling and Erection

The following are the works involved.

1. Hot gas duct modification.

2. Erection of new dryer Dia 2.0 x 2.0m length and shifting feed chute position.

3. Erection of new conveyor belt 650w x 9.0m length.

4. Dismentling and erection of mill outlet duct

5. Dismentling and erection of static separator with dynamic separator. (Seperator size 2.0m dia x 2.0m approx)

6. Dismentling and erection of duct from separator to bag filter. New duct Dia 660mm

7. Dismentling & erection of existing 180 bags bag filter with 270 bags bag filter, height approx 20m

8. Dismentling and erection of duct from bag filter to ventfan, new duct size 680mm.

9. Dismentling and erection of Dust collector fan.

10. Desmentling and erection of ducting from fan outlet to chimney

Kindly quote your lowest price for the above.

Expected time to complete the above work is 10 to 12 days.