COAL BY NIGHT , CSP BYDAY POWER PLANTPOWER PLANT - COAL, CSP – ANDY ROTARY ENGINE. NO BOILER. NO TURBINE.
DESIGN FUEL MW COST$ HP VOL FUEL/H CO2E CER
NOR COAL 1000 1 BN 1.44MN 36KL 300T/H 700T/H --ANDY COAL 1000 1 BN 1.44MN 12KL 100T/H 233T/H 466T/HNOR DIESEL 100 150MN 0.15MN 6KL 24KL 14T/H --
ANDY DIESEL 100 150MN 0.15MN 2KL 8KL 4.65 9.30T/H
COST 1 Mn$ / MW
ANDY CSP SOLAR THERMAL POWER PLANT
NEW DESIGN : CSP by DAY, COAL by NIGHTSAME HOT BOX - COAL FURNACE, CSP STORAGESAME ANDY ENGINE, GENERATOR
CUBE CORNER ANTENNA for TOWER, PARABOLICAIR for SALT, WATERANDY ENGINE for BOILER, TURBINE to SPIN GENERATORCOST 4 Mn$ /.MWBy CSP, NUKE, GEO-THERMALCOAL SAVED 2160 T/MW/Yr 30 Yrs LIFECOST SAVED 2160*150*30= 9.72 Mn$/MWCO2e SAVED = 2.333 * 2160= 5034 T/MW/Yr
M ANDY APPAN, M E , 45 Yrs Expert
E mail [email protected]