12
co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo e Filippo, 7 Genova-Italy

Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

Embed Size (px)

Citation preview

Page 1: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

co-funded by the European Community eContentplus programme

Actions summary

Kick-off meetingGenova, 6-8 November 2008

IRIDE Congress CentreVia SS Giacomo e Filippo, 7

Genova-Italy

Page 2: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

co-funded by the European Community eContentplus programme

Nature-SDIplus and the INSPIRE metho-dology:

the Annex I (Protected Sites) theme is already at this step, with the testing phase starting now

actions:

1: what available

2: match analysis

3.1: reporting difference

3.2: what to do

Page 3: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

Annex 1 Protected sites – INSPIRE TESTING

Step 1Distribution of the template for identification of available data sets GISIG 11 Nov, after receiving and processing comments from UNABDN

all Partners (Data Providers and/or National ”Intermediates”) to return the template:

November 24° Data sets of Protected sites (only)

•Analysis and systematisation of the available datasets (UNIABDN)•December 5 Data sets of Protected sites

Page 4: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

Preparation of the table of the available datasets

1: what available

Examples:

Page 5: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

Annex 1 Protected sites – INSPIRE TESTING

Step 2Definition of draft template and guidelines with the INSPIRE structure WG Testing 5 December

all Partners (Data Providers and/or National ”Intermediates”) to return the template:

January 15 2009 (after one month from the final version of the template)

Page 6: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

The data structure proposed

by INSPIRE

The actual data

structures met in the

project datasets

A match to individuate concordance,

differences, gaps and the definition of critical

points

ok

mmmh

ko(1)

not considered,

out of scope

(1) Not only difference, but

also presence or absence

between the two

A description spreadsheet

… 2: match analyis

Page 7: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

Annex 1 Protected sites – INSPIRE TESTING

Step 3Definition of template and guidelines for 3.1 and 3.2 WG Testing 31 December

all Partners (Data Providers and/or National ”Intermediates”) to return the templates filled:

Until 10 February 2009

Page 8: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

TELLING THE USE CASES THAT HAVE MOTIVATED CONTENT AND STRUCTURE OF THE PROVIDED

DATASET AND VERIFICATION OF HOW THESE NEEDS ARE

MATCHED, IF ARE, BY THE INSPIRE PROPOSED STRUCTURE.

REPORTING GAPS AND LACKS WITH REGARD TO THE INSPIRE

VISION

Description of the need(s) originating the datasets

3.1: gap description

report and evidence of differences

to INSPIRE; comments.

A: in another data theme Annex I ; reporting how is needed for protected sites

B: is expected in another data theme Annex II or III

C: it should be here

Page 9: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

DISCUSSIONSTARTING NOW AND,

LATER, PROPOSALS BY THE PARTNERS ON THE BASIS OF THE DATASET ANALYSIS AND OF THE

MEANINGFUL DIFFERENCES TO BE

INVESTIGATED

TESTING TRANSFORMATION: A PROPOSAL 3.2: what to do

Harmonised solution

Harmonised solution

… … …

Harmonised solution

No match no. 5

No match no. 6

No match no. 7

No match no. 2

Harmonised solution

… … …

… … …

Harmonised solution

Harmonised solution

No match no. 4

… … …

No match no. 1

Harmonised solution

No match no. 3

… … …

… … …

Transformation

Transformation

Transformation

Transformation

… … …

… … …

Transformation

Transformation

Transformation

… … …

Page 10: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

TESTING GENERAL A Technical Working Group for the INSPIRE Testing

activity (TWG-INSPIRE) is constituted to: define templates, including the data structure proposed by

INSPIRE define “guidelines” for the steps 1-2-3.1- 3.2 for the

partners

The TWG-INSPIRE is constituted by GISIG, the WPs 2-3-4-5 Leaders, the task leaders of 2.3, all WP3 tasks and 5.1, as well as by Wassilios Kazakos (Disy) and Anders Ostman-HiG (for his parallel activity for INSPIRE testing in Sweden)

Interwise telco TWG-INSPIRE: December 1st

NATURA 2000 testing (by KU.LEUVEN) will be considered as example for the templates, to help the other testing groups.

Page 11: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

WPs ACTION PLAN

Action plan for the first semester (until March 31st)

All the Task Leaders with task staring within Mar 09

To provide to the WPL and GISIG with a draft action plan for the taskWith expected contributions by the partners and inputs from other tasks Deadline 28 November

WPs telco First week of December

Page 12: Co-funded by the European Community eContentplus programme Actions summary Kick-off meeting Genova, 6-8 November 2008 IRIDE Congress Centre Via SS Giacomo

A very draft proposal about it:

1. Participation into the Annex III INSPIRE TWGs

1. Data themes:Biogeographical regionsHabitats and biotopesSpecies distribution

For each of the TWGs at least 2 persons from the Nature-SDIplus partnership

Feed-back to partners and consequent decision to operate