34
J M Kohli – India-CMS, Sept., 2004 1 CMS-Week Sept 20-24, 2004 Prof. J.M. Kohli

CMS-Week Sept 20-24, 2004 Prof. J.M. Kohli

  • Upload
    seanna

  • View
    28

  • Download
    2

Embed Size (px)

DESCRIPTION

CMS-Week Sept 20-24, 2004 Prof. J.M. Kohli. CMS Collaboration. CMS Collaboration. CMS Schedule April 2007: Low Luminosity CMS detector but without ECAL Endcaps will become operational. Pixels and EE in Autumn 2007 after pilot run. - PowerPoint PPT Presentation

Citation preview

Page 1: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 1

CMS-Week

Sept 20-24, 2004

Prof. J.M. Kohli

Page 2: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 2

CMS CollaborationCMS CollaborationCMS CollaborationCMS Collaboration

Page 3: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 3

CMS CollaborationCMS CollaborationCMS CollaborationCMS Collaboration

• CMS Schedule• April 2007: Low Luminosity

CMS detector but without ECAL Endcaps will become operational.

• Pixels and EE in Autumn 2007 after pilot run.

No Significant cash flow problem for 2004 budget balance sheet.

Page 4: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 4

CMS CollaborationCMS CollaborationCMS CollaborationCMS Collaboration

CMS WEEKS2004 06-10th Dec ’042005 21-25th Feb ’05 11-15th Apr ’05 (Physics Week)

19-23th Sep ’05 05-09th Dec ’05

CMS Week outside CERN in ’05 & ‘06- China: Peking University and Beijing IHEP- Italy: Naples- USA: Fermilab

Fermilab was voted for the CMS Week starting from 11th April 2005

CMS Week for early 2006 will be held outside CERN, preferably Europe

Page 5: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 5

CMS Collaboration BoardCMS Collaboration BoardCMS Collaboration BoardCMS Collaboration Board

New Members for CMS

• Louisiana Technical University N. Prashar

• Rudjer Boskovic Institute, Zagreb V. Brigjevic

Presenations were made and decision is pending.

Page 6: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 6

PUBLISHING POLICYPUBLISHING POLICYPUBLISHING POLICYPUBLISHING POLICYPUBLISHING POLICYPUBLISHING POLICYPUBLISHING POLICYPUBLISHING POLICY

Page 7: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 7

Publishing PolicyPublishing Policy Publishing PolicyPublishing Policy

Page 8: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 8

Publishing PolicyPublishing Policy Publishing PolicyPublishing Policy

Page 9: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 9

Publishing PolicyPublishing Policy Publishing PolicyPublishing Policy

Page 10: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 10

Publishing PolicyPublishing Policy Publishing PolicyPublishing Policy

Page 11: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 11

2004 CMS Thesis AwardSeptember 24, 2004

Award committee members (6) (2 new this year)Dobrzynski, Foà (chair), Heath, Snow (secretary), Tuominiemi, Vandervelde

Schedule of 2004 Award Activities• Deadline for Award nominations September 1, 2004

• 11 theses nominated for 2004 Award – a record year

• First-round decisions by Award CommitteeOctober 29, 2004• Each nominated thesis is read by at least 2 Committee members• Three theses selected as finalists

• Selection of Award recipient by Committee December 1, 2004• Three final theses read by all Committee members

• Approval of Award recipient by CB December 2004 CMS week

• Presentation of 2004 Award March 2005 CMS week

Page 12: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 12

Theses Nominated for 2004 CMS Thesis Award

Student Nominated by Institute Thesis Title

M. AXER G. Flugge Aachen, Germany Development of a Test System for the Quality Assurance of silicon Microstrip Detectors for the Inner Tracking System of the CMS Experiment

V. BARTSCH A. Nikiteno Karlsruhe, Germany

Simulation of Silicon Sensors and Study of the Higgs

Decay H ZZ* 4 for CMS (LHC)

S. GENNAI L. Foà Pisa, Italy Search of a Graviscalar Particle of the Randall-Sundrum

Model with the CMS Experiment at LHC

F. GONZALES

ARTECHE

P. Sharp Oviedo, Spain EMC: A Mapping for the CMS Experiment

S. KÖNIG S. Shael Aachen, Germany Deformation Studies on CMS Endcap Modules and

Misalignment Studies on the CMS Tracker

F. MOORTGAT

D. Denegri Antwerp, Belgium

Discovery Potential of MSSM Higgs Bosons Using

Supersymmetric Decay Modes with the CMS Detector

Page 13: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 13

Theses Nominated for 2004 CMS Thesis Award

Student Nominated by Institute Thesis Title

J. PUERTA PELAYO

M. Cerrada Madrid, Spain Estudio sobre las Cámaras de Tubos de Deriva para el

Espectrómetro de Muones del Experimento CMS

M. RYAN D. Britton Imperial College,

London

Light Collection Uniformity of Lead Tungstate Crystals for the CMS Electromagnetic Calorimeter Endcaps

R. TRAVAGLINI

M. Dellavalle Bologna, Italy Design and Test-Experiment of the Trigger Electronics for the Muon Drift Tube Chambers of the CMS Detector

at LHC

S. UDRIOT F. Pauss ETH, Zurich Development and Simulation of the Read-out Chain

Electronics for the CMS Electromagnetic Calorimeter

D. UNGARO E. Tuominen Helsinki, Finland

The Link-Board Control in the RPC Trigger System

for the CMS Experiment

Page 14: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 14

OrganizationOrganizationOrganizationOrganization

S. Linn

??

New DCS manager and vacancy for HF manager.

Page 15: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 15

Hadronic Calorimeter: HCALHadronic Calorimeter: HCALHadronic Calorimeter: HCALHadronic Calorimeter: HCAL

Page 16: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 16

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

During May, while installing the HO trays into the honeycomb panels, a problem was noticed in the panels.

The inner c-channels were to be glued to the honeycomb panels on both sides. But the amount of glue applied was not enough and hence the channels were getting unglued.

It was decided to do the repair of all the panels and then do the insertion of the trays.

Pascal tried a procedure of fixing nuts and screws on the mockup and found it to be satisfactory.

K.Sudhakar, CMS Week, Sept ‘04K.Sudhakar, CMS Week, Sept ‘04K.Sudhakar, CMS Week, Sept ‘04K.Sudhakar, CMS Week, Sept ‘04

Page 17: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 17

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

Same procedure, of fixing nuts and screws between the c-channels and honeycomb panels, was decided to be applied to all the panels and the materials needed were procured.

Pascal has devised the tools needed for carrying out the necessary work.

During last week of August our people came and carried out repair on 3 panels. Along with Pascal we checked the repaired panels for pressure test, sagging, tray insertion in order to validate them.

Page 18: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 18

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

The panels were tested up to a pressure of 1 bar

The sagging was within 3 to 4 mm with load.

The tray insertion was also smooth without any obstruction from the nut heads(0.7 mm)

So the procedure was validated and we are making 10 holes along the 2.5 meter length of the c-channel. Every panel will have 100 nuts fixed.

The repair work was shifted from B184 to B186 area. The space is limited here (unlike in B184)

Page 19: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 19

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

The work started with R+2 panels (i.e. YB+2) from 10th September

Already 9 panels were repaired and tray insertion was done. No problems were noticed while lifting the stuffed panels.

Right now the speed is about 1 panel a day and is expected to pick up and may go up to about 1.5 panels a day

Page 20: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 20

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

The panels will be repaired in the order of the needs of the overall mounting schedule

R+2, R+1, R0, R-1, R-2

Expected to complete repair of all 72 panels by about mid November.

The overall installation schedule will not be affected

Page 21: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 21

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

Using the Autocad drawings provided by Dattola for the outer wheels and the RBX positions given by Randy et al, the lengths of optical cables were worked out for R+2.

The cables for two adjacent sectors were made and brought to CERN for validating the lengths and the routing of the cables.

Dummy panels with connectors (both on tray side and RBX side) are being made for carrying out this in SX5 and will be done in the next 10 days.

Page 22: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 22

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

Once the validation is done, the cables for full Ring will be fabricated.

For wheel 0, the validation will have to be carried out again at a later date after getting the final drawings from Dattola and working out the lengths of the cables.

Our people have participated in the testbeam runs and analysis has been carried out

Page 23: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 23

STATUS OF HOSTATUS OF HOSTATUS OF HOSTATUS OF HO

There was a short meeting with A. Gurtu, myself, Pascal Petiot, Pawel de Barbaro and Austin Ball present in it.

Basically we went over the schedules concerned with HO mounting and cabling.

Tentatively the periods for installation of cables (optical and HV, LV cables) was indicated as

March/April 2005 for YB+2

August 2005 for YB+1 and YB0

Spring 2006 for YB-1 and YB-2

Page 24: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 24

HO Trial AssemblyHO Trial AssemblyHO Trial AssemblyHO Trial Assembly

Page 25: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 25

Page 26: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 26

Muon/Ped Separation:Muon/Ped Separation:HO Ring 0HO Ring 0

Muon/Ped Separation:Muon/Ped Separation:HO Ring 0HO Ring 0

n.b. Not fully optimized

Page 27: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 27

300, 150, 100, 30 GeV 300, 150, 100, 30 GeV Pions, HCAL vs ECAL Pions, HCAL vs ECAL 300, 150, 100, 30 GeV 300, 150, 100, 30 GeV Pions, HCAL vs ECAL Pions, HCAL vs ECAL

Page 28: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 28

2004 Test Beam Goals: 2004 Test Beam Goals: Summary Summary

2004 Test Beam Goals: 2004 Test Beam Goals: Summary Summary

• 25 ns structured beam to measure relative timing and to verify trigger primitive generation

• Very Low Energy (VLE) run to study ECAL+HCAL response for pions 2- 9 GeV

• Measure longitudinal shower profiles for MC comparison/tuning

• Calibrate a number of production HF wedges

• vertical slice test HCAL+EMU, will take place sep22-oct 11

Page 29: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 29

FE Electronics Status FE Electronics Status FE Electronics Status FE Electronics Status

HE• RBX Production – over 2/3 completed

• Rate of ~1 RBX/day – finish by mid-Oct

• Begin HE installation/cabling early Nov

HB• RBX production – 1/6 completed

• Finish mid-Jan

• Need final HB cable lengths before order can be placed

HO• RM status – some hardware at Fermilab

• FE boards ready to be tested

• Need to produce HPD interface card (4-6 wks)

• Need to order HPD-QIE signal cable (4-6 wks)

Page 30: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 30

HPD StatusHPD StatusHPD StatusHPD Status

Tubes Delivered vs Month

0

10

20

30

40

50

2 7 12 17 22 27 32Month

# of

Tub

es D

eliv

ered

Jan03 Jan04 July04

Average # of Tubes Delivered per Month = 19.9 TubesAverage # of Tubes Delivered per Month = 19.9 TubesTotal # of Tubes Delivered as of 7/20/04 = 612. TubesTotal # of Tubes Delivered as of 7/20/04 = 612. TubesPercentage of Good Tubes = 62%Percentage of Good Tubes = 62%Good Tubes So Far = 379 TubesGood Tubes So Far = 379 TubesTotal Tubes needed with Spares = 484 TubesTotal Tubes needed with Spares = 484 TubesTubes Left to Go = 484-379 = 105TubesTubes Left to Go = 484-379 = 105Tubes

Final Delivery in Dec, 2004 if no Final Delivery in Dec, 2004 if no improvementimprovement

Page 31: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 31

• YB+2:

late fall ‘04

• YB+1,YB0:

summer ‘05

• YB-1, YB-2:

spring ‘05

Schedule for HO

Page 32: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 32

SummarySummarySummarySummary

• HCAL is complete with respect to Absorber Structures.

• PMT are complete. HPD will done but are the pacing item.

• FE electronics is built and largely tested.

• TRIDAS electronics is entering production without any issues.

• DCS is functional.• I&C is underway – starting with HE.• TB2004 was very successful.

Page 33: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 33

Meetings before the December CMS weekMeetings before the December CMS weekMeetings before the December CMS weekMeetings before the December CMS week

1) 9-th Annual RDMS CMS Conf. in Minsk, Belarus , 28 Nov-2 Dec 2004

Hosted by NCPHEP, N.ShumeikoMainly dedicated to the Data Processing/Analysis Scenario, Physics with CMS Detector.

Preliminary agenda: Opening session: organizers: M.Della Negra, I.

Golutvin, N.Shumeiko

Physics session (selected topics) organizers: P.Sphicas, V.GavrilovComputing Scenario organizers: D.Stickland, V.IlyinHCAL session (3rd day) organizer: D.Green

http:// cmsdoc.cern.ch/cms.html or http://www.hep.by/RDMS-2004/

2) Run Meeting 2-3 Dec 2004 Getting ready for first beam in 07.Preparation of the Magnet test end 05.

Page 34: CMS-Week  Sept 20-24, 2004 Prof. J.M. Kohli

J M Kohli – India-CMS, Sept., 2004 34

ECALECALECALECAL