NDIA Top SE-SW Issues – 2010Preliminary Results
1
CMMI Status Report
NDIA Systems Engineering Division
April 19, 2010
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 2/13
NDIA Top SE-SW Issues – 2010Preliminary Results
2
CMMI Transition Status
Reported to the SEI as of 2-28-10
TrainingIntroduction to CMMI - 113,148
Intermediate CMMI - 3,020Understanding CMMI High Maturity Practices - 595Introduction to CMMI V1.2 Supplement for ACQ - 1,114Introduction to CMMI V1.2 Supplement for SVC (1 Day) - 1,582Introduction to CMMI Services V1.2 (3 Day)
CMMI Level 2 for Practitioners
CMMI Level 3 for Practitioners
- 189
- 66
- 48
CertifiedIntroduction to CMMI V1.2 Instructors (all certified) - 436CMMI-ACQ V1.2 Instructors (all certified) - 61CMMI-SVC V1.2 Instructors (all certified)
CMMI Level 2 for Practitioners (all certified)
CMMI Level 3 for Practitioners (all certified)
- 111
- 13
- 13
SCAMPI V1.2 Lead Appraisers (all certified) - 486SCAMPI V1.2 High Maturity Lead Appraisers (all certified) - 164CMMI-ACQ V1.2 Lead Appraisers (all certified) - 66CMMI-SVC V1.2 Lead Appraisers (all certified) - 127
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 3/13
NDIA Top SE-SW Issues – 2010Preliminary Results
3
CMMI for Acquisition Transition Statusas reported to the SEI as of 2-28-10
TrainingAcquisition Supplement for CMMI V1.2 - 1,114
Certified
CMMI for Acquisition Supplement Instructors - 61
SCAMPI Lead Appraisers for Acquisition - 66
CMMI-ACQ V1.2 SCAMPI Appraisals Reported
Class A - 6
Class B - 8Class C - 3
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 4/13
NDIA Top SE-SW Issues – 2010Preliminary Results
4
CMMI for Services Transition Statusas reported to the SEI as of 2-28-10
Training
Services Supplement for CMMI V1.2 (1 Day) -1,582
Introduction to CMMI-Services V1.2 (3 Day) - 189
Certified
CMMI for Services Supplement Instructors - 117
SCAMPI Lead Appraisers for Services - 127
CMMI-SVC V1.2 SCAMPI Appraisals Reported
Class A - 6Class B - 1
Class C - 5
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 5/13
NDIA Top SE-SW Issues – 2010Preliminary Results
5
Appraisal Statistics
Data Reported through April 16, 2010
Appraisals through March 19, 2010
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 6/13
NDIA Top SE-SW Issues – 2010Preliminary Results
6
•Record setting
totals for all 4
quarters & overall.
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 7/13
NDIA Top SE-SW Issues – 2010Preliminary Results
7
Annual Appraisal Percentages(Level 2-3 versus Level 4-5)
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 8/13
NDIA Top SE-SW Issues – 2010Preliminary Results
8
Another View
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 9/13
NDIA Top SE-SW Issues – 2010Preliminary Results
9CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 10/13
NDIA Top SE-SW Issues – 2010Preliminary Results
10
Version 1.3 Progress
Through February 2010
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 11/13
NDIA Top SE-SW Issues – 2010Preliminary Results
11
Revised Schedule for CMMI V1.3Models
•Redlines
Aug 2009 – Apri l 2010
•CPsJune – Dec 2009
•Piloting Monthly P-Drafts*Sept 2009 – May 2010
•Updates
May – July 2010
•QAJuly – Nov 1, 2010
•Entire Project = Jan 2009 to November 1, 2010
•PreparationJan – May 2009
•CCB Review of CPs
July – Dec 2009
•CCB Review of CPs/Redlines
Jan 2010 – April 2010
•CCB Review of Updates
July 2010
•HM Orientation for CCB (Sep 2009) •Confirmation of HM Acceptability (Mar 2010)
• * Pilot ing will include candidate so lut ions for appraising mult ip le
constellations as well as a training approach for CMMI.
CMMI Status Report
NDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 12/13
NDIA Top SE-SW Issues – 2010Preliminary Results
12•12
•Status of Model CPsModel CPs Developed
82%
•(In Feb 80% of Model CPs were complete.)
Model CPs that Completed Peer Review
•(In Feb 80% had completed peer review.)
Model CPs that Have Draft Redlines80%
•(In Feb 78% had draft redlines.)
Model CPs Processed by the CCB
Model CPs Submitted to the CCB
•(In Feb 80% had been processed by the CCB.)
•(In Feb 80% had been submit ted to the CCB.)
Redlines Ready for Inclusion in Pilot Drafts
82%
82%
80%
78%•(In Feb 67% had draft redl ines.)
CMMI Status ReportNDIA SED Meeting – April 19, 2010
7/28/2019 CMMI Status Report 041910
http://slidepdf.com/reader/full/cmmi-status-report-041910 13/13
NDIA Top SE-SW Issues – 2010Preliminary Results
13
Change Packages Status
Change Package Title Current StateTarget Date for CCB
Review of CP
1. Appraisal Scoping CP in Draft March 2010
2. Evidence Drafting CP now April 2010
3. CleanupAccumulatingRequirements May 2010
4. QualificationsCP in Draft,
SUT Consensus MeetingScheduled (29 J anuary)
February 2010
5. Other Appraisal Types
Requirements analyzed,
finalization deferredin favor of other CPs TBD
6. Multi-ConstellationInputreceived from
Industry Working Group TBD
7. ARC Done – CCB Complete J anuary 2010
CMMI Status ReportNDIA SED Meeting – April 19, 2010