    The Capability Maturity Modelin Software Development

    Paul X. Harder, JD

    Government Micro Resources, Inc.September 14, 2004

  • 7/30/2019 CMMI Details

    2/23

    The Capability Maturity Model

    What is the Capability Maturity Model

    (CMM)?

    The application of process management and

    quality improvement concepts to software

    development and maintenance.

    A guide for evolving toward a culture of

    engineering excellence. A model for organizational improvement.

  • 7/30/2019 CMMI Details

    3/23

    The Capability Maturity Model

    Working with DoD, Carnegie-Mellon University (CMU)

    created the Software Engineering Institute

    In September 1987, the SEI released a brief description

    of the process maturity framework Two methods,

    software process assessment and software capability

    evaluation and a maturity questionnaire were developed

    to appraise software process maturity.

    In 1991, SEI released the Capability Maturity Model for

    Software version 1.0.

    In 2001, SEI released the Capability Maturity Model

    Integrated, superseding the CMM for software.

  • 7/30/2019 CMMI Details

    4/23

    Focuses on practices that are under control of

    the software group

    Presents a minimum set of recommended

    practices that have been shown to enhance asoftware development and maintenance

    capability

    It defines the expectation (the what)

    Without overly constraining the implementation (the

    how)

    Capability Maturity Model

  • 7/30/2019 CMMI Details

    5/23

    Process Maturity Increases

    Project Success

    Probability

    Proba

    bility

    Probability

    Probabi

    lity

    Probability

    Time/$/ . . .

    Time/$/ . . .

    Time/$/ . . .

    Time/$/ . . .

    Time/$/ . . .

    TargetN

    TargetN

    +a

    TargetN-x

    TargetN-y

    TargetN-z

    1

    2

    3

    4

    5

    MaturityLevels

    Plans based on past performanceare more realistic in Level 2organizations

    With well-defined processes,performance improves in Level 3organizations

    Schedule and cost targets aretypically overrun by Level 1organizations

    Based on quantitativeunderstanding of process andproduct, performance continues to

    improve in Level 4 organizations

    Performance continuouslyimproves in Level 5 organizations

  • 7/30/2019 CMMI Details

    6/23

    CMM-I

    Based on the CMM-SW model created in 1991to assess the maturity of software development,

    with integration into other models.

    Multiple models, based on disciplinesaddressedCMMI - SW: Software Engineering

    CMMI - SE / SW: above plus Systems Engineering

    CMMI - SE / SW / IPPD: above plus Integrated Product &Process Development

    CMMI - SE / SW / IPPD / SS: above plus Supplier

    Sourcing

    C M M I

  • 7/30/2019 CMMI Details

    7/23

    Why We Chose CMM

    CMM today serves as a seal of approval in softwaredevelopment

    CMM helped guide us towards standard, repeatableprocesses reduced learning time on how to get thingsdone

    Standard practices mean time savings to our team -everyone knows what to expect and what to deliver

    Our quality activities became more aligned within theproject rather than thought of as a separate event

    We rely on our processes and our people together, notjust one or the other

    Ideas in CMM creates an environment of improvementif you dont like things one way, make it better!

  • 7/30/2019 CMMI Details

    8/23

    Level Focus Process Areas

    5 OptimizingCont inuous

    Process

    Improvement

    Organizational Innovation and DeploymentCausal Analysis and Resolution

    4 QuantitativelyManaged

    Quantitat ive

    Management

    Organizational Process PerformanceQuantitative Project Management

    3 Defined ProcessStandardizat ion

    Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidation

    Organizational Process FocusOrganizational Process DefinitionOrganizational TrainingIntegrated Project Mgmt (with IPPD extras)Risk ManagementDecision Analysis and ResolutionIntegrated Teaming (IPPD only)Org. Environment for Integration (IPPD only)Integrated Supplier Management (SS only)

    Requirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

    2 ManagedBasic

    Project

    Management

    1 Initial

    QualityProductivity

    RiskRework

    Stages of Process Maturity

  • 7/30/2019 CMMI Details

    9/23

    Level 1: the Initial Level

    Success depends on heroesGood performance is possible - but

    Requirements often misunderstood, uncontrolled

    Schedules and budgets frequently missed

    Progress not measured

    Product content not tracked or controlled

    Engineering activities nonstandard, inconsistent

    Teams not coordinated, not trained

    Defects proliferate

  • 7/30/2019 CMMI Details

    10/23

    CMMI Level 2: Managed

    Baseline the product requirements

    Estimate project parameters,Develop plans and processes

    Measure actual progress to enabletimely corrective actionMeasure for mgmt. info needsVerify adherence of processesand products to requirements

    Identify and control products,changes, problem reportsSelect qualified suppliers / vendors;manage their activities

    CLARIFY REQUIREMENTS

    DOCUMENT PLANS

    TRACK PROGRESS

    CONTROL PRODUCTS

    7 Process Areas

    Requirements Management (REQM)

    Project Planning (PP)

    Project Monitoringand Control (PMC)

    Measurement & Analysis (M&A) Process & Product

    Quality Assurance (PPQA)

    ConfigurationManagement (CM) Supplier Agreement

    Management (SAM)

  • 7/30/2019 CMMI Details

    11/23

    What Happens During Level 2

    Processes become easier to digest andunderstand

    Managers and team members spend less timeexplaining how things are done and more time

    doingProjects are better estimated, better planned,and more flexible

    Quality is integrated into the project

    Costs may go up initially, but do go down overtime

    And yes, there may be more documentation andpaper

  • 7/30/2019 CMMI Details

    12/23

    Clarify customer requirementsSolve design requirements; develop

    implementation processes

    Assemble product components, deliver

    Ensure products meet requirements

    Ensure products fulfill intended use

    Analyze decisions systematically

    Follow integrated, defined processes

    Identify and control potential problems

    Establish org. responsibility for PIDefine the orgs best practices

    Develop skills and knowledge

    ENGINEER THE PRODUCT

    MANAGE THE PROCESSES

    PROVIDE ORG. INFRASTRUCTURE

    CMMI Level 3: Defined11 Process Areas*

    Requirements Definition (RD) Technical Solution (TS)

    Product Integration (PI) Verification (Ver) Validation (Val) Decision Analysis

    & Resolution (DAR)

    Integrated Project Mgmt (IPM) Risk Management (RSKM)

    Org. Process Focus (OPF) Org. Process Definition (OPD) Org. Training (OT)

  • 7/30/2019 CMMI Details

    13/23

    What Happens During Level 3

    Process Improvement becomes the standardCross-Functional teams look for ways to short-cut the system

    Solutions go from being coded to beingengineered

    Quality gates appear throughout the projecteffort with the entire team involved in the

    process, reducing reworkRisks are managed and dont take the team bysurprise

  • 7/30/2019 CMMI Details

    14/23

    MANAGE PROJECTS QUANTITATIVELY

    MANAGE THE ORGANIZATIONQUANTITATIVELY

    CMMI Level 4: Quantitatively

    ManagedStatistically manage the projectsprocesses and sub-processes

    Understand process performance;quantitatively managethe organizations projects

    2 Process Areas

    Quantitative ProjectManagement (QPM)

    OrganizationalProcess Performance (OPP)

  • 7/30/2019 CMMI Details

    15/23

    CMMI Level 5: Optimizing

    Identify and eliminatethe cause of defects early

    Identify and deploy new tools andprocess improvements to meet needsand business objectives

    OPTIMIZE PERFORMANCE

    ADOPT IMPROVEMENTS

    2 Process Areas

    Causal Analysisand Resolution (CAR)

    Organizational Innovationand Deployment (OID)

  • 7/30/2019 CMMI Details

    16/23

    The CMM Maturity Levels

    Maturity Level 1

    ~

    Maturity Level 2

    ~ ~~

    Maturity Level 3

    ~~~~ ~ ~

    Maturity Level 4

    ~~~~~ ~ ~

    Maturity Level 5

  • 7/30/2019 CMMI Details

    17/23

    Proving Maturity Levels

    Five characteristics must be demonstrated in eachpractice to be assessed in that maturity level practiceareas: Commitment to Perform Policies, procedures, and resources to

    perform the work

    Ability to Perform Personnel, tools, and templates in place Activities Performed Documentation and interviews

    demonstrating that policies are implemented

    Measurement and Analysis Metrics and other tools used toevaluate effectiveness of processes

    Verifying Implementation Independent review and evaluation of

    the processesMaturity levels are proven through documentation(policies, procedures, templates) and interviews of staff(to prove institutionalization).

  • 7/30/2019 CMMI Details

    18/23

    Source: http://www.sei.cmu.edu/sema/profile.html

    CMM Process Maturity Profile

    of Software OrganizationsMaturity Level 1987-91 1997 1999 2001 December

    20021- Initial 80% 61% 48% 38% 32%

    2- Repeatable 12% 23% 30% 34% 37%

    3- Defined 7% 14% 16% 20% 21%

    4- Managed 0% 2% 4% 5% 5%

    5- Optimizing 1% 1% 2% 4% 5%

    Organizationsreporting to SEI

    130 795 1179 1641 1998

    http://www.sei.cmu.edu/sema/profile.htmlhttp://www.sei.cmu.edu/sema/profile.html
  • 7/30/2019 CMMI Details

    19/23

    Pitfalls of

    Implementation

  • 7/30/2019 CMMI Details

    20/23

    How Long Does it Take?

    Implementing CMM does not occurovernight.

    Implementing CMM is not merely a paper

    drill.Typical times for implementation:

    3-6 months of preparation

    6-12 months of implementation 3 months of assessment preparation

    12 months for each new level

  • 7/30/2019 CMMI Details

    21/23

    Is it Perfect?

    No! Some implementations do more

    harm than good.

    Complete re-vamp of processes to get

    certified instead of smartly adaptingprocesses.

    Process focus used more as a stick

    than as a carrot. Focusing on compliance instead of

    improvement.

  • 7/30/2019 CMMI Details

    22/23

    Overall Benefits

    Defect rates have dropped

    Defect detection occurs earlier

    User requirements are documented, controlled,

    and managed Especially important when users change their minds!

    Estimating improves and becomes more precise

    Risk management is a practiceDevelopment processes remain agile!

  • 7/30/2019 CMMI Details

    23/23

    Implementation Best Practices

    Be Realistic Some processes will be

    more ready than others.

    Be Flexible Allowing tailoring is key to

    adoption.

    Be Open The key is to learn how to do

    things better, not how to comply.

    Be Patient It does not happen overnight.