CMAA Water Summit Service Provider Executives Forum. July 19, 2010 Richard D. Fox Chairman & Chief Executive Officer Camp Dresser & McKee Inc. Underfunded Investment Is Clear But No Obvious Way Forward. “More for Less”. Infrastructure Investment ($ billions). (Needed). (Needed). - PowerPoint PPT Presentation

Citation preview

Page 1: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

CMAA Water SummitCMAA Water SummitService Provider Executives ForumService Provider Executives Forum

July 19, 2010Richard D. FoxChairman & Chief Executive OfficerCamp Dresser & McKee Inc.

Page 2: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Infr

astr

uctu

reIn

vest

men

t ($

billi

ons)

Water Water ResourceWastewater

Underfunded Investment Is Clear But No Obvious Way

Forward

“More for Less”

(Nee

ded)

(Nee

ded)

(Nee

ded)

(Act

ual)

(Act

ual)

(Act

ual)

Page 3: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

OpportunitiesOpportunities

Improving the Delivery of Assets

Better policies / regulations More sustainable infrastructure Technology advancement Raising the Value of Water

Page 4: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Productivity of US construction versus Productivity of US construction versus productivity gain in non-farm industriesproductivity gain in non-farm industries

Source: US Department of Labor

1964 70 75 80 85 90 95 00

Page 5: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Why?Why?

MasterPlan

InvestmentPhase Design Bid Construct

Design-Bid-Build (D-B-B)

Commission Operate/Maintain

Page 6: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Service Provider OpportunityService Provider Opportunity

MasterPlan

InvestmentPhase Design Bid Construct

Design-Bid-Build (D-B-B)

Commission Operate/Maintain

Lev

el o

f Inv

estm

ent

1 – 5 years 7 – 9 years 20 – 30 years

Page 7: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Seizing the OpportunitySeizing the Opportunity

Gain Productivity:• Eliminate interfaces• Lower LOE• Reduce re-work• Reduce schedule• Reduce change orders

Improve Owner Comfort:• Visualization• Transparency

Rationale Risk Transfer:• Procurement process• Knowledgeable advisor• Co-sponsored risk register

Collaborative 4-D Design

Page 8: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Owner ComfortOwner Comfort

Rehab Consistency Aesthetics/

Noise/Odor

High levels ofdesign control

Traditional design build

EPCM

Procure 65 % Design Negotiate Construct/Commission

– – –

Page 9: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

TransparencyTransparency

Procure Design / Construct / Commission

D-BCompetitive Price / 10% Design Escalation

Change Orders

D-B-B Criteria/Price MarketCompetitivePrice

ChangeOrders Criteria/Price

Construction Manager

Select Designer Design Bid Construct Commission

EPCM

Procure 65 % Design Negotiate Construct/Commission

Target Price

Criteria/Design

Firm Price

Sub-bids

Page 10: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Risk TransferRisk Transfer

General Liability Insurance0.1% - 0.2%

Errors/Omissions Professional Liability 0.1% - 0.3%

Worker Injury Workman’s Compensation 0.1% -

3.0% Contractor Payment Bonds 0.5% - 1.0%

Contractor Performance-Schedule Liquidated Damages 0% -

10% -Overall Contractual Transfer0% - 7%

Force Majuere Contract Exclusion 0% - 0%

Facilities Performance Contract Transfer (warranty) 0% - 3%

Limits on Liability Contractual Terms Erratic/Exorbitant

Consequentials Contractual TermsErratic/Exorbitant

RISKS MEANS/METHODS PRICING

Page 11: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

4-D Design4-D Design

Page 12: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

Orlando DB CenterOrlando DB Center

Page 13: CMAA Water Summit Service Provider Executives Forum

listen. think. deliver.

SummarySummary

Global forces demand “More For Less” Productivity of traditional delivery Design Control = Modified D/B or EPCM Transparency

– A real, client specific issue– Discuss it / manage it

Risk Transfer – Rationale – Fair Pricing– Full – Exorbitant Pricing/No Responsible players