14
CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Embed Size (px)

Citation preview

Page 1: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

CMAA 2010 Owners Forum Joe P. Gionfriddo

May 3, 2010

Corporate Engineering Global Construction Manager

The Procter & Gamble Company

Page 2: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Agenda:

• Business • Success Drivers • Practices • Leveraging scale • Innovation / Breakthrough• In touch & connected • Questions

We build the business, safely!

Page 3: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Global Consumer Products Industry Leader

• 76.7 Billion Sales • Employees: 135,000, Engineers: 2000• Operations: >80 countries • Trusted Brands touch the lives of consumers

>180 countries. • 22 - Billion dollar brands w/ > $1Billion in sales. • Global Business Unit Structure

Page 4: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Success Drivers Power of People, Mind, & Agility

• Purpose, Values, & Principles (PVP)

• Promote & develop internally.

• Horizontal Work Process.

• Internal / External Skill Development.

• Rotational Assignments.

• Technical / Managerial Career Paths.

Page 5: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Capital Management More with less.

Capital Spending (> $3.0 Billion)

11%

40%

11%

38%

Asia - Pacific

North America

Latin America

Europe - Middle East -Africa

> $3.0 Billion Capital

40 % Construction

Highest Growth in P&G History

Page 6: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Safety Nothing we do is worth getting hurt for!

• Global Total Incident Rate: .38 TIR • P&G / Contractor Safety Networks. • Principle based behavioral focused. • Safety Blue print foundation. (CURT

Construction User Round table)• Raising the expectation bar globally. • Going Beyond Zero.

Page 7: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Best Practices P&G Construction: Touching >600 practitioners/yr.

• Foundation – Built from CII best practices. – Workshops– Networks – Community of Practice– Mentoring / Coaching– Instructor Lead Face

to Face – Web based

• Challenges: – Knowing your people– Virtual interface. – Travel budget

reductions

Page 8: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Leveraging Scale

• Engineering – Global • Equipment – Global • Labor – Local / Regional • Raising the global bar in expectations

– Safety– Quality– Schedule – Cost

Page 9: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Innovation Journey

• Opportunities:

– Focus on optimizing the whole.

– Getting back to basics. – Integration of new

emerging technologies. – Attraction of the future

generations.

• Challenges:

– Rapidly moving a company our size on a dime.

– Mging. continuous work flow.

– Less Mobile workforce.

Page 10: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Constructability

Modularization

E-Technologies

Loss EliminationAnalysis

Peer Reviews

Lean Project Delivery (LPD)

Pri

ncip

les

Focu

s A

reas

Modularization (PPMSOF) = Preassembly – Prefabrication – Module

– Skid – Off site Fabrication

1

Increased project participants interactions

Projects are networks of commitments

Optimize the project, not the pieces

Tightly couple learning with the continuous improvement cycle

P&G and Supplier Collaboration

2

3

45

Our Journey to Competitive Advantage!

(End 2 End)

VSUConstruction Driven Engineering Concepts

Page 11: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Where to play?

Deliver Specific Projects w/LPD

Horizontal Transformation

Expand Knowledge Via Regional COPs

Award Contracts toInnovative Proposal Options applying LEAN Tools & Concepts

Project Loss Analysis Work Process Simplification

TARGETED LEAN STRATEGY APPROACH to Delivery System Improvement Productivity Savings of Capital Project Cost

Drive Supplier Relation Collaboration top to top Discussions.

Page 12: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

CII + CMAA Alliance “Best Practices & Best Practitioners”

• Networking• Trusted Communication• CII Leading Industry Research • Leadership & Professional growth via

Certified Construction Mgrs.(CCM) certification technical competence.

• Body of knowledge combination breadth. • Access to best practices, information forums,

events, & more…..

“In touch & connected”

Page 13: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

Questions

Page 14: CMAA 2010 Owners Forum Joe P. Gionfriddo May 3, 2010 Corporate Engineering Global Construction Manager The Procter & Gamble Company

CMAA Owners

Forum