Sponsored by the National Science Foundation 1 Nov 4, 2010 Cluster-D Mtg at GEC9 Tue, Nov 2, 12noon – 4:30pm Meeting Chair: Ilia Baldine (RENCI) System Engineer: Harry Mussman (GPO, Raytheon BBN Technologies) • Introductions (12noon) Spiral 3 Goals (12:05pm) Proposed Spiral 3 Roadmap for Discussion (12:15pm) ORCA Features (1pm) Break (1:40pm) Cluster D Project Plans for Spiral 3 (2pm) Open Discussion (3:30pm) • Adjourn (4pm)

Cluster-D Mtg at GEC9 Tue, Nov 2, 12noon – 4:30pm

  • Upload
    aira

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Cluster-D Mtg at GEC9 Tue, Nov 2, 12noon – 4:30pm. Meeting Chair: Ilia Baldine (RENCI) System Engineer: Harry Mussman (GPO, Raytheon BBN Technologies) Introductions (12noon) Spiral 3 Goals (12:05pm) Proposed Spiral 3 Roadmap for Discussion (12:15pm) ORCA Features (1pm) Break (1:40pm) - PowerPoint PPT Presentation

Citation preview

Page 1: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 1Nov 4, 2010

Cluster-D Mtg at GEC9 Tue, Nov 2, 12noon – 4:30pm

• Meeting Chair: Ilia Baldine (RENCI)– System Engineer: Harry Mussman (GPO, Raytheon BBN

Technologies)

• Introductions (12noon)• Spiral 3 Goals (12:05pm)• Proposed Spiral 3 Roadmap for Discussion

(12:15pm)• ORCA Features (1pm)• Break (1:40pm)• Cluster D Project Plans for Spiral 3 (2pm)• Open Discussion (3:30pm)• Adjourn (4pm)

Page 2: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 2Nov 4, 2010

Introductions(12noon, All)

Page 3: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 3Nov 4, 2010

Spiral 3 Goals (12:05pm, Mussman)

• Experiments: – Use by outside researchers– Use involving multiple aggregates– Use for research experiments

• Some expected experiments using Cluster D during Spiral 3:– Programmable Packet Networks over Dynamic Circuit Substrate (Jeff Chase, Xiaowei

Yang)– Optical-layer experiments (BEN network, ERM sensors and actuators, IMF capabiliites)– Mobile wireless experiments (DOME)– Nowcasting experiments, using weather data from ViSE radar, processed in local cluster

and/or cloud (ViSE and DICLOUD)– Sensor network experiments (Kansei, Neteye)– Robotics experiments (OKGems)

• Interoperability:– Researchers can obtain and stitch resources from multiple aggregates– Researchers from other CFs (e.g., protoGENI) can obtain resources from Cluster D

aggregates via GENI AM API – Researchers in Cluster D can obtain resources from aggregates other CFs (e.g.,

protoGENI)via GENI AM API

Page 4: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 4Nov 4, 2010

Proposed Spiral 3 Roadmap for Discussion (12:15pm, Mussman and Baldine)

• Cluster D clearinghouse from Spiral 2: – Operational readiness– Connectivity by aggregates– Features

• Cluster D connectivity from Spiral 2: – Control framework message flows between actors – Component programming via SSH – VLAN connectivity to Internet 2 or NLR – Many VLANs – Bridge between backbone networks – Ability to control setup of VLANs as part of experiment – Ability to control setup of VLANs as part of experiment

involving multiple aggregates

Page 5: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 5Nov 4, 2010

continued

• Task list for Spiral 3: – Streamline Cluster D site setup and operation, including

cluster (Eucalyptus) and connector (L2 switch, with full tag mapping)

– Streamline connectivity to Cluster D sites on campuses, via regional networks (LEARN project)

– Plan to allow Cluster D researchers to obtain and stitch resources from multiple Cluster D sites, connected by backbone domain, using their SM.

– Plan to authenticate users in SM via InCommon/Shibboleth – With other CFs, a plan for consistent names and interfaces – With other CFs, a plan for resource descriptions at

interoperability interfaces – Plan to interop with other CFs, particularly from and to

protoGENI (Cluster C)

Page 6: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 6Nov 4, 2010

continued

– Plan to allow GENI (e.g., protoGENI) researchers to obtain resources via GENI AM API v1.0 (using RSpec resource description)

– Plan to allow Cluster D researchers to include tools (e.g., GUSH) to help authorize, reserve, assign and configure resources via “ORCA SM API v1.0” XMLRPC interface to their SM (similar to protoGENI AM API, or possibly same as GENI AM API v2.0)

– Plan for Cluster D researchers to get resources from protoGENI aggregates via GENI AM API v1.0 (or possibly protoGENI AM API) (using RSpec resource description)

– Plan for naming and stitching L2 connectivity across Cluster C (protoGENI), and Cluster D sites

– Plan for operations portal into Cluster D site, including status and logs, with connections to GMOC

Page 7: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 7Nov 4, 2010

continued

• Demos for GEC10– Demo experiment where Cluster D researchers obtain and

stitch resources from multiple Cluster D sites (and backbone domains) using their SM.

– Demo experiment where protoGENI researchers obtain resources via GENI AM API v1.0, using RSpec resource description.

– Demo operations portal into Cluster D site, for status and logs, with connections to GMOC

Page 8: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 8Nov 4, 2010

continued

• Demos for GEC11: – Demo experiment where Cluster D researchers get

resources from protoGENI aggregates via GENI AM API v1.0 (or possibly protoGENI AM API) (using RSpec resource description)

– Demo experiment where Cluster D researchers stitch L2 connectivity across Cluster C (protoGENI), and Cluster D sites

– Demo experiment where Cluster D researchers include tools (e.g., GUSH) to help authorize, reserve and assign resources via “ORCA SM API v1.0” XMLRPC interface to their SM (similar to protoGENI AM API, or possibly same as GENI AM API v2.0)

Page 9: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 9Nov 4, 2010

continued

• Figure 1-1) and 1-2): Cluster D Config at end of Spiral 3– Each Cluster D site is a self-contained aggregate, which

can offer resources to all of GENI using GENI AM API.

Page 10: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 10Nov 4, 2010

Figure 1-1) Cluster D Config at end of Spiral 3

Page 11: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 11Nov 4, 2010

Figure 1-2)Cluster D Config at end of Spiral 3

Page 12: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 12Nov 4, 2010

continued

• Figure 2): ORCA Site Config – Adding interface for Site and GMOC admin/operations– Adding ExpCntrlTools– Adding Measurement Tools (various I&M projects)

– Adding UserWorkspaceSrvc and DigitalObjectArchiveSrvc (CNRI project)

Page 13: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 13Nov 4, 2010

Figure 2)ORCA Site Config

Page 14: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 14Nov 4, 2010

continued

• Figure 3): Multiple ORCA Sites – Actors exchange ORCA messages– Supports stitching

– Supports advanced reservations

Page 15: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 15Nov 4, 2010

Figure 3)Multiple ORCA Sites

Page 16: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 16Nov 4, 2010

continued

• Figure 4): ORCA Interop with protGENI – Both from and to protoGENI– Expect to be able to stitch both Cluster D and protoGENI

resources

Page 17: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 17Nov 4, 2010

Figure 4)ORCA Interop with protGENI

Page 18: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 18Nov 4, 2010

continued

• Figure 5): ORCA Experiment Flow – All steps need to be supported, per I&M architecture

Page 19: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 19Nov 4, 2010

Figure 5)ORCA Experiment Flow

Page 20: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 20Nov 4, 2010

ORCA Features: Spiral 2 report and Spiral 3 roadmap

(1pm, Baldine) • Upcoming Bella 2.2 status • Bella 2.2 Features in detail

– XMLRPC controller – Eucalyptus integration and NEuca extensions – Euca site experiment topology embedding – Format conversions (http://geni-test.renci.org:11080/ndl-

conversion/convert.jsp) – Actor registry

• Bella 3.x upcoming Spiral 3 features – New substrate support – Experiment support – Authentication and authorization

Page 21: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 21Nov 4, 2010

continued

• ProtoGENI interoperability – Connectivity planning – Naming and format conversions – Handlers and policies – Tools integration

• Clearinghouse and intra-cluster connectivity – Status – Actor registry – Future

Page 22: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 22Nov 4, 2010

Break (1:40-2:00pm)

Page 23: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 23Nov 4, 2010

Cluster D Project Plans for Spiral 3 (2pm - 3:30pm)

• Each project should prepare NO MORE THAN THREE slides for presentation, and upload to the wiki:

• 1) Functions and features planned for Spiral 3:• 2) Connectivity planned for Spiral 3:

– Component programming via SSH? – VLAN connectivity to Internet 2? NLR? How many VLANs? – Ability to control setup of VLANs as part of experiment?

• 3) Experiments planned for Spiral 3: – Use by outside researchers? – Use involving multiple aggregates? – Use for research experiments?

Page 24: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 24Nov 4, 2010

Projects

• ORCA/BEN, Ilia Baldine• DOME, Brian Lynn• ViSE, David Irwin• DICloud, Michael Zink• KANSEI, Anish Aurora• OKGems, Andy Li• ERM, Keren Bergman• IMF, Rudra Dutta • LEARN, Deniz Gurkan• iGENI, Joe Mambretti

Page 25: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 25Nov 4, 2010

Open Discussion (3:30pm)

• Who is going to work with the ORCA group on the following tasks? – Streamline Cluster D site setup and operation, including

cluster (Eucalyptus) and connector (L2 switch, with full tag mapping)

– Streamline connectivity to Cluster D sites on campuses, via regional networks (LEARN project)

– Plan to allow Cluster D researchers to obtain and stitch resources from multiple Cluster D sites, connected by backbone domain, using their SM.

– Plan to authenticate users in SM via InCommon/Shibboleth? – With other CFs, a plan for consistent names and interfaces – With other CFs, a plan for resource descriptions at

interoperability interfaces

Page 26: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 26Nov 4, 2010

continued

– Plan to interop with other CFs, particularly from and to protoGENI (Cluster C)

– Plan to allow GENI (e.g., protoGENI) researchers to obtain resources via GENI AM API v1.0 (using RSpec resource description)

– Plan to allow Cluster D researchers to include tools (e.g., GUSH) to help authorize, reserve, assign and configure resources via “ORCA SM API v1.0” XMLRPC interface to their SM (similar to protoGENI AM API, or possibly same as GENI AM API v2.0)

– Plan for Cluster D researchers to get resources from protoGENI aggregates via GENI AM API v1.0 (or possibly protoGENI AM API) (using RSpec resource description)

– Plan for naming and stitching L2 connectivity across Cluster C (protoGENI), and Cluster D sites

– Plan for operations portal into Cluster D site, including status and logs, with connections to GMOC

Page 27: Cluster-D Mtg at GEC9  Tue, Nov 2, 12noon – 4:30pm

Sponsored by the National Science Foundation 27Nov 4, 2010

Adjourn (4:00pm)