Lr. No. AA/EWS/2401/MBD/2021-22/Dis-AMRO/0454 Date: 05.10.2021 To, The Execuve Engineer, Construcon division, Jal Nigam Office Amroha District, Uar Pradesh-244221. Sub: Consultancy services for Third Party Inspecon and Monitoring of Physical and Financial Progress of various Rural Water Supply Projects in the state of Uar Pradesh – Cluster -14 Moradabad (Revenue Division, Amroha- District -Submission of Site Inspecon Report of Rukhalu rural water supply scheme- Under JJM-Reg. Ref: - 1. TPI LoA– Ref. No: 2713/W-23/NIT/2020-21, dated: 05.03.2021& Agreement, dated 12-03-21. 2. RFI, Dated: 25-09-2021. With reference to the RA Bill 2 nd cited above and as per your instrucons, our TPI team had visited the respecve Retrofing works of each scheme at site as listed below. S. No. Scheme & District Name Name of Contracng Agency RA Bill Details (Bill Number, Date & Amount claimed Date of Inspecon 1 Rukhalu rural water supply scheme & Amroha M/S RR Associate RA02, MB 229-L, Page no 143 to 153,20/02/2021& 427348/- 25/09/2021 The TPI report is being submied along with the observaons made during field verificaon of the RA Bill and enclosed herewith as Annexure- I. Status of Bill Verified. The work was found ok based on sample checking. Thanking you and assuring you of our best services at all mes. With regards, Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. (Rajeev Agrawal) Project Manger TPI Moradabad Cluster-14 Enclosure: TPI report as Annexure-I. Copy to: 1. Execuve Director, SWSM, Lucknow - for kind informaon. 2. CDO, Amroha district- for kind informaon. 3. Nodal Officer, SWSM, Lucknow- for kind informaon. 4. Head Office, Aarvee Associate, Hyderabad- for kind informaon.

Cluster -14 Ref S

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Lr. No. AA/EWS/2401/MBD/2021-22/Distt-AMRO/0454 Date: 05.10.2021

To,

The Executive Engineer,Construction division,Jal Nigam Office Amroha District,Uttar Pradesh-244221.

Sub: Consultancy services for Third Party Inspection and Monitoring of Physical and FinancialProgress of various Rural Water Supply Projects in the state of Uttar Pradesh – Cluster -14Moradabad (Revenue Division, Amroha- District -Submission of Site Inspection Report of Rukhalurural water supply scheme- Under JJM-Reg.

Ref: - 1. TPI LoA– Ref. No: 2713/W-23/NIT/2020-21, dated: 05.03.2021& Agreement, dated 12-03-21.2. RFI, Dated: 25-09-2021.

With reference to the RA Bill 2nd cited above and as per your instructions, our TPI team had visitedthe respective Retrofitting works of each scheme at site as listed below.

S.No.

Scheme & DistrictName

Name ofContracting

Agency

RA Bill Details(Bill Number, Date & Amount

claimed

Date ofInspection

1Rukhalu ruralwater supply

scheme & Amroha

M/S RRAssociate

RA02, MB 229-L, Page no 143 to153,20/02/2021& 427348/- 25/09/2021

The TPI report is being submitted along with the observations made during field verification of the RABill and enclosed herewith as Annexure- I.

Status of Bill – Verified.

The work was found ok based on sample checking.

Thanking you and assuring you of our best services at all times.

With regards,

Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

(Rajeev Agrawal)Project MangerTPI Moradabad Cluster-14

Enclosure: TPI report as Annexure-I.

Copy to:1. Executive Director, SWSM, Lucknow - for kind information.2. CDO, Amroha district- for kind information.3. Nodal Officer, SWSM, Lucknow- for kind information.4. Head Office, Aarvee Associate, Hyderabad- for kind information.

ANNEXURE-I

Bill Inspection - TPI Report

TPI for Monitoring and Supervision of various Rural Water Supply Projects under Jal Jeevan Mission– Inspection of retro-fitting work under Rukhalu Rural Scheme Water Supply Scheme.

A. General detailsS. No. Particulars Information

1 Name of District Amroha2 Name of Block Gangeshwari3 Name of Panchayat Rukhalu4 Name of Village Rukhalu5 Name of Scheme Rukhalu Rural Water Supply Scheme6 Name of Work Retrofitting7 Name of TKC (Contracting Agency) M/S RR Associate8 TKCs Agreement No. & Date 30/EE/2020-20219 Bill No. & Date RA-02 &20/02/2021

10 Amount of Bill (In Rs.) 427348

11 Type of Bill (Supply/ Laying/ Construction/other) FHTC & laying of pipe line

12 Date of Bill Received 25/09/202113 Date of Inspection 25/09/202114 Details of Inspecting Persons-

14.1 Name & Designation of UPJN Representatives

Mr. Pradeep Kumar(Junior Engineer)

14.2 Name & Designation of TPIA Representatives

Mr. SM Hizfur Rahman (QC/QA Engineer)

14.3 Name & Designation of TKC Representatives

Not available

B. Details of documents

S. No. Name of Document Remark(Provided/ Not Provided)

1 BOQ & Price Schedule Provided

2 Payment terms & Conditions/breakup Provided

3 Copy of RA Bill Provided

4 Previous claimed bill (if any) Not Provided

5 Certification from TKC that all these items are not claimed previously.

Not Applicable

A Pump house

1 Design Mix Not Applicable

2 Slump Test Report Not Applicable

3 Cube Test Report Not Applicable

4 Soil Test Report Not Applicable

2

5 Brick Test Report Not Applicable

6 Steel Test Report (Manufacturing Test Certificate - MTC) Not Applicable

7 Cement Test Report (MTC) Not Applicable

8 Aggregate (Fine & Coarse) Test Report Not Applicable

9 Silt Content Test Report for sand Not Applicable

10 Pipe Test Report (MTC) Not Applicable

11 Water Quality Test Report Not Applicable

B Over Head Tank

1 Design Mix Not Applicable

2 Slump Test Report Not Applicable

3 Cube Test Report Not Applicable

4 Soil Test Report Not Applicable

5 Steel Test Report (MTC) Not Applicable

6 Cement Test Report (MTC) Not Applicable

7 Aggregate (Fine & Coarse) Test Report Not Applicable

8 Silt Content Test Report for sand Not Applicable

9 Pipe Test Report (MTC) Not Applicable

10 Water Tightness Test Report Not Applicable

11 Water Quality Test Report Not Applicable

C Staff Quarter

1 Design Mix Not Applicable

2 Slump Test Report Not Applicable

3 Cube Test Report Not Applicable

4 Soil Test Report Not Applicable

5 Brick test report Not Applicable

6 Steel Test Report (MTC) Not Applicable

7 Cement Test Report (MTC) Not Applicable

8 Aggregate (Fine & Coarse) Test Report Not Applicable

9 Silt Content Test Report for sand Not Applicable

10 Water Quality Test Report Not Applicable

D Bore Well

1 Geo Electric Resistivity Tomography Report Not Applicable

2 Compressor Test Report Not Applicable

3 Yield Test Report - OP Unit Not Applicable

4 Verticality Test Report Not Applicable

5 Strata Chart Not Applicable

6 Water Test Laboratory Not Applicable

E Distribution System

1 Field Hydro Test Report Not Applicable

2 Pipe (DI/ HDPE) Test Report (MTC) Provided

3

3 Specials (Bends/ Tees/ Reducers) Material Test Report (MTC) Not Applicable

4 Valves Test Report (MTC) Not Applicable

F FHTC

1 Pipe (GI/MDPE) Test Report (MTC) Provided

2 Specials (Saddle, Ferrules, Tap) Material Test Report (MTC) Not Applicable

3 Household Service Connection List Provided

C. Work status details (Write down all items claimed in the RA bill)C.B.itemNo.

Description of itemsObservation on quality of work as per site

inspection (Defects/ GeneralObservations / Remedial Measures)

1.

Reinstatement of the folloing type road surface withold and new material including supply of allmaterials, labour, T&P etc. Required for propercompletion of the work as per instruction ofEngineer- in –Charge. As per PWD specification

1.1Laying of cc road with concrete of 1:2:4 (1 cement,2coarse sand, 4 coarse aggregate) thickness may betaken according to PWD specification of therespective roads and proper compaction.

As per Specification

1.2

Reinstatement of CC tiles soling including dressingsurface filling of joints with local sand spreading andblinding coat of 10mm to 25mm deep of local sandover the entire surface and including all labour andT&P etc. Required for proper completion of work.

As per Specification

2.

Leakage repairing of existing pipe line of followingdie include bailing out of water cutting and jointingof p.v.c./DI Pipes using P.V.C./DI Detachable jointand pipe gap pipes as requirement including cost oftrenches as well as including supply of all material,labour T&P etc complete required for propercompletion of work

2.1 160MM DIA As per Specification

2.2 110 MM DIA As per Specification

2.3 75MM DIA As per Specification

2.4 63MM DIA As per Specification

3. Functional house taps water connection:Supply all material like HDPE pipe 20mm Dia (PN-16PE 80 or above) and GI pipe medium quality 15mmDía,special and fittings such as brassferrule,clamp,service saddle,bib cock 3 numbers etc.complete as per relevant I.S specification for makinghouse connection including dismantling&reinstatement of all type of roads, excavation,

4

C.B.itemNo.

Description of itemsObservation on quality of work as per site

inspection (Defects/ GeneralObservations / Remedial Measures)

cutting of HDPE/GI pipe etc. complete in all respectin 63mm dia to 200mm dia PVC/DI/CI/AC pipe

3.1 FHTC As per Specification

D. Status-Bill Verification status ReasonVerified The work was found ok based on sample checking.

E. Other observationsAs the TPI was asked to conduct the inspection after completion of the work by TKC, therefore the aboveobservations are specifically for the overall works executed on sample basis and not for individual itemswhich were not visible. The TKC may be notified from your end to take corrective measure at the earliest.

Rectification of above-mentioned defects and submission of pending documents and reports may beensured before release of payment to the Contractor. Otherwise, applicable penalty may be imposed bydeducting suitable amount from the RA Bill as per the Payment terms and conditions of contractagreement done between UPJN and TKC

Mr. S M Hizfur Rahman(QC/QA Engineer)TPI-Amroha

5

Photographs of site observations

Fig .1 Full OHT view Fig .2 FHTC in CC tile road

Fig.3 FHTC in CC road Fig.4FHTC in BOE road

6

Fig .5 FHTC in Earthen road Fig.6 Reinstatement of cc tile road

Fig.7Repairing of leakage of 63mm dia Fig.8 Repairing of leakage of 160mm dia

7

Fig .9 Repairing of leakage 110mm Fig.10 Reinstatement of C C tile road &Repairingof leakage of 75mm dia