CLRC 08-09 & 09-10

Embed Size (px)

Text of CLRC 08-09 & 09-10

"G"SCHEDULEBSR(Provisional) 2006-07 & 2007-08 of Jaipur Discom

M/s.. Address..... .....

Phone No.-

CHAPTER NO.

TITLE

RATE QUOTED OF BSR % Above % Below

CHAPTER-1 CHAPTER-2 CHAPTER-3 CHAPTER-4 CHAPTER-5 CHAPTER-6 CHAPTER-7 CHAPTER-8 CHAPTER-9 CHAPTER-10 CHAPTER-11 CHAPTER-12 CHAPTER-13 CHAPTER-14 CHAPTER-15 CHAPTER-16 CHAPTER-17 CHAPTER-18 CHAPTER-19 (A) CHAPTER-19 (B) CHAPTER-20 CHAPTER-21 CHAPTER-22 CHAPTER-23 CHAPTER-24 (A) CHAPTER-24 (B) CHAPTER-25 CHAPTER-26 (A) CHAPTER-26 (B)

SURVEY,DRESSING AND TRIMMING EARTH WORKS INCLUDING FOUNDATION ACTIVITIES TRANSPORTATION OF MATERIAL LOADING AND UNLOADING OF MATERIAL ERECTION OF SUPPORTS & STAYS ASSEMBLY OF VARIOUS ITEMS STRINGING OF CONDUCTOR/ EARTH WIRE EARTHING OF LINE AND SUB-STATIONS METER AND SERVICE LINES ERECTION OF 33KV SUB-STATIONS & BUS BAR LAYING OF HT/LT CONTROL CABLE INSTALLATION OF C&R PANEL KIOSKS BREAKERS ETC. PAINTING WORKS LIGHTING FIXTURES FABRICATION MAINTENANCE OF LINES MAINTENANCE OF 11/0.4KV SUB-STATION OPERATION AND MAINTENANCE OF 33/11 KV SUB-STATION FENCING WORKS KUTIR JYOTI CONNECTION IN RURAL AREA KUTIR JYOTI CONNECTION IN RURAL AREA ERECTION AND COMMISSIONING OF CABLE ERECTION AND COMMISSIONING OF CAPACITOR AND CAPACITOR BANK LABOUR HIRE CHARGES OF PLANTS AND MACHINERIES SUPPLY FOR INSTALLATION OF SINGLE PHASE TRANSFORMER TRANSPORTATION AND ERECTION FOR INSTALLATION OF SINGLE PHASE TRANSFORMER REPLACEMENT OF 11 KV CT PT SETS SUPPLY OF MATERIAL FOR HT METERING ON DISTRIBUTION TRANSFORMER TRANSPORTATION /ERECTION OF MATERIAL FOR HT METERING ON DISTRIBUTION TRANSFORMER

JAIPUR DISCOM

CENTRAL LABOUR RATE CONTRACTFOR THE YEAR 2008-09 & 2009-10

JAIPUR VIDYUT VITARAN NIGAM LIMITED. JAIPUR

COST Rs. 500/-

INDEXCHAPTER NO.CHAPTER-1 CHAPTER-2 CHAPTER-3 CHAPTER-4 CHAPTER-5 CHAPTER-6 CHAPTER-7 CHAPTER-8 CHAPTER-9 CHAPTER-10 CHAPTER-11 CHAPTER-12 CHAPTER-13 CHAPTER-14 CHAPTER-15 CHAPTER-16 CHAPTER-17 CHAPTER-18

TITLESURVEY,DRESSING AND TRIMMING EARTH WORKS INCLUDING FOUNDATION ACTIVITIES TRANSPORTATION OF MATERIAL LOADING AND UNLOADING OF MATERIAL ERECTION OF SUPPORTS & STAYS ASSEMBLY OF VARIOUS ITEMS STRINGING OF CONDUCTOR/ EARTH WIRE EARTHING OF LINE AND SUB-STATIONS METER AND SERVICE LINES ERECTION OF 33KV SUB-STATIONS & BUS BAR LAYING OF HT/LT CONTROL CABLE INSTALLATION OF C&R PANEL KIOSKS BREAKERS ETC. PAINTING WORKS LIGHTING FIXTURES FABRICATION MAINTENANCE OF LINES MAINTENANCE OF 11/0.4KV SUB-STATION OPERATION AND MAINTENANCE OF 33/11 KV SUB-STATION FENCING WORKS

PAGE NO.1 2 5 8 9 12 18 21 23 26 27 32 33 34 35 40 43 46 47

CHAPTER-19 (A) SUPPLY OF MATERIAL FOR KUTIR JYOTI CONNECTION IN RURAL AREA

CHAPTER-19 (B) TRANSPORTATION AND ERECTION FOR KUTIR JYOTI CONNECTION IN RURAL AREA 48 CHAPTER-20 CHAPTER-21 CHAPTER-22 CHAPTER-23 CHAPTER-24 ERECTION AND COMMISSIONING OF CABLE ERECTION AND COMMISSIONING OF CAPACITOR AND CAPACITOR BANK LABOUR HIRE CHARGES OF PLANTS AND MACHINERIES REPLACEMENT OF 11 KV CT PT SETS 50 52 53 54 57 58 59 60

CHAPTER-25 (A) SUPPLY OF MATERIAL FOR HT METERING ON DISTRIBUTION TRANSFORMER TRANSPORTATION /ERECTION OF MATERIAL FOR HT METERING ON CHAPTER-25 (B) DISTRIBUTION TRANSFORMER STANDARD DATA

CLRC FOR THE YEAR 2006-07 &2007-08 JAIPUR DISCOM. CHAPTER NO.1 SURVEY,DRESSING AND TRIMMING DESCRIPTION OF WORK Chapter Code No 1 2 1.1 Conducting route survey as per approved Route map and pegging of route with tee off point section point & double pole locations. 1.2 Grass cutting and surface dressing including removal of unwanted/rubbish plants with roots from open ground /yard and other Nigam premises with stacking of grass/plants at desired place near the ground. 1.3 1.3.1 Levelling of ground Levelling of ground up to 30 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & 1.3.2 marking of boundary with lime powder.(Including all lead & lifting) Levelling of ground above 30 CM.to 90 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting) Sq.Mtr 5.80 UNIT 3 Km. Rate/Unit 4 171.90

Sq.Mtr

0.90

Sq.Mtr

1.30

1.4

Trimming of tree branches/plants and preparing route approchases for Per tree/plant proposed line.

25.80

NOTE: The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra by Nigam if applicable.

CHAPTER NO.2 EARTH WORKS INCLUDING FOUNDATION ACTIVITIESChapter DESCRIPTION OF WORK Code No 1 2 Excavation of pit in soil (ordinary) to erect various support and stay set 2.1 including stacking of excavated soil from the edge of excavation. (A) Height of poles/R.S.Joist/M.S. Rail Size of pit IN URBAN AREA 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.2 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep 9 Mtr/ 1.2mx0.6mx1.50 m deep 10/11 Mtr/ 1.2mx0.6mx1.65 m deep IN RURAL AREA 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep 9 Mtr/ 1.2mx0.6mx1.50 m deep 10/11 Mtr/ 1.2mx0.6mx1.65 m deep (B) Lattice Tower /Size of pit 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep (C)Stay set/Depth of pit 8'x 3/4" -0.75x0.5x1.6 m 6'x 5/8" -0.75x0.5x1.35 m Excavation of pit in Hard soil (A) Height of poles/R.S.Joist/M.S. Rail Size of pit IN URBAN AREA 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 2.3 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep 9 Mtr/ 1.2mx0.6mx1.50 m deep 10/11 Mtr/ 1.2mx0.6mx1.65 m deep IN RURAL AREA 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep 9 Mtr/ 1.2mx0.6mx1.50 m deep 10/11 Mtr/ 1.2mx0.6mx1.65 m deep (B) Lattice Tower /Size of pit 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep (C)Stay set/Depth of pit 8'x 3/4" -0.75x0.5x1.6 m 6'x 5/8" -0.75x0.5x1.35 m Excavation of pit in ordinary rock which does not require blasting to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. (A) Height of poles/R.S.Joist/M.S. Rail /Size of pit 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep 9 Mtr/ 1.2mx0.6mx1.50 m deep 10/11 Mtr/ 1.2mx0.6mx1.65 m deep (B) Lattice Tower /Size of pit 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep Pit Pit 845.60 1010.60 Pit Pit Pit 155.60 165.00 176.20 Pit Pit 51.60 45.40 Pit Pit 216.60 229.00 Pit Pit Pit 61.90 66.00 70.10 Pit Pit Pit 61.90 66.00 70.10 Pit Pit 46.90 41.20 Pit Pit 196.90 208.10 Pit Pit Pit 56.30 60.00 63.80 Pit Pit Pit 56.30 60.00 63.80 UNIT 3 Rate/Unit 4

Chapter Code No 1 (C)Stay set/Depth of pit 2.3.6 2.3.7 2.4 8'x 3/4" -0.75x0.5x1.6 m

DESCRIPTION OF WORK 2

UNIT 3 Pit Pit

Rate/Unit 4 150.00 135.00

6'x 5/8" -0.75x0.5x1.35 m Excavation of pit in Hard rock ( Where blasting is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. (A) Height of poles/R.S.Joist/M.S. Rail /Size of pit 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep 9 Mtr/ 1.2mx0.6mx1.50 m deep 10/11 Mtr/ 1.2mx0.6mx1.65 m deep (B) Lattice Tower /Size of pit 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep (C)Stay set/Depth of pit 8'x 3/4" -0.75x0.5x1.6 m 6'x 5/8" -0.75x0.5x1.35 m Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter. Soft /loose soil Hard /dense soil

2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 2.5

Pit Pit Pit Pit Pit Pit Pit

523.60 618.60 732.60 1710.70 1873.20 428.40 380.20

2.5.1 2.5.2 2.5.3 2.6

CUM CUM

38.90 49.70 69.60

Hard soil mixed with boulders CUM Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix. CUM

1530.00

Note 1 2 3 4

5 2.7 Note 1

The rates are all lead of cement,lime,ballast, sand,surkhi and grit etc.at site of work. For all concrete work coarse sand shall be used no extra will be paid . Concrete mix prepared by power driven mechanical mixer shall be used . Under exceptional coditions, where mechanical mixer and vibrator are not used(with the approval of Engineer Incharge reduced by 3% for mechanical mixer and 2% for Vibrator Thickness of the cement concrete should not exceeed 100 mm. Plaster on new surface on walls in cement ,sand mortar 1:6 including racking Sq.M of joint etc. complete fine finsh 25 mm thick. The rates for complete work including racking of joints,curing,grinding,mixing and finishing T&P and scaffolding material and cost of material with all lead and lift. The rates cover protection of all place and things,requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc. Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate ) rounding off edges etc.but excluding cost of nosing of steps etc. complete. 25 mm thick with 12.5 mm thick nominal size aggregate. 75 mm thick with 20 mm thick nominal size aggregate. The rates for all items inculde all form of work , laying ,curing and finishing etc. The rates are for complete work at site, inclusive of all leads. The rates cover the preparation and cleaing of all places SqM SqM

82.80

2

2.8

2.8.1 2.8.2 Note 1 2

108.00 257.40

Chapter Code No 1 2.9

DESCRIPTION OF WORK 2

U