    Item Description of Work Unit Qty

    1.0 Item Allow

    2.0 Cum 18.50

    3.0 Sqm 44.16

    4.0 Sqm 82.30

    5.0 Sqm 82.00

    6.0 Sqm 82.00

    7.0 Sqm 82.00

    TOTAL AMOUNT

    PREPARED BY :

    T. Vijayarajah ( T.O)

    EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FOR MRS. B20, THIRUMAKAL ROAD WEST, KALLADY - UPPODAI, BATTIC

    Allow for removng old cadjan roofing andframe work. Rate include for transport ofwastes and etc.

    Brick work in super structure in 1:5 cement andsand mixture .

    Rendering to floor in 1:3 cement and sandmixture . With neated by cement floating.

    Calicut tile roofing in super class timber withapply two coats of wood preservative . Rateinclude for G. I sheet gutters and guttersupport ceiling.

    Chipping and plastering to internal and externalwalls in 1:3 cement and sand mixture withneated by wood. Rate

    include for scaffolding and etc.

    Emlusion painting to internal and external walls.Rate include for one coat of primer and twocoats of emlusion painting.

    Supplying and fixing window sashes in superclass timber . With rate include for one coat ofsealer and two coats of varnishing.

  • 8/6/2019 Clock Tower Improvement

    2/26

    Rate Amount

    Sum 5,000.00

    8,750.00 161,875.00

    404.00 17,840.64

    3,550.00 292,165.00

    820.00 67,240.00

    215.00 17,630.00

    1,420.00 116,440.00

    678,190.64

    VANI YOGANATHAN No :ALOA

  • 8/6/2019 Clock Tower Improvement

    3/26

    Item Description of Work Unit Qty

    1.0 Item Allow

    2.0 Cum 4.10

    3.0 Sqm 16.30

    4.0 Sqm 45.00

    TOTAL AMOUNT

    PREPARED BY :

    T. Vijayarajah ( T.O)

    EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FOR MRS. S. AT 6th LANE PUTHOOR ,BATTICALOA

    Allow for removng old cadjan roofing andframe work. Rate include for transport ofwastes and etc.

    Brick work in super structure in 1:5 cement andsand mixture .

    Rendering to floor in 1:3 cement and sandmixture . With neated by cement floating.

    Calicut tile roofing in super class timber withapply two coats of wood preservative . Rateinclude for G. I sheet gutters and guttersupport ceiling.

  • 8/6/2019 Clock Tower Improvement

    4/26

    Rate Amount

    Sum 5,000.00

    8,750.00 35,875.00

    404.00 6,585.20

    3,550.00 159,750.00

    207,210.20

    ANJINI

  • 8/6/2019 Clock Tower Improvement

    5/26

    Item Description of Work Unit Qty

    1.0

    Item Allow

    2.0

    Cum 10.40

    3.0

    Sqm 36.004.0

    Sqm 24.00

    5.0

    Sqm 12.00

    6.0

    Sqm 28.00

    7.0

    Sqm 8.00

    TOTAL AMOUNT

    Prepared By :

    Technical officer

    Manmunai west P.S

    Vavunativu

    Date:

    EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FORMR.K. RAVIVARMAN , URANI , BATTICALOA

    Allow for removng old cadjan roofing and

    frame work. Rate include for transport of

    wastes and etc.

    Brick work in super structure in 1:5 cement

    and sand mixture .

    Rendering to floor in 1:3 cement and sand

    mixture . With neated by cement floating.

    Calicut tile roofing in super class timber

    with apply two coats of wood

    preservative . Rate include for G. I

    sheet gutters and gutter support ceiling.

    Chipping and plastering to internal and

    external walls in 1:3 cement and sand

    mixture with neated by wood.

    Rate include for scaffolding

    and etc.

    Emlusion painting to internal and externalwalls. Rate include for one coat of primer

    and two coats of emlusion painting.

    Supplying and fixing window sashes in super

    class timber . With rate include for one

    coat of sealer and two coats of

    varnishing.

  • 8/6/2019 Clock Tower Improvement

    6/26

    Rate Amount

    Sum 5,000.00

    8,750.00 91,000.00

    404.00 14,544.00

    3,550.00 85,200.00

    820.00 9,840.00

    215.00 6,020.00

    1,420.00 11,360.00

    222,964.00

  • 8/6/2019 Clock Tower Improvement

    7/26

    Item Description of Work Unit Qty

    1.0

    Item Allow

    2.0

    Cum 8.20

    3.0

    Sqm 21.00

    4.0

    Sqm 21.00

    5.0

    Sqm 12.00

    TOTAL AMOUNT

    PREPARED BY :

    T. Vijayarajah ( T.O)

    EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FORTRINCO ROAD THANNAMUNAI , BATTICALOA

    Allow for removng old cadjan roofing andframe work. Rate include for transport ofwastes and etc.

    Brick work in super structure in 1:5 cement and

    sand mixture .

    Rendering to floor in 1:3 cement and sandmixture . With neated by cement floating.

    Calicut tile roofing in super class timber withapply two coats of wood preservative . Rateinclude for G. I sheet gutters and guttersupport ceiling.

    Chipping and plastering to internal and externalwalls in 1:3 cement and sand mixture withneated by wood. Rateinclude for scaffolding and etc.

  • 8/6/2019 Clock Tower Improvement

    8/26

    Rate Amount

    Sum 5,000.00

    8,750.00 71,750.00

    404.00 8,484.00

    3,550.00 74,550.00

    820.00 9,840.00

    169,624.00

    MR. P.ALFERET AT

  • 8/6/2019 Clock Tower Improvement

    9/26

    Item Description of Work Unit Qty

    1.0

    Sqm 25.00

    2.0

    Sqm 35.00

    3.0

    Sqm 20.00

    4.0

    Sqm 32.00

    5.0

    Sqm 320.00

    6.0

    Sqm 8.20

    7.0

    Sqm 8.60

    EXPENSE NECESSARY TO BE INCURRED FOR RENEWATION HOUSE FOR MR .V. MAMANGAPILLIYAR KOVIL ROAD , BATTICALO

    Laying 1:1 1/2: 5 mixture concrete for

    floor in 75mm thick.

    Laying floor tiles in lanka tiles variety

    with laying matching skirting tiles.

    Laying wall tiles in lanka tiles variety

    with laying border tiles.

    Chipping and plastering to internal

    and external walls in 1:3 cement andsand mixture with neated by wood.

    Rate include

    for scaffolding and etc.

    Emlusion painting to internal and

    external walls. Rate include for one

    coat of primer and two coats of emlusion

    painting.

    Supplying and fixing window frames with

    glass sashes in super class timber .

    With rate include for one coat of

    sealer and two coats of varnishing.

    Supplying and fixing door frames with

    panelled sashes in super class timber .

    With rate include for one coat ofsealer and two coats of varnishing.

  • 8/6/2019 Clock Tower Improvement

    10/26

    8.0

    Sqm 60.00

    Item Description of Work Unit Qty

    10.0

    Nos 1.00

    11.0

    Nos 1.00

    TOTAL AMOUNT

    PREPARED BY :

    T. Vijayarajah ( T.O)

    Flat asbestors ceiling in super class

    timber with apply two coats of wood

    preservative . Rate include for

    beading , moulding , two coats of

    emlusion painting , and oil painting to

    beading and moulding.

    Supplying and fixing commode with low

    level systen and wash basin in ceylon

    ceremic corporation made.

    Supplying and fixing mirror , soap tray ,

    towel rail and brush holder .

  • 8/6/2019 Clock Tower Improvement

    11/26

  • 8/6/2019 Clock Tower Improvement

    12/26

    3,550.00 213,000.00

    Rate Amount

    15,550.00 15,550.00

    4,500.00 4,500.00

    616,522.00

  • 8/6/2019 Clock Tower Improvement

    13/26

    I.No Description of Work Unit Qty

    1.0 Removing of old paint & Cleaning of Surface Item Allow

    2.0 Sqm 144.00

    3.0 Supplying and applying Floor Painting to Floor. Sqm 10.00

    4.0 Lm 50.00

    5.0 Supplying of flower pots with flower plants as directed Nos 20.00

    6.0 Lm 100.00

    7.0 Nos 10.00 Total Amount in LKR

    Prepared By:-

    Approved By:-

    EXPENSE NECESSARY TO BE INCURRED FOR IMROVEMENT OFSTREET OF ERAVUR URBAN COUNCIL

    Supplying and applying Weather Shieled Painting to externalwalls.

    Supplying and Fixing Stainless Steel Fence with gate allnecessary fitting as directed.

    Supplying and Fixing watering pipes with necessary fittings asdirected

    Supplying and Fixing decration Bulb with necessary fittings as

    directed.

  • 8/6/2019 Clock Tower Improvement

    14/26

    Item Description of Work Unit Qty

    A Front House

    1.0 Damage Door removed from existing walls and stacked. Sqm 18.00

    2.0

    Sqm 9.00 3.0

    Sqm 9.00

    4.0 Supplying and applying Weather Shieled Painting to external walls.Sqm 160.00

    5.0 Supplying and applying Emlusion Painting to internal walls.Sqm 310.00

    6.0

    Sqm 18.00

    SubTotal

    B Behind House

    1.0 Damage Door removed from existing walls and stacked. Sqm 18.00

    2.0 Floors brick paved, demolished and debris cleared away. (75mm thick floor).

    Sqm 37.80

    3.0

    Sqm 37.80

    4.0Sqm 7.08

    EXPENSES NECESSARY TO BE INCURRED FOR RENOVATION OF DAMAGED HOUSE BY FLOOD.MB.MUZAMMIL ,AB.PARIKARIYAR ROAD,ODDAMAVADY-03,BATTICAL

    Apron of well brick paved, demolished and debris cleared away. (75mm thick

    floor).Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.

    Supplying and fixing door frames with panelled sashes in superclass timber.

    Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.

    Supplying and fixing door frames with panelled sashes in superclass timber .

  • 8/6/2019 Clock Tower Improvement

    15/26

    SubTotal

    C Small Hut

    1.0 Damage Door removed from existing walls and stacked. Sqm 18.00

    2.0

    Sq.m 11.00

    3.0

    Sqm 11.00

    4.0Sqm 2.36

    5.0 Floors brick paved, demolished and debris cleared away. (75mm thick floor).

    Sqm 10.50

    6.0

    Sqm 10.50

    SubTotal

    Grand Total in LKR

    Prepared By:-

    Item Description of Work Unit Qty

    ADamaged House

    1.0

    Suplying fixing Iron GateSqm 2.00

    2.0

    Sqm 9.00

    3.0

    Sqm 9.00

    4.0 Supplying and applying Weather Shieled Painting to external walls.

    Sqm 450.00

    5.0 Supplying and applying Emlusion Painting to internal walls.

    Sqm 169.00

    B Lost Articles

    Roof, removing tiles and timber, stacking serviceable material and clearing debrisin single storeyed buildings

    Roof, Hipped with calicut pattern tiles on 150x50 ridge and hip plates, 150x75

    purlin, 100x75 wall plates, 100x50 rafter at 550mm centres and 50x25 reeper at300 centres in sp.cl.upper timber frame work including ridging.

    Supplying and fixing door frames with panelled sashes in super classtimber .

    Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.

    EXPENSES NECESSARY TO BE INCURRED FOR RENOVATION OF DAMAGED HOUSE BY FLOOD.MHM.NALEEM.JUMMAH MASJITH ROAD,ODDAMAVADY-02,BATTICALO

    Apron of well brick paved, demolished and debris cleared away. (75mm thickfloor).

    Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.

  • 8/6/2019 Clock Tower Improvement

    16/26

    1.0 Micro Oven-20lit.Samsung

    Nos 1.00

    2.0 Water Pump-0.5HP-Aquva Tech.

    Sqm 18.00

    Grand Total in LKR

    Prepared By:-

    Item Description of Work Unit Qty

    1.0 Damage Door removed from existing walls and stacked.

    Sqm 3.78

    2.0 Floors brick paved, demolished and debris cleared away. (75mm thick floor).

    Sqm 11.00

    3.0

    Sqm 11.00

    4.0

    Sqm 22.00

    5.0

    Sqm 3.78

    EXPENSES NECESSARY TO BE INCURRED FOR IMPROVEMENT OF DAMAGEHEAVY RAIN FOR MR.A.SAHABDEEN,THAIKA VEETHY,ERAVUR-0

    Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.

    Supplying and applying Weather Shieled Painting to external boundarywalls.

    Supplying and fixing door frames with panelled sashes in superclass timber.

  • 8/6/2019 Clock Tower Improvement

    17/26

    Grand Total in LKR

    Prpared By:-

  • 8/6/2019 Clock Tower Improvement

    18/26

    Prepared By:-

  • 8/6/2019 Clock Tower Improvement

    19/26

    I.No Description of Work Unit Qty

    1.0 Sqm 144.00

    2.0 Anti-Crossive Painting forSteel Fence with gate Lm 50.00

    Total Amount in LKR

    Prepared By:-

    EXPENSE NECESSARY TO BE INCURRED FOR IMROVEMENTUSING WORKS LABOURS AT MAIN STREET OF ERAVUR U

    Supplying And Applying of Weather Shieled Painting to externalwalls.

  • 8/6/2019 Clock Tower Improvement

    20/26

    Rate Amount

    Sum 2,500.00

    248.00 35,712.00

    254.00 2,540.00

    9,000.00 450,000.00

    2,000.00 40,000.00

    175.00 17,500.00

    2,000.00 20,000.00

    568,252.00

    CLOCK TOWER AT MAIN

  • 8/6/2019 Clock Tower Improvement

    21/26

    Rate Amount

    300.00 5,400.00

    65.00 585.00

    1,670.00 15,030.00

    355.00 56,800.00

    315.00 97,650.00

    10,500.00 189,000.00

    364,465.00

    300.00 5,400.00

    65.00 2,457.00

    1,670.00 63,126.00

    10,500.00 74,340.00

    DUE TO HEAVY RAIN FOR MRA.

  • 8/6/2019 Clock Tower Improvement

    22/26

    145,323.00

    300.00 5,400.00

    165.00 1,815.00

    3,570.00 39,270.00

    10,500.00 24,780.00

    65.00 682.50

    1,670.00 17,535.00

    89,482.50

    599,270.50

    Rate Amount

    13,000.00 26,000.00

    65.00 585.00

    1,670.00 15,030.00

    355.00 159,750.00

    315.00 53,235.00

    DUE TO HEAVY RAIN FOR MR.

  • 8/6/2019 Clock Tower Improvement

    23/26

    22,000.00 22,000.00

    5,500.00 99,000.00

    375,600.00

    Rate Amount

    300.00 1,134.00

    65.00 715.00

    1,670.00 18,370.00

    355.00 7,810.00

    10,500.00 39,690.00

    D HOUSE BY FLOOD DUE TO, BATTICALOA.

  • 8/6/2019 Clock Tower Improvement

    24/26

  • 8/6/2019 Clock Tower Improvement

    25/26

  • 8/6/2019 Clock Tower Improvement

    26/26

    Rate Amount

    138.00 19,872.00

    23.00 1,150.00

    21,022.00

    OF CLOCK TOWER BYBAN COUNCIL