8/6/2019 Clock Tower Improvement
1/26
Item Description of Work Unit Qty
1.0 Item Allow
2.0 Cum 18.50
3.0 Sqm 44.16
4.0 Sqm 82.30
5.0 Sqm 82.00
6.0 Sqm 82.00
7.0 Sqm 82.00
TOTAL AMOUNT
PREPARED BY :
T. Vijayarajah ( T.O)
EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FOR MRS. B20, THIRUMAKAL ROAD WEST, KALLADY - UPPODAI, BATTIC
Allow for removng old cadjan roofing andframe work. Rate include for transport ofwastes and etc.
Brick work in super structure in 1:5 cement andsand mixture .
Rendering to floor in 1:3 cement and sandmixture . With neated by cement floating.
Calicut tile roofing in super class timber withapply two coats of wood preservative . Rateinclude for G. I sheet gutters and guttersupport ceiling.
Chipping and plastering to internal and externalwalls in 1:3 cement and sand mixture withneated by wood. Rate
include for scaffolding and etc.
Emlusion painting to internal and external walls.Rate include for one coat of primer and twocoats of emlusion painting.
Supplying and fixing window sashes in superclass timber . With rate include for one coat ofsealer and two coats of varnishing.
8/6/2019 Clock Tower Improvement
2/26
Rate Amount
Sum 5,000.00
8,750.00 161,875.00
404.00 17,840.64
3,550.00 292,165.00
820.00 67,240.00
215.00 17,630.00
1,420.00 116,440.00
678,190.64
VANI YOGANATHAN No :ALOA
8/6/2019 Clock Tower Improvement
3/26
Item Description of Work Unit Qty
1.0 Item Allow
2.0 Cum 4.10
3.0 Sqm 16.30
4.0 Sqm 45.00
TOTAL AMOUNT
PREPARED BY :
T. Vijayarajah ( T.O)
EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FOR MRS. S. AT 6th LANE PUTHOOR ,BATTICALOA
Allow for removng old cadjan roofing andframe work. Rate include for transport ofwastes and etc.
Brick work in super structure in 1:5 cement andsand mixture .
Rendering to floor in 1:3 cement and sandmixture . With neated by cement floating.
Calicut tile roofing in super class timber withapply two coats of wood preservative . Rateinclude for G. I sheet gutters and guttersupport ceiling.
8/6/2019 Clock Tower Improvement
4/26
Rate Amount
Sum 5,000.00
8,750.00 35,875.00
404.00 6,585.20
3,550.00 159,750.00
207,210.20
ANJINI
8/6/2019 Clock Tower Improvement
5/26
Item Description of Work Unit Qty
1.0
Item Allow
2.0
Cum 10.40
3.0
Sqm 36.004.0
Sqm 24.00
5.0
Sqm 12.00
6.0
Sqm 28.00
7.0
Sqm 8.00
TOTAL AMOUNT
Prepared By :
Technical officer
Manmunai west P.S
Vavunativu
Date:
EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FORMR.K. RAVIVARMAN , URANI , BATTICALOA
Allow for removng old cadjan roofing and
frame work. Rate include for transport of
wastes and etc.
Brick work in super structure in 1:5 cement
and sand mixture .
Rendering to floor in 1:3 cement and sand
mixture . With neated by cement floating.
Calicut tile roofing in super class timber
with apply two coats of wood
preservative . Rate include for G. I
sheet gutters and gutter support ceiling.
Chipping and plastering to internal and
external walls in 1:3 cement and sand
mixture with neated by wood.
Rate include for scaffolding
and etc.
Emlusion painting to internal and externalwalls. Rate include for one coat of primer
and two coats of emlusion painting.
Supplying and fixing window sashes in super
class timber . With rate include for one
coat of sealer and two coats of
varnishing.
8/6/2019 Clock Tower Improvement
6/26
Rate Amount
Sum 5,000.00
8,750.00 91,000.00
404.00 14,544.00
3,550.00 85,200.00
820.00 9,840.00
215.00 6,020.00
1,420.00 11,360.00
222,964.00
8/6/2019 Clock Tower Improvement
7/26
Item Description of Work Unit Qty
1.0
Item Allow
2.0
Cum 8.20
3.0
Sqm 21.00
4.0
Sqm 21.00
5.0
Sqm 12.00
TOTAL AMOUNT
PREPARED BY :
T. Vijayarajah ( T.O)
EXPENSE NECESSARY TO BE INCURRED FOR REPAIRING HOUSE FORTRINCO ROAD THANNAMUNAI , BATTICALOA
Allow for removng old cadjan roofing andframe work. Rate include for transport ofwastes and etc.
Brick work in super structure in 1:5 cement and
sand mixture .
Rendering to floor in 1:3 cement and sandmixture . With neated by cement floating.
Calicut tile roofing in super class timber withapply two coats of wood preservative . Rateinclude for G. I sheet gutters and guttersupport ceiling.
Chipping and plastering to internal and externalwalls in 1:3 cement and sand mixture withneated by wood. Rateinclude for scaffolding and etc.
8/6/2019 Clock Tower Improvement
8/26
Rate Amount
Sum 5,000.00
8,750.00 71,750.00
404.00 8,484.00
3,550.00 74,550.00
820.00 9,840.00
169,624.00
MR. P.ALFERET AT
8/6/2019 Clock Tower Improvement
9/26
Item Description of Work Unit Qty
1.0
Sqm 25.00
2.0
Sqm 35.00
3.0
Sqm 20.00
4.0
Sqm 32.00
5.0
Sqm 320.00
6.0
Sqm 8.20
7.0
Sqm 8.60
EXPENSE NECESSARY TO BE INCURRED FOR RENEWATION HOUSE FOR MR .V. MAMANGAPILLIYAR KOVIL ROAD , BATTICALO
Laying 1:1 1/2: 5 mixture concrete for
floor in 75mm thick.
Laying floor tiles in lanka tiles variety
with laying matching skirting tiles.
Laying wall tiles in lanka tiles variety
with laying border tiles.
Chipping and plastering to internal
and external walls in 1:3 cement andsand mixture with neated by wood.
Rate include
for scaffolding and etc.
Emlusion painting to internal and
external walls. Rate include for one
coat of primer and two coats of emlusion
painting.
Supplying and fixing window frames with
glass sashes in super class timber .
With rate include for one coat of
sealer and two coats of varnishing.
Supplying and fixing door frames with
panelled sashes in super class timber .
With rate include for one coat ofsealer and two coats of varnishing.
8/6/2019 Clock Tower Improvement
10/26
8.0
Sqm 60.00
Item Description of Work Unit Qty
10.0
Nos 1.00
11.0
Nos 1.00
TOTAL AMOUNT
PREPARED BY :
T. Vijayarajah ( T.O)
Flat asbestors ceiling in super class
timber with apply two coats of wood
preservative . Rate include for
beading , moulding , two coats of
emlusion painting , and oil painting to
beading and moulding.
Supplying and fixing commode with low
level systen and wash basin in ceylon
ceremic corporation made.
Supplying and fixing mirror , soap tray ,
towel rail and brush holder .
8/6/2019 Clock Tower Improvement
11/26
8/6/2019 Clock Tower Improvement
12/26
3,550.00 213,000.00
Rate Amount
15,550.00 15,550.00
4,500.00 4,500.00
616,522.00
8/6/2019 Clock Tower Improvement
13/26
I.No Description of Work Unit Qty
1.0 Removing of old paint & Cleaning of Surface Item Allow
2.0 Sqm 144.00
3.0 Supplying and applying Floor Painting to Floor. Sqm 10.00
4.0 Lm 50.00
5.0 Supplying of flower pots with flower plants as directed Nos 20.00
6.0 Lm 100.00
7.0 Nos 10.00 Total Amount in LKR
Prepared By:-
Approved By:-
EXPENSE NECESSARY TO BE INCURRED FOR IMROVEMENT OFSTREET OF ERAVUR URBAN COUNCIL
Supplying and applying Weather Shieled Painting to externalwalls.
Supplying and Fixing Stainless Steel Fence with gate allnecessary fitting as directed.
Supplying and Fixing watering pipes with necessary fittings asdirected
Supplying and Fixing decration Bulb with necessary fittings as
directed.
8/6/2019 Clock Tower Improvement
14/26
Item Description of Work Unit Qty
A Front House
1.0 Damage Door removed from existing walls and stacked. Sqm 18.00
2.0
Sqm 9.00 3.0
Sqm 9.00
4.0 Supplying and applying Weather Shieled Painting to external walls.Sqm 160.00
5.0 Supplying and applying Emlusion Painting to internal walls.Sqm 310.00
6.0
Sqm 18.00
SubTotal
B Behind House
1.0 Damage Door removed from existing walls and stacked. Sqm 18.00
2.0 Floors brick paved, demolished and debris cleared away. (75mm thick floor).
Sqm 37.80
3.0
Sqm 37.80
4.0Sqm 7.08
EXPENSES NECESSARY TO BE INCURRED FOR RENOVATION OF DAMAGED HOUSE BY FLOOD.MB.MUZAMMIL ,AB.PARIKARIYAR ROAD,ODDAMAVADY-03,BATTICAL
Apron of well brick paved, demolished and debris cleared away. (75mm thick
floor).Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.
Supplying and fixing door frames with panelled sashes in superclass timber.
Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.
Supplying and fixing door frames with panelled sashes in superclass timber .
8/6/2019 Clock Tower Improvement
15/26
SubTotal
C Small Hut
1.0 Damage Door removed from existing walls and stacked. Sqm 18.00
2.0
Sq.m 11.00
3.0
Sqm 11.00
4.0Sqm 2.36
5.0 Floors brick paved, demolished and debris cleared away. (75mm thick floor).
Sqm 10.50
6.0
Sqm 10.50
SubTotal
Grand Total in LKR
Prepared By:-
Item Description of Work Unit Qty
ADamaged House
1.0
Suplying fixing Iron GateSqm 2.00
2.0
Sqm 9.00
3.0
Sqm 9.00
4.0 Supplying and applying Weather Shieled Painting to external walls.
Sqm 450.00
5.0 Supplying and applying Emlusion Painting to internal walls.
Sqm 169.00
B Lost Articles
Roof, removing tiles and timber, stacking serviceable material and clearing debrisin single storeyed buildings
Roof, Hipped with calicut pattern tiles on 150x50 ridge and hip plates, 150x75
purlin, 100x75 wall plates, 100x50 rafter at 550mm centres and 50x25 reeper at300 centres in sp.cl.upper timber frame work including ridging.
Supplying and fixing door frames with panelled sashes in super classtimber .
Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.
EXPENSES NECESSARY TO BE INCURRED FOR RENOVATION OF DAMAGED HOUSE BY FLOOD.MHM.NALEEM.JUMMAH MASJITH ROAD,ODDAMAVADY-02,BATTICALO
Apron of well brick paved, demolished and debris cleared away. (75mm thickfloor).
Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.
8/6/2019 Clock Tower Improvement
16/26
1.0 Micro Oven-20lit.Samsung
Nos 1.00
2.0 Water Pump-0.5HP-Aquva Tech.
Sqm 18.00
Grand Total in LKR
Prepared By:-
Item Description of Work Unit Qty
1.0 Damage Door removed from existing walls and stacked.
Sqm 3.78
2.0 Floors brick paved, demolished and debris cleared away. (75mm thick floor).
Sqm 11.00
3.0
Sqm 11.00
4.0
Sqm 22.00
5.0
Sqm 3.78
EXPENSES NECESSARY TO BE INCURRED FOR IMPROVEMENT OF DAMAGEHEAVY RAIN FOR MR.A.SAHABDEEN,THAIKA VEETHY,ERAVUR-0
Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cementrendered with expansion joints filled with cement and sand.
Supplying and applying Weather Shieled Painting to external boundarywalls.
Supplying and fixing door frames with panelled sashes in superclass timber.
8/6/2019 Clock Tower Improvement
17/26
Grand Total in LKR
Prpared By:-
8/6/2019 Clock Tower Improvement
18/26
Prepared By:-
8/6/2019 Clock Tower Improvement
19/26
I.No Description of Work Unit Qty
1.0 Sqm 144.00
2.0 Anti-Crossive Painting forSteel Fence with gate Lm 50.00
Total Amount in LKR
Prepared By:-
EXPENSE NECESSARY TO BE INCURRED FOR IMROVEMENTUSING WORKS LABOURS AT MAIN STREET OF ERAVUR U
Supplying And Applying of Weather Shieled Painting to externalwalls.
8/6/2019 Clock Tower Improvement
20/26
Rate Amount
Sum 2,500.00
248.00 35,712.00
254.00 2,540.00
9,000.00 450,000.00
2,000.00 40,000.00
175.00 17,500.00
2,000.00 20,000.00
568,252.00
CLOCK TOWER AT MAIN
8/6/2019 Clock Tower Improvement
21/26
Rate Amount
300.00 5,400.00
65.00 585.00
1,670.00 15,030.00
355.00 56,800.00
315.00 97,650.00
10,500.00 189,000.00
364,465.00
300.00 5,400.00
65.00 2,457.00
1,670.00 63,126.00
10,500.00 74,340.00
DUE TO HEAVY RAIN FOR MRA.
8/6/2019 Clock Tower Improvement
22/26
145,323.00
300.00 5,400.00
165.00 1,815.00
3,570.00 39,270.00
10,500.00 24,780.00
65.00 682.50
1,670.00 17,535.00
89,482.50
599,270.50
Rate Amount
13,000.00 26,000.00
65.00 585.00
1,670.00 15,030.00
355.00 159,750.00
315.00 53,235.00
DUE TO HEAVY RAIN FOR MR.
8/6/2019 Clock Tower Improvement
23/26
22,000.00 22,000.00
5,500.00 99,000.00
375,600.00
Rate Amount
300.00 1,134.00
65.00 715.00
1,670.00 18,370.00
355.00 7,810.00
10,500.00 39,690.00
D HOUSE BY FLOOD DUE TO, BATTICALOA.
8/6/2019 Clock Tower Improvement
24/26
8/6/2019 Clock Tower Improvement
25/26
8/6/2019 Clock Tower Improvement
26/26
Rate Amount
138.00 19,872.00
23.00 1,150.00
21,022.00
OF CLOCK TOWER BYBAN COUNCIL