13
FOR AT CONTROL TOWER KCAHL PARAPARAUMU AIRPORT DRAWING LIST No. Sheet Name Rev. A01 BUILDING 3D 5 A02 CONSTRUCTION NOTES A03 SITE PLAN 5 A04 LOCATION PLAN 5 A05 GROUND FLOOR PLAN 5 A06 CONTROL CABIN FLOOR PLAN 5 A07 ELEVATIONS 5 A08 FOUNDATION PLAN 5 A09 GROUND FLOOR FRAMING PLAN 5 A10 CONTROL CABIN FRAMING & JOIST PLAN 5 A11 ROOF PLAN 5 A12 BUILDING SECTION 5 A13 BUILDING SECTION 5

C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

FOR

AT

CONTROL TOWER

KCAHL

PARAPARAUMU

AIRPORT

DRAWING LIST

No. Sheet Name Rev.A01 BUILDING 3D 5

A02 CONSTRUCTION NOTES

A03 SITE PLAN 5

A04 LOCATION PLAN 5

A05 GROUND FLOOR PLAN 5

A06 CONTROL CABIN FLOOR PLAN 5

A07 ELEVATIONS 5

A08 FOUNDATION PLAN 5

A09 GROUND FLOOR FRAMING PLAN 5

A10 CONTROL CABIN FRAMING & JOIST PLAN 5

A11 ROOF PLAN 5

A12 BUILDING SECTION 5

A13 BUILDING SECTION 5

Page 2: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

BUILDING 3D

A01

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

Rev Date Description

5 08-08-16 Meeting Updates

3D View 1

3D View 2

Page 3: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

PROPOSED ACCESS ROAD

EXISTING ACCESS ROAD

EXISTING BUILDINGS

EXISTING BUILDING

NEW CONTROL TOWER

EXISTING AIRPORT FENCE

PROPOSED PASSING BAY

PROPOSED PASSING BAY

CARPARKS

BOUNDAR

Y

BOUNDAR

Y

DIVERT EXISTING FENCE AROUND PASSING BAY

DIVERT EXISTING FENCE AROUND PASSING BAY

NEW 2.4m HIGH AVIATION SECURITY FENCING WITH BARBED WIRE ANGLED CRANKS ON TOP (FACING OUTWARDS) FENCE EXTENT TBC

6.04

5.80

5.81

5.89

6.156.15

6.16

6.0

24133

EXISTING TAXIWAY

CENTRE LIN

E

EXISTNG SPOT ELEVATIONS

5.92

5.92

6.136.04

6.18

N 726159.416E 358070.245

TEMP CONTROL TOWER

SITE NOTESTHIS PAGE IS TO BE READ IN CONJUNCTION WITH SHEET A02 - CONSTRUCTION NOTES FOR ADDITIONAL INFORMATION

LEGAL DESCRIPTION:PT NGARARA WEST B5

SITE AREA = XXXm²

SITE FEATURES:PLANNING ZONE = AIRPORT COREWIND ZONE = VERY HIGHEXPOSURE ZONE = ZONE CEARTHQUAKE ZONE = ZONE 3SOIL CLASS = D AND E / REFER ENGINEERS DOCUMENTATIONSNOW ZONE = N1 ( 0 - 400m ALTITUDE )CLIMATE ZONE = ZONE 2

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

SITE PLAN

A03

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

1 : 750

SITE PLAN

Rev Date Description

5 08-08-16 Meeting Updates

Page 4: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

LOCATION OF NEW CONTROL TOWER

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

LOCATION PLAN

A04

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

Rev Date Description

5 08-08-16 Meeting Updates

1 : 10000

LOCATION PLAN

Page 5: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

x

OFFICE4.1 3.5

x

EQUIPMENTROOM5.3 3.5

CEILING SUSPENDED CABLE DUCT

PR

INT

ER

BOOKCASE

DIS

TR

IBU

TIO

N B

OA

RD

W06

W07

W04 W05

8001251

1000

950

CA

BLE

DU

CT

EXTERIOR AC UNITS SERVING OFFICE AND EQUIPMENT ROOM

INTERIOR HIGH WALL AC UNIT

PORTACOM BUILDING

DP

W08

INTERIOR HIGH WALL AC UNIT

A07

A07

ELE

VA

TIO

N 1

A07

A07

ELEVATION 2

ELE

VA

TIO

N 3

ELEVATION 4

ACCWC

SERVICE VOID FOR WATER & SEWAGE

CABLE RISER 60MIN FIRE RATED

CABLE DUCT IN CEILING SPACE

ST

60 MIN FIRE RATED DOOR

STORAGE

ENTRY

PERSPEX ROOF GLAZING ABOVE

150x6 SHS SUPERSTRUCTURE AS PER ENGINEERS DESIGN

D02

D03

D01

W01

W03W02

CONCRETE PATH

EXHAUST FAN CONNECTED TO TEMPERATURE ALARM

DP

HWC

60 FRR TO EQUIPMENT ROOM SOUTH WALL

BULKHEAD

FFL 6.305

60 MIN FIRE RATED DOOR

FIRE ALARM PANEL

CABLE TRAY TO EXTEND TO AND DOWN WALL FOR UNDERFLOOR ACCESS TO TEMPORARY TOWER (OFFICE)

CABLE ACCESS FROM UNDERNEATH TO CONTROL DESK

FFL 6.305

FFL 6.305

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

GROUND FLOOR PLAN

A05

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

1 : 50

GROUND FLOOR PLAN

Rev Date Description

5 08-08-16 Meeting Updates

Page 6: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

S

CONTROLCABIN

FRIDGEUNDER

SINK

800x800mm ACCESS DOOR TO PLATFORM AT LANDING LEVEL WITH 200mm STEP DOWN ONTO PLATFORM LEVEL

BAR GRATING PLATFORM

1.1m HIGH RAILING

ATTIC STAIR

BUILT-IN KITCHENETTE

ALLOW FOR ANTI-STATIC FLOOR TILES IN CABIN

TYPE 4 SMOKE DETECTION SYSTEM AS PER FIRE ENGINEERS DESIGN

DUCTED AC UNIT

110x20 TIMBER CAPPING (PQ)ON 1000mm HIGH WALL

48-A

38-A

800

BUILT-IN WORK DESK

1200

600

800DUCTED AC UNIT

FFL 9.516

FFL 11.122

FFL 11.300

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

CONTROL CABIN FLOORPLAN

A06

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

1 : 50

CONTROL CABIN FLOOR PLAN

Rev Date Description

5 08-08-16 Meeting Updates

Page 7: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

FIRE ALARM PANEL

42-A

48-A

42-A

48-A

EXHAUST FAN CONNECTED TO TEMPERATURE ALARM

99-A

45-E

45-B

74-A

74-C

EXTERIOR AC UNITS SERVING OFFICE AND EQUIPMENT ROOM

45-A

45-B

45-A

45-E99-A

42-A

42-A

48-A

48-A

45-B

45-A

45-A

WC EXTRACT FAN

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

ELEVATIONS

A07

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

KEYNOTE LEGEND

42-A PBS XPRESSCLAD CLADDING SYSTEMON 6mm ETERPAN RIGID AIR BARRIERON FRAMING

45-A APL RESIDENTIAL SUITE POWDERCOATALUMINIUM DOUBLE GLAZED WINDOWS

45-B TINTED DOUBLE GLAZED WINDOWSWITH FITTED BLINDS (TBC)

45-E ROOF GLAZING - REFER EXTERIORJOINERY SCHEDULE

48-A KEEGUARD ROOF FALL PROTECTIONRAILING OR SIM ALUMINIUMBALUSTRADE

74-A MARLEY 65x50mm RECTANGULAR PVCDOWNPIPE

74-C PROPRIETARY RAINHEAD

99-A PORTACOM PROPRIETARY PORTABLEBUILDING

Rev Date Description

5 08-08-16 Meeting Updates

1 : 100

ELEVATION 1

1 : 100

ELEVATION 2

1 : 100

ELEVATION 3

1 : 100

ELEVATION 4

Page 8: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

FOUNDATION NOTES

● THIS PAGE IS TO BE READ IN CONJUNCTION WITH SHEET A02 - CONSTRUCTION NOTES FOR ADDITIONAL INFORMATION

● ALL CONCRETE TO BE 20MPa UNLESS SPECIFIED OTHERWISE BY ENGINEER

● ALL REINFORCING MESH TO BE GRADE 500E

● COVER TO REINFORCING TO BE :- 75mm FOR CONCRETE AGAINST GROUND- 50mm FOR CONCRETE AGAINST FORMWORK- 30mm FOR SLAB MESH

● FOUNDATION DETAILS TO ENGINEERS DESIGN

● SEAL ALL SLAB PENETRATIONS WITH DPM MANUFACTURER APPROVED TAPE

● REFER TO ENGINEERS DWGS FOR SAWCUT LOCATIONS

● THIS SITE IS IN EXPOSURE ZONE D ( COASTAL CORROSION ). ALL FIXINGS AND CONNECTIONS EXPOSED TO THE AIR MUST BE STAINLESS STEEL

● THIS SITE IS IN EXPOSURE ZONE C : - ALL TREATED TIMBER PILE CONNECTIONS AND SUBFLOOR FIXING CONNECTIONS WITHIN 600 FROM GROUND LEVEL OR IN EXPOSED SITUATIONS ARE TO BE TYPE 304 S.S. - ALL OTHER STRUCTURAL FIXINGS ( EXCEPT FABRICATED BRACKETS ) IN SHELTERED LOCATIONS TO BE HOT DIP GALVANISED, AND IN EXPOSED SITUATIONS TO BE TYPE 304 S.S. - ALL FABRICATED BRACKETS TO BE MINIMUM 5mm MILD STEEL AND HOT DIP GALVANISED

● ALL FIXINGS IN CONTACT WITH TIMBER TREATED WITH COPPER QUATERNARY ( ACQ ) OR COPPER AZOLE ( CuAz ) PRESERVATIVE ARE TO BE TYPE 304 S.S. IN EXPOSED OR SHELTERED LOCATIONS, AND HOT DIPPED GALVANISED IN CLOSED SITUATIONS

A

1

3840 4650 510

2600

2038

4650

WHB

WC

500

4650

500

HWC

Ø65 WASTEWATER STACK

FFL 6.305

300 1800 1800 1800 1800 1800 300

500

2600

500

500 4650 500

HT

DP

LINE OF PORTACOM ABOVE

PFC BEAMS TO ENIGNEERS DESIGN

CONCRETE PILES TO ENGINEERS DESIGN

REINFORCED CONCRETE SLAB TO ENGINEERS DESIGN

STEEL SUPERSTRUCTURE TO ENGINEERS DESIGN

B

2

120

4410

120

120 4410 120

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

FOUNDATION PLAN

A08

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

Rev Date Description

5 08-08-16 Meeting Updates

1 : 50

FOUNDATION PLAN

Page 9: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

A

1

1A13

1A13

3600

75525075412575

9600

75

3450

75

W06

W07

W04 W05

OFFICEEQUIPMENT

ROOM

4140 4650 810

90 60 90 1030 90 920 90 2040 90 60 90

90 60 90 2040 90 2040 90 60 90

90

60

90

2460

90

1620

90

60

90

BM

01

BM 02

D03

D02

D01

W01

W03W02

ACCWC

ENTRY

STORAGE

150SHS6 SUPERSTRUCTURE AS PER ENGINEERS DESIGN 2205 2205

4650

2205

2205

4650

90 60 90 4170 90 60 90

BM

03

ST

AA12

AA12

400

400

90

60

90

1030

90

1340

90

1620

90

60

90

1030

590

3600

1538

90

60

90

1030

90

1930

90

1030

90

60

90

BULKHEAD

W08

B

2

1030

1460 FFL 6.305

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

GROUND FLOORFRAMING PLAN

A09

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

Rev Date Description

5 08-08-16 Meeting Updates

1 : 50

GROUND FLOOR FRAMING PLAN

BEAM SCHEDULE

MARK SIZE/TYPE GRADE TREATMENT DESIGN NOTESBM 01 240x90 SG8 H1.2 per 3604 IN CEILING SPACE

BM 02 240x90 SG8 H1.2 per 3604 IN CEILING SPACE

BM 03 240x90 SG8 H1.2 per 3604 IN CEILING SPACE

BM 04 200x75PFC by Engineer IN FLOOR SPACE

BM 05 200x75PFC by Engineer IN FLOOR SPACE

BM 06 200x75PFC by Engineer IN FLOOR SPACE

BM 07 200x75PFC by Engineer IN FLOOR SPACE

Page 10: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

A

1

1A13

1A13

600

CONTROLCABIN

140

4720

140 2

30

1467

1467

1467

230

5000

230 1467 1467 1467 230

140 4720 140

5000

140 3325 90 1305 140

140

1020

90

3610

140

2835A

A12

AA12

1395

610

B

2

212

212

FFL 9.516

FFL 11.122

FFL 11.300

A

1

BM

07

150x6 SHS SUPER-STRUCTURE AS PER ENGINEERS DESIGN

75x5 SHS OUTRIGGERS AS PER ENGINEERS DESIGN

75x5 SHS OUTRIGGERS @ 550crs AS PER ENGINEERS DESIGN

200 LVL JOISTS @ 300crs AS PER ENGINEERS DESIGN

BM 06

BM 05

BM

04

100x6 SHS SUPER-STRUCTURE AS PER ENGINEERS DESIGN

B

2

2000

1150

1150

1150

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

CONTROL CABINFRAMING & JOIST PLAN

A10

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

Rev Date Description

5 08-08-16 Meeting Updates

1 : 50

CONTROL CABIN FRAMING PLAN

BEAM SCHEDULE

MARK SIZE/TYPE GRADE TREATMENT DESIGN NOTESBM 01 240x90 SG8 H1.2 per 3604 IN CEILING SPACE

BM 02 240x90 SG8 H1.2 per 3604 IN CEILING SPACE

BM 03 240x90 SG8 H1.2 per 3604 IN CEILING SPACE

BM 04 200x75PFC by Engineer IN FLOOR SPACE

BM 05 200x75PFC by Engineer IN FLOOR SPACE

BM 06 200x75PFC by Engineer IN FLOOR SPACE

BM 07 200x75PFC by Engineer IN FLOOR SPACE

1 : 50

CONTROL CABIN JOIST PLAN

Page 11: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

PORTACOM ROOF

1.1m HIGH RAILING

POWDERCOATED PARAPET CAPPING

44-A

48-A

ROOF ACCESS HATCH -LOCATION TO BE CONFIRMED

EXTERIOR AC UNIT - LOCATION TO BE CONFIRMED

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

ROOF PLAN

A11

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

KEYNOTE LEGEND

44-A MEMBRANE ON 17mm H3 CCA PLY LAIDAT 2° FALL ON FRAMING @ 400crs

48-A KEEGUARD ROOF FALL PROTECTIONRAILING OR SIM ALUMINIUMBALUSTRADE

Rev Date Description

5 08-08-16 Meeting Updates

1 : 50

ROOF PLAN

Page 12: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

6305

11300

13950

9005

5900

12500

12150

10725

12950

15150

850

LEVEL U/SIDE ROOF FRAME

OPERATOR EYE LEVEL (SITTING)

SILL HEIGHT

LEVEL CONTROL CABIN FLOOR

LEVEL PLATFORM STRUC

STUD HEIGHT PORTACOM

LEVEL GROUND FLOOR

2.05m HEAD

HEIGHT

OPERATOR EYE LEVEL (STANDING UP)

LEVEL TOP ROOF FRAME

CONCRETE PATH

GROUND LEVEL

TIMBER STAIRS WITH 28 RISERS @ 178.4mm AND 27 TREADS @ 310mm (20mm NOSING)

40mmØ WALL MOUNTED TIMBER HANDRAILS EACH SIDE

53-F

31-A

51-D

42-A

48-A

42-A

45-B

42-A

48-A

51-C

1200 1650

44

25

(C

AB

IN)

44

20

(T

OW

ER

)

92

50 O

VE

RA

LL

BU

ILD

ING

HE

IGH

T

6600

325

ACCWC

CONTROLCABIN

BM 07

38-A

2455

2405

FIRE ALARM PANEL

870

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

BUILDING SECTION

A12

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

KEYNOTE LEGEND

31-A 500mm CONCRETE SLAB ON POLYTHENEDPM ON SAND BLINDING ON SOLIDBEARING TO ENGINEERS DESIGN

38-A 25mm H3 CAA PLYWOOD ON 200x45 LVLFLOOR JOISTS @ 300crs TO ENGINEERSDESIGN

42-A PBS XPRESSCLAD CLADDING SYSTEMON 6mm ETERPAN RIGID AIR BARRIERON FRAMING

45-B TINTED DOUBLE GLAZED WINDOWSWITH FITTED BLINDS (TBC)

48-A KEEGUARD ROOF FALL PROTECTIONRAILING OR SIM ALUMINIUMBALUSTRADE

51-C 2x 10mm GIB STANDARD WALL LINING

51-D 10mm GIB AQUALINE WALL LINING ON10mm GIB STANDARD WALL LINING

53-F 13mm GIB AQUALINE ON 70x35 H1.2TIMBER BATTENS @ 600crs

Rev Date Description

5 08-08-16 Meeting Updates

1 : 50

SECTION A

Page 13: C:Local Revitp82 Airport Control Tower ALEX Coast... · 4.1 3.5 x equipment room 5.3 3.5 printer ceiling suspended cable duct bookcase distribution board w06 w07 w04 w05 1251 800

6305

11300

9005

5900

12500

12150

10725

12950

15150

2455

240

2080

LEVEL U/SIDE ROOF FRAME

OPERATOR EYE LEVEL (SITTING)

SILL HEIGHT

LEVEL CONTROL CABIN FLOOR

LEVEL PLATFORM STRUC

STUD HEIGHT PORTACOM

LEVEL GROUND FLOOR

OPERATOR EYE LEVEL (STANDING UP)

LEVEL TOP ROOF FRAME

CONCRETE PATH

GROUND LEVEL

TIMBER STAIRS WITH 28 RISERS @ 178.4mm AND 27 TREADS @ 310mm (20mm NOSING)

40mmØ WALL MOUNTED TIMBER HANDRAILS EACH SIDE

BM 05BM 06

BM 02

ACCWC

ENTRY

BM 01

38-A 870

1000

900

750

VOID50

INTERIOR HIGH WALL AC UNIT

99-A45-E

42-A

48-A

45-B

42-A

48-A

51-D

53-F

31-A

51-C

53-C

51-B

51-A51-E

EQUIPMENTROOM

2700

Sheet Rev.(A3)Job Date

DO NOT SCALE DRAWING

for

© COPYRIGHT

Kapiti Office - Phone: (04) 298 5662Smarter Building Centre45B Te Roto Drive, Paraparaumu 5032

Wellington Office - Phone: (04) 232 4258Level 9 Crowe Horwath House57 Willis Street, Wellington 6011

Email: [email protected] Web: adarchitecture.nz

5

BUILDING SECTION

A13

KCAHL

PROGRESS

CONTROL TOWER

16082 28/07/16NO

T F

OR

CO

NS

TR

UC

TIO

N

AIRPORT

PARAPARAUMU

1 : 50

SECTION B

Rev Date Description

5 08-08-16 Meeting Updates

KEYNOTE LEGEND

31-A 500mm CONCRETE SLAB ON POLYTHENEDPM ON SAND BLINDING ON SOLIDBEARING TO ENGINEERS DESIGN

38-A 25mm H3 CAA PLYWOOD ON 200x45 LVLFLOOR JOISTS @ 300crs TO ENGINEERSDESIGN

42-A PBS XPRESSCLAD CLADDING SYSTEMON 6mm ETERPAN RIGID AIR BARRIERON FRAMING

45-B TINTED DOUBLE GLAZED WINDOWSWITH FITTED BLINDS (TBC)

45-E ROOF GLAZING - REFER EXTERIORJOINERY SCHEDULE

48-A KEEGUARD ROOF FALL PROTECTIONRAILING OR SIM ALUMINIUMBALUSTRADE

51-A 10mm GIB STANDARD WALL LINING

51-B 10mm GIB AQUALINE WALL LINING

51-C 2x 10mm GIB STANDARD WALL LINING

51-D 10mm GIB AQUALINE WALL LINING ON10mm GIB STANDARD WALL LINING

51-E 2x 10mm GIB FYRELINE WALL LINING

53-C 10mm GIB ULTRALINE ON 70x35 H1.2TIMBER BATTENS @ 450crs

53-F 13mm GIB AQUALINE ON 70x35 H1.2TIMBER BATTENS @ 600crs

99-A PORTACOM PROPRIETARY PORTABLEBUILDING