The components of the Clinton Junction - Jensen Road Transmission Line Rebuild Project include: Rebuild approximately 63 miles of 138-kV transmission line; Build approximately 4 miles of new 138 kV transmission line near El Reno; Replace wooden H-frame structures with steel single poles and install new wire; Upgrade infrastructure at four local substations. This project is necessary to upgrade the transmission infrastructure along the I-40 corridor. Upgrades to the associated substations and transmission line will enhance reliability and lessen the likelihood of extended power outages during inclement weather. Southwest Power Pool (SPP), the regional transmission organization, also identified the need for these upgrades. SPP ensures reliable supplies of power and adequate transmission infrastructure are in place to serve customers in Oklahoma and 13 other states. Construction began in September 2017 between Hinton and Weatherford. Crews expect to complete construction to the Weatherford Junction Substation by early Summer 2018. The remaining construction on the project is expected to begin Summer 2018. All line work is expected to be complete by mid-2019. The associated substation upgrades will be complete by spring of 2020. WHAT WHY WHERE/WHEN CLINTON JUNCTIONJENSEN ROAD TRANSMISSION LINE REBUILD PROJECT Public Service Company of Oklahoma (PSO) and its affiliate, AEP Oklahoma Transmission Co., Inc. plan to invest approximately $63 million to upgrade over 60 miles of 138-kilovolt (kV) transmission line between Clinton and El Reno, Oklahoma. These upgrades will strengthen PSO’s transmission system in western Oklahoma and provide significant improvement in electric service reliability in the area. PROJECT SCHEDULE PROJECT ANNOUNCEMENT & RIGHT-OF-WAY COMMUNICATIONS Fall 2016 TRANSMISSION LINE CONSTRUCTION Fall 2017 - Late 2020 CLINTON JUNCTION SUBSTATION UPGRADES Early 2019 - Summer 2019 WEATHERFORD SOUTHEAST SUBSTATION UPGRADES Early 2020 - Spring 2020 SUBSTATION UPGRADES COMPLETE Summer 2020 WEATHERFORD JUNCTION SUBSTATION UPGRADES Spring 2020 - Summer 2020 WEATHERFORD WIND FARM SUBSTATION UPGRADES Fall 2019 - Late 2019 *Timeline subject to change. *Timeline subject to change. 2016 2017 2019 2020 2018 2021

CLINTON JUNCTION˜JENSEN ROAD...Crews expect to complete construction to the Weatherford Junction Substation by early Summer 2018. The remaining construction on the project is expected

  • Upload
    others

  • View
    16

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CLINTON JUNCTION˜JENSEN ROAD...Crews expect to complete construction to the Weatherford Junction Substation by early Summer 2018. The remaining construction on the project is expected

The components of the Clinton Junction - Jensen

Road Transmission Line Rebuild Project include:

• Rebuild approximately 63 miles of 138-kV

transmission line;

• Build approximately 4 miles of new 138 kV

transmission line near El Reno;

• Replace wooden H-frame structures with

steel single poles and install new wire;

• Upgrade infrastructure at four local

substations.

This project is necessary to upgrade the transmission

infrastructure along the I-40 corridor. Upgrades to the

associated substations and transmission line will

enhance reliability and lessen the likelihood of

extended power outages during inclement weather.

Southwest Power Pool (SPP), the regional

transmission organization, also identified the need for

these upgrades. SPP ensures reliable supplies of

power and adequate transmission infrastructure are

in place to serve customers in Oklahoma and 13 other

states.

Construction began in September 2017 between

Hinton and Weatherford. Crews expect to complete

construction to the Weatherford Junction Substation

by early Summer 2018.

The remaining construction on the project is

expected to begin Summer 2018. All line work is

expected to be complete by mid-2019.

The associated substation upgrades will be complete

by spring of 2020.

WHAT WHY WHERE/WHEN

CLINTON JUNCTIONJENSEN ROADTRANSMISSION LINE REBUILD PROJECT

Public Service Company of Oklahoma (PSO) and its affiliate, AEP Oklahoma Transmission Co.,

Inc. plan to invest approximately $63 million to upgrade over 60 miles of 138-kilovolt (kV)

transmission line between Clinton and El Reno, Oklahoma. These upgrades will strengthen

PSO’s transmission system in western Oklahoma and provide significant improvement in

electric service reliability in the area.

PROJECT SCHEDULE

PROJECT ANNOUNCEMENT & RIGHT-OF-WAY COMMUNICATIONSFall 2016

TRANSMISSION LINE CONSTRUCTIONFall 2017 - Late 2020

CLINTON JUNCTION SUBSTATION UPGRADESEarly 2019 - Summer 2019

WEATHERFORD SOUTHEAST SUBSTATION UPGRADESEarly 2020 - Spring 2020

SUBSTATION UPGRADES COMPLETESummer 2020

WEATHERFORD JUNCTION SUBSTATION UPGRADESSpring 2020 - Summer 2020

WEATHERFORD WIND FARM SUBSTATION UPGRADESFall 2019 - Late 2019

*Timeline subject to change.*Timeline subject to change.

2016 2017 2019 20202018 2021

Page 2: CLINTON JUNCTION˜JENSEN ROAD...Crews expect to complete construction to the Weatherford Junction Substation by early Summer 2018. The remaining construction on the project is expected

44

35

81

281

281

183

183

CLINTONCLINTON

WEATHERFORDWEATHERFORDEL RENOEL RENO

OKLAHOMA CITYOKLAHOMA CITYHINTONHINTON

81

40

PSO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

05/03/201805/03/2018

PSO is committed to carefully balancing the energy needs of homes and businesses while protecting the environment and natural beauty of the region.

Typical Structure Height: 85 - 90 feetTypical Right-of-Way: 100 feetTypical Distance Between Structures: 600 feet

TYPICAL STRUCTURES

JULIET CAPEHEARTAEP Project Outreach [email protected]/ClintonJunction-JensenRoad

DEWEY COUNTYDEWEY COUNTY

CUSTER COUNTYCUSTER COUNTY

KINGFISHER COUNTYKINGFISHER COUNTY

CANADIAN COUNTYCANADIAN COUNTY

BLA

INE

CO

UN

TYB

LAIN

E C

OU

NTY

KIN

GFI

SHER

CO

UN

TYK

ING

FISH

ER C

OU

NTY

WAS

HIT

A C

OU

NTY

WAS

HIT

A C

OU

NTY

CAD

DO

CO

UN

TYC

ADD

O C

OU

NTY

CAD

DO

CO

UN

TYC

ADD

O C

OU

NTY

GR

ADY

CO

UN

TYG

RAD

Y C

OU

NTY

GR

ADY

CO

UN

TYG

RAD

Y C

OU

NTY

MC

CLA

IN C

OU

NTY

MC

CLA

IN C

OU

NTY

KIN

GFI

SHER

CO

UN

TYK

ING

FISH

ER C

OU

NTY

LOG

AN C

OU

NTY

LOG

AN C

OU

NTY

CAN

ADIA

N C

OU

NTY

CAN

ADIA

N C

OU

NTY

OK

LAH

OM

A C

OU

NTY

OK

LAH

OM

A C

OU

NTY

CLINTON JUNCTION JENSEN ROAD TRANSMISSION LINE REBUILD PROJECT

EXISTING SUBSTATIONS138 KV TRANSMISSION LINE REBUILDTRANSMISSION LINE REROUTEEXISTING TRANSMISSION LINE TO BE REMOVED

SUBSTATIONS TO BE UPGRADEDN

CLINTON JUNCTIONSUBSTATION

WEATHERFORD SOUTHEASTSUBSTATION

WEATHERFORDJUNCTION SUBSTATION

WEATHERFORD WINDFARM SUBSTATION