26
ICLEI 2017-BONN-2017.05.04 ARNE BERNT HASLING, [email protected] 1 ICLEI 2017 – 2017-05-04 Climate adaptation – Cloudburst Plan Copenhagen Arne Bernt Hasling [email protected]

Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, [email protected] ICLEI

  • Upload
    lytu

  • View
    218

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 1

ICLEI 2017 – 2017-05-04

Climate adaptation – Cloudburst Plan Copenhagen

Arne Bernt Hasling [email protected]

Page 2: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 2

Climate Change Adaptation Planning Process Copenhagen 2008-2017

Climate Change Plan 2009

Climate Change Adaptation Plan

2011

Master Plan, Implementation Plan, Tendering, On-going

Cloudburst Plan 2012

Lighthouse Projects

Easy and no regret projects

Easy and no regret projects

Area based implementation

20 years

Page 3: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 3

Tools – Methods

ICLEI 2017-BONN-2017.05.04

• Flood simulation

• Likelihood of flooding

• Damage costs

• Economic risk

• Development in economic risk

• Measures to reduce economic risk

• Most feasible solution

• Most feasible level of safety

Page 4: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 4

Flood simulation - Storm water

- Storm surge

ICLEI 2017-BONN-2017.05.04

Page 5: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

5 ICLEI 2017-BONN-2017.05.04

DTM, Digital Terrain Model

ARNE BERNT HASLING, [email protected]

Page 6: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 6

Full dynamic analysis of rain and storm surge

Page 7: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

7 ICLEI 2017-BONN-2017.05.04

Maximum water depth on land during storm surge

Storm surge: 2,55 m

Full dynamic analysis of rain and storm surge

HØJVANDE OG KLIMA, KØBENHAVN

Page 8: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

8 ICLEI 2017-BONN-2017.05.04

Full dynamic analysis of rain and storm surge Storm surge 1,69 meter, December 2013

ARNE BERNT HASLING, [email protected]

Page 9: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 9

Development in economic risk - Storm water

- Storm surge

ICLEI 2017-BONN-2017.05.04

Page 10: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 10

Economic risk - Storm water

- Storm surge

ICLEI 2017-BONN-2017.05.04

Likelihood Damage Cost Risk

X =

Page 11: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

Accumulated economical risk 2010-2110

11 ICLEI 2017-BONN-2017.05.04

Rain Sea

ARNE BERNT HASLING, [email protected]

Page 12: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

12 ICLEI 2017-BONN-2017.05.04

Year ARNE BERNT HASLING, [email protected]

Development in economic risk caused by floods from rain or sea

Rain

Sea

Page 13: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 13

Measures to reduce economic risk - Storm water

ICLEI 2017-BONN-2017.05.04

Page 14: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 14

The basic assumptions: Sewers / Cloudburst Investment period and re-investments 100 years period for comparison Macroeconomics for the society

ICLEI 2017-BONN-2017.05.04

Page 15: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 15

2 Climate Change Adaptation Scenarios, Cloudburst

Cover the whole city with same level of protection

Surface solutions only Surface solutions and tunnels

Page 16: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 16

Most feasible solution - Storm water

ICLEI 2017-BONN-2017.05.04

Page 17: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 17

Macroeconomics, Adaptation Initiatives

› Sewers only: (upgrading/unload to meet the 2110 situation)

Sewer initiative. Protection method NPV

Damage Reduction

Bil.Kr.

Construction and O&M.

Bil.Kr.

Net Profit

Bil.Kr.

Upgrading sewers 10-year (2110)

10.1 13.8 -3.7

Non-return valves 5.8 1.5 4.3

Page 18: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 18

Macroeconomics, Adaptation Initiatives

› Cloudburst only: (assuming that the sewers are upgraded or unloaded)

Design Storm, Protection Level NPV

Damage Reduction

Billion Kr.

Construction and O&M.

Open Canals

Billion Kr.

Net Profit Open

Canals

Billion Kr.

Construction and O&M Pipes and

Canals

Billion Kr.

Net Profit

Pipes and Canals

Billion Kr.

20-year (2010) - - - - -

100-year (2010) 20-year (2110)

1.2 4.2 -2.9 3.2 -2.0

100-year (2110) 2.1 6.4 -4.3 4.7 -2.5

400-year (2110) (2/7-2011)

2.3 8.2 -5.9 5.5 -3.2

Page 19: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 19

Macroeconomics, Adaptation Initiatives

› Combination of sewers and cloudburst initiatives: Cph. + Frb. Cloudburst initiatives are also used to relieve the rainwater pressure on the sewers during more comment events. Non-return valves in all connection pipes.

Design Storm, Protection Level NPV

Damage Reduction Combined Initiative

Billion Kr.

Construction and O&M. Combined Initiative

Billion Kr.

Net Profit

Combined Initiative

Billion Kr.

20-year (2010) - - -

100-year (2010) 20-year (2110)

8.8 8.0 0.8

100-year (2110) 10.8 8.8 2.0

400-year (2110) (2/7-2011)

11.0 10.2 0.8

Page 20: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 20

Most Feasible Climate Change Adaptation Scenario

› Local collection and storage system on surface

› Main transportation system on or below ground

Page 21: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 21

Most Feasible Climate Change Adaptation Scenario

Page 22: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ARNE BERNT HASLING, [email protected] 22

Most feasible level of safety - Storm water

ICLEI 2017-BONN-2017.05.04

Page 23: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 23

Most Feasible Climate Change Adaptation Scenario

20 50 100 200 400

0

2000

4000

6000

8000

10000

12000M

io k

r.

Gentagelsesperiode for tiltag (år)

Tiltagsomkostning Nettogevinst Skadesomkostninger efter tiltag

Return period, years

Cost of measures Net profit Damages after measures

Costs

Profit

Damages

Page 24: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 24

Adaptation Initiatives › Where to start?

Nr. Catchm ent Area Econom ic

Risk

Easy to

Im plem ent

Synergy

effects

Tota l

score

I2 Indre by S 9,00 5 3,6 17,6

I1 Indre by N 7,02 4 3,6 14,6

N Østerbro 3,96 3 6,0 13,0

SH Sluseholmen 6,03 4 2,4 12,4

M1 Vesterbro 4,86 2 2,4 9,3

M4 Ladegårdsåen 2,25 2 4,8 9,1

CH Christianshavn 2,97 4 1,2 8,2

SV Svanemøllen 2,25 2 3,6 7,9

R Valby 1,80 2 3,6 7,4

M2 Frederiksberg 3,15 3 1,2 7,4

U2 Utterslev 0,63 3 3,6 7,2

Ø Lersøgrøften 2,43 1 3,6 7,0

A2 Kastrup Fort 1,62 3 2,4 7,0

BV Vanløse 0,18 3 3,6 6,8

U1 Utterslev mose 0,36 4 2,4 6,8

A1 Amager Stand 1,08 3 2,4 6,5

KE Kongens Enghave 1,08 3 2,4 6,5

V Grøndalsåen 0,81 2 3,6 6,4

NH Nordhavn 0,72 4 1,2 5,9

IB Islands Brygge 0,45 3 2,4 5,9

M3 København NV 1,08 3 1,2 5,3

U4 Emdrup 0,45 1 3,6 5,1

KF Kalvebod Fælled 0,00 2 2,4 4,4

U3 Husum 0,45 2 1,2 3,7

Page 25: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 25

Adaptation Initiatives › Where to start?

Page 26: Climate adaptation Cloudburst Plan Copenhagen - …resilientcities2017.iclei.org/fileadmin/sites/resilient-cities/...ICLEI 2017-BONN-2017.05.04 1 ARNE BERNT HASLING, ABH@COWI.DK ICLEI

ICLEI 2017-BONN-2017.05.04

ARNE BERNT HASLING, [email protected] 26