1
The Soluon High pressure power washing was used to remove surface contaminants and clean the surfaces to help with idenfying any hidden defects. Redundant steel plates were removed and tradional concrete repairs to the defecve areas under the plates and spalled concrete areas. Sealant to expansion joints ripped out and edges made good and prepared followed by the installaon of new polysulphide sealant. Cracks were repaired by opening up the cracks and cung horizontal slots across the cracks (crack stching). Fing new reinforcement steel to the slots embedded in epoxy resin and tradional concrete repair to finish. Trowbridge STW Remedial Works to Sewerage Treatment Works © South West Concrete Repairs Ltd | Registered in England & Wales No. 3431115 Unit 17, Reynolds Park E [email protected] 8 Bell Close W www.swconcreterepairs.co.uk Newnham Industrial Estate T 01752 561300 Plymouth F 01752 605900 PL7 4FE Case Study The Problem Numerous defects to the filter bed walls were idenfied by Wessex Water; they included spalling concrete with reinforcement bars showing, cracks running up the walls, expansion joints to walls fail- ing and failing concrete under steel plates fied for the sprinklers to run on. Project: Trowbridge STW Client: Wessex Water Remedial Works to STW Main Contractor: SWCR Ltd Date: February 2008 Products Structural Repairs: Fosroc Nitoprime Zincrich Fosroc Nitobon AR/HAR Fosroc Renderoc HB40 Fosroc Nitokit LV Fosroc Nitoseal MS600

Client: Wessex Water - SW Concrete Repairs...prepared followed by the installation of new polysulphide sealant. Cracks were repaired by opening up the cracks and cutting horizontal

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • The Solution High pressure power washing was used to remove surface contaminants and clean the surfaces to help with identifying any hidden defects. Redundant steel plates were removed and traditional concrete repairs to the defective areas under the plates and spalled concrete areas. Sealant to expansion joints ripped out and edges made good and prepared followed by the installation of new polysulphide sealant. Cracks were repaired by opening up the cracks and cutting

    horizontal slots across the cracks (crack stitching). Fitting new

    reinforcement steel to the slots embedded in epoxy resin and

    traditional concrete repair to finish.

    Trowbridge STW Remedial Works to Sewerage Treatment Works

    © South West Concrete Repairs Ltd | Registered in England & Wales No. 3431115

    Unit 17, Reynolds Park E [email protected]

    8 Bell Close W www.swconcreterepairs.co.uk

    Newnham Industrial Estate T 01752 561300

    Plymouth F 01752 605900

    PL7 4FE

    Case Study

    The Problem Numerous defects to the filter bed walls were

    identified by Wessex Water; they included spalling

    concrete with reinforcement bars showing, cracks

    running up the walls, expansion joints to walls fail-

    ing and failing concrete under steel plates fitted for

    the sprinklers to run on.

    Project: Trowbridge STW

    Client: Wessex Water

    Remedial Works to STW

    Main Contractor: SWCR Ltd

    Date: February 2008

    Products

    Structural Repairs: Fosroc Nitoprime Zincrich Fosroc Nitobon AR/HAR Fosroc Renderoc HB40 Fosroc Nitokit LV Fosroc Nitoseal MS600